Introduction
Please find here the computed results for the LTLCardinality examination. The table is organized as follows:
- A global list of scores (per tool),
- Three main sections for «Surprise», «Stripped» and «Known» models,
- Within a main sections, a subsection per model that summarizes scores, bonuses an displays results for each instance.
The information for a model instance is summarized in a «line» where:
- You may get the expected results (and the confidence associated with such results) by moving your cursor over the name of the instance. The values are surrounded by parenthesis are considered as being «unsafe» and are discarded when computing scores (we expect a confidence greater than 0.97 for 2018),
- computed results and their interpretation are all located in the same table cell.
The structure of a table cell is always the same. In black, you have the output provided by the tool followed by the interpretation mask stating if the tool did computed something corresponding to the expected values (T means that it is the expected result, ? means that no tool computed the corresponding value and X means that the value is not the expected one). Then, three consistency flags are displayed : V means that at least one value was wrong (i.e. at least one X in the result mask), C means that the tool was not consistent between the colored Petri net and the P/T equivalent one. This part is displayed in green when some points was considered, in orange when it was not possible («unsafe» values estimated for example) and red when the result is discarded due to an error.
Then a second group of flags outline the fastest tool (P) and the tool having the smallest memory footprint (M). These tools get a +1 bonus that is always considered for green and orange results. These two flags are followed by the score (without bonus) and a link to the execution report containing: a summary of results, a chart reporting memory and CPU evolution over the execution, a full execution log and the commands applied to the tool for this run.
You will note that DNC means «Do Not Compete» and CC means «Cannot Compute». Results are labelled CC only when no output was produced for this execution and the tool reported a problem. DNF (Did Not Finished) is displayed when no output was produced within the 1 hour time confinement.
The Results
They are displayed in the table below, together with scores (total, sum per category of model and sum per model).
Summary of Results for LTLCardinality | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Total Points | 12979 | 14885 | 4620 | 4834 | 11337 | 11248 | 4755 | 4780 |
All «Surprise» models |
||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Total Points | 5472 | 6052 | 0 | 0 | 4144 | 4136 | 0 | 0 |
Road Runner | 17 | 40 | 0 | 0 | 14 | 7 | 0 | 0 |
Camel | 12 | 49 | 0 | 0 | 12 | 5 | 0 | 0 |
ASLink — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 532 | 520 | 0 | 0 | 196 | 272 | 0 | 0 |
Road Runner | 4 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 2 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
01a FFFFFFFFFTTTTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFFFTTTTFTF TTTTTTTTTTTTTTTT --:P- / 32 |
FFFFFFFFFTTTTFTF TTTTTTTTTTTTTTTT --:-M / 32 |
CC 0 |
CC 0 |
FFFFFFFFFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFFFFFFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
01b TFFFFFTFFFFTFFFF (expected value) 4.00 2.00 4.00 4.00 2.00 4.00 1.00 2.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 (confidence rate) |
TFFFFF?FFFFTFFFF TTTTTT-TTTTTTTTT --:-- / 28 |
TFFFFFTFFFFTF?FF TTTTTTTTTTTTT-TT --:-- / 28 |
CC 0 |
CC 0 |
T?FF?F?????????? T-TT-T---------- --:-- / 8 |
T?FF?F??FFFTF?FF T-TT-T--TTTTT-TT --:-- / 20 |
CC 0 |
CC 0 |
02a FTTFFFTTFTFTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFFFTTFTFTFFFT TTTTTTTTTTTTTTTT --:PM / 32 |
FTTFF?TTFTFTFFFT TTTTT-TTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FTTFFFTTFTFTFFFT TTTTTTTTTTTTTTTT --:-- / 32 |
FTTFFFTTFTFTFFFT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
02b TFFFT? TFFTFFFFFF (expected value) 4.00 4.00 2.00 4.00 4.00 0 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate) |
TFFFT?TF?TFFFFFF TTTTT?TT-TTTTTTT --:-- / 28 |
TFFFT?TFFTFFFFF? TTTTT?TTTTTTTTT- --:-- / 28 |
CC 0 |
CC 0 |
TF?FT??????????? TT-TT?---------- --:-- / 8 |
TF?FT??????????? TT-TT?---------- --:-- / 8 |
CC 0 |
CC 0 |
03a TTFTFFTTFFFTFTFF (expected value) 4.00 4.00 4.00 4.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 1.00 2.00 (confidence rate) |
TTFTF?TTFFFTFT?F TTTTT-TTTTTTTT-T --:-- / 28 |
TTFTFFTTFFFTFTFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TTFT???????????? TTTT------------ --:-- / 8 |
TTFTF?TTFFFTF??? TTTTT-TTTTTTT--- --:-- / 24 |
CC 0 |
CC 0 |
03b TTFFFTFF? FTT? F? F (expected value) 4.00 4.00 3.00 4.00 3.00 3.00 2.00 2.00 0 2.00 2.00 2.00 0 2.00 0 2.00 (confidence rate) |
TTFFFTFF?FTT?F?F TTTTTTTT?TTT?T?T --:-- / 24 |
TTFFFTFF?FTT?F?F TTTTTTTT?TTT?T?T --:-- / 24 |
CC 0 |
CC 0 |
TTFFFT?????????? TTTTTT--?---?-?- --:-- / 12 |
TT?F???????????? TT-T----?---?-?- --:-- / 4 |
CC 0 |
CC 0 |
04a FFFTFTFFTFFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 3.00 1.00 (confidence rate) |
FFFTFTFFTFFF?FT? TTTTTTTTTTTT-TT- --:-- / 28 |
FFFTFTFFTFFFFFTF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFFTFTFFTFFF???? TTTTTTTTTTTT---- --:-- / 24 |
FFFTFTFFTFFFFFT? TTTTTTTTTTTTTTT- --:-- / 28 |
CC 0 |
CC 0 |
04b TF? FF? TFFFFFFF? F (expected value) 2.00 4.00 0 3.00 1.00 0 2.00 2.00 1.00 2.00 2.00 1.00 2.00 1.00 0 2.00 (confidence rate) |
TF?FF?TFFFFFFF?F TT?TT?TTTTTTTT?T --:-- / 24 |
TF?F??TF?FF?F??F TT?T-?TT-TT-T-?T --:-- / 16 |
CC 0 |
CC 0 |
?F?????????????? -T?--?--------?- --:-- / 0 |
?F?F???????????? -T?T-?--------?- --:-- / 4 |
CC 0 |
CC 0 |
05a FFTFTFFFFTTFTTFT (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFTFTFFFFTTFTTFT TTTTTTTTTTTTTTTT --:PM / 32 |
?FTFTFFFFTTFTTFT -TTTTTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FFTFTFFFF??????? TTTTTTTTT------- --:-- / 16 |
FFTFTFFFFTTFTTFT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
05b ? TFFTTFTTFFFFTFF (expected value) 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
?TFFTTFTTFFFFTFF ?TTTTTTTTTTTTTTT --:-- / 28 |
?TFFTTFTTF?FFTFF ?TTTTTTTTT-TTTTT --:-- / 28 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
06a ? FF? FFTFTTFTFFFF (expected value) 0 4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?FF?FFTFTTFTFFFF ?TT?TTTTTTTTTTTT --:-- / 28 |
?FF?FFTFTTFTFFFF ?TT?TTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
?FF?FFTFTTFTFFFF ?TT?TTTTTTTTTTTT --:-- / 28 |
?FF?FFTFTTFTFFFF ?TT?TTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
06b TTTFFFFFTTFFFFFF (expected value) 2.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate) |
TTTFFF?FTTFFFFFF TTTTTT-TTTTTTTTT --:-- / 28 |
TTTF?FFFTTFFF?FF TTTT-TTTTTTTT-TT --:-- / 28 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
07a FF? F? ? F? TTTFTF? T (expected value) 1.00 4.00 0 1.00 0 0 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 0 3.00 (confidence rate) |
?F????F?TTTFTF?T -T?-??T?TTTTTT?T --:-- / 16 |
FF?F??F?TTTFTF?T TT?T??T?TTTTTT?T --:-- / 20 |
CC 0 |
CC 0 |
?F?????????????? -T?-??-?------?- --:-- / 0 |
?F????F?TTTFTF?T -T?-??T?TTTTTT?T --:-- / 16 |
CC 0 |
CC 0 |
07b FF? FFTFFFT? ? F? FF (expected value) 4.00 3.00 0 2.00 2.00 2.00 2.00 3.00 3.00 2.00 0 0 3.00 0 1.00 3.00 (confidence rate) |
FF?FFTFFFT??F??F TT?TTTTTTT??T?-T --:-- / 20 |
FF?FFTFFFT??F?FF TT?TTTTTTT??T?TT --:-- / 24 |
CC 0 |
CC 0 |
FF?????FF???F??F TT?----TT-??T?-T --:-- / 12 |
F??????????????? T-?-------??-?-- --:-- / 0 |
CC 0 |
CC 0 |
08a FFFF? ? FFTTFTTFTF (expected value) 4.00 4.00 4.00 4.00 0 0 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFFF??FFTTFTTFTF TTTT??TTTTTTTTTT --:-- / 28 |
FFFF??FFTTFTTFTF TTTT??TTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FFFF???????????? TTTT??---------- --:-- / 8 |
FFFF??F????????? TTTT??T--------- --:-- / 8 |
CC 0 |
CC 0 |
08b FTFTF? FFTFTF? FTF (expected value) 2.00 2.00 3.00 3.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 (confidence rate) |
FTFTF?FFTFTF?FTF TTTTT?TTTTTT?TTT --:-- / 28 |
FTFTF?FFTFTF?FTF TTTTT?TTTTTT?TTT --:-- / 28 |
CC 0 |
CC 0 |
CC 0 |
??FT???????????? --TT-?------?--- --:-- / 4 |
CC 0 |
CC 0 |
09a TTTFFFFTFF? FTTFF (expected value) 4.00 4.00 4.00 3.00 3.00 2.00 2.00 3.00 2.00 3.00 0 2.00 3.00 2.00 2.00 1.00 (confidence rate) |
TTTFFFFTFF?FTTFF TTTTTTTTTT?TTTTT --:-- / 28 |
TTTFFFFTFF?FTTF? TTTTTTTTTT?TTTT- --:-- / 28 |
CC 0 |
CC 0 |
TTT????????????? TTT-------?----- --:-- / 4 |
TTTFF??T?F??T??? TTTTT--T-T?-T--- --:-- / 16 |
CC 0 |
CC 0 |
09b FFT? TT? ? ? F? ? FF? ? (expected value) 4.00 1.00 3.00 0 1.00 1.00 0 0 0 1.00 0 0 2.00 1.00 0 0 (confidence rate) |
FFT?TT???F??FF?? TTT?TT???T??TT?? --:-- / 16 |
F???????????F??? T--?--???-??T-?? --:-- / 4 |
CC 0 |
CC 0 |
F?T????????????? T-T?--???-??--?? --:-- / 4 |
F?T????????????? T-T?--???-??--?? --:-- / 4 |
CC 0 |
CC 0 |
10a FTFFFTTFFTTFFFTF (expected value) 2.00 4.00 2.00 3.00 3.00 2.00 3.00 3.00 2.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FTFFFTTFFTTFFFTF TTTTTTTTTTTTTTTT --:P- / 32 |
FTFFFTTFFTTFFFTF TTTTTTTTTTTTTTTT --:-M / 32 |
CC 0 |
CC 0 |
?T?????????????? -T-------------- --:-- / 0 |
?T?FF?TF??T????? -T-TT-TT--T----- --:-- / 12 |
CC 0 |
CC 0 |
10b TFF? T? T? TFTTFTFF (expected value) 4.00 2.00 2.00 0 2.00 0 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
TFF?T?T?TFTTFTFF TTT?T?T?TTTTTTTT --:-- / 24 |
TFF?T?T?TFTTFTFF TTT?T?T?TTTTTTTT --:-- / 24 |
CC 0 |
CC 0 |
T??????????????? T--?-?-?-------- --:-- / 0 |
T??????????????? T--?-?-?-------- --:-- / 0 |
CC 0 |
CC 0 |
BusinessProcesses — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 568 | 572 | 0 | 0 | 572 | 536 | 0 | 0 |
Road Runner | 2 | 5 | 0 | 0 | 8 | 0 | 0 | 0 |
Camel | 2 | 6 | 0 | 0 | 6 | 1 | 0 | 0 |
01 FFTFTFFFFTTTFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 1.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate) |
FFTFTF?FFTTTF?TF TTTTTT-TTTTTT-TT --:-- / 28 |
FFTFTF?FFTTTFFTF TTTTTT-TTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FFTFTFFFFTTTFFTF TTTTTTTTTTTTTTTT --:PM / 32 |
FFTFT??F?TTTFFTF TTTTT--T-TTTTTTT --:-- / 24 |
CC 0 |
CC 0 |
02 FTFTFFTFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate) |
FTFTFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 32 |
FTFTFFTFFFFFFF?F TTTTTTTTTTTTTT-T --:-- / 28 |
CC 0 |
CC 0 |
FTFTFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FTFTFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
03 FFTTFTFTFFFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTFTFTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFTTFTFTFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFTTFTFTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFTTFTFTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
04 TFFFTFTFFTFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFTFTFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
TFFFTFTFFTFTFFFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TFFFTFTFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
TFFFT?TFFTFTFFFF TTTTT-TTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
05 FFFTTTFFTTTFTFFT (expected value) 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 4.00 (confidence rate) |
FFF?TTFFTTTFTFFT TTT-TTTTTTTTTTTT --:-- / 28 |
FFFTTTFFTTTFTF?T TTTTTTTTTTTTTT-T --:-- / 28 |
CC 0 |
CC 0 |
FFFTTTFFTTTFTFFT TTTTTTTTTTTTTTTT --:PM / 32 |
FFFTTTFFTTT?TFFT TTTTTTTTTTT-TTTT --:-- / 28 |
CC 0 |
CC 0 |
06 FFFFFFFFTFFTFTTT (expected value) 4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFF?FFF?FFTFTTT TTTT-TTT-TTTTTTT --:-- / 28 |
FFFFFFFFTF?TFTTT TTTTTTTTTT-TTTTT --:-- / 28 |
CC 0 |
CC 0 |
FFFFFFFFTFFTFTTT TTTTTTTTTTTTTTTT --:PM / 32 |
FFFFFF?????????? TTTTTT---------- --:-- / 12 |
CC 0 |
CC 0 |
07 FFFFFFFTFTFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 3.00 (confidence rate) |
FFFFFFFTFTFFF?TF TTTTTTTTTTTTT-TT --:-- / 28 |
FFFFFFFTFTFFFFTF TTTTTTTTTTTTTTTT --:-M / 32 |
CC 0 |
CC 0 |
FFFFFFFTFTFFFFTF TTTTTTTTTTTTTTTT --:P- / 32 |
FFFFFFFTFTFFF??? TTTTTTTTTTTTT--- --:-- / 24 |
CC 0 |
CC 0 |
08 FFFFFTTTFTFFTFFF (expected value) 4.00 4.00 3.00 4.00 4.00 1.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFF?T?FTFFTFFF TTTTT-T-TTTTTTTT --:-- / 28 |
FFFFF?TTTTFFTFFF TTTTT-TTXTTTTTTT V-:-- / 24 |
CC 0 |
CC 0 |
FFFFFTTTFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 32 |
FF?FF?TTFTFFTFFF TT-TT-TTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
09 FFFFFTTFFTT? FFFT (expected value) 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 3.00 4.00 4.00 (confidence rate) |
FFFFFTTFFTT?F?FT TTTTTTTTTTT?T-TT --:-- / 28 |
FFFFFTTFFTT?FFFT TTTTTTTTTTT?TTTT --:-- / 28 |
CC 0 |
CC 0 |
FF?FFTTFFTT?FFFT TT-TTTTTTTT?TTTT --:-- / 28 |
FF?FFTTFFTT?FFFT TT-TTTTTTTT?TTTT --:-- / 28 |
CC 0 |
CC 0 |
10 FFTTTTTFFTFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTTTTFFTFFFFFF TTTTTTTTTTTTTTTT --:PM / 32 |
FFTTTTT?FTFFFFFF TTTTTTT-TTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FFTTTTT?FTFFFFFF TTTTTTT-TTTTTTTT --:-- / 28 |
FFTTTTT?FTFFFFFF TTTTTTT-TTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
11 FTFFTTFFTFFFFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate) |
FTFFTT?FTFFFFTTF TTTTTT-TTTTTTTTT --:-- / 28 |
FTFFTTFFTFFFF?TF TTTTTTTTTTTTT-TT --:-- / 28 |
CC 0 |
CC 0 |
FTFFTTFFTFFFFTTF TTTTTTTTTTTTTTTT --:P- / 32 |
FTFFTTFFTFFFFTTF TTTTTTTTTTTTTTTT --:-M / 32 |
CC 0 |
CC 0 |
12 FFTTFTTFFFFTFFTF (expected value) 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 2.00 4.00 4.00 (confidence rate) |
?FTTFTTFFFFTF?TF -TTTTTTTTTTTT-TT --:-- / 28 |
FFTTFTTFFFFT?TTF TTTTTTTTTTTT-XTT V-:-- / 24 |
CC 0 |
CC 0 |
FFTTFTTFFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 32 |
?FTTFTTFFFFTFFTF -TTTTTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
13 FTFFTF? FFFFFTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFTF?FFF?FTFTF TTTTTT?TTT-TTTTT --:-- / 28 |
FTFFTF?FFF?FTFTF TTTTTT?TTT-TTTTT --:-- / 28 |
CC 0 |
CC 0 |
FTFFTF?FFF?FTFTF TTTTTT?TTT-TTTTT --:-- / 28 |
FTFFTF?FFFFFTFTF TTTTTT?TTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
14 FTFTTTFTTTTTFTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 1.00 4.00 4.00 (confidence rate) |
FTFTTTFTTTTT??TT TTTTTTTTTTTT--TT --:-- / 28 |
FTFTTTFTTTTTFTTT TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FTFTTTFTTTTT??TT TTTTTTTTTTTT--TT --:-- / 28 |
FTFTTTFTTTTT??TT TTTTTTTTTTTT--TT --:-- / 28 |
CC 0 |
CC 0 |
15 FTFFFTTFFFFFFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFTTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 32 |
FTFFFTTFFFFFFTTF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FTFFFTTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 32 |
FTFFFTTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
16 TFTFFFFFFTTTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 4.00 1.00 3.00 4.00 4.00 4.00 (confidence rate) |
TFTFF?FFFTT??FFT TTTTT-TTTTT--TTT --:-- / 24 |
TFTFFFFFF?TTFFFT TTTTTTTTT-TTTTTT --:-- / 28 |
CC 0 |
CC 0 |
TFTFFFFFFTT?FFFT TTTTTTTTTTT-TTTT --:-- / 28 |
TFTFFFFFFTT?FFFT TTTTTTTTTTT-TTTT --:-- / 28 |
CC 0 |
CC 0 |
17 TFTFFFFTFTFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 2.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 (confidence rate) |
TFTFFFF?FTFFTFF? TTTTTTT-TTTTTTT- --:-- / 28 |
TFTFFFFTFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TFTFF?F?FTFFTFF? TTTTT-T-TTTTTTT- --:-- / 24 |
TFTFF?F?FTFFTFF? TTTTT-T-TTTTTTT- --:-- / 24 |
CC 0 |
CC 0 |
18 TFFFTTFFFTTFFFFF (expected value) 4.00 3.00 4.00 4.00 4.00 1.00 4.00 4.00 2.00 4.00 1.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
TFFFT?FFFT?FFFFF TTTTT-TTTT-TTTTT --:-- / 28 |
T?FFTTFFFTTFFFFF T-TTTTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
TFFFT?FF?T?????? TTTTT-TT-T------ --:-- / 16 |
TFFFT?FF?T?FFFFF TTTTT-TT-T-TTTTT --:-- / 24 |
CC 0 |
CC 0 |
19 FTTTTFFFFFFTTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTTTFFFF?FTTFFF TTTTTTTTT-TTTTTT --:-- / 28 |
FTTTTFFFF?FTTFFF TTTTTTTTT-TTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FTTTTFFFFFFTTFFF TTTTTTTTTTTTTTTT --:PM / 32 |
FTTTTFFFF?FTTFFF TTTTTTTTT-TTTTTT --:-- / 28 |
CC 0 |
CC 0 |
20 TFTFFF? TTTF? ? FFF (expected value) 4.00 4.00 1.00 4.00 4.00 4.00 0 3.00 3.00 3.00 3.00 0 0 3.00 3.00 1.00 (confidence rate) |
TF?FFF?TTTF??FF? TT-TTT?TTTT??TT- --:-- / 20 |
TFTFFF?TTTF??FFF TTTTTT?TTTT??TTT --:-- / 24 |
CC 0 |
CC 0 |
TF?FFF?????????? TT-TTT?----??--- --:-- / 8 |
TF?FFF?TTTF??FF? TT-TTT?TTTT??TT- --:-- / 20 |
CC 0 |
CC 0 |
DLCflexbar — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 460 | 476 | 0 | 0 | 244 | 252 | 0 | 0 |
Road Runner | 0 | 2 | 0 | 0 | 3 | 2 | 0 | 0 |
Camel | 0 | 3 | 0 | 0 | 3 | 1 | 0 | 0 |
2a FTFFTTFTFTTFTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate) |
FTFFT?F?FTTFTF?F TTTTT-T-TTTTTT-T --:-- / 32 |
FTFFTTFT?TTFTF?F TTTTTTTT-TTTTT-T --:-- / 36 |
CC 0 |
CC 0 |
FTFFTTFTFTTFTFTF TTTTTTTTTTTTTTTT --:-M / 40 |
FTFFTTFTFTTFTFTF TTTTTTTTTTTTTTTT --:P- / 40 |
CC 0 |
CC 0 |
2b FFFFTFFF? FFFFF? F (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 0 2.00 (confidence rate) |
FFFFTFFF?FFFFF?F TTTTTTTT?TTTTT?T --:-- / 36 |
FFFFTFFF?FFFFF?F TTTTTTTT?TTTTT?T --:-- / 36 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
3a FFTFFTFTFTTTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 2.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFF?FTFT??FFFF TTTTT-TTTT--TTTT --:-- / 32 |
FFTFFTFTFTT?FFFF TTTTTTTTTTT-TTTT --:-- / 36 |
CC 0 |
CC 0 |
FFTFFTFTFTTTFFFF TTTTTTTTTTTTTTTT --:PM / 40 |
FFTFFTFTFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 40 |
CC 0 |
CC 0 |
3b FFT? TFTT? FTTFF? F (expected value) 3.00 3.00 3.00 0 3.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 0 2.00 (confidence rate) |
FFT?TFTT?FTTFF?F TTT?TTTT?TTTTT?T --:-- / 32 |
FFT?TFTT?FTTFF?F TTT?TTTT?TTTTT?T --:-- / 32 |
CC 0 |
CC 0 |
CC 0 |
FFT?T??????????? TTT?T---?-----?- --:-- / 8 |
CC 0 |
CC 0 |
4a FFFFFTTFFFFFFFFF (expected value) 4.00 4.00 3.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FF?FFT?FFFFFFFFF TT-TTT-TTTTTTTTT --:-- / 36 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 40 |
CC 0 |
CC 0 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 40 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 40 |
CC 0 |
CC 0 |
4b FTF? FTFF? TFFFFFT (expected value) 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FTF?FTFF?TFFFFFT TTT?TTTT?TTTTTTT --:-- / 36 |
FTF?FTFF?TFFFFFT TTT?TTTT?TTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
5a FTTFFTFFTFTTFFTF (expected value) 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 (confidence rate) |
FT?FFTFF?FT?FFTF TT-TTTTT-TT-TTTT --:-- / 32 |
FTTFFTFFTFT?FFTF TTTTTTTTTTT-TTTT --:-- / 36 |
CC 0 |
CC 0 |
FTTFFTFFTFTTFFTF TTTTTTTTTTTTTTTT --:PM / 40 |
FTTFFTFFTFTTFFTF TTTTTTTTTTTTTTTT --:-- / 40 |
CC 0 |
CC 0 |
5b FFFF? FTTFFTFTFFF (expected value) 2.00 2.00 2.00 1.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate) |
FFF??FTTFFTFTFF? TTT-?TTTTTTTTTT- --:-- / 32 |
FFFF?FTTFFTFTFFF TTTT?TTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
6a TFFFTFFFTTTTTFFF (expected value) 3.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?FFF?FFFT?TTTFFF -TTT-TTTT-TTTTTT --:-- / 32 |
TFFFTFFFTTTTTFFF TTTTTTTTTTTTTTTT --:PM / 40 |
CC 0 |
CC 0 |
TFFFTFFFTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 40 |
TFFFTFFFTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 40 |
CC 0 |
CC 0 |
6b FTT? FFFT? FTFFFFT (expected value) 1.00 2.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
?TT?FFFT?FTFFFFT -TT?TTTT?TTTTTTT --:-- / 32 |
FTT?FFFT?FTFFFFT TTT?TTTT?TTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
7a FFFFTTTFTTTTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 2.00 4.00 (confidence rate) |
FFFFTTTFTTT?FF?T TTTTTTTTTTT-TT-T --:-- / 36 |
FFFFTTTFTTTT?F?T TTTTTTTTTTTT-T-T --:-- / 36 |
CC 0 |
CC 0 |
FFFFTTTFTTTTFFFT TTTTTTTTTTTTTTTT --:-- / 40 |
FFFFTTTFTTTTFFFT TTTTTTTTTTTTTTTT --:PM / 40 |
CC 0 |
CC 0 |
7b TTF? FFFTTFFFTFTT (expected value) 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate) |
TTF?FFFTTFFFT?TT TTT?TTTTTTTTT-TT --:-- / 36 |
TTF?FFFTTFFFTFTT TTT?TTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
8a TFFTTFFFTFFTTTTF (expected value) 3.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate) |
?F?TTFFFTFF?TTTF -T-TTTTTTTT-TTTT --:-- / 32 |
TFFTTFFFTFFTTTTF TTTTTTTTTTTTTTTT --:PM / 40 |
CC 0 |
CC 0 |
T??????????????? T--------------- --:-- / 4 |
T??????????????? T--------------- --:-- / 4 |
CC 0 |
CC 0 |
8b ? T? FTT? ? ? FFTFT? F (expected value) 0 1.00 0 1.00 1.00 1.00 0 0 0 1.00 1.00 1.00 1.00 1.00 0 1.00 (confidence rate) |
?T?FTT???FFTFT?F ?T?TTT???TTTTT?T --:-- / 24 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
DiscoveryGPU — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 620 | 612 | 0 | 0 | 640 | 640 | 0 | 0 |
Road Runner | 1 | 13 | 0 | 0 | 3 | 3 | 0 | 0 |
Camel | 1 | 14 | 0 | 0 | 3 | 2 | 0 | 0 |
06a FFTFFFFFFTTFTFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFFFFFFTTFTFTT TTTTTTTTTTTTTTTT --:-- / 32 |
FFTFFFFFFTTFTFTT TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFTFFFFFFTTFTFTT TTTTTTTTTTTTTTTT --:-- / 32 |
FFTFFFFFFTTFTFTT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
06b FFTFTFFTFFFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFTFFTFFFFTFFF TTTTTTTTTTTTTTTT --:P- / 32 |
FFTFTFFTFFFFTFFF TTTTTTTTTTTTTTTT --:-M / 32 |
CC 0 |
CC 0 |
FFTFTFFTFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FFTFTFFTFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
07a TFTTTFFTFFFFFTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTTTFFTFFFFFTTT TTTTTTTTTTTTTTTT --:-- / 32 |
TFTTTFFTFFFFFTTT TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TFTTTFFTFFFFFTTT TTTTTTTTTTTTTTTT --:-- / 32 |
TFTTTFFTFFFFFTTT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
07b TTFFFFTFTFFFTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TTFFFFTFTFFFTFFT TTTTTTTTTTTTTTTT --:-- / 32 |
TTFFFFTFTFFFTFFT TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TTFFFFTFTFFFTFFT TTTTTTTTTTTTTTTT --:-- / 32 |
TTFFFFTFTFFFTFFT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
08a TFTTFTTTTTFTTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTTFTTTTTFTTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
TFTTFTTTTTFTTFFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TFTTFTTTTTFTTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
TFTTFTTTTTFTTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
08b FFTFTFFFTFFFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate) |
FFTFTFFFTFFFFTF? TTTTTTTTTTTTTTT- --:-- / 28 |
FFTFTFF?TFFFFTFF TTTTTTT-TTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FFTFTFFFTFFFFTFF TTTTTTTTTTTTTTTT --:-M / 32 |
FFTFTFFFTFFFFTFF TTTTTTTTTTTTTTTT --:P- / 32 |
CC 0 |
CC 0 |
09a FFFTFFTTFFFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFTTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFTFFTTFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFFTFFTTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFTFFTTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
09b FFFFFFFFFFFFTTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFFFFFFTTTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFFFFFFFFFTTTF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFFFFFFFFFFFTTTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFFFFFFFFFTTTF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
10a FFFFFFFTFFFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFTFFFFTFFF TTTTTTTTTTTTTTTT --:-M / 32 |
FFFFFFFTFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
FFFFFFFTFFFFTFFF TTTTTTTTTTTTTTTT --:P- / 32 |
FFFFFFFTFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
10b FFFFFFFFFFTFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFFFFFFFTFTFFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFFFFFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFFFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
11a FFTFTTFFFTFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FFTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FFTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
11b FFFFFFTFFFFFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
12a FTFFTTTTFFFFFTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 (confidence rate) |
FTFFTTTTFFFFF?TT TTTTTTTTTTTTT-TT --:-- / 28 |
FTFFTTTTFFFFF?TT TTTTTTTTTTTTT-TT --:-- / 28 |
CC 0 |
CC 0 |
FTFFTTTTFFFFFTTT TTTTTTTTTTTTTTTT --:-- / 32 |
FTFFTTTTFFFFFTTT TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
12b FFFFTFTFFFFFFFTF (expected value) 4.00 4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFT?TFFFFFFFTF TTTTT-TTTTTTTTTT --:-- / 28 |
FF?FTFTFFFFFFFTF TT-TTTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
FFFFTFTFFFFFFFTF TTTTTTTTTTTTTTTT --:-M / 32 |
FFFFTFTFFFFFFFTF TTTTTTTTTTTTTTTT --:P- / 32 |
CC 0 |
CC 0 |
13a TFFFTFFTTFFFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFTFFTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 32 |
TFFFTFFTTFFFFTFT TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TFFFTFFTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 32 |
TFFFTFFTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
13b TFTTFTFTTFTFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTTFTFTTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
TFTTFTFTTFTFTFFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
TFTTFTFTTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
TFTTFTFTTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
14a FFFFTFFFFTTTTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFTFFFFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFTFFFFTTTTFTF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FFFFTFFFFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 32 |
FFFFTFFFFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
14b TTFFFFFTTTTFTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate) |
TTFFFFFTTTTFTF?T TTTTTTTTTTTTTT-T --:-- / 28 |
TTFFF??TTTTFTF?T TTTTT--TTTTTTT-T --:-- / 24 |
CC 0 |
CC 0 |
TTFFFFFTTTTFTFFT TTTTTTTTTTTTTTTT --:PM / 32 |
TTFFFFFTTTTFTFFT TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
15a FFFFFFFFFFFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 (confidence rate) |
FFFFFFFFFFFFFFF? TTTTTTTTTTTTTTT- --:-- / 28 |
FFFFF?FF?FFFFFF? TTTTT-TT-TTTTTT- --:-- / 24 |
CC 0 |
CC 0 |
FFFFFFFFFFFFFFFT TTTTTTTTTTTTTTTT --:P- / 32 |
FFFFFFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-M / 32 |
CC 0 |
CC 0 |
15b FTFTFTFFFFTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFTFTFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FTFTFTFFFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 32 |
CC 0 |
CC 0 |
FTFTFTFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
FTFTFTFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
DoubleExponent — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 420 | 436 | 0 | 0 | 360 | 324 | 0 | 0 |
Road Runner | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
001 FFTFFFTTTTFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFFFTTTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 60 |
FFTFFFTTTTFFTFFF TTTTTTTTTTTTTTTT --:PM / 60 |
CC 0 |
CC 0 |
FFTFFFTTTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 60 |
FFTFFFTTTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 60 |
CC 0 |
CC 0 |
002 TFFTFFTFFFFTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
TFFTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:PM / 60 |
CC 0 |
CC 0 |
TFFTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
TFFTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
CC 0 |
CC 0 |
003 TTFFFFFTFFTFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TTFFFFFTFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 60 |
TTFFFFFTFFTFFTFF TTTTTTTTTTTTTTTT --:PM / 60 |
CC 0 |
CC 0 |
TTFFFFFTFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 60 |
TTFFFFFTFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 60 |
CC 0 |
CC 0 |
004 TF? TTFFTFTTF? FFT (expected value) 4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 (confidence rate) |
TF?TTFFTFTTF?FFT TT?TTTTTTTTT?TTT --:-- / 52 |
TF?TTFFTFTTF?FFT TT?TTTTTTTTT?TTT --:-- / 52 |
CC 0 |
CC 0 |
TF?TTFFTFTTF?FFT TT?TTTTTTTTT?TTT --:-- / 52 |
TF?TTFFTFTTF?FFT TT?TTTTTTTTT?TTT --:-- / 52 |
CC 0 |
CC 0 |
010 FTTTTFFFFT? ? FFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 0 4.00 4.00 4.00 4.00 (confidence rate) |
FTTTTFFFFT??FFFF TTTTTTTTTT??TTTT --:-- / 52 |
FTTTTFFFFT??FFFF TTTTTTTTTT??TTTT --:-- / 52 |
CC 0 |
CC 0 |
FTTTTFFFFT??FFFF TTTTTTTTTT??TTTT --:-- / 52 |
FTTTTFFFFT??FFFF TTTTTTTTTT??TTTT --:-- / 52 |
CC 0 |
CC 0 |
020 TF? TFF? F? TFF? TFF (expected value) 4.00 4.00 0 3.00 3.00 3.00 0 3.00 0 3.00 3.00 3.00 0 2.00 2.00 1.00 (confidence rate) |
TF?TFF?F?TFF?TF? TT?TTT?T?TTT?TT- --:-- / 40 |
TF?TFF?F?TFF?TFF TT?TTT?T?TTT?TTT --:-- / 44 |
CC 0 |
CC 0 |
TF?TFF?F?TFF???? TT?TTT?T?TTT?--- --:-- / 36 |
TF?????????????? TT?---?-?---?--- --:-- / 8 |
CC 0 |
CC 0 |
100 FTFFFTFTTTFFT? TT (expected value) 4.00 2.00 2.00 2.00 4.00 2.00 1.00 4.00 2.00 3.00 3.00 2.00 1.00 0 1.00 1.00 (confidence rate) |
FTFFFTFTTTFF???? TTTTTTTTTTTT-?-- --:-- / 44 |
FTFFFT?TTTFFT?TT TTTTTT-TTTTTT?TT --:-- / 52 |
CC 0 |
CC 0 |
F???F??T?TF????? T---T--T-TT--?-- --:-- / 20 |
F???F??T???????? T---T--T-----?-- --:-- / 12 |
CC 0 |
CC 0 |
200 ? TFFTTFFFTFFFFFT (expected value) 0 4.00 2.00 4.00 4.00 1.00 2.00 4.00 2.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
?TFFT?FFFTFFFFFT ?TTTT-TTTTTTTTTT --:-- / 52 |
?TFFTTFFFTFFFFFT ?TTTTTTTTTTTTTTT --:-- / 56 |
CC 0 |
CC 0 |
?T?FT??F?T?????? ?T-TT--T-T------ --:-- / 20 |
?T?FT??F?T?????? ?T-TT--T-T------ --:-- / 20 |
CC 0 |
CC 0 |
EGFr — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 368 | 424 | 0 | 0 | 396 | 396 | 0 | 0 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
02010 FTFFTFTTTFTFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFTFTTTFTFFFTF TTTTTTTTTTTTTTTT --:-- / 144 |
FTFFTFTTTFTFFFTF TTTTTTTTTTTTTTTT --:PM / 144 |
CC 0 |
CC 0 |
FTFFTFTTTFTFFFTF TTTTTTTTTTTTTTTT --:-- / 144 |
FTFFTFTTTFTFFFTF TTTTTTTTTTTTTTTT --:-- / 144 |
CC 0 |
CC 0 |
10420 TTTFTFTTFFFFFFFF (expected value) 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 4.00 4.00 4.00 (confidence rate) |
?TTFTFTTFFF??FFF -TTTTTTTTTT--TTT --:-- / 116 |
TTTFTFTTFFF?FFFF TTTTTTTTTTT-TTTT --:-- / 136 |
CC 0 |
CC 0 |
?TTFTFTTFFFFFFFF -TTTTTTTTTTTTTTT --:-- / 136 |
?TTFTFTTFFFFFFFF -TTTTTTTTTTTTTTT --:-- / 136 |
CC 0 |
CC 0 |
10421 FFFTFFTFTTTFFTTT (expected value) 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 1.00 4.00 3.00 4.00 4.00 1.00 4.00 4.00 (confidence rate) |
FFF?FFTF?T?FF?TT TTT-TTTT-T-TT-TT --:-- / 108 |
FFFTFFTFTTTFFTTT TTTTTTTTTTTTTTTT --:PM / 144 |
CC 0 |
CC 0 |
FFF?FFTF?TTFF?TT TTT-TTTT-TTTT-TT --:-- / 116 |
FFF?FFTF?TTFF?TT TTT-TTTT-TTTT-TT --:-- / 116 |
CC 0 |
CC 0 |
HospitalTriage — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 408 | 408 | 0 | 0 | 408 | 408 | 0 | 0 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none TFFFFFTFFTTTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFFTFFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 408 |
TFFFFFTFFTTTFFFF TTTTTTTTTTTTTTTT --:PM / 408 |
CC 0 |
CC 0 |
TFFFFFTFFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 408 |
TFFFFFTFFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 408 |
CC 0 |
CC 0 |
MAPKbis — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 396 | 408 | 0 | 0 | 424 | 424 | 0 | 0 |
Road Runner | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 0 |
Camel | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
5310 FFFFFFFFTFFTFFFF (expected value) 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFFTFFTFFFF TTTTTTTTTTTTTTTT --:PM / 212 |
FFFF?FFFTFFTFFFF TTTT-TTTTTTTTTTT --:-- / 196 |
CC 0 |
CC 0 |
FFFFFFFFTFFTFFFF TTTTTTTTTTTTTTTT --:-- / 212 |
FFFFFFFFTFFTFFFF TTTTTTTTTTTTTTTT --:-- / 212 |
CC 0 |
CC 0 |
5320 FTTFTFFFFFTFTFFF (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate) |
F?TFTFFFFFTF?FFF T-TTTTTTTTTT-TTT --:-- / 184 |
FTTFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-M / 212 |
CC 0 |
CC 0 |
FTTFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 212 |
FTTFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:P- / 212 |
CC 0 |
CC 0 |
NQueens — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 464 | 444 | 0 | 0 | 400 | 400 | 0 | 0 |
Road Runner | 2 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
05 TFFFFFFFTFFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
TFFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:PM / 60 |
CC 0 |
CC 0 |
TFFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
TFFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
CC 0 |
CC 0 |
08 FFTFTTFFTFFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFTTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
FFTFTTFFTFFFFFFT TTTTTTTTTTTTTTTT --:PM / 60 |
CC 0 |
CC 0 |
FFTFTTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
FFTFTTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 60 |
CC 0 |
CC 0 |
10 FFFTFFFFFFFFTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:P- / 60 |
FFFTFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-M / 60 |
CC 0 |
CC 0 |
FFFTFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 60 |
FFFTFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 60 |
CC 0 |
CC 0 |
12 TFFFFFFTFFTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 60 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 60 |
CC 0 |
CC 0 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 60 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 60 |
CC 0 |
CC 0 |
15 FFFFFFFFFFFFFFFF (expected value) 4.00 2.00 4.00 2.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 2.00 3.00 (confidence rate) |
FFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 60 |
F?F?FFFFFFFFF??F T-T-TTTTTTTTT--T --:-- / 44 |
CC 0 |
CC 0 |
F?F?FFFFFFFFFF?? T-T-TTTTTTTTTT-- --:-- / 44 |
FFFFFFF?FFFFFFFF TTTTTTT-TTTTTTTT --:-- / 56 |
CC 0 |
CC 0 |
20 FFFFTFTTFFFFFFFF (expected value) 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 1.00 4.00 (confidence rate) |
F?FFTFTTFFFFFF?F T-TTTTTTTTTTTT-T --:-- / 52 |
FFFFTFTTFFFFF??F TTTTTTTTTTTTT--T --:-- / 52 |
CC 0 |
CC 0 |
FFFFTFTTFFFFF?FF TTTTTTTTTTTTT-TT --:-- / 56 |
F?FFTFTTFFFFF??F T-TTTTTTTTTTT--T --:-- / 48 |
CC 0 |
CC 0 |
25 FFFFFFFTTTTTFFFF (expected value) 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFFFFFFTTTTTFFFF TTTTTTTTTTTTTTTT --:-- / 60 |
FFFFFFFTTTTTFFFF TTTTTTTTTTTTTTTT --:PM / 60 |
CC 0 |
CC 0 |
F??????????????? T--------------- --:-- / 4 |
F??????????????? T--------------- --:-- / 4 |
CC 0 |
CC 0 |
30 FTFFFFTFTFFFFFFF (expected value) 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 1.00 4.00 3.00 3.00 (confidence rate) |
?TFFFFTFTFFF?FFF -TTTTTTTTTTT-TTT --:-- / 52 |
?TFFFFTFTFF?FFF? -TTTTTTTTTT-TTT- --:-- / 48 |
CC 0 |
CC 0 |
FTFFFFTFTFFF?FFF TTTTTTTTTTTT-TTT --:-- / 56 |
FTFFFFTFTFFF?F?F TTTTTTTTTTTT-T-T --:-- / 52 |
CC 0 |
CC 0 |
RERS17pb113 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 448 | 416 | 0 | 0 | 0 | 0 | 0 | 0 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
1 FFFFFF? TT? FFTF? F (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 (confidence rate) |
FFFFFF?TT?FFTF?F TTTTTT?TT?TTTT?T --:-- / 44 |
FFFFFF?TT?FFTF?F TTTTTT?TT?TTTT?T --:-- / 44 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
2 ? TFFFFFTTTFFFFFF (expected value) 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate) |
?TFFFFFTTTFFFFFF ?TTTTTTTTTTTTTTT --:-- / 52 |
?TFFFFFTTTF?FFFF ?TTTTTTTTTT-TTTT --:-- / 48 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
3 TF? F? TTTTTFFFTFF (expected value) 2.00 2.00 0 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate) |
TF?F?TTTTTFFFTFF TT?T?TTTTTTTTTTT --:-- / 48 |
TF?F?TTTTTFF?TFF TT?T?TTTTTTT-TTT --:-- / 44 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
4 FFTTFFTF? FFF? TFF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 0 2.00 2.00 2.00 (confidence rate) |
FFTTFFTF?FFF?TFF TTTTTTTT?TTT?TTT --:-- / 48 |
FFTTFFTF?FFF?TFF TTTTTTTT?TTT?TTT --:-- / 48 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
CC 0 |
5 ? FFFTFFFFTTFFFFF (expected value) 0 2.00 1.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
?FFFTFFFFTTFFFFF ?TTTTTTTTTTTTTTT --:-- / 52 |
?F??TFFF?TTFFFFF ?T--TTTT-TTTTTTT --:-- / 40 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
6 FFFTFFFF? ? FTF? FF (expected value) 2.00 2.00 2.00 2.00 1.00 1.00 2.00 2.00 0 0 2.00 2.00 2.00 0 2.00 2.00 (confidence rate) |
FFFTFFFF??FTF?FF TTTTTTTT??TTT?TT --:-- / 44 |
FFFT??FF??FTF?FF TTTT--TT??TTT?TT --:-- / 36 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
7 FT? FTFFTFFFFFTFT (expected value) 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FT?FTFFTFFFFFTFT TT?TTTTTTTTTTTTT --:-- / 52 |
FT?FTFFTFFFFFTFT TT?TTTTTTTTTTTTT --:-- / 52 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
8 FFTFFFF? FTTFTFFF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 1.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFTFFFF?FTTFTFFF TTTTTTT?TTTTTTTT --:-- / 52 |
FFTFFF??FTTFTFFF TTTTTT-?TTTTTTTT --:-- / 48 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
9 FFFFFFTFFFFTFFTF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFFFFFTFFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 56 |
FFFFFFTFFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 56 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
RERS17pb114 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 480 | 460 | 0 | 0 | 0 | 0 | 0 | 0 |
Road Runner | 6 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 4 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
1 FFFFFFFFTTFFFTFF (expected value) 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFFFFFFFTTFFFTFF TTTTTTTTTTTTTTTT --:PM / 56 |
?FFFFFFFTTFFFTFF -TTTTTTTTTTTTTTT --:-- / 52 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
2 FFTTFFFFFFFFFTTF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFTTFFFFFFFFFTTF TTTTTTTTTTTTTTTT --:P- / 56 |
FFTTFFFFFFFFFTTF TTTTTTTTTTTTTTTT --:-M / 56 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
3 TFTTTFTTFFTTFTFT (expected value) 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate) |
TFTTTFTTFFTTFTFT TTTTTTTTTTTTTTTT --:PM / 56 |
TFTTT?TTF?TTFT?T TTTTT-TTT-TTTT-T --:-- / 44 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
4 FFFFFTFTTFFTFFFT (expected value) 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 (confidence rate) |
FF?FFTFTTFFT?F?T TT-TTTTTTTTT-T-T --:-- / 44 |
FFFFFTFTTFFTFFFT TTTTTTTTTTTTTTTT --:PM / 56 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
5 FFFFFTFFTFFFF? F? (expected value) 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 0 (confidence rate) |
FFFFFTFFTFFFF?F? TTTTTTTTTTTTT?T? --:-- / 48 |
??FFFTFFTFFFF?F? --TTTTTTTTTTT?T? --:-- / 40 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
6 TTFFFFTFTFFTFFFT (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate) |
TTFFFFTFTFFTFFFT TTTTTTTTTTTTTTTT --:PM / 56 |
TTFFFFTFTFFTF?FT TTTTTTTTTTTTT-TT --:-- / 52 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
7 TFFTFTTTFFFFFFFF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
TFFTFTTTFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 56 |
TFFTFTTTFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 56 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
8 FF? FFFFFFFTFFFFF (expected value) 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FF?FFFFFFFTFFFFF TT?TTTTTTTTTTTTT --:-- / 52 |
FF?FFFFFFFTFFFFF TT?TTTTTTTTTTTTT --:-- / 52 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
9 TFFFFTTFTTFTTFFF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate) |
TFFFFTTFTTFTTFFF TTTTTTTTTTTTTTTT --:PM / 56 |
TFFFFTTFTTF?TFFF TTTTTTTTTTT-TTTT --:-- / 52 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
RERS17pb115 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 240 | 372 | 0 | 0 | 0 | 0 | 0 | 0 |
Road Runner | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
1 ? FF? FF? FTTTFTFTT (expected value) 0 1.00 2.00 0 1.00 2.00 0 1.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 2.00 (confidence rate) |
??F??F??TTT?T?TT ?-T?-T?-TTT-T-TT --:-- / 28 |
?FF?FF?FTTTFTFTT ?TT?TT?TTTTTTTTT --:-- / 44 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
2 FFFFFTFT? FFTTTT? (expected value) 1.00 1.00 1.00 1.00 1.00 2.00 1.00 2.00 0 1.00 1.00 2.00 2.00 2.00 2.00 0 (confidence rate) |
?????TFT???TTTT? -----TTT?--TTTT? --:-- / 24 |
FFFFFT?T?FFTTTT? TTTTTT-T?TTTTTT? --:-- / 44 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
3 TFTF? T? FFF? FFTFF (expected value) 2.00 1.00 2.00 2.00 0 2.00 0 1.00 1.00 1.00 0 1.00 1.00 2.00 1.00 2.00 (confidence rate) |
T?TF?T???????T?F T-TT?T?---?--T-T --:-- / 20 |
TFTF?T?FFF?FFTFF TTTT?T?TTT?TTTTT --:-- / 44 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
4 TTFTFTTTFFF? FFT? (expected value) 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 1.00 0 1.00 2.00 2.00 0 (confidence rate) |
TTFT?TTTFF???FT? TTTT-TTTTT-?-TT? --:-- / 36 |
TTFTFTTTFFF?FFT? TTTTTTTTTTT?TTT? --:-- / 48 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
5 FFTFFTTTTTTFFFFF (expected value) 1.00 2.00 2.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 1.00 1.00 1.00 (confidence rate) |
FFT??TTTTTTFF??F TTT--TTTTTTTT--T --:-- / 40 |
?FTFFTTTTTT?FFF? -TTTTTTTTTT-TTT- --:-- / 44 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
6 FFFT? FT? TF? ? F? ? F (expected value) 2.00 2.00 1.00 2.00 0 1.00 2.00 0 2.00 2.00 0 0 1.00 0 0 2.00 (confidence rate) |
FF?T??T?TF?????F TT-T?-T?TT??-??T --:-- / 24 |
FFFT?FT?TF??F??F TTTT?TT?TT??T??T --:-- / 36 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
7 FTFFFFFT? F? ? ? TFF (expected value) 2.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 0 1.00 0 0 0 2.00 2.00 1.00 (confidence rate) |
FTFF?F?T?????TF? TTTT-T-T?-???TT- --:-- / 28 |
FTFFFFFT?F???TFF TTTTTTTT?T???TTT --:-- / 40 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
8 FFF? ? F? FT? FFT? FT (expected value) 2.00 1.00 1.00 0 0 1.00 0 1.00 2.00 0 1.00 1.00 2.00 0 1.00 2.00 (confidence rate) |
FF?????FT???T??T TT-??-?TT?--T?-T --:-- / 20 |
F?F??F??T?FFT?FT T-T??T?-T?TTT?TT --:-- / 32 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
9 T? FTFT? FFFF? FFFF (expected value) 2.00 0 1.00 2.00 1.00 2.00 0 1.00 1.00 1.00 1.00 0 1.00 1.00 2.00 2.00 (confidence rate) |
T??T?T???????FFF T?-T-T?----?-TTT --:-- / 20 |
T?FTFT?FFFF?F?FF T?TTTT?TTTT?T-TT --:-- / 40 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
RefineWMG — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 68 | 504 | 0 | 0 | 504 | 484 | 0 | 0 |
Road Runner | 1 | 6 | 0 | 0 | 0 | 1 | 0 | 0 |
Camel | 1 | 6 | 0 | 0 | 0 | 1 | 0 | 0 |
002002 TFFFFFFFTFFFFTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------------- --:-- / 0 |
TFFFFFFFTFFFFTFF TTTTTTTTTTTTTTTT --:PM / 36 |
CC 0 |
CC 0 |
TFFFFFFFTFFFFTFF TTTTTTTTTTTTTTTT --:-- / 36 |
TFFFFFFFTFFFFTFF TTTTTTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
002003 FFFTTFFFTFFFFFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------------- --:-- / 0 |
FFFTTFFFTFFFFFFF TTTTTTTTTTTTTTTT --:PM / 36 |
CC 0 |
CC 0 |
FFFTTFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 36 |
FFFTTFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
005005 TFFFFTFFFFFTFTTT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------------- --:-- / 0 |
TFFFFTFFFFFTFTTT TTTTTTTTTTTTTTTT --:PM / 36 |
CC 0 |
CC 0 |
TFFFFTFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 36 |
TFFFFTFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
005006 TTFTFTFTFFTFFFTT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------------- --:-- / 0 |
TTFTFTFTFFTFFFTT TTTTTTTTTTTTTTTT --:PM / 36 |
CC 0 |
CC 0 |
TTFTFTFTFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 36 |
TTFTFTFTFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
007007 TFFTFFFFFTTFTTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------------- --:-- / 0 |
TFFTFFFFFTTFTTFF TTTTTTTTTTTTTTTT --:PM / 36 |
CC 0 |
CC 0 |
TFFTFFFFFTTFTTFF TTTTTTTTTTTTTTTT --:-- / 36 |
TFFTFFFFFTTFTTFF TTTTTTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
007008 TFFFTFFFFFFFTTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------------- --:-- / 0 |
TFFFTFFFFFFFTTFF TTTTTTTTTTTTTTTT --:PM / 36 |
CC 0 |
CC 0 |
TFFFTFFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 36 |
TFFFTFFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
010010 FFTFFFFFTFFTFF? F (expected value) 3.00 3.00 3.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 1.00 (confidence rate) |
???????????????? --------------?- --:-- / 0 |
FFTFFFFFTFFTFF?? TTTTTTTTTTTTTT?- --:-- / 32 |
CC 0 |
CC 0 |
FFTFFFFFTFFTFF?F TTTTTTTTTTTTTT?T --:-- / 32 |
FFTFF??????????? TTTTT---------?- --:-- / 12 |
CC 0 |
CC 0 |
010011 FFFF? TTFFFFFFF? F (expected value) 3.00 3.00 3.00 3.00 0 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 1.00 (confidence rate) |
???????????????? ----?---------?- --:-- / 0 |
FFFF?TTFFFFFFF?F TTTT?TTTTTTTTT?T --:-- / 32 |
CC 0 |
CC 0 |
FFFF?TT????????? TTTT?TT-------?- --:-- / 12 |
FFFF?TTFFFFFFF?? TTTT?TTTTTTTTT?- --:-- / 28 |
CC 0 |
CC 0 |
015015 FFFFFTFTFTFFFTTT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 1.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------------- --:-- / 0 |
FFFFFT?T?T?F?TTT TTTTTT-T-T-T-TTT --:-- / 28 |
CC 0 |
CC 0 |
FFFFFTFT?TFFFTTT TTTTTTTT-TTTTTTT --:-- / 32 |
FFFFFTFTFTFFFTTT TTTTTTTTTTTTTTTT --:PM / 36 |
CC 0 |
CC 0 |
015016 FTFTF? ? FFFTTTFFT (expected value) 3.00 3.00 3.00 3.00 2.00 0 0 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate) |
???????????????? -----??--------- --:-- / 0 |
FTFTF??FFFTTT?FT TTTTT??TTTTTT-TT --:-- / 28 |
CC 0 |
CC 0 |
FTFTF??FFFTTTFFT TTTTT??TTTTTTTTT --:-- / 32 |
FTFT???????????? TTTT-??--------- --:-- / 8 |
CC 0 |
CC 0 |
025025 TFFFFTTFFFFT? FTF (expected value) 3.00 3.00 2.00 2.00 3.00 3.00 3.00 1.00 2.00 1.00 2.00 3.00 0 2.00 3.00 3.00 (confidence rate) |
???????????????? ------------?--- --:-- / 0 |
TF??FTT????T?FTF TT--TTT----T?TTT --:-- / 20 |
CC 0 |
CC 0 |
TFFFFTTFFFFT??TF TTTTTTTTTTTT?-TT --:-- / 32 |
TFFFFTT?F?FT?FTF TTTTTTT-T-TT?TTT --:-- / 28 |
CC 0 |
CC 0 |
025026 FF? FT? FTFTTFFFFF (expected value) 3.00 3.00 0 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? --?--?---------- --:-- / 0 |
FF?FT?FTFTTFFFFF TT?TT?TTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
FF?FT?FTFTTFFFFF TT?TT?TTTTTTTTTT --:-- / 32 |
FF?FT?FTFTTFFFFF TT?TT?TTTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
050050 FFTTF? ? ? TTTFFTFF (expected value) 3.00 3.00 3.00 3.00 1.00 0 0 0 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? -----???-------- --:-- / 0 |
FFTTF???TTT?FTFF TTTTT???TTT-TTTT --:-- / 28 |
CC 0 |
CC 0 |
FFTT????TTT?FTFF TTTT-???TTT-TTTT --:-- / 24 |
FFTT????TTTFFTFF TTTT-???TTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
050051 FTTFTFTTF? FFFTFF (expected value) 3.00 3.00 3.00 1.00 3.00 1.00 3.00 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
???????????????? ---------?------ --:-- / 0 |
FTTTT?TTF?FFFTFF TTTXT-TTT?TTTTTT V-:-- / 24 |
CC 0 |
CC 0 |
FTT?T?TTF?FFFTFF TTT-T-TTT?TTTTTT --:-- / 28 |
FTTFTFTTF?FFFTFF TTTTTTTTT?TTTTTT --:-- / 32 |
CC 0 |
CC 0 |
100100 TFTFFF? TFFFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 0 4.00 1.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate) |
TFTFFF?T?FFTFFFF TTTTTT?T-TTTTTTT --:-- / 32 |
TFTFFF?TFFFTFFFF TTTTTT?TTTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
TFTFFF?T?FFTFF?F TTTTTT?T-TTTTT-T --:-- / 28 |
TFTFF??T?FFTFF?F TTTTT-?T-TTTTT-T --:-- / 28 |
CC 0 |
CC 0 |
100101 FTFFTFFTTFFTFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFTFFTTFFTFFTF TTTTTTTTTTTTTTTT --:PM / 36 |
FTFFTFF?TFFTFFTF TTTTTTT-TTTTTTTT --:-- / 32 |
CC 0 |
CC 0 |
FTFFTFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 36 |
FTFFTFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 36 |
CC 0 |
CC 0 |
All «Known» models |
||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Total Points | 7507 | 8833 | 4620 | 4834 | 7193 | 7112 | 4755 | 4780 |
Road Runner | 102 | 289 | 2 | 3 | 59 | 42 | 4 | 10 |
Camel | 95 | 334 | 4 | 6 | 18 | 23 | 13 | 18 |
ARMCacheCoherence — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 89 | 102 | 102 | 102 | 102 | 102 | 102 |
Road Runner | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 |
none FFFTFTTFTFFTFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFTTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFTT??FFTFFFT TTTTTTT--TTTTTTT --:-- / 89 |
FFFTFTTFTFFTFFFT TTTTTTTTTTTTTTTT --:PM / 102 |
FFFTFTTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFTTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFTTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFTTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFTTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 102 |
AirplaneLD — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 65 | 15 | 15 | 56 | 56 | 31 | 31 |
Road Runner | 0 | 1 | 0 | 0 | 3 | 3 | 0 | 0 |
Camel | 0 | 3 | 0 | 0 | 0 | 2 | 1 | 1 |
0010 FFTFFFTFFFFFFTTF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FFTFFFTFFFFFFTTF TTTTTTTTTTTTTTTT --:PM / 8 |
FFTFFFTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
0020 FTTFFFFTFTFFFTTF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTTFFFFTFTFFFTTF TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
FTTFFFFTFTFFFTTF TTTTTTTTTTTTTTTT --:P- / 8 |
FTTFFFFTFTFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
0050 FFTFFFFFTFFFTFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FFTFFFFFTFFFTFFF TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
FFTFFFFFTFFFTFFF TTTTTTTTTTTTTTTT --:P- / 8 |
FFTFFFFFTFFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
0100 FTTTFFFTTFFFFFFF (expected value) 3.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FT?TFFFTTFFFFFFF TT-TTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
FTTTFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:P- / 8 |
FTTTFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
0200 FTTFTTFFFFTFFFFT (expected value) 5.00 4.00 5.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
F?TF?TFFFFTFFFFT T-TT-TTTTTTTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTTFTTFFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTTFFFFTFFFFT TTTTTTTTTTTTTTTT --:P- / 8 |
FTTFTTFFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTTFFFFTFFFFT TTTTTTTTTTTTTTTT --:-M / 8 |
0500 TTFTTTTFFTFTTFTF (expected value) 4.00 4.00 5.00 4.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
??F?T?TFFTFTTFTF --T-T-TTTTTTTTTT --:-- / 6 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFTTTTFFTFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFTTTTFFTFTTFTF TTTTTTTTTTTTTTTT --:P- / 8 |
TTFTTTTFFTFTTFTF TTTTTTTTTTTTTTTT --:-M / 8 |
TTFTTTTFFTFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
1000 FTTFFTFTFFTTFFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 3.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTTFFT??FFT?FFFF TTTTTT--TTT-TTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTTFFTFTFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFFTFTFFTTFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
2000 ? TFF? ? F? FFFFFFTF (expected value) 0 1.00 1.00 1.00 0 0 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
?TFF??F?FFFFFFTF ?TTT??T?TTTTTTTT --:-- / 6 |
???????????????? ?---??-?-------- --:-- / 0 |
???????????????? ?---??-?-------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ?---??-?-------- --:-- / 0 |
???????????????? ?---??-?-------- --:-- / 0 |
4000 FFFFFFFFFF? FFTF? (expected value) 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 5.00 5.00 5.00 5.00 0 (confidence rate) |
DNC |
FFFFFFFFFF?FFTF? TTTTTTTTTT?TTTT? --:-- / 7 |
FFFFFFFFFF?FFTF? TTTTTTTTTT?TTTT? --:-- / 7 |
FFFFFFFFFF?FFTF? TTTTTTTTTT?TTTT? --:-- / 7 |
CC 0 |
CC 0 |
FFFFFFFFFF?FFTF? TTTTTTTTTT?TTTT? --:-- / 7 |
FFFFFFFFFF?FFTF? TTTTTTTTTT?TTTT? --:-- / 7 |
AirplaneLD — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 51 | 66 | 22 | 22 | 56 | 56 | 38 | 38 |
Road Runner | 0 | 0 | 0 | 0 | 2 | 5 | 0 | 0 |
Camel | 0 | 4 | 0 | 0 | 1 | 0 | 2 | 0 |
0010 FFTFFFTFTFFFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-M / 8 |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:P- / 8 |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
0020 FTTFFFFTTFFTTTFT (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
F?TFFFFTTFFTTTFT T-TTTTTTTTTTTTTT --:-- / 8 |
FTTFFFFTTFFTTTFT TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
FTTFFFFTTFFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFFFFTTFFTTTFT TTTTTTTTTTTTTTTT --:P- / 8 |
CC 0 |
CC 0 |
0050 FFTFFFFFTFFFTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate) |
FFTFF?FF?FFFTFF? TTTTT-TT-TTTTTT- --:-- / 7 |
FFTFFFFFTFFFTFFT TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
FFTFFFFFTFFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFFTFFFTFFT TTTTTTTTTTTTTTTT --:P- / 8 |
CC 0 |
CC 0 |
0100 FTTTFFFTTTFFTTTT (expected value) 3.00 3.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 (confidence rate) |
????F????TFFT??T ----T----TTTT--T --:-- / 3 |
FTTTFFFTTTFFTTTT TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
FTTTFFFTTTFFTTTT TTTTTTTTTTTTTTTT --:P- / 8 |
FTTTFFFTTTFFTTTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
0200 FTTFTTFFTTTTTFFF (expected value) 6.00 4.00 5.00 6.00 4.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 5.00 (confidence rate) |
F??F?T?FTTTT?FF? T--T-T-TTTTT-TT- --:-- / 5 |
F?TF?TFFTTTTTFFF T-TT-TTTTTTTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTTFTTFFTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTTFFTTTTTFFF TTTTTTTTTTTTTTTT --:P- / 8 |
FTTFTTFFTTTTTFFF TTTTTTTTTTTTTTTT --:-M / 8 |
FTTFTTFFTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
0500 TTFTTTTFTTTTTFTF (expected value) 4.00 4.00 5.00 4.00 5.00 4.00 5.00 6.00 6.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate) |
???????FT?T?TFTF -------TT-T-TTTT --:-- / 4 |
??F?T?TFTTTTTFTF --T-T-TTTTTTTTTT --:-- / 6 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFTTTTFTTTTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFTTTTFTTTTTFTF TTTTTTTTTTTTTTTT --:P- / 8 |
TTFTTTTFTTTTTFTF TTTTTTTTTTTTTTTT --:-M / 8 |
TTFTTTTFTTTTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
1000 FTTFFTFTFFFTFFTF (expected value) 7.00 8.00 8.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 (confidence rate) |
?TTFFTF?FFFTFFTF -TTTTTT-TTTTTTTT --:-- / 7 |
FTTFFTF?FFFTFFTF TTTTTTT-TTTTTTTT --:-- / 8 |
FTTFFTF?FFFT?FTF TTTTTTT-TTTT-TTT --:-- / 7 |
FTTFFTF?FFFT?FTF TTTTTTT-TTTT-TTT --:-- / 7 |
FTTFFTFTFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
FTTFFTFTFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFFTF?FFFT?FTF TTTTTTT-TTTT-TTT --:-- / 7 |
FTTFFTF?FFFT?FTF TTTTTTT-TTTT-TTT --:-- / 7 |
2000 ? TFFF? F? ? F? TFTTF (expected value) 0 2.00 2.00 2.00 2.00 0 2.00 0 0 1.00 0 2.00 2.00 2.00 2.00 1.00 (confidence rate) |
?TFFF?F????TFTTF ?TTTT?T??-?TTTTT --:-- / 5 |
?TFFF?F??F?TFTT? ?TTTT?T??T?TTTT- --:-- / 5 |
???????????????? ?----?-??-?----- --:-- / 0 |
???????????????? ?----?-??-?----- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ?----?-??-?----- --:-- / 0 |
???????????????? ?----?-??-?----- --:-- / 0 |
4000 FFFFFFFFFTTF? TFF (expected value) 6.00 5.00 6.00 6.00 6.00 5.00 5.00 5.00 6.00 6.00 5.00 5.00 0 1.00 6.00 6.00 (confidence rate) |
F?FFF???FT????FF T-TTT---TT--?-TT --:-- / 4 |
FFFFFFFFFTTF?TFF TTTTTTTTTTTT?TTT --:-- / 8 |
FFFFFFFFFTTF??FF TTTTTTTTTTTT?-TT --:-- / 7 |
FFFFFFFFFTTF??FF TTTTTTTTTTTT?-TT --:-- / 7 |
CC 0 |
DNF 0 |
FFFFFFFFFTTF??FF TTTTTTTTTTTT?-TT --:-- / 7 |
FFFFFFFFFTTF??FF TTTTTTTTTTTT?-TT --:-- / 7 |
Angiogenesis — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 118 | 119 | 84 | 84 | 119 | 119 | 53 | 53 |
Road Runner | 4 | 1 | 0 | 0 | 2 | 0 | 0 | 0 |
Camel | 3 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
01 FFFFFFFFFFTFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-M / 17 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:P- / 17 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
05 FFFFTFFFFFFFFTTT (expected value) 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFF?FFFFFFFFTTT TTTT-TTTTTTTTTTT --:-- / 16 |
FFFFTFFFFFFFFTTT TTTTTTTTTTTTTTTT --:PM / 17 |
CC 0 |
CC 0 |
FFFFTFFFFFFFFTTT TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTFFFFFFFFTTT TTTTTTTTTTTTTTTT --:-- / 17 |
CC 0 |
CC 0 |
10 FFFFFTTFFTTTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFTTFFTTTFFFF TTTTTTTTTTTTTTTT --:P- / 17 |
FFFFFTTFFTTTFFFF TTTTTTTTTTTTTTTT --:-M / 17 |
CC 0 |
CC 0 |
FFFFFTTFFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFTTFFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
CC 0 |
CC 0 |
15 TFFFFTTTFTTFFFFT (expected value) 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFFFTTTFTTFFFFT TTTTTTTTTTTTTTTT --:PM / 17 |
TFFFFTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 17 |
TF?????????????? TT-------------- --:-- / 2 |
TF?????????????? TT-------------- --:-- / 2 |
20 FFTTTFFFTFTFTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:PM / 17 |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTTFFFTFTFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
25 TFFFFFTFFFTFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:P- / 17 |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-M / 17 |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
50 FFFTTFFFFFFTTFFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFTTFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-M / 17 |
FFFTTFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFTTFF?FFFTTFFF TTTTTTT-TTTTTTTT --:-- / 16 |
FFFTTFF?FFFTTFFF TTTTTTT-TTTTTTTT --:-- / 16 |
FFFTTFFFFFFTTFFF TTTTTTTTTTTTTTTT --:P- / 17 |
FFFTTFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
DNF 0 |
CC 0 |
AutoFlight — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 142 | 148 | 65 | 65 | 125 | 115 | 53 | 53 |
Road Runner | 2 | 4 | 0 | 0 | 2 | 4 | 0 | 0 |
Camel | 1 | 10 | 0 | 0 | 1 | 0 | 0 | 0 |
01a TFTFFTTTFFFTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:-M / 8 |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:P- / 8 |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTFFTTTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
01b FFFFTFTFFFFFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
02a FFFTFTFFFTFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
FFFTFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:P- / 8 |
FFFTFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
02b FFTFTFFFFFFFFTFT (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFTFFFF?F?FTFT TTTTTTTTT-T-TTTT --:-- / 7 |
F?TFTFFFFFFFFTFT T-TTTTTTTTTTTTTT --:-- / 7 |
CC 0 |
CC 0 |
FFTFTFFFFFFFFTFT TTTTTTTTTTTTTTTT --:PM / 8 |
FFTFTFFFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
03a TTFFFFFFTTTFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TTFFFFFFTTTFFTFF TTTTTTTTTTTTTTTT --:-M / 8 |
TTFFFFFFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
TTFFFFFFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFFTTTFFTFF TTTTTTTTTTTTTTTT --:P- / 8 |
CC 0 |
CC 0 |
03b TFFFFFFFFFFFFFFF (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 (confidence rate) |
T?FFFFFFFFFFFF?F T-TTTTTTTTTTTT-T --:-- / 7 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TFFFFFFFFFFFFF?F TTTTTTTTTTTTTT-T --:-- / 7 |
TFFFFFFFFFFFFF?F TTTTTTTTTTTTTT-T --:-- / 7 |
CC 0 |
CC 0 |
04a FFFFTFTTFFFFTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFT?T?FFFFTFFT TTTTT-T-TTTTTTTT --:-- / 7 |
FFFFTFTTFFFFTFFT TTTTTTTTTTTTTTTT --:-M / 8 |
CC 0 |
CC 0 |
FFFFTFTTFFFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTTFFFFTFFT TTTTTTTTTTTTTTTT --:P- / 8 |
CC 0 |
CC 0 |
04b FFFFTFTFTTFTFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 3.00 4.00 2.00 4.00 (confidence rate) |
FFFFTFTF?TFT?TFT TTTTTTTT-TTT-TTT --:-- / 7 |
FFFFTFTFTTFTFTFT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FFFFTFTF?TFTFT?T TTTTTTTT-TTTTT-T --:-- / 7 |
FFFFTFTF?TFTFT?T TTTTTTTT-TTTTT-T --:-- / 7 |
CC 0 |
CC 0 |
05a FTFTTTTFFFTFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:P- / 8 |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:-M / 8 |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTTFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
05b TFF? FTTTFFTFFTFF (expected value) 6.00 2.00 4.00 0 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 (confidence rate) |
T?F??TTTFFTFFTFF T-T?-TTTTTTTTTTT --:-- / 6 |
TFF?FTTTFFTFFTF? TTT?TTTTTTTTTTT- --:-- / 7 |
DNF 0 |
DNF 0 |
TFF??TTTFFTFFT?F TTT?-TTTTTTTTT-T --:-- / 6 |
T?F????????????? T-T?------------ --:-- / 1 |
T??????????????? T--?------------ --:-- / 0 |
T??????????????? T--?------------ --:-- / 0 |
06a TFFTFFTFFFTFTFTF (expected value) 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFF?FFTFFFTFTFTF TTT-TTTTTTTTTTTT --:-- / 7 |
TFFTFFTFFFTFTFTF TTTTTTTTTTTTTTTT --:-M / 8 |
TFF?FFTFFFTFTFTF TTT-TTTTTTTTTTTT --:-- / 7 |
TFF?FFTFFFTFTFTF TTT-TTTTTTTTTTTT --:-- / 7 |
TFFTFFTFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFTFFTFFFTFTFTF TTTTTTTTTTTTTTTT --:P- / 8 |
TFFTFFTFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFTFFTFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
06b TFTFTFFFFFFTFFTF (expected value) 6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFTFT?FFFFFTFFTF TTTTT-TTTTTTTTTT --:-- / 7 |
TFTFTFFFFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
TFTFT?FFFFFTFFTF TTTTT-TTTTTTTTTT --:-- / 7 |
TFTFT?FFFFFTFFTF TTTTT-TTTTTTTTTT --:-- / 7 |
TFTFT?FFFFFTFFTF TTTTT-TTTTTTTTTT --:-- / 7 |
TFTFT?FFFFFTFFTF TTTTT-TTTTTTTTTT --:-- / 7 |
CC 0 |
CC 0 |
12a FTFFTFFTTFFTTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 (confidence rate) |
FTFFTFFTTFFTTFFF TTTTTTTTTTTTTTTT --:P- / 8 |
FTFFTFFTTFFTTFFF TTTTTTTTTTTTTTTT --:-M / 8 |
FTFFTFFTTFFTTFF? TTTTTTTTTTTTTTT- --:-- / 7 |
FTFFTFFTTFFTTFF? TTTTTTTTTTTTTTT- --:-- / 7 |
FTFFTFFTTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFFTTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFFTTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFFTTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
12b FFFTFFTFFT? FTTFF (expected value) 6.00 6.00 3.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
FF?TFFTFFT?FTTFF TT-TTTTTTT?TTTTT --:-- / 7 |
FFFTFFTFFT?FTTFF TTTTTTTTTT?TTTTT --:-- / 7 |
FFFTFFTFFT?FTTFF TTTTTTTTTT?TTTTT --:-- / 7 |
FFFTFFTFFT?FTTFF TTTTTTTTTT?TTTTT --:-- / 7 |
FF?TFFTFFT?FTTFF TT-TTTTTTT?TTTTT --:-- / 7 |
FF?TFFTFFT?????? TT-TTTTTTT?----- --:-- / 4 |
CC 0 |
CC 0 |
24a FF? TFFTTFFFFTFTF (expected value) 4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate) |
FF?TFFTTFFFFTFTF TT?TTTTTTTTTTTTT --:-- / 7 |
FF?TFFTTFFFFTFTF TT?TTTTTTTTTTTTT --:-- / 7 |
???????????????? --?------------- --:-- / 0 |
???????????????? --?------------- --:-- / 0 |
FF?TFFTTFFFFTFT? TT?TTTTTTTTTTTT- --:-- / 7 |
FF?TFFTTFFFFTFTF TT?TTTTTTTTTTTTT --:-- / 7 |
CC 0 |
CC 0 |
24b ? TTTTFF? ? ? FF? FTT (expected value) 0 2.00 2.00 2.00 2.00 2.00 2.00 0 0 0 2.00 2.00 0 2.00 2.00 2.00 (confidence rate) |
?TTTTFF???FF?FTT ?TTTTTT???TT?TTT --:-- / 5 |
?TTTTFF???FF?FTT ?TTTTTT???TT?TTT --:-- / 5 |
???????????????? ?------???--?--- --:-- / 0 |
???????????????? ?------???--?--- --:-- / 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
48a TTFTFFTFTFTFTFFF (expected value) 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 (confidence rate) |
?TFTFFTFTFTFTF?F -TTTTTTTTTTTTT-T --:-- / 7 |
?TFTFFTFTFTFTFFF -TTTTTTTTTTTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFTFFTFTFTFTF?F TTTTTTTTTTTTTT-T --:-- / 7 |
TTFTFFTFTFTFTF?F TTTTTTTTTTTTTT-T --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
48b ? FFTTFTFFTT? TTFT (expected value) 0 4.00 4.00 2.00 4.00 2.00 3.00 3.00 2.00 2.00 2.00 0 2.00 2.00 1.00 2.00 (confidence rate) |
?FFTTFTFFTT?TTFT ?TTTTTTTTTT?TTTT --:-- / 7 |
?FFTTFTFFTT?TT?T ?TTTTTTTTTT?TT-T --:-- / 6 |
???????????????? ?----------?---- --:-- / 0 |
???????????????? ?----------?---- --:-- / 0 |
?FF?T?TF???????? ?TT-T-TT---?---- --:-- / 2 |
?FF?T??????????? ?TT-T------?---- --:-- / 1 |
???????????????? ?----------?---- --:-- / 0 |
???????????????? ?----------?---- --:-- / 0 |
96a FTFFFFTFFFFFF? FF (expected value) 8.00 8.00 7.00 5.00 8.00 8.00 7.00 1.00 6.00 6.00 6.00 6.00 6.00 0 6.00 2.00 (confidence rate) |
FT??FFT?FFFFF?FF TT--TTT-TTTTT?TT --:-- / 6 |
FTFFFFTFFFFFF?FF TTTTTTTTTTTTT?TT --:-- / 7 |
FTFFFFT?FFFFF?F? TTTTTTT-TTTTT?T- --:-- / 6 |
FTFFFFT?FFFFF?F? TTTTTTT-TTTTT?T- --:-- / 6 |
FTF?FFT????????? TTT-TTT------?-- --:-- / 3 |
FTF?FF?????????? TTT-TT-------?-- --:-- / 2 |
FTFFFFT?FFFFF?F? TTTTTTT-TTTTT?T- --:-- / 6 |
FTFFFFT?FFFFF?F? TTTTTTT-TTTTT?T- --:-- / 6 |
96b TFTFFFFTFTTFFF? T (expected value) 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 6.00 (confidence rate) |
TFTFFFFTFTTFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
TFTFFFFTFTTFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
TFTFFFFTFTTFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
TFTFFFFTFTTFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
T??????????????? T-------------?- --:-- / 0 |
T??????????????? T-------------?- --:-- / 0 |
TFTFFFFTFTTFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
TFTFFFFTFTTFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
BART — Colored (first 8 formulas disabled + no check between colored and P/T) | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 0 | 0 | 0 | 44 | 42 | 0 | 0 |
Road Runner | 0 | 0 | 0 | 0 | 2 | 2 | 0 | 0 |
Camel | 0 | 0 | 0 | 0 | 2 | 2 | 0 | 0 |
002 TTFFTFTTTTTTFTTT (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
DNC | CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFFTFTTTTTTFTTT TTTTTTTTTTTTTTTT --:P- / 9 |
TTFFTFTTTTTTFTTT TTTTTTTTTTTTTTTT --:-M / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
005 TTTTTTTTTTFFFTTF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
DNC | CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTTTTTTTTTFFFTTF TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTFFFTTF TTTTTTTTTTTTTTTT --:PM / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
010 TTFTTTTTTTTFTTTF (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
DNC | CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFTTTTTTTTFTTTF TTTTTTTTTTTTTTTT --:-M / 9 |
TTFTTTTTTTTFTTTF TTTTTTTTTTTTTTTT --:P- / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
020 TTTTTFTTTTFTFTTT (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate) |
DNC | CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTTTTFTTTTFTFTTT TTTTTTTTTTTTTTTT --:PM / 9 |
TTTTTFTTTTFT?TTT TTTTTTTTTTTT-TTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
030 TTTTFTTTTTTTTT? ? (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? --------------?? --:-- / 0 |
???????????????? --------------?? --:-- / 0 |
TTTTFTTTTTTTTT?? TTTTTTTTTTTTTT?? --:-- / 8 |
TTTTFTTTTT?????? TTTTTTTTTT----?? --:-- / 6 |
???????????????? --------------?? --:-- / 0 |
???????????????? --------------?? --:-- / 0 |
040 TT? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 1.00 1.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? --?????????????? --:-- / 0 |
???????????????? --?????????????? --:-- / 0 |
CC 0 |
TT?????????????? TT?????????????? --:-- / 1 |
???????????????? --?????????????? --:-- / 0 |
???????????????? --?????????????? --:-- / 0 |
050 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
060 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
BART — P/T (first 8 formulas disabled + no check between colored and P/T) | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 26 | 25 | 9 | 9 | 10 | 10 | 9 | 9 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 1 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 1 | 0 | 0 |
002 TTFFTFTTTTTFTFTF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
???????TTTTFTFTF --------TTTTTTTT --:-- / 5 |
TTFFTFTTTTTFTFTF --------TTTTTTTT --:PM / 5 |
TTFFTFTTTTTFTFTF --------TTTTTTTT --:-- / 5 |
TTFFTFTTTTTFTFTF --------TTTTTTTT --:-- / 5 |
TTFFTFTTTTTFTFTF --------TTTTTTTT --:-- / 5 |
TTFFTFTTTTTFTFTF --------TTTTTTTT --:-- / 5 |
TTFFTFTTTTTFTFTF --------TTTTTTTT --:-- / 5 |
TTFFTFTTTTTFTFTF --------TTTTTTTT --:-- / 5 |
005 TTTTTTTTTFFTTTFF (expected value) 7.00 8.00 7.00 7.00 7.00 7.00 7.00 7.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
?T??????T?FTTTFF --------T-TTTTTT --:-- / 4 |
TTTTTTTTT?FTTTFF --------T-TTTTTT --:-- / 4 |
TTTTTTTTT?FTTTFF --------T-TTTTTT --:-- / 4 |
TTTTTTTTT?FTTTFF --------T-TTTTTT --:-- / 4 |
TTTTTTTTTFFTTTFF --------TTTTTTTT --:-- / 5 |
TTTTTTTTTFFTTTFF --------TTTTTTTT --:PM / 5 |
TTTTTTTTT?FTTTFF --------T-TTTTTT --:-- / 4 |
TTTTTTTTT?FTTTFF --------T-TTTTTT --:-- / 4 |
010 TTFTTTTTFTFTT? T? (expected value) 3.00 3.00 3.00 4.00 1.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 0 2.00 0 (confidence rate) |
???T???TFTFTT?T? --------TTTTT?T? --:-- / 3 |
TTFTTTTT?TFTT?T? ---------TTTT?T? --:-- / 3 |
???????????????? -------------?-? --:-- / 0 |
???????????????? -------------?-? --:-- / 0 |
TTFT???????????? -------------?-? --:-- / 0 |
TTFT???????????? -------------?-? --:-- / 0 |
???????????????? -------------?-? --:-- / 0 |
???????????????? -------------?-? --:-- / 0 |
020 TTTTTFTTF? T? FT? T (expected value) 1.00 3.00 1.00 2.00 4.00 1.00 2.00 1.00 2.00 0 2.00 0 1.00 2.00 0 2.00 (confidence rate) |
???TT?T?F?T?FT?T --------T?T?TT?T --:-- / 3 |
TTTTTFTTF?T??T?T --------T?T?-T?T --:-- / 2 |
???????????????? ---------?-?--?- --:-- / 0 |
???????????????? ---------?-?--?- --:-- / 0 |
?T??T??????????? ---------?-?--?- --:-- / 0 |
?T??T??????????? ---------?-?--?- --:-- / 0 |
???????????????? ---------?-?--?- --:-- / 0 |
???????????????? ---------?-?--?- --:-- / 0 |
030 TTTTFTTTTT? TTTFT (expected value) 1.00 1.00 3.00 2.00 1.00 1.00 2.00 1.00 2.00 2.00 0 2.00 2.00 2.00 1.00 2.00 (confidence rate) |
???T??T?TT?TTT?T --------TT?TTT-T --:-- / 3 |
TTTTFTTTTT?TTTFT --------TT?TTTTT --:-- / 4 |
???????????????? ----------?----- --:-- / 0 |
???????????????? ----------?----- --:-- / 0 |
??T????????????? ----------?----- --:-- / 0 |
??T????????????? ----------?----- --:-- / 0 |
???????????????? ----------?----- --:-- / 0 |
???????????????? ----------?----- --:-- / 0 |
040 TTTTTTTTTTTT? ? F? (expected value) 1.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 0 0 1.00 0 (confidence rate) |
?T??????TTTT??F? --------TTTT??T? --:-- / 3 |
TTTTTTTTTTTT???? --------TTTT??-? --:-- / 2 |
???????????????? ------------??-? --:-- / 0 |
???????????????? ------------??-? --:-- / 0 |
?T?????????????? ------------??-? --:-- / 0 |
?T?????????????? ------------??-? --:-- / 0 |
???????????????? ------------??-? --:-- / 0 |
???????????????? ------------??-? --:-- / 0 |
050 TTTTTTTTTTFFT? ? ? (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 0 0 0 (confidence rate) |
??????T?TTFFT??? --------TTTTT??? --:-- / 3 |
TTTTTTTTTTFFT??? --------TTTTT??? --:-- / 3 |
???????????????? -------------??? --:-- / 0 |
???????????????? -------------??? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -------------??? --:-- / 0 |
???????????????? -------------??? --:-- / 0 |
060 TTTTTTTT? ? T? ? TTF (expected value) 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 0 2.00 0 0 1.00 2.00 2.00 (confidence rate) |
T?????????T???TF --------??T??-TT --:-- / 2 |
TTTTTTTT??T??TTF --------??T??TTT --:-- / 2 |
???????????????? --------??-??--- --:-- / 0 |
???????????????? --------??-??--- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? --------??-??--- --:-- / 0 |
???????????????? --------??-??--- --:-- / 0 |
BridgeAndVehicles — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 92 | 44 | 48 | 84 | 81 | 46 | 47 |
Road Runner | 0 | 4 | 0 | 0 | 0 | 0 | 1 | 0 |
Camel | 0 | 4 | 0 | 1 | 0 | 0 | 0 | 0 |
V04P05N02 FFTTTFFFFFFTTTFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FFTTTFFFFFFTTTFT TTTTTTTTTTTTTTTT --:PM / 5 |
FFTTTFFFFFFTTTFT TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFFFTTTFT TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFFFTTTFT TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFFFTTTFT TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFFFTTTFT TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFFFTTTFT TTTTTTTTTTTTTTTT --:-- / 5 |
V10P10N10 TFFTFFTFTTFTTTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TFFTFFTFTTFTTTFF TTTTTTTTTTTTTTTT --:PM / 5 |
CC 0 |
CC 0 |
TFFTFFTFTTFTTTFF TTTTTTTTTTTTTTTT --:-- / 5 |
TFFTFFTFTTFTTTFF TTTTTTTTTTTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
V20P10N10 TFFFFFTFFTFFTTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 (confidence rate) |
DNC |
TFFFFFTFFTFFTTFF TTTTTTTTTTTTTTTT --:PM / 5 |
CC 0 |
CC 0 |
TFFFFFTFFTFFT?FF TTTTTTTTTTTTT-TT --:-- / 5 |
TFFFFFTFFTFFT?FF TTTTTTTTTTTTT-TT --:-- / 5 |
CC 0 |
CC 0 |
V20P10N20 FTFFFFFFTFFTFTTT (expected value) 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 (confidence rate) |
DNC |
FTFFFFFFTFFTFTTT TTTTTTTTTTTTTTTT --:PM / 5 |
CC 0 |
CC 0 |
F?FFFFFF?FF?FT?T T-TTTTTT-TT-TT-T --:-- / 4 |
F?FFFFFF?FF?FT?T T-TTTTTT-TT-TT-T --:-- / 4 |
CC 0 |
CC 0 |
V20P10N50 FFTFTTTF? FTTTFTF (expected value) 3.00 3.00 3.00 2.00 3.00 1.00 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FFT?TTTF?FTTTFTF TTT-TTTT?TTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
FFTFT?TF?FTTTFTF TTTTT-TT?TTTTTTT --:-- / 5 |
FFTFT?TF?FTTTFTF TTTTT-TT?TTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
V20P20N10 TTTTTFFFTTTFFFFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 4.00 (confidence rate) |
DNC |
TTTTTFFFTTTFFFF? TTTTTTTTTTTTTTT- --:-- / 5 |
TTTTTFFFTTTFFFFT TTTTTTTTTTTTTTTT --:-- / 5 |
TTTTTFFFTTTFFFFT TTTTTTTTTTTTTTTT --:-M / 5 |
TTTTTFFFTTTFFFF? TTTTTTTTTTTTTTT- --:-- / 5 |
TTTTTFFFTTTFFFF? TTTTTTTTTTTTTTT- --:-- / 5 |
TTTTTFFFTTTFFFFT TTTTTTTTTTTTTTTT --:P- / 5 |
TTTTTFFFTTTFFFFT TTTTTTTTTTTTTTTT --:-- / 5 |
V20P20N20 TTFTFTFTTTFFTTFF (expected value) 7.00 1.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 1.00 7.00 7.00 (confidence rate) |
DNC |
TTFTFTFTTTFFT?FF TTTTTTTTTTTTT-TT --:-- / 5 |
T?FTFTFTTTFFT?FF T-TTTTTTTTTTT-TT --:-- / 5 |
T?FTFTFTTTFFTTFF T-TTTTTTTTTTTTTT --:-- / 5 |
T?FTFTFTTTFFT?FF T-TTTTTTTTTTT-TT --:-- / 5 |
T?FTFTFTTTFFT?FF T-TTTTTTTTTTT-TT --:-- / 5 |
T?FTFTFTTTFFT?FF T-TTTTTTTTTTT-TT --:-- / 5 |
T?FTFTFTTTFFT?FF T-TTTTTTTTTTT-TT --:-- / 5 |
V20P20N50 TTF? FFFFTTTFFFFF (expected value) 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
TTF?FFFFTTTFFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
TTF?FFFFTTTFFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
TTF?FFFFTTTFFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
TTF?FFFFTTTFFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
TTF?FFFFTTTFFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
TTF?FFFFTTTFFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
TTF?FFFFTTTFFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
V50P20N10 ? ? FFF? FT? F? ? TFFF (expected value) 0 0 2.00 2.00 2.00 0 2.00 2.00 0 1.00 0 0 1.00 2.00 2.00 2.00 (confidence rate) |
DNC |
??FFF?FT????TFFF ??TTT?TT?-??TTTT --:-- / 3 |
???????????????? ??---?--?-??---- --:-- / 0 |
???????????????? ??---?--?-??---- --:-- / 0 |
??FFF?FT?F???FFF ??TTT?TT?T??-TTT --:-- / 3 |
DNF 0 |
???????????????? ??---?--?-??---- --:-- / 0 |
???????????????? ??---?--?-??---- --:-- / 0 |
V50P20N20 TFFT? FFFTT? FFF? ? (expected value) 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 0 0 (confidence rate) |
DNC |
TFFT?FFFTT?FFF?? TTTT?TTTTT?TTT?? --:-- / 4 |
TFFT?FFFTT?FFF?? TTTT?TTTTT?TTT?? --:-- / 4 |
TFFT?FFFTT?FFF?? TTTT?TTTTT?TTT?? --:-- / 4 |
TFFT?FFFTT?FFF?? TTTT?TTTTT?TTT?? --:-- / 4 |
TFFT?FFFTT?FFF?? TTTT?TTTTT?TTT?? --:-- / 4 |
TFFT?FFFTT?FFF?? TTTT?TTTTT?TTT?? --:-- / 4 |
TFFT?FFFTT?FFF?? TTTT?TTTTT?TTT?? --:-- / 4 |
V50P20N50 FFFFFT? ? FFT? ? F? F (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 0 0 3.00 3.00 3.00 0 0 3.00 0 1.00 (confidence rate) |
DNC |
FFFFFT??FFT??F?F TTTTTT??TTT??T?T --:-- / 4 |
???????????????? ------??---??-?- --:-- / 0 |
FFFFFT?????????? TTTTTT??---??-?- --:-- / 2 |
FFFFFT??FFT??F?? TTTTTT??TTT??T?- --:-- / 3 |
FFFFFT??FFT??F?? TTTTTT??TTT??T?- --:-- / 3 |
???????????????? ------??---??-?- --:-- / 0 |
???????????????? ------??---??-?- --:-- / 0 |
V50P50N10 FTFT? FFTFTFF? ? FT (expected value) 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0 0 5.00 1.00 (confidence rate) |
DNC |
FTFT?FFTFTFF??FT TTTT?TTTTTTT??TT --:-- / 4 |
FTFT?FFTFTFF??F? TTTT?TTTTTTT??T- --:-- / 4 |
FTFT?FFTFTFF??F? TTTT?TTTTTTT??T- --:-- / 4 |
FTFT?FFTFTFF???? TTTT?TTTTTTT??-- --:-- / 4 |
FTFT?FFTFTFF???? TTTT?TTTTTTT??-- --:-- / 4 |
FTFT?FFTFTFF??F? TTTT?TTTTTTT??T- --:-- / 4 |
FTFT?FFTFTFF??F? TTTT?TTTTTTT??T- --:-- / 4 |
V50P50N20 ? FTTFFFFFTTTTFFF (expected value) 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
?FTTFFFFFTTTTFFF ?TTTTTTTTTTTTTTT --:-- / 5 |
???????????????? ?--------------- --:-- / 0 |
???????????????? ?--------------- --:-- / 0 |
?FTTFFFFFTTTTFFF ?TTTTTTTTTTTTTTT --:-- / 5 |
?FTTFFFFFTTTTFFF ?TTTTTTTTTTTTTTT --:-- / 5 |
???????????????? ?--------------- --:-- / 0 |
???????????????? ?--------------- --:-- / 0 |
V50P50N50 FFTTFT? FTFFFFTTF (expected value) 3.00 4.00 2.00 4.00 4.00 4.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
?FTTFT?FTFFFFTTF -TTTTT?TTTTTTTTT --:-- / 5 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
FF?TFT?FTFFFFTTF TT-TTT?TTTTTTTTT --:-- / 5 |
FF?TFT?FTFFFFTTF TT-TTT?TTTTTTTTT --:-- / 5 |
???????????????? ------?--------- --:-- / 0 |
FFTTFT?????????? TTTTTT?--------- --:-- / 2 |
V80P20N10 TTTFFTFFF? ? ? TFFF (expected value) 3.00 3.00 1.00 3.00 1.00 3.00 3.00 1.00 3.00 0 0 0 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TTTFFTFFF???TFFF TTTTTTTTT???TTTT --:-- / 4 |
???????????????? ---------???---- --:-- / 0 |
???????????????? ---------???---- --:-- / 0 |
TT?F?TF?F???TFFF TT-T-TT-T???TTTT --:-- / 3 |
TT?F?TF?F???TFFF TT-T-TT-T???TTTT --:-- / 3 |
???????????????? ---------???---- --:-- / 0 |
???????????????? ---------???---- --:-- / 0 |
V80P20N20 FFTFFTFFFFFT? TTT (expected value) 7.00 7.00 1.00 7.00 7.00 1.00 7.00 7.00 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 (confidence rate) |
DNC |
FFTFFTFFFFFT?TTT TTTTTTTTTTTT?TTT --:-- / 5 |
FF?FF?FFFFFT?TTT TT-TT-TTTTTT?TTT --:-- / 4 |
FF?FF?FFFFFT?TTT TT-TT-TTTTTT?TTT --:-- / 4 |
FF?FF?FFFFFT?TTT TT-TT-TTTTTT?TTT --:-- / 4 |
FF?FF?FFFFFT?TTT TT-TT-TTTTTT?TTT --:-- / 4 |
FF?FF?FFFFFT?TTT TT-TT-TTTTTT?TTT --:-- / 4 |
FF?FF?FFFFFT?TTT TT-TT-TTTTTT?TTT --:-- / 4 |
V80P20N50 FFFTFTF? TFTFTFFF (expected value) 7.00 7.00 4.00 7.00 7.00 7.00 7.00 0 4.00 7.00 7.00 5.00 7.00 5.00 1.00 7.00 (confidence rate) |
DNC |
FFFTFTF?TFTFTFFF TTTTTTT?TTTTTTTT --:-- / 5 |
FFFTFTF??FTFTF?F TTTTTTT?-TTTTT-T --:-- / 4 |
FFFTFTF?TFTFTF?F TTTTTTT?TTTTTT-T --:-- / 5 |
FF?TFTF??FT?T??F TT-TTTT?-TT-T--T --:-- / 3 |
FF?TFTF??FT?T??F TT-TTTT?-TT-T--T --:-- / 3 |
FFFTFTF?TFTFTF?F TTTTTTT?TTTTTT-T --:-- / 5 |
FF?TFTF?TFTFTF?F TT-TTTT?TTTTTT-T --:-- / 4 |
V80P50N10 FTTF? TFFFFFFT? F? (expected value) 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 5.00 7.00 7.00 7.00 7.00 0 7.00 0 (confidence rate) |
DNC |
FTTF?TFFFFFFT?F? TTTT?TTTTTTTT?T? --:-- / 4 |
FTTF?TFFFFFFT?F? TTTT?TTTTTTTT?T? --:-- / 4 |
FTTF?TFFFFFFT?F? TTTT?TTTTTTTT?T? --:-- / 4 |
FTTF?TFF?FFFT?F? TTTT?TTT-TTTT?T? --:-- / 4 |
FTTF?TFF?FFFT?F? TTTT?TTT-TTTT?T? --:-- / 4 |
FTTF?TFFFFFFT?F? TTTT?TTTTTTTT?T? --:-- / 4 |
FTTF?TFFFFFFT?F? TTTT?TTTTTTTT?T? --:-- / 4 |
V80P50N20 TF? TFF? FTFF? TTFT (expected value) 3.00 3.00 0 3.00 3.00 3.00 0 3.00 3.00 3.00 3.00 0 3.00 3.00 3.00 1.00 (confidence rate) |
DNC |
TF?TFF?FTFF?TTFT TT?TTT?TTTT?TTTT --:-- / 4 |
???????????????? --?---?----?---- --:-- / 0 |
???????????????? --?---?----?---- --:-- / 0 |
TF?TFF?FTFF?TTF? TT?TTT?TTTT?TTT- --:-- / 4 |
TF?TFF?FTFF?TTF? TT?TTT?TTTT?TTT- --:-- / 4 |
???????????????? --?---?----?---- --:-- / 0 |
???????????????? --?---?----?---- --:-- / 0 |
V80P50N50 FFFF? FFFFF? FFFTT (expected value) 7.00 7.00 7.00 7.00 0 7.00 7.00 5.00 5.00 7.00 0 5.00 5.00 5.00 7.00 7.00 (confidence rate) |
DNC |
FFFF?FFFFF?FFFTT TTTT?TTTTT?TTTTT --:-- / 5 |
FFFF?FFFFF?F?FTT TTTT?TTTTT?T-TTT --:-- / 4 |
FFFF?FFFFF?FFFTT TTTT?TTTTT?TTTTT --:-- / 5 |
FFFF?FF??F??F?TT TTTT?TT--T?-T-TT --:-- / 3 |
FFFF?FF??F????TT TTTT?TT--T?---TT --:-- / 3 |
FFFF?FFFFF?FFFTT TTTT?TTTTT?TTTTT --:-- / 5 |
FFFF?FFFFF?FFFTT TTTT?TTTTT?TTTTT --:-- / 5 |
BridgeAndVehicles — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 81 | 90 | 24 | 24 | 61 | 60 | 24 | 24 |
Road Runner | 2 | 3 | 1 | 0 | 0 | 0 | 0 | 1 |
Camel | 1 | 6 | 0 | 0 | 0 | 0 | 0 | 0 |
V04P05N02 FFTTTFFFFTTFFTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:PM / 5 |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 5 |
FFTTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 5 |
V10P10N10 TFFTFFTFTTFTFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFFTFTTFTFTFF TTTTTTTTTTTTTTTT --:P- / 5 |
TFFTFFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-M / 5 |
CC 0 |
CC 0 |
TFFTFFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 5 |
TFFTFFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
V20P10N10 TFFFFFTFTTTFTTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFFTF?TTFTTTT TTTTTTTT-TTTTTTT --:-- / 5 |
TFFFFFTFTTTFTTTT TTTTTTTTTTTTTTTT --:PM / 5 |
CC 0 |
CC 0 |
TFFFFFTFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
TFFFFFTFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
V20P10N20 FTFFFFFFTTTFTTTT (expected value) 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 1.00 4.00 4.00 (confidence rate) |
F?FFFFFFT?TFT?TT T-TTTTTTT-TTT-TT --:-- / 4 |
FTFFFFFFTTTFTTTT TTTTTTTTTTTTTTTT --:PM / 5 |
CC 0 |
CC 0 |
F?FFFFFFT?TFT?TT T-TTTTTTT-TTT-TT --:-- / 4 |
F?FFFFFFT?TFT?TT T-TTTTTTT-TTT-TT --:-- / 4 |
CC 0 |
CC 0 |
V20P10N50 FFTFTTTFTTTFTTTF (expected value) 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFTTTFTTTFTTTF TTTTTTTTTTTTTTTT --:PM / 5 |
FFTFTTTFTTTFTTTF TTTTTTTTTTTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
FFTFT?TFTTTFTTTF TTTTT-TTTTTTTTTT --:-- / 5 |
FFTFT?TFTTTFTTTF TTTTT-TTTTTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
V20P20N10 TTTTTFFFFTTTTTTT (expected value) 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
?TTTTFFFF?TTTTTT -TTTTTTTT-TTTTTT --:-- / 5 |
TTTTTFFFFTTTTTTT TTTTTTTTTTTTTTTT --:-M / 5 |
TTTTTFFFFTTTTTTT TTTTTTTTTTTTTTTT --:P- / 5 |
TTTTTFFFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
TTTTTFFFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
TTTTTFFFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
TTTTTFFFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
TTTTTFFFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
V20P20N20 TTFTFTFTTTTTTTTT (expected value) 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 5.00 8.00 (confidence rate) |
T?FTFTFTTT?TTT?T T-TTTTTTTT-TTT-T --:-- / 4 |
TTFTFTFTTTTTTTTT TTTTTTTTTTTTTTTT --:-M / 5 |
TTFTFTFTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
TTFTFTFTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
T?FTFTFTTT?TTT?T T-TTTTTTTT-TTT-T --:-- / 4 |
T?FTFTFTTT?TTT?T T-TTTTTTTT-TTT-T --:-- / 4 |
TTFTFTFTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 5 |
TTFTFTFTTTTTTTTT TTTTTTTTTTTTTTTT --:P- / 5 |
V20P20N50 TTF? FFFFTTFTTT? T (expected value) 8.00 8.00 8.00 0 8.00 8.00 8.00 7.00 4.00 8.00 8.00 8.00 8.00 5.00 0 4.00 (confidence rate) |
TTF?FFFF?TFTT??? TTT?TTTT-TTTT-?- --:-- / 4 |
TTF?FFFF?TFTTT?? TTT?TTTT-TTTTT?- --:-- / 4 |
TTF?FFFFTTFTTT?T TTT?TTTTTTTTTT?T --:-- / 5 |
TTF?FFFFTTFTTT?T TTT?TTTTTTTTTT?T --:-- / 5 |
TTF?FFFF?TFTT??? TTT?TTTT-TTTT-?- --:-- / 4 |
TTF?FFF??TFTT??? TTT?TTT--TTTT-?- --:-- / 3 |
TTF?FFFFTTFTTT?T TTT?TTTTTTTTTT?T --:-- / 5 |
TTF?FFFFTTFTTT?T TTT?TTTTTTTTTT?T --:-- / 5 |
V50P20N10 ? ? FFF? FT? TT? FTTT (expected value) 0 0 2.00 1.00 2.00 0 1.00 2.00 0 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate) |
??F?F??T?TT?FTTT ??T-T?-T?TT?TTTT --:-- / 3 |
??FFF?FT?TT?FTTT ??TTT?TT?TT?TTTT --:-- / 4 |
???????????????? ??---?--?--?---- --:-- / 0 |
???????????????? ??---?--?--?---- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ??---?--?--?---- --:-- / 0 |
???????????????? ??---?--?--?---- --:-- / 0 |
V50P20N20 TFFT? FFFTTTT? ? TT (expected value) 8.00 7.00 8.00 8.00 0 8.00 8.00 6.00 8.00 8.00 8.00 8.00 0 0 6.00 6.00 (confidence rate) |
T?FT?FFFTTTT??TT T-TT?TTTTTTT??TT --:-- / 4 |
TFFT?FFFTTTT??TT TTTT?TTTTTTT??TT --:-- / 4 |
TFFT?FFFTTTT??TT TTTT?TTTTTTT??TT --:-- / 4 |
TFFT?FFFTTTT??TT TTTT?TTTTTTT??TT --:-- / 4 |
TFFT?FF?TTTT???? TTTT?TT-TTTT??-- --:-- / 3 |
TFFT?FF?TTTT???? TTTT?TT-TTTT??-- --:-- / 3 |
TFFT?FFFTTTT??TT TTTT?TTTTTTT??TT --:-- / 4 |
TFFT?FFFTTTT??TT TTTT?TTTTTTT??TT --:-- / 4 |
V50P20N50 FFFFFT? ? FFTFFTTT (expected value) 4.00 4.00 3.00 4.00 3.00 3.00 0 0 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFFF????FFTFFTTT TTTT--??TTTTTTTT --:-- / 4 |
FF?FFT??FFTFFTTT TT-TTT??TTTTTTTT --:-- / 4 |
???????????????? ------??-------- --:-- / 0 |
???????????????? ------??-------- --:-- / 0 |
FFFFFT??F??????? TTTTTT??T------- --:-- / 2 |
FFFFFT?????????? TTTTTT??-------- --:-- / 2 |
???????????????? ------??-------- --:-- / 0 |
???????????????? ------??-------- --:-- / 0 |
V50P50N10 FTFT? FFTTF? ? ? TF? (expected value) 2.00 2.00 3.00 2.00 0 2.00 2.00 1.00 2.00 2.00 0 0 0 2.00 2.00 0 (confidence rate) |
??FT?FF?TF???TF? --TT?TT-TT???TT? --:-- / 3 |
FTFT?FFTTF???TF? TTTT?TTTTT???TT? --:-- / 4 |
???????????????? ----?-----???--? --:-- / 0 |
???????????????? ----?-----???--? --:-- / 0 |
CC 0 |
FTF????????????? TTT-?-----???--? --:-- / 1 |
???????????????? ----?-----???--? --:-- / 0 |
???????????????? ----?-----???--? --:-- / 0 |
V50P50N20 ? FTTFFFFTTT? ? TFF (expected value) 0 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 0 2.00 3.00 3.00 (confidence rate) |
?F?TFFFFTTT??TFF ?T-TTTTTTTT??TTT --:-- / 4 |
?FTTFFFFTTT???FF ?TTTTTTTTTT??-TT --:-- / 4 |
???????????????? ?----------??--- --:-- / 0 |
???????????????? ?----------??--- --:-- / 0 |
?FTTFFFFTTT??TFF ?TTTTTTTTTT??TTT --:-- / 4 |
?FTTFFFFTTT????? ?TTTTTTTTTT??--- --:-- / 3 |
???????????????? ?----------??--- --:-- / 0 |
???????????????? ?----------??--- --:-- / 0 |
V50P50N50 FFTTFT? FFTFFFFFT (expected value) 2.00 2.00 1.00 4.00 4.00 4.00 0 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate) |
FF?TFT??FTFFFFFT TT-TTT?-TTTTTTTT --:-- / 4 |
?FTTFT?FFTFFFF?T -TTTTT?TTTTTTT-T --:-- / 4 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
F??TFT?????????? T--TTT?--------- --:-- / 1 |
???TFT?????????? ---TTT?--------- --:-- / 1 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
V80P20N10 TTTFFTFF? FFTT? T? (expected value) 4.00 3.00 1.00 4.00 1.00 4.00 3.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 0 (confidence rate) |
T??F?T?F?FFTT?T? T--T-T-T?TTTT?T? --:-- / 3 |
TTTFFTFF?FFTT?T? TTTTTTTT?TTTT?T? --:-- / 4 |
???????????????? --------?----?-? --:-- / 0 |
???????????????? --------?----?-? --:-- / 0 |
TT?F?TF????????? TT-T-TT-?----?-? --:-- / 2 |
TT?F?TF????????? TT-T-TT-?----?-? --:-- / 2 |
???????????????? --------?----?-? --:-- / 0 |
???????????????? --------?----?-? --:-- / 0 |
V80P20N20 FFTFFTFFTTT? TTTT (expected value) 4.00 4.00 1.00 4.00 4.00 1.00 4.00 3.00 4.00 4.00 3.00 0 2.00 2.00 2.00 2.00 (confidence rate) |
FF?FF?F?TTT?TTTT TT-TT-T-TTT?TTTT --:-- / 4 |
FFTFFTFFTTT?TTTT TTTTTTTTTTT?TTTT --:-- / 5 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
FF?FF?FFTT?????? TT-TT-TTTT-?---- --:-- / 3 |
FF?FF?FFTTT????? TT-TT-TTTTT?---- --:-- / 3 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
V80P20N50 FFFTFTF? FTFFTTTT (expected value) 3.00 2.00 2.00 3.00 3.00 4.00 4.00 0 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate) |
?FF??TF?FTF?TTTT -TT--TT?TTT-TTTT --:-- / 4 |
FFFTFTF?FTFFTTTT TTTTTTT?TTTTTTTT --:-- / 5 |
???????????????? -------?-------- --:-- / 0 |
???????????????? -------?-------- --:-- / 0 |
F??TFTF????????? T--TTTT?-------- --:-- / 2 |
F??TFTF????????? T--TTTT?-------- --:-- / 2 |
???????????????? -------?-------- --:-- / 0 |
???????????????? -------?-------- --:-- / 0 |
V80P50N10 FTTF? TFFTF? ? ? TFT (expected value) 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 2.00 0 0 0 2.00 2.00 2.00 (confidence rate) |
FTTF?TFFTF???TFT TTTT?TTTTT???TTT --:-- / 4 |
FTTF?TFFTF???TFT TTTT?TTTTT???TTT --:-- / 4 |
???????????????? ----?-----???--- --:-- / 0 |
???????????????? ----?-----???--- --:-- / 0 |
FTTF?TFFT??????? TTTT?TTTT-???--- --:-- / 3 |
FTTF?TFFT??????? TTTT?TTTT-???--- --:-- / 3 |
???????????????? ----?-----???--- --:-- / 0 |
???????????????? ----?-----???--- --:-- / 0 |
V80P50N20 TF? TFF? F? TTTTTTT (expected value) 4.00 4.00 0 4.00 3.00 3.00 0 3.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
TF?T?????TTTTTTT TT?T--?-?TTTTTTT --:-- / 3 |
TF?TFF?F?TTTTTTT TT?TTT?T?TTTTTTT --:-- / 4 |
???????????????? --?---?-?------- --:-- / 0 |
???????????????? --?---?-?------- --:-- / 0 |
TF?TFF?F???????? TT?TTT?T?------- --:-- / 2 |
TF?TFF?F???????? TT?TTT?T?------- --:-- / 2 |
???????????????? --?---?-?------- --:-- / 0 |
???????????????? --?---?-?------- --:-- / 0 |
V80P50N50 FFFF? FFFTTT? TTTF (expected value) 3.00 1.00 3.00 4.00 0 4.00 4.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate) |
???F?FFFTTT?TTTF ---T?TTTTTT?TTTT --:-- / 4 |
FFFF?FFFTTT?TTTF TTTT?TTTTTT?TTTT --:-- / 5 |
???????????????? ----?------?---- --:-- / 0 |
???????????????? ----?------?---- --:-- / 0 |
F?FF?FF????????? T-TT?TT----?---- --:-- / 2 |
F?FF?FF????????? T-TT?TT----?---- --:-- / 2 |
???????????????? ----?------?---- --:-- / 0 |
???????????????? ----?------?---- --:-- / 0 |
CSRepetitions — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 59 | 0 | 33 | 52 | 46 | 22 | 33 |
Road Runner | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 1 |
Camel | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 1 |
02 FFTTFFTTFFFFFFFT (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
DNC |
FFTTFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:PM / 11 |
DNC |
FFTTFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
03 TFFFFFFFTTTTFTTF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TFFFFFFFTTTTFTTF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
TFFFFFFFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFFFFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
04 TFFFFTFFFFTTFTFT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TFFFFTFFFFTTFTFT TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
TFFFFTFFFFTTFTFT TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFTFFFFTTFTFT TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
05 FFTTFFFFFFTFFFTT (expected value) 5.00 5.00 5.00 5.00 5.00 4.00 5.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
DNC |
FFTTF?F????????? TTTTT-T--------- --:-- / 4 |
DNC |
FFTTFFFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFF?FFTFFFTT TTTTTTT-TTTTTTTT --:-- / 10 |
???????????????? ---------------- --:-- / 0 |
FFTTFFFFFFTFFFTT TTTTTTTTTTTTTTTT --:PM / 11 |
07 FTFFFTTFFTTFTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
DNC |
FTFFFTTFFTTFTFFT TTTTTTTTTTTTTTTT --:PM / 11 |
DNC |
FTFFFTTFFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
FTFFFTTFFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFFFTTFFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 11 |
10 TFFTFFFFFTFFFFFF (expected value) 3.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 (confidence rate) |
DNC |
TFFTFFFFFTFFFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
DNC |
???????????????? ---------------- --:-- / 0 |
TF?T?FFF?TFFFF?? TT-T-TTT-TTTTT-- --:-- / 8 |
TF?T?F?????????? TT-T-T---------- --:-- / 3 |
DNF 0 |
???????????????? ---------------- --:-- / 0 |
CSRepetitions — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 50 | 56 | 0 | 11 | 54 | 56 | 11 | 11 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 2 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 2 | 0 | 0 | 0 |
02 FFTTFFTTFTTTTFFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FFTTFFTTFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFTTTTFFF TTTTTTTTTTTTTTTT --:PM / 11 |
DNC |
FFTTFFTTFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFTTFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
03 TFFFFFFFFFFTFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFFFFFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFFFFFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
TFFFFFFFFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFFFFFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
04 TFFFFTFFFTFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate) |
TFFFFT?FFTFFFFTF TTTTTT-TTTTTTTTT --:-- / 10 |
TFFFFTFF?TFFFF?F TTTTTTTT-TTTTT-T --:-- / 10 |
CC 0 |
CC 0 |
TFFFFTFFFTFFFFTF TTTTTTTTTTTTTTTT --:-M / 11 |
TFFFFTFFFTFFFFTF TTTTTTTTTTTTTTTT --:P- / 11 |
CC 0 |
CC 0 |
05 FFTTFFFFFTFTTFTF (expected value) 4.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 3.00 4.00 2.00 4.00 4.00 3.00 4.00 3.00 (confidence rate) |
FFTT??FFFT?TTFTF TTTT--TTTT-TTTTT --:-- / 9 |
FFTTFFFF?T?TT?T? TTTTTTTT-T-TT-T- --:-- / 8 |
DNC |
???????????????? ---------------- --:-- / 0 |
FFTTFFFFFTFTTFTF TTTTTTTTTTTTTTTT --:-M / 11 |
FFTTFFFFFTFTTFTF TTTTTTTTTTTTTTTT --:P- / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
07 FTFFFTTFT? F? FF? T (expected value) 3.00 4.00 1.00 3.00 3.00 3.00 4.00 2.00 4.00 0 4.00 0 3.00 1.00 0 3.00 (confidence rate) |
?T????TFT?F?F??T -T----TTT?T?T-?T --:-- / 5 |
FTFFFTTFT?F?F??T TTTTTTTTT?T?T-?T --:-- / 8 |
DNC |
???????????????? ---------?-?--?- --:-- / 0 |
FT?FFTT?T?F????? TT-TTTT-T?T?--?- --:-- / 6 |
FT?FFTT?T?F?FF?T TT-TTTT-T?T?TT?T --:-- / 8 |
???????????????? ---------?-?--?- --:-- / 0 |
???????????????? ---------?-?--?- --:-- / 0 |
10 TFFTFFFF? TT? ? TF? (expected value) 3.00 4.00 1.00 3.00 1.00 3.00 4.00 3.00 0 2.00 2.00 0 0 2.00 2.00 0 (confidence rate) |
?F????F??TT??TF? -T----T-?TT??TT? --:-- / 4 |
TFFTFFFF?TT??TF? TTTTTTTT?TT??TT? --:-- / 8 |
DNC |
???????????????? --------?--??--? --:-- / 0 |
TF?T?FFF???????? TT-T-TTT?--??--? --:-- / 4 |
TF?T?FFF???????? TT-T-TTT?--??--? --:-- / 4 |
???????????????? --------?--??--? --:-- / 0 |
???????????????? --------?--??--? --:-- / 0 |
CircadianClock — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 112 | 111 | 55 | 55 | 100 | 83 | 55 | 55 |
Road Runner | 1 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 2 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
000001 TFFFFFFFFFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
000010 TFFTTFFFFFTTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
TFFTTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
000100 TFFFTTTFFTFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFTTTFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFTTTFFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
TFFFTTTFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFTTTFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
001000 FTFFTFTTFFFTFFTF (expected value) 8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFTFTTFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
FT?FTFTTFFFTFFTF TT-TTTTTTTTTTTTT --:-- / 18 |
FT?FTFTTFFFTFFTF TT-TTTTTTTTTTTTT --:-- / 18 |
FT?FTFTTFFFTFFTF TT-TTTTTTTTTTTTT --:-- / 18 |
FTFFTFTTFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTFTTFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FT?FTFTTFFFTFFTF TT-TTTTTTTTTTTTT --:-- / 18 |
FT?FTFTTFFFTFFTF TT-TTTTTTTTTTTTT --:-- / 18 |
010000 FFFFFFFFFTTFTFFT (expected value) 4.00 4.00 3.00 3.00 3.00 1.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFF??FFFTTFTFFT TTTT--TTTTTTTTTT --:-- / 17 |
FFF?FF?FFTTFTFFT TTT-TT-TTTTTTTTT --:-- / 17 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFF??FFTTFTFFT TTTTT--TTTTTTTTT --:-- / 17 |
FF?FF??????????? TT-TT----------- --:-- / 5 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
100000 FFFFTFFFFTFFTFFF (expected value) 8.00 8.00 3.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFTFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-M / 19 |
FFFFTFFFFTFFTFFF TTTTTTTTTTTTTTTT --:P- / 19 |
FF?FTFFFFTFFTFFF TT-TTTTTTTTTTTTT --:-- / 18 |
FF?FTFFFFTFFTFFF TT-TTTTTTTTTTTTT --:-- / 18 |
FFFFTF?????????? TTTTTT---------- --:-- / 7 |
FF?????????????? TT-------------- --:-- / 2 |
FF?FTFFFFTFFTFFF TT-TTTTTTTTTTTTT --:-- / 18 |
FF?FTFFFFTFFTFFF TT-TTTTTTTTTTTTT --:-- / 18 |
CircularTrains — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 113 | 113 | 48 | 48 | 85 | 85 | 48 | 48 |
Road Runner | 1 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
012 TFFFTFFFFFFFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 17 |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 17 |
024 FFFFFFTFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 17 |
CC 0 |
CC 0 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
CC 0 |
CC 0 |
048 FFFFTFFFTTTFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate) |
FFFFTFFFT?TFFFF? TTTTTTTTT-TTTTT- --:-- / 15 |
FFFFTFFFTTTFFFFT TTTTTTTTTTTTTTTT --:PM / 17 |
CC 0 |
CC 0 |
FFFFTFFFTTTFFFFT TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTFFFTTTFFFFT TTTTTTTTTTTTTTTT --:-- / 17 |
CC 0 |
CC 0 |
096 FFTFTFFTFFFTFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate) |
FFTFTFFTFFFTFTFT TTTTTTTTTTTTTTTT --:PM / 17 |
FFTFTFFTFFFTFT?T TTTTTTTTTTTTTT-T --:-- / 16 |
CC 0 |
CC 0 |
FFTFTFFT???????? TTTTTTTT-------- --:-- / 9 |
FFTFTFFT???????? TTTTTTTT-------- --:-- / 9 |
CC 0 |
CC 0 |
192 TFFTFT? TTTFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 1.00 2.00 1.00 2.00 2.00 2.00 (confidence rate) |
TFFTFT?TTTFFFFFT TTTTTT?TTTTTTTTT --:-- / 16 |
TFFTFT?TTT?F?FFT TTTTTT?TTT-T-TTT --:-- / 14 |
CC 0 |
CC 0 |
TFFTFT?TTT?????? TTTTTT?TTT------ --:-- / 10 |
TFFTFT?TTT?????? TTTTTT?TTT------ --:-- / 10 |
CC 0 |
CC 0 |
384 TFFFTFTFF? FFTFFF (expected value) 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 0 8.00 8.00 8.00 7.00 8.00 6.00 (confidence rate) |
?FFFTFTFF?FFTFFF -TTTTTTTT?TTTTTT --:-- / 15 |
TFFFTFTFF?FFT?FF TTTTTTTTT?TTT-TT --:-- / 15 |
TFFFTFTFF?FFTFFF TTTTTTTTT?TTTTTT --:-- / 16 |
TFFFTFTFF?FFTFFF TTTTTTTTT?TTTTTT --:-- / 16 |
?FFFTFTFF?FFTFF? -TTTTTTTT?TTTTT- --:-- / 14 |
?FFFTFTFF?FFTFF? -TTTTTTTT?TTTTT- --:-- / 14 |
TFFFTFTFF?FFTFFF TTTTTTTTT?TTTTTT --:-- / 16 |
TFFFTFTFF?FFTFFF TTTTTTTTT?TTTTTT --:-- / 16 |
768 TFTTTFTTFTFTTTFT (expected value) 8.00 6.00 6.00 6.00 6.00 2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate) |
TFTTTFTTFTFTTTF? TTTTTTTTTTTTTTT- --:-- / 16 |
TFTTTFTTFTFTTTFT TTTTTTTTTTTTTTTT --:PM / 17 |
TFTTT?TTFTFTTTF? TTTTT-TTTTTTTTT- --:-- / 15 |
TFTTT?TTFTFTTTF? TTTTT-TTTTTTTTT- --:-- / 15 |
T??????????????? T--------------- --:-- / 1 |
T??????????????? T--------------- --:-- / 1 |
TFTTT?TTFTFTTTF? TTTTT-TTTTTTTTT- --:-- / 15 |
TFTTT?TTFTFTTTF? TTTTT-TTTTTTTTT- --:-- / 15 |
ClientsAndServers — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 148 | 148 | 141 | 141 | 115 | 118 | 125 | 125 |
Road Runner | 4 | 8 | 0 | 0 | 0 | 0 | 0 | 1 |
Camel | 2 | 8 | 1 | 1 | 0 | 0 | 0 | 1 |
N0001P0 FFFTFFFTFFFTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFTFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
N0002P0 FFFTFFFFFFTFTTTF (expected value) 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFFFFFTFTTTF TTTTTTTTTTTTTTTT --:PM / 8 |
F?FTFFFFFFTFTTTF T-TTTTTTTTTTTTTT --:-- / 7 |
FFFTFFFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
N0002P1 TFFFTTFTFFTFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
N0005P0 FFFFFTFFFTFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
N0005P1 FFFTFFFFFFTTFFFF (expected value) 8.00 8.00 8.00 1.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFF?F?FFFFTTFFFF TTT-T-TTTTTTTTTT --:-- / 7 |
FFFTFFFFFFTTFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFF?FFFFFFTTFFFF TTT-TTTTTTTTTTTT --:-- / 7 |
FFF?FFFFFFTTFFFF TTT-TTTTTTTTTTTT --:-- / 7 |
FFF?FFFFFFTTFFFF TTT-TTTTTTTTTTTT --:-- / 7 |
FFF?FFFFFFTTFFFF TTT-TTTTTTTTTTTT --:-- / 7 |
FFF?FFFFFFTTFFFF TTT-TTTTTTTTTTTT --:-- / 7 |
FFF?FFFFFFTTFFFF TTT-TTTTTTTTTTTT --:-- / 7 |
N0010P0 FTFFFFTFFFF? FFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 1.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 1.00 (confidence rate) |
FTFFFF?FFFF?FFF? TTTTTT-TTTT?TTT- --:-- / 6 |
FTFFFFTFFFF?FFFT TTTTTTTTTTT?TTTT --:-- / 7 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
FTFFFF?????????? TTTTTT-----?---- --:-- / 3 |
FTFFFF?????????? TTTTTT-----?---- --:-- / 3 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
N0010P1 FFFFTTFTFFTTTTFF (expected value) 8.00 7.00 7.00 7.00 7.00 1.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 (confidence rate) |
FFFFT?FTFFTTTTFF TTTTT-TTTTTTTTTT --:-- / 7 |
FFFFTTFTFFTTTTF? TTTTTTTTTTTTTTT- --:-- / 7 |
FFFFT?FTFFTTTTFF TTTTT-TTTTTTTTTT --:-- / 7 |
FFFFT?FTFFTTTTFF TTTTT-TTTTTTTTTT --:-- / 7 |
F??????????????? T--------------- --:-- / 0 |
FFFFT?FTFFTTTTFF TTTTT-TTTTTTTTTT --:-- / 7 |
FFFFT?FTFFTTTTFF TTTTT-TTTTTTTTTT --:-- / 7 |
FFFFT?FTFFTTTTFF TTTTT-TTTTTTTTTT --:-- / 7 |
N0010P2 FTFFFFFFFFTTFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 (confidence rate) |
FTFFFFFFFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFFTTFFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FTFFFFFFFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFFTTFF?? TTTTTTTTTTTTTT-- --:-- / 7 |
FTFFFFFFFFTTFF?? TTTTTTTTTTTTTT-- --:-- / 7 |
FTFFFFFFFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
N0020P0 FFFTTTFTTFFFTTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 7.00 8.00 7.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFTTTFT?FFFTTFT TTTTTTTT-TTTTTTT --:-- / 7 |
FFFTTTFTTF?FTTFT TTTTTTTTTT-TTTTT --:-- / 7 |
FFFTTTFTTFFFTTFT TTTTTTTTTTTTTTTT --:-M / 8 |
FFFTTTFTTFFFTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTT?TTFF????? TTTTTT-TTTT----- --:-- / 5 |
FFFTTT?TTFF????? TTTTTT-TTTT----- --:-- / 5 |
FFFTTTFTTFFFTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTTFFFTTFT TTTTTTTTTTTTTTTT --:P- / 8 |
N0020P1 TFTTFTFTTFTFFFTT (expected value) 8.00 8.00 7.00 7.00 1.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 5.00 (confidence rate) |
TF??FTF?TFTFFFT? TT--TTT-TTTTTTT- --:-- / 6 |
TFTT?TFTTFTFFFTT TTTT-TTTTTTTTTTT --:-- / 7 |
TFTT?TF?TFTFFFTT TTTT-TT-TTTTTTTT --:-- / 7 |
TFTT?TF?TFTFFFTT TTTT-TT-TTTTTTTT --:-- / 7 |
TFTT?TF?TFTFFFT? TTTT-TT-TTTTTTT- --:-- / 6 |
TFTT?TF?TFTFF??? TTTT-TT-TTTTT--- --:-- / 5 |
TFTT?TF?TFTFFFTT TTTT-TT-TTTTTTTT --:-- / 7 |
TFTT?TF?TFTFFFTT TTTT-TT-TTTTTTTT --:-- / 7 |
N0020P2 FFFFFFFTFFTFFTTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 (confidence rate) |
FFFFFFF?FFTFFT?T TTTTTTT-TTTTTT-T --:-- / 7 |
FFFFFFFTFFTFFTTT TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFFF?FFTFFTTT TTTTTTT-TTTTTTTT --:-- / 7 |
FFFFFFF?FFTFFTTT TTTTTTT-TTTTTTTT --:-- / 7 |
FFFFFFF?FFTFFT?T TTTTTTT-TTTTTT-T --:-- / 7 |
FFFFFFF?FFTFFT?T TTTTTTT-TTTTTT-T --:-- / 7 |
FFFFFFF?FFTFFTTT TTTTTTT-TTTTTTTT --:-- / 7 |
FFFFFFF?FFTFFTTT TTTTTTT-TTTTTTTT --:-- / 7 |
N0020P3 FFFFTTFTTFFTTFTF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFTTFTTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFTTFFTTFTF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFTTFTTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFTTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFTTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFTTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
DNF 0 |
DNF 0 |
N0020P4 TTFFFFFTTFFTFTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFFFFTTFFTFTFT TTTTTTTTTTTTTTTT --:P- / 8 |
TTFFFFFTT?FTFTFT TTTTTTTTT-TTTTTT --:-- / 7 |
TTFFFFFTTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFTTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFTTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFTTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFTTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFTTFFTFTFT TTTTTTTTTTTTTTTT --:-M / 8 |
N0050P0 FFFFFFFFFFFFTTFF (expected value) 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 1.00 (confidence rate) |
FFFFFFFFFFFFTTF? TTTTTTTTTTTTTTT- --:-- / 7 |
FFFF?FFFFFFFTTF? TTTT-TTTTTTTTTT- --:-- / 7 |
FFFFFFFFFFFFTTF? TTTTTTTTTTTTTTT- --:-- / 7 |
FFFFFFFFFFFFTTF? TTTTTTTTTTTTTTT- --:-- / 7 |
FFFFFFFFF?FFTTFF TTTTTTTTT-TTTTTT --:-- / 7 |
FFFFFFFFF?FFTTF? TTTTTTTTT-TTTTT- --:-- / 7 |
FFFFFFFFFFFFTTF? TTTTTTTTTTTTTTT- --:-- / 7 |
FFFFFFFFFFFFTTF? TTTTTTTTTTTTTTT- --:-- / 7 |
N0100P0 TFTTTFFFTTFFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTTFFFTTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
N0200P0 FTFFTFFTFFFFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FTFFTFFTFFFFFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
FTFFTFFT?FFFFTFF TTTTTTTT-TTTTTTT --:-- / 7 |
FTFFTFFT?FFFFTFF TTTTTTTT-TTTTTTT --:-- / 7 |
FTFFTFFT?FFFFTFF TTTTTTTT-TTTTTTT --:-- / 7 |
FTFFTFFTFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFFTFFF????? TTTTTTTTTTT----- --:-- / 5 |
FTFFTFFT?FFFFTFF TTTTTTTT-TTTTTTT --:-- / 7 |
FTFFTFFT?FFFFTFF TTTTTTTT-TTTTTTT --:-- / 7 |
N0500P0 FFFFFFTF? TFFTFFF (expected value) 8.00 4.00 2.00 6.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FF?FFFTF?TFFTFFF TT-TTTTT?TTTTTTT --:-- / 7 |
FFFFFFTF?TFFTFFF TTTTTTTT?TTTTTTT --:-- / 7 |
F??FFFTF?TFFTFFF T--TTTTT?TTTTTTT --:-- / 6 |
F??FFFTF?TFFTFFF T--TTTTT?TTTTTTT --:-- / 6 |
FF?????????????? TT------?------- --:-- / 1 |
FFF????????????? TTT-----?------- --:-- / 1 |
F??FFFTF?TFFTFFF T--TTTTT?TTTTTTT --:-- / 6 |
F??FFFTF?TFFTFFF T--TTTTT?TTTTTTT --:-- / 6 |
N1000P0 TFFFFFFFFTTTFFFF (expected value) 6.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFFFFFTTTFFFF TTTTTTTTTTTTTTTT --:P- / 8 |
TFFFFFFFFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTTTFFFF TTTTTTTTTTTTTTTT --:-M / 8 |
T??????????????? T--------------- --:-- / 0 |
T??????????????? T--------------- --:-- / 0 |
CC 0 |
CC 0 |
N2000P0 FTFFFTTFT? FFFFFF (expected value) 8.00 8.00 2.00 7.00 7.00 7.00 7.00 7.00 1.00 0 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FTFFFTTF??FFFFFF TTTTTTTT-?TTTTTT --:-- / 7 |
FT?FFTTFT?FFFFFF TT-TTTTTT?TTTTTT --:-- / 7 |
FT?FFTTF??FFFFFF TT-TTTTT-?TTTTTT --:-- / 6 |
FT?FFTTF??FFFFFF TT-TTTTT-?TTTTTT --:-- / 6 |
FT?????????????? TT-------?------ --:-- / 1 |
FTFFFTTF???????? TTTTTTTT-?------ --:-- / 4 |
FT?FFTTF??FFFFFF TT-TTTTT-?TTTTTT --:-- / 6 |
FT?FFTTF??FFFFFF TT-TTTTT-?TTTTTT --:-- / 6 |
N5000P0 TFFFTTFF? FFFFFFT (expected value) 8.00 7.00 8.00 8.00 8.00 8.00 7.00 8.00 0 2.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
TFFFTTFF?FFFFFFT TTTTTTTT?TTTTTTT --:-- / 7 |
T?FFTT?F??FFFFFT T-TTTT-T?-TTTTTT --:-- / 6 |
TFFFTTFF??FFFFFT TTTTTTTT?-TTTTTT --:-- / 7 |
TFFFTTFF??FFFFFT TTTTTTTT?-TTTTTT --:-- / 7 |
TFFFTTFF?FFFFFFT TTTTTTTT?TTTTTTT --:-- / 7 |
TFFFTTFF???????? TTTTTTTT?------- --:-- / 4 |
TFFFTTFF??FFFFFT TTTTTTTT?-TTTTTT --:-- / 7 |
TFFFTTFF??FFFFFT TTTTTTTT?-TTTTTT --:-- / 7 |
CloudDeployment — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 124 | 123 | 59 | 59 | 93 | 87 | 65 | 65 |
Road Runner | 3 | 4 | 0 | 0 | 2 | 0 | 0 | 0 |
Camel | 3 | 5 | 0 | 0 | 0 | 0 | 0 | 1 |
2a TTFFTFFFTFFFTTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:PM / 11 |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
2b FFFFFFFTFFFTFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:PM / 11 |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
3a FFFFFFFTFFTFFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFTFFTFFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFTFFTTF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
FFFFFFFTFFTFFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFTFFTFFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
3b FFFFFFFTFFFFTFFF (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 3.00 3.00 3.00 3.00 2.00 2.00 (confidence rate) |
FFFFFFFTFFFFTFFF TTTTTTTTTTTTTTTT --:PM / 11 |
FFFFFFFT?FFFTF?F TTTTTTTT-TTTTT-T --:-- / 10 |
CC 0 |
CC 0 |
FFFFFFFTF?FFTFF? TTTTTTTTT-TTTTT- --:-- / 10 |
F?FFFFFT???????? T-TTTTTT-------- --:-- / 5 |
CC 0 |
CC 0 |
4a FTTFFFTFFFFFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFFFTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFTFFFFFFTFF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FTTFFFTFFFFFFTFF TTTTTTTTTTTTTTTT --:P- / 11 |
FTTFFFTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
4b T? FT? FFFFFFTTTFF (expected value) 4.00 0 4.00 4.00 0 3.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
T?FT?FFFFFFTTTFF T?TT?TTTTTTTTTTT --:-- / 10 |
T?FT?FFFFFFTTTFF T?TT?TTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
T?FT???????????? T?TT?----------- --:-- / 2 |
T?FT?FFF???????? T?TT?TTT-------- --:-- / 4 |
CC 0 |
CC 0 |
5a TFFFFTFFFTTFFFFF (expected value) 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 (confidence rate) |
TFFFFTFFFTTFFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
TFFFFTFFFTTFFF?F TTTTTTTTTTTTTT-T --:-- / 10 |
TFF?FTFFFTTFFF?F TTT-TTTTTTTTTT-T --:-- / 10 |
TFF?FTFFFTTFFF?F TTT-TTTTTTTTTT-T --:-- / 10 |
TFFFFTFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFTFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFTFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFTFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
5b FFTFFFFFFFT? TTTF (expected value) 1.00 1.00 2.00 3.00 3.00 3.00 3.00 2.00 1.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate) |
?FTFFFFF?FT?TTTF -TTTTTTT-TT?TTTT --:-- / 9 |
F?TFFFFFFFT?TTTF T-TTTTTTTTT?TTTT --:-- / 10 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
???FFFF????????? ---TTTT----?---- --:-- / 3 |
CC 0 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
6a TFFFFFFFTFFFFTTT (expected value) 8.00 8.00 4.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 6.00 6.00 6.00 6.00 (confidence rate) |
TF?F?FFFTFF?FTTT TT-T-TTTTTT-TTTT --:-- / 9 |
TF?F?FFFTFF?FTTT TT-T-TTTTTT-TTTT --:-- / 9 |
TF?F?FFFTFF????? TT-T-TTTTTT----- --:-- / 6 |
TF?F?FFFTFF????? TT-T-TTTTTT----- --:-- / 6 |
TFFFFFFFTFFFFTTT TTTTTTTTTTTTTTTT --:P- / 11 |
TFFFFFFFTFFFFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFFFFTFFFFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFFFFTFFFFTTT TTTTTTTTTTTTTTTT --:-M / 11 |
6b TFFFFFFF? FF? FF? F (expected value) 2.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 0 2.00 1.00 0 2.00 (confidence rate) |
TFFFFFFF?FF?F??F TTTTTTTT?TT?T-?T --:-- / 8 |
TFFFFFFF?FF?FF?F TTTTTTTT?TT?TT?T --:-- / 9 |
???????????????? --------?--?--?- --:-- / 0 |
???????????????? --------?--?--?- --:-- / 0 |
?F?????????????? -T------?--?--?- --:-- / 1 |
?F?????????????? -T------?--?--?- --:-- / 1 |
???????????????? --------?--?--?- --:-- / 0 |
???????????????? --------?--?--?- --:-- / 0 |
7a FTTFFFFTTFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
7b TFFFFFFFTFTFFTFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFFFFFFTFTFFTFF TTTTTTTTTTTTTTTT --:PM / 11 |
TFFFFFFFT?TFFTFF TTTTTTTTT-TTTTTT --:-- / 10 |
TFFFFFFFT?TFFTFF TTTTTTTTT-TTTTTT --:-- / 10 |
TFFFFFFFT?TFFTFF TTTTTTTTT-TTTTTT --:-- / 10 |
CC 0 |
DNF 0 |
TFFFFFFFT?TFFTFF TTTTTTTTT-TTTTTT --:-- / 10 |
TFFFFFFFT?TFFTFF TTTTTTTTT-TTTTTT --:-- / 10 |
CloudReconfiguration — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 142 | 152 | 90 | 90 | 106 | 35 | 90 | 90 |
Road Runner | 3 | 11 | 0 | 0 | 2 | 0 | 0 | 1 |
Camel | 1 | 14 | 0 | 0 | 2 | 0 | 0 | 0 |
301 FFFTFFFFFFFTFFFF (expected value) 7.00 8.00 8.00 8.00 8.00 7.00 5.00 6.00 6.00 7.00 6.00 6.00 6.00 6.00 8.00 8.00 (confidence rate) |
?FFTFF?FF?FTFFFF -TTTTT-TT-TTTTTT --:-- / 6 |
FFFTFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 7 |
FFFTFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFF???F????FF TTTTTT---T----TT --:-- / 4 |
FFFTF????F????FF TTTTT----T----TT --:-- / 4 |
FFFTFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
302 FFFTFFFFFFFFTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFTFFFF?FFFTFTF TTTTTTTT-TTTTTTT --:-- / 7 |
FFFTFFFFFF?FTFTF TTTTTTTTTT-TTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:PM / 7 |
FFFTFFFF?F?????? TTTTTTTT-T------ --:-- / 4 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
303 FFTFFFFFFFFTFFFF (expected value) 8.00 8.00 8.00 7.00 8.00 7.00 7.00 7.00 7.00 7.00 8.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FFT?FFFFFFFTFFFF TTT-TTTTTTTTTTTT --:-- / 7 |
FFTFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 7 |
FFTFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FFTFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FFTFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FFTFF?????F????? TTTTT-----T----- --:-- / 3 |
FFTFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FFTFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
304 TFFFFFFFTFFTTFFF (expected value) 8.00 8.00 8.00 8.00 7.00 6.00 6.00 6.00 7.00 7.00 7.00 6.00 7.00 6.00 6.00 6.00 (confidence rate) |
TFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:PM / 7 |
TFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFF???TFF?T??? TTTTT---TTT-T--- --:-- / 4 |
TFFF???????????? TTTT------------ --:-- / 2 |
TFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
305 TFFTFTFFFFF? FFFF (expected value) 4.00 4.00 2.00 3.00 2.00 3.00 3.00 3.00 1.00 3.00 3.00 0 2.00 2.00 1.00 1.00 (confidence rate) |
TFFT?TFF?FF?FF?? TTTT-TTT-TT?TT-- --:-- / 5 |
TF?TFTFFFFF?FFFF TT-TTTTTTTT?TTTT --:-- / 6 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
TFFTFTFF?FF????? TTTTTTTT-TT?---- --:-- / 5 |
TF?????????????? TT---------?---- --:-- / 1 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
306 FFFTFFTTFFFTFTFF (expected value) 4.00 3.00 4.00 4.00 3.00 2.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFTF??TFFFTFTFF TTTTT--TTTTTTTTT --:-- / 6 |
FFFTFFTTFFFTFTFF TTTTTTTTTTTTTTTT --:PM / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTFFTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 7 |
F?FT???????????? T-TT------------ --:-- / 1 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
307 FFFFFFTFFFFFFFFF (expected value) 3.00 4.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
?F?FFFTFF?FFFFFF -T-TTTTTT-TTTTTT --:-- / 6 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FF?????????????? TT-------------- --:-- / 1 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
308 FFTFFFFFFTFTFFFF (expected value) 2.00 4.00 2.00 2.00 2.00 2.00 3.00 1.00 2.00 2.00 3.00 2.00 1.00 2.00 3.00 3.00 (confidence rate) |
FFTFFFFFFTFT?FFF TTTTTTTTTTTT-TTT --:-- / 7 |
FFTFFFF?FTFTFFFF TTTTTTT-TTTTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
?F????F???F???FF -T----T---T---TT --:-- / 2 |
?F?????????????? -T-------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
309 FFFFFFTFFTFFFTTF (expected value) 8.00 8.00 7.00 7.00 6.00 6.00 6.00 7.00 5.00 7.00 5.00 7.00 7.00 7.00 6.00 7.00 (confidence rate) |
FFFFFFTF?T?FFTTF TTTTTTTT-T-TTTTT --:-- / 6 |
FFFFFFTFFTFFFTTF TTTTTTTTTTTTTTTT --:-M / 7 |
FFFFFFTFFTFFFTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FFFFFFTFFTFFFTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FFFF???F?T?FFT?F TTTT---T-T-TTT-T --:-- / 5 |
FF?????????????? TT-------------- --:-- / 1 |
FFFFFFTFFTFFFTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FFFFFFTFFTFFFTTF TTTTTTTTTTTTTTTT --:P- / 7 |
310 FTFTFFTFFFFFFFFF (expected value) 8.00 8.00 8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 1.00 7.00 7.00 6.00 6.00 6.00 (confidence rate) |
FTFTFFTFFF?FFFFF TTTTTTTTTT-TTTTT --:-- / 7 |
FTFTFFTFFF?FFFFF TTTTTTTTTT-TTTTT --:-- / 7 |
FTFTFFTFFF?FFFFF TTTTTTTTTT-TTTTT --:-- / 7 |
FTFTFFTFFF?FFFFF TTTTTTTTTT-TTTTT --:-- / 7 |
FTFTFFTFFFFFF??? TTTTTTTTTTTTT--- --:-- / 6 |
FTF????????????? TTT------------- --:-- / 1 |
FTFTFFTFFF?FFFFF TTTTTTTTTT-TTTTT --:-- / 7 |
FTFTFFTFFF?FFFFF TTTTTTTTTT-TTTTT --:-- / 7 |
311 FTTTFFFTFTFFFTTF (expected value) 3.00 4.00 4.00 1.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
?TT?FFFTFTFFFTTF -TT-TTTTTTTTTTTT --:-- / 6 |
FTT?FFFTFTFFFTTF TTT-TTTTTTTTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTTTFFFTFTFFFTTF TTTTTTTTTTTTTTTT --:PM / 7 |
FTT?F??????????? TTT-T----------- --:-- / 2 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
312 TFFFFFTTFTFFTTFT (expected value) 8.00 8.00 8.00 7.00 2.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
TFFF?FTTFTFFTTFT TTTT-TTTTTTTTTTT --:-- / 7 |
TFFFFFTTFTFFTTFT TTTTTTTTTTTTTTTT --:PM / 7 |
TFFF?FTTFTFFTTFT TTTT-TTTTTTTTTTT --:-- / 7 |
TFFF?FTTFTFFTTFT TTTT-TTTTTTTTTTT --:-- / 7 |
TFFFFFTTFTFFTTFT TTTTTTTTTTTTTTTT --:-- / 7 |
TFF????????????? TTT------------- --:-- / 1 |
TFFF?FTTFTFFTTFT TTTT-TTTTTTTTTTT --:-- / 7 |
TFFF?FTTFTFFTTFT TTTT-TTTTTTTTTTT --:-- / 7 |
313 FFFTFTFFTFTFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 6.00 5.00 6.00 8.00 8.00 8.00 (confidence rate) |
FFFTFTFFT?T?FFFT TTTTTTTTT-T-TTTT --:-- / 6 |
FFFTFTFFTFTFFFFT TTTTTTTTTTTTTTTT --:PM / 7 |
FFFTFTFFTFTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTFFTFTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTFFT????FFT TTTTTTTTT----TTT --:-- / 5 |
FFFTFTFFT????FFT TTTTTTTTT----TTT --:-- / 5 |
FFFTFTFFTFTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTFFTFTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
314 TFFFTTTTFFFFFFTF (expected value) 8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFFTTTT?FFFFFTF TTTTTTTT-TTTTTTT --:-- / 7 |
TFFFTTTTFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 7 |
TFFFTTTTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFTTTTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFTTTTFFFF???? TTTTTTTTTTTT---- --:-- / 5 |
T??????????????? T--------------- --:-- / 0 |
TFFFTTTTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFTTTTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 7 |
315 FFFTFTTFFFFFTTFF (expected value) 3.00 3.00 4.00 4.00 3.00 3.00 3.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 2.00 2.00 (confidence rate) |
??FTFTTF?FFFTTFF --TTTTTT-TTTTTTT --:-- / 6 |
FFFTFTTFFFFFTTFF TTTTTTTTTTTTTTTT --:PM / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTFTTFFF?FTT?? TTTTTTTTTT-TTT-- --:-- / 6 |
FFFT???????????? TTTT------------ --:-- / 2 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
316 TTTFTFTTFFFTFTTF (expected value) 7.00 8.00 8.00 8.00 2.00 7.00 6.00 7.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TTTF?FTTF?FTFTTF TTTT-TTTT-TTTTTT --:-- / 6 |
?TTFTFTTFFFTFTTF -TTTTTTTTTTTTTTT --:-- / 7 |
TTTF?FTTFFFTFTTF TTTT-TTTTTTTTTTT --:-- / 7 |
TTTF?FTTFFFTFTTF TTTT-TTTTTTTTTTT --:-- / 7 |
TTTFTF?T???????? TTTTTT-T-------- --:-- / 3 |
TTTF???????????? TTTT------------ --:-- / 2 |
TTTF?FTTFFFTFTTF TTTT-TTTTTTTTTTT --:-- / 7 |
TTTF?FTTFFFTFTTF TTTT-TTTTTTTTTTT --:-- / 7 |
317 FTFTTTTFFFTTTFFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 2.00 7.00 6.00 6.00 2.00 6.00 6.00 (confidence rate) |
FTFTTTTFFFTTTFFF TTTTTTTTTTTTTTTT --:P- / 7 |
FTFTTTTFFFTTTFFF TTTTTTTTTTTTTTTT --:-M / 7 |
FTFTTTTFF?TTT?FF TTTTTTTTT-TTT-TT --:-- / 6 |
FTFTTTTFF?TTT?FF TTTTTTTTT-TTT-TT --:-- / 6 |
FTFTTTTFF?T????? TTTTTTTTT-T----- --:-- / 5 |
CC 0 |
FTFTTTTFF?TTT?FF TTTTTTTTT-TTT-TT --:-- / 6 |
FTFTTTTFF?TTT?FF TTTTTTTTT-TTT-TT --:-- / 6 |
318 TFTFTFFFTTTFFFFF (expected value) 8.00 8.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 5.00 6.00 6.00 (confidence rate) |
TFTFTFFFTTTF??FF TTTTTTTTTTTT--TT --:-- / 6 |
TFTFTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:PM / 7 |
TFTFTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFTFTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFT????????????? TTT------------- --:-- / 1 |
TF?????????????? TT-------------- --:-- / 1 |
TFTFTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFTFTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 7 |
319 FFFTFTFFTFFTFTFT (expected value) 8.00 7.00 8.00 8.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 (confidence rate) |
F?FT?TFFTFFTFT?T T-TT-TTTTTTTTT-T --:-- / 6 |
FFFTFTFFTFFTFTFT TTTTTTTTTTTTTTTT --:PM / 7 |
FFFTFTFFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTFFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTFFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFT???????????? TTTT------------ --:-- / 2 |
FFFTFTFFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTFFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 7 |
320 FFTFTFFTTTFTTFFT (expected value) 8.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 7.00 7.00 (confidence rate) |
FFTFTFFTTTFTTFFT TTTTTTTTTTTTTTTT --:P- / 7 |
FFTFTFFTTTFTTFFT TTTTTTTTTTTTTTTT --:-M / 7 |
FFTFTFFTTTFTTFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFTFTFFTTTFTTFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFTF??????????FT TTTT----------TT --:-- / 3 |
F??????????????? T--------------- --:-- / 0 |
FFTFTFFTTTFTTFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFTFTFFTTTFTTFFT TTTTTTTTTTTTTTTT --:-- / 7 |
401 FFTFFFTFTFFFFTFF (expected value) 4.00 4.00 4.00 2.00 1.00 3.00 3.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFTFFFTFTFFFFTFF TTTTTTTTTTTTTTTT --:PM / 7 |
FFTF?FT?TFFFFTFF TTTT-TT-TTTTTTTT --:-- / 6 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFT??FT????????? TTT--TT--------- --:-- / 2 |
FFT????????????? TTT------------- --:-- / 1 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
402 TFFFTTTTFTT? FFFT (expected value) 4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate) |
TFFFTTTTFTT?FFFT TTTTTTTTTTT?TTTT --:-- / 7 |
TFFFTTTTFTT?FFFT TTTTTTTTTTT?TTTT --:-- / 7 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
TF?????????????? TT---------?---- --:-- / 1 |
TF?????????????? TT---------?---- --:-- / 1 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
DES — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 147 | 146 | 96 | 96 | 148 | 139 | 74 | 74 |
Road Runner | 4 | 11 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 3 | 12 | 0 | 0 | 0 | 0 | 0 | 0 |
00a TTFFFFFFTFFFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:PM / 8 |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
00b FFFTTTTFTFTFFFFF (expected value) 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 6.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FF?TTTTFT??FFFFF TT-TTTTTT--TTTTT --:-- / 6 |
FFFTTTTFTFTFFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FF?TTTTFT?TFFFFF TT-TTTTTT-TTTTTT --:-- / 7 |
FF?TTTTFT?TFFFFF TT-TTTTTT-TTTTTT --:-- / 7 |
FFFTTTTFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FF?TTTTFT??????? TT-TTTTTT------- --:-- / 4 |
FFFTTTTFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTTFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
01a TFFTFTFTFFTTFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFTFTFFTTFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
TFFTFTFTFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
TFFTFTFTFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFTFTFTFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
01b TFFFTFTFFFTTFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFTFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFFFTTFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TFFFTFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
02a FFTTFTTTTFFFFTTT (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
F?TTFTTTTFFFFTTT T-TTTTTTTTTTTTTT --:-- / 7 |
FFTTFTTTTFFFFTTT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FFTTFTTTTFFFFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFTTFTTTTFFFFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
02b TFTFFTFTTFFTFFFT (expected value) 4.00 4.00 4.00 3.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTF?TFTTFFTFFFT TTTT-TTTTTTTTTTT --:-- / 7 |
TFTFFTFTTFFTFFFT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TFT??TFTTFFTFFFT TTT--TTTTTTTTTTT --:-- / 7 |
TFTF?TFTTFFTFFFT TTTT-TTTTTTTTTTT --:-- / 7 |
CC 0 |
CC 0 |
05a FTFFFFFFFTFFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
05b FFTF? FFF? F? FTFTT (expected value) 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 0 4.00 0 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFTF?FFF?F?FTFTT TTTT?TTT?T?TTTTT --:-- / 6 |
FFTF?FFF?F?FTFTT TTTT?TTT?T?TTTTT --:-- / 6 |
CC 0 |
CC 0 |
FFTF?FFF?F?????? TTTT?TTT?T?----- --:-- / 4 |
FFTF?FFF?F?????? TTTT?TTT?T?----- --:-- / 4 |
CC 0 |
CC 0 |
10a FTFFFTFFTFFTFFTF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FTFFFTFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTFFTFFTFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
FTFFFTFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
10b FT? F? FFFTTFFFFTF (expected value) 4.00 4.00 0 4.00 0 4.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 (confidence rate) |
FT?F?FFFTTFFFFTF TT?T?TTTTTTTTTTT --:-- / 7 |
FT?F?F?FTTFFFFTF TT?T?T-TTTTTTTTT --:-- / 6 |
???????????????? --?-?----------- --:-- / 0 |
???????????????? --?-?----------- --:-- / 0 |
FT?F?F?FTTFFF?TF TT?T?T-TTTTTT-TT --:-- / 6 |
FT?F?F?????????? TT?T?T---------- --:-- / 2 |
DNF 0 |
DNF 0 |
20a FFTTFFFFFFFTFTTT (expected value) 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTTFFFFFFFTFTTT TTTTTTTTTTTTTTTT --:PM / 8 |
FFTT?FFFFFFTFTTT TTTT-TTTTTTTTTTT --:-- / 7 |
FFTTFFFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFTTFFFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFTTFFFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFTTFFFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFTTFFFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFTTFFFFFFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
20b TFTFFTTTFFTFTFFF (expected value) 8.00 1.00 5.00 2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 5.00 (confidence rate) |
TFT?FTTTFFTFTFFF TTT-TTTTTTTTTTTT --:-- / 7 |
T???FTTTFFTFTFFF T---TTTTTTTTTTTT --:-- / 6 |
T?T?FTTTFFTFTFFF T-T-TTTTTTTTTTTT --:-- / 7 |
T?T?FTTTFFTFTFFF T-T-TTTTTTTTTTTT --:-- / 7 |
T?TFFTTTFFTFTF?F T-TTTTTTTTTTTT-T --:-- / 7 |
T?TFFTTTFFTFTF?? T-TTTTTTTTTTTT-- --:-- / 6 |
T??????????????? T--------------- --:-- / 0 |
T??????????????? T--------------- --:-- / 0 |
30a FFFFFFFFTTFFFFF? (expected value) 8.00 8.00 8.00 6.00 8.00 8.00 7.00 7.00 8.00 8.00 8.00 7.00 7.00 8.00 3.00 0 (confidence rate) |
FFF?FFFFTTFFFFF? TTT-TTTTTTTTTTT? --:-- / 7 |
FFF?FF??TTF??F?? TTT-TT--TTT--T-? --:-- / 4 |
FFFFFFFFTTFFFF?? TTTTTTTTTTTTTT-? --:-- / 7 |
FFFFFFFFTTFFFF?? TTTTTTTTTTTTTT-? --:-- / 7 |
FFFFFFFFTTFFFFF? TTTTTTTTTTTTTTT? --:-- / 7 |
FFFFFFFFTTFFFFF? TTTTTTTTTTTTTTT? --:-- / 7 |
FFFFFFFFTTFFFF?? TTTTTTTTTTTTTT-? --:-- / 7 |
FFFFFFFFTTFFFF?? TTTTTTTTTTTTTT-? --:-- / 7 |
30b TFFFFTFFFFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 (confidence rate) |
TFFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 8 |
TFFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 8 |
TFFFFTFFFFFFFF?F TTTTTTTTTTTTTT-T --:-- / 7 |
TFFFFTFFFFFFFF?F TTTTTTTTTTTTTT-T --:-- / 7 |
TFFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFFFFF?F TTTTTTTTTTTTTT-T --:-- / 7 |
TFFFFTFFFFFFFF?F TTTTTTTTTTTTTT-T --:-- / 7 |
40a FFFFTFFFFFTTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFFFFFTTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
40b TFFTFTTFTFFFTTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 6.00 (confidence rate) |
TFFTFTT?TFFFTTT? TTTTTTT-TTTTTTT- --:-- / 7 |
TFFTFTTFTFFFTTTF TTTTTTTTTTTTTTTT --:PM / 8 |
TFFTFTTFT?FFTTTF TTTTTTTTT-TTTTTT --:-- / 7 |
TFFTFTTFT?FFTTTF TTTTTTTTT-TTTTTT --:-- / 7 |
TFFTFTTFT?FFTTTF TTTTTTTTT-TTTTTT --:-- / 7 |
TFFTFTTFT?FFTTT? TTTTTTTTT-TTTTT- --:-- / 7 |
TFFTFTTFT?FFTTTF TTTTTTTTT-TTTTTT --:-- / 7 |
TFFTFTTFT?FFTTTF TTTTTTTTT-TTTTTT --:-- / 7 |
50a FFFTTTFTFFTFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
50b FTFFFFTTTFFTFTTT (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FTFFFF?TTFFTFTTT TTTTTT-TTTTTTTTT --:-- / 7 |
FTFFFFTTTFFTFTTT TTTTTTTTTTTTTTTT --:PM / 8 |
FTFFFFTTTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFTTTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFTTTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFTTTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
60a TFFFFFFTFFFFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFFTFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
TFFFFFFT?FFFFFTF TTTTTTTT-TTTTTTT --:-- / 7 |
TFFFFFFT?FFFFFTF TTTTTTTT-TTTTTTT --:-- / 7 |
TFFFFFFT?FFFFFTF TTTTTTTT-TTTTTTT --:-- / 7 |
TFFFFFFTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFT?FFFFFTF TTTTTTTT-TTTTTTT --:-- / 7 |
TFFFFFFT?FFFFFTF TTTTTTTT-TTTTTTT --:-- / 7 |
60b TFFFFFFFFF? FFF? F (expected value) 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 1.00 8.00 0 8.00 8.00 8.00 0 7.00 (confidence rate) |
TFFFFFFF?F?FFF?F TTTTTTTT-T?TTT?T --:-- / 6 |
TFFFF?FFFF?FFF?F TTTTT-TTTT?TTT?T --:-- / 6 |
TFFFFFFF?F?FFF?F TTTTTTTT-T?TTT?T --:-- / 6 |
TFFFFFFF?F?FFF?F TTTTTTTT-T?TTT?T --:-- / 6 |
TFFFFFFF?F?FFF?F TTTTTTTT-T?TTT?T --:-- / 6 |
TFFFFFFF?F?FFF?? TTTTTTTT-T?TTT?- --:-- / 6 |
TFFFFFFF?F?FFF?F TTTTTTTT-T?TTT?T --:-- / 6 |
TFFFFFFF?F?FFF?F TTTTTTTT-T?TTT?T --:-- / 6 |
DLCround — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 139 | 146 | 102 | 102 | 90 | 88 | 118 | 118 |
Road Runner | 1 | 5 | 0 | 0 | 6 | 1 | 0 | 0 |
Camel | 0 | 6 | 0 | 0 | 0 | 2 | 1 | 4 |
03a FTFTFFFTTTFTFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFTFFFT??FTFFTT TTTTTTTT--TTTTTT --:-- / 6 |
FTFTFFFTTTFTFFTT TTTTTTTTTTTTTTTT --:PM / 7 |
FTFTFFFT??FTFFTT TTTTTTTT--TTTTTT --:-- / 6 |
FTFTFFFT??FTFFTT TTTTTTTT--TTTTTT --:-- / 6 |
FTFTFFFTTTFTFFTT TTTTTTTTTTTTTTTT --:-- / 7 |
FTFTFFFTTTFTFFTT TTTTTTTTTTTTTTTT --:-- / 7 |
FTFTFFFTTTFTFFTT TTTTTTTTTTTTTTTT --:-- / 7 |
FTFTFFFTTTFTFFTT TTTTTTTTTTTTTTTT --:-- / 7 |
03b TFFFFFTFFTFF? FTT (expected value) 6.00 1.00 6.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 3.00 0 2.00 5.00 5.00 (confidence rate) |
T?FFFFTFFTFF??TT T-TTTTTTTTTT?-TT --:-- / 6 |
TFFFFFTFFTF??FTT TTTTTTTTTTT-?TTT --:-- / 6 |
T?FFFFTFFTFF??TT T-TTTTTTTTTT?-TT --:-- / 6 |
T?FFFFTFFTFF??TT T-TTTTTTTTTT?-TT --:-- / 6 |
T?F?FFTFFTF??FTT T-T-TTTTTTT-?TTT --:-- / 5 |
T?F????????????? T-T---------?--- --:-- / 1 |
CC 0 |
CC 0 |
04a FTFTTTFFFTTFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 3.00 (confidence rate) |
FTFTTTFFFT?FFFF? TTTTTTTTTT-TTTT- --:-- / 6 |
FTFTTTFFFT?FFFFT TTTTTTTTTT-TTTTT --:-- / 7 |
FTFTTTFFFT?FFFF? TTTTTTTTTT-TTTT- --:-- / 6 |
FTFTTTFFFT?FFFF? TTTTTTTTTT-TTTT- --:-- / 6 |
FTFTTTFFFTTFFFFT TTTTTTTTTTTTTTTT --:P- / 7 |
FTFTTTFFFTTFFFFT TTTTTTTTTTTTTTTT --:-M / 7 |
FTFTTTFFFT?FFFF? TTTTTTTTTT-TTTT- --:-- / 6 |
FTFTTTFFFT?FFFF? TTTTTTTTTT-TTTT- --:-- / 6 |
04b FFFFTTFFFTF? ? FFF (expected value) 4.00 4.00 2.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 1.00 0 0 2.00 1.00 2.00 (confidence rate) |
FF??TTFFFTF??F?F TT--TTTTTTT??T-T --:-- / 5 |
FF??TTFFFT???FFF TT--TTTTTT-??TTT --:-- / 5 |
???????????????? -----------??--- --:-- / 0 |
???????????????? -----------??--- --:-- / 0 |
FFFFT??????????? TTTTT------??--- --:-- / 2 |
FFFF???????????? TTTT-------??--- --:-- / 2 |
CC 0 |
CC 0 |
05a FFFTTTFFTTFTTFTT (expected value) 8.00 8.00 6.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTT?FFTTFTTFTT TTTTT-TTTTTTTTTT --:-- / 7 |
FFFTT?FFTTFTTFTT TTTTT-TTTTTTTTTT --:-- / 7 |
FF?TT?FFTTFTTFTT TT-TT-TTTTTTTTTT --:-- / 6 |
FF?TT?FFTTFTTFTT TT-TT-TTTTTTTTTT --:-- / 6 |
FFFTTTFFTTFTTFTT TTTTTTTTTTTTTTTT --:P- / 7 |
FFFTTTFFTTFTTFTT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTTTFFTTFTTFTT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTTTFFTTFTTFTT TTTTTTTTTTTTTTTT --:-M / 7 |
05b FTFTF? FFFFFTFFTF (expected value) 7.00 7.00 6.00 6.00 7.00 0 7.00 6.00 6.00 6.00 1.00 6.00 6.00 7.00 7.00 6.00 (confidence rate) |
FTFTF?FFFFFTFFTF TTTTT?TTTTTTTTTT --:-- / 7 |
FTFTF?FFFF?TFFTF TTTTT?TTTT-TTTTT --:-- / 6 |
FTFTF?FFFF?TFFTF TTTTT?TTTT-TTTTT --:-- / 6 |
FTFTF?FFFF?TFFTF TTTTT?TTTT-TTTTT --:-- / 6 |
CC 0 |
FT??F?F??????FT? TT--T?T------TT- --:-- / 3 |
FTFTF?FFFF?TFFTF TTTTT?TTTT-TTTTT --:-- / 6 |
FTFTF?FFFF?TFFTF TTTTT?TTTT-TTTTT --:-- / 6 |
06a FTFTTFTFTTFTFTTF (expected value) 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
F?FTTFTFTTFTFTTF T-TTTTTTTTTTTTTT --:-- / 7 |
FTFTTFTFTTFTFTTF TTTTTTTTTTTTTTTT --:PM / 7 |
F?FTTFTFTTFTFTTF T-TTTTTTTTTTTTTT --:-- / 7 |
F?FTTFTFTTFTFTTF T-TTTTTTTTTTTTTT --:-- / 7 |
FTFTTFTFTTFTFTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FTFTTFTFTTFTFTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FTFTTFTFTTFTFTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FTFTTFTFTTFTFTTF TTTTTTTTTTTTTTTT --:-- / 7 |
06b FFFFTFTFFFFFFFFF (expected value) 6.00 6.00 1.00 6.00 6.00 7.00 6.00 6.00 6.00 7.00 6.00 6.00 6.00 1.00 7.00 6.00 (confidence rate) |
FFFFTFTFFFFFF?FF TTTTTTTTTTTTT-TT --:-- / 7 |
FF?FTFTFFFFFFFFF TT-TTTTTTTTTTTTT --:-- / 7 |
FF?FTFTFFFFFF?FF TT-TTTTTTTTTT-TT --:-- / 6 |
FF?FTFTFFFFFF?FF TT-TTTTTTTTTT-TT --:-- / 6 |
CC 0 |
?????F???F????F? -----T---T----T- --:-- / 1 |
FF?FTFTFFFFFF?FF TT-TTTTTTTTTT-TT --:-- / 6 |
FF?FTFTFFFFFF?FF TT-TTTTTTTTTT-TT --:-- / 6 |
07a FFFTFTTTFFFTTTTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 5.00 5.00 6.00 6.00 6.00 6.00 6.00 4.00 6.00 6.00 (confidence rate) |
FFFTFT??FFFTT?TT TTTTTT--TTTTT-TT --:-- / 6 |
FFFTFTTTFFFTT?TT TTTTTTTTTTTTT-TT --:-- / 7 |
FFFTFT?????????? TTTTTT---------- --:-- / 3 |
FFFTFT?????????? TTTTTT---------- --:-- / 3 |
FFFTFTTTFFFTTTTT TTTTTTTTTTTTTTTT --:P- / 7 |
FFFTFTTTFFFTTTTT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTTTFFFTTTTT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTTTFFFTTTTT TTTTTTTTTTTTTTTT --:-M / 7 |
07b FFFFFFTFFFFFFF? T (expected value) 7.00 8.00 6.00 6.00 6.00 6.00 8.00 7.00 6.00 6.00 8.00 7.00 6.00 6.00 0 8.00 (confidence rate) |
FFFFFFTFFFFFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
FFFFFFTFFFFFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
FFFFFFTFFFFFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
FFFFFFTFFFFFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
FF????T???FF???T TT----T---TT--?T --:-- / 3 |
?F????TF??F????T -T----TT--T---?T --:-- / 2 |
FFFFFFTFFFFFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
FFFFFFTFFFFFFF?T TTTTTTTTTTTTTT?T --:-- / 7 |
08a TFFFTTFFFFFFTTFF (expected value) 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFF?TFFFFFFTTFF TTTT-TTTTTTTTTTT --:-- / 7 |
TFFF?TFFFFFFTTFF TTTT-TTTTTTTTTTT --:-- / 7 |
TFFF?TFFFFFFTTFF TTTT-TTTTTTTTTTT --:-- / 7 |
TFFF?TFFFFFFTTFF TTTT-TTTTTTTTTTT --:-- / 7 |
TFFFTTFFFFFFTTFF TTTTTTTTTTTTTTTT --:P- / 7 |
TFFFTTFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 7 |
TFFFTTFFFFFFTTFF TTTTTTTTTTTTTTTT --:-M / 7 |
TFFFTTFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 7 |
08b FTTFFFFTFTTFFFFT (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FTTFFFFTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FTTFFFFTFTTFFFFT TTTTTTTTTTTTTTTT --:PM / 7 |
FTTFFFFTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FTTFFFFTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
CC 0 |
CC 0 |
FTTFFFFTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FTTFFFFTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
09a FFFFFFTFTFTFTTTT (expected value) 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 (confidence rate) |
FFFFFFTF?FTFTTT? TTTTTTTT-TTTTTT- --:-- / 6 |
FFF?FFTFTFTFTTTT TTT-TTTTTTTTTTTT --:-- / 7 |
FFF?FFTF?FTFTTT? TTT-TTTT-TTTTTT- --:-- / 6 |
FFF?FFTF?FTFTTT? TTT-TTTT-TTTTTT- --:-- / 6 |
FFFFFFTFTFTFTTTT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFFFFTFTFTFTTTT TTTTTTTTTTTTTTTT --:P- / 7 |
FFFFFFTFTFTFTTTT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFFFFTFTFTFTTTT TTTTTTTTTTTTTTTT --:-M / 7 |
09b FTFFTTTFT? FFFF? F (expected value) 6.00 6.00 2.00 6.00 7.00 5.00 6.00 6.00 7.00 0 2.00 6.00 6.00 6.00 0 6.00 (confidence rate) |
FTFFTTTFT?FFFF?F TTTTTTTTT?TTTT?T --:-- / 6 |
FTFFT?TFT?FFFF?F TTTTT-TTT?TTTT?T --:-- / 6 |
FT?FTTTFT??FFF?F TT-TTTTTT?-TTT?T --:-- / 5 |
FT?FTTTFT??FFF?F TT-TTTTTT?-TTT?T --:-- / 5 |
????T???T??????? ----T---T?----?- --:-- / 1 |
CC 0 |
FT?FTTTFT??FFF?F TT-TTTTTT?-TTT?T --:-- / 5 |
FT?FTTTFT??FFF?F TT-TTTTTT?-TTT?T --:-- / 5 |
10a TFFTTFTTFFTFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTTF??FFTFTFFF TTTTTT--TTTTTTTT --:-- / 6 |
TFFTTF?TFFTFTFFF TTTTTT-TTTTTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TFFTTFTTFFTFTFFF TTTTTTTTTTTTTTTT --:P- / 7 |
TFFTTFTTFFTFTFFF TTTTTTTTTTTTTTTT --:-M / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
10b TFTFF? F? FTFFFFFF (expected value) 6.00 6.00 6.00 6.00 6.00 0 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFTFF?F?FTFFFFFF TTTTT?T?TTTTTTTT --:-- / 6 |
TFTFF?F?FTFFFFFF TTTTT?T?TTTTTTTT --:-- / 6 |
TFTFF?F?FTFFFFFF TTTTT?T?TTTTTTTT --:-- / 6 |
TFTFF?F?FTFFFFFF TTTTT?T?TTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
TFTFF?F?FTFFFFFF TTTTT?T?TTTTTTTT --:-- / 6 |
TFTFF?F?FTFFFFFF TTTTT?T?TTTTTTTT --:-- / 6 |
11a FTFFFFFTFFFTFFFT (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 5.00 6.00 6.00 (confidence rate) |
FTFFFFFTFFF?FFFT TTTTTTTTTTT-TTTT --:-- / 7 |
FTFFFFFTFFFTF?FT TTTTTTTTTTTTT-TT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:P- / 7 |
FTFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FTFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FTFFFFFTFFFTFFFT TTTTTTTTTTTTTTTT --:-M / 7 |
11b FTTFFFFFFTF? TFTT (expected value) 2.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 3.00 2.00 0 3.00 2.00 3.00 3.00 (confidence rate) |
FTTFFFFF?TF?TFTT TTTTTTTT-TT?TTTT --:-- / 6 |
FTTFFFFFFTF?TFTT TTTTTTTTTTT?TTTT --:-- / 7 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
?T?????????????? -T---------?---- --:-- / 0 |
?T???????T??T?TT -T-------T-?T-TT --:-- / 2 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
12a FTTTFFFFTFTFTFFF (expected value) 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 (confidence rate) |
FTT?FFFF?FTF?FFF TTT-TTTT-TTT-TTT --:-- / 6 |
FTTTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:PM / 7 |
FTT?FFFF?FTF?FFF TTT-TTTT-TTT-TTT --:-- / 6 |
FTT?FFFF?FTF?FFF TTT-TTTT-TTT-TTT --:-- / 6 |
FTTTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FTTTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FTTTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
FTTTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 7 |
12b FFFTFTTTTTFFFFFT (expected value) 6.00 6.00 8.00 6.00 6.00 6.00 7.00 7.00 6.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:P- / 7 |
FFFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-M / 7 |
FFFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
??F???TT?T?????? --T---TT-T------ --:-- / 2 |
??F????????????? --T------------- --:-- / 0 |
FFFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
FFFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 7 |
13a FTTFFTTFFFFTTTTF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 5.00 6.00 6.00 6.00 (confidence rate) |
FTTFFTTFFFF??TTF TTTTTTTTTTT--TTT --:-- / 6 |
FTTFFTTFFFFTTTTF TTTTTTTTTTTTTTTT --:PM / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTTFFTTFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FTTFFTTFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FTTFFTTFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 7 |
FTTFFTTFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 7 |
13b FT? TFFTTFF? TFT? F (expected value) 6.00 6.00 0 6.00 2.00 1.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 0 6.00 (confidence rate) |
FT?TF?TTFF?TFT?F TT?TT-TTTT?TTT?T --:-- / 5 |
FT?T?FTTFF?TFT?F TT?T-TTTTT?TTT?T --:-- / 5 |
FT?T??TTFF?TFT?F TT?T--TTTT?TTT?T --:-- / 5 |
FT?T??TTFF?TFT?F TT?T--TTTT?TTT?T --:-- / 5 |
????F??????????? --?-T-----?---?- --:-- / 0 |
CC 0 |
FT?T??TTFF?TFT?F TT?T--TTTT?TTT?T --:-- / 5 |
FT?T??TTFF?TFT?F TT?T--TTTT?TTT?T --:-- / 5 |
DLCshifumi — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 105 | 104 | 53 | 53 | 62 | 65 | 72 | 72 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 2 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 1 | 0 | 0 | 1 |
2a FTTTFFFTFFTFTFFF (expected value) 8.00 8.00 5.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 5.00 8.00 4.00 8.00 8.00 8.00 (confidence rate) |
FT?TFFF?FF?F?FFF TT-TTTT-TT-T-TTT --:-- / 10 |
FTTTFFFTFFTF?FFF TTTTTTTTTTTT-TTT --:-- / 12 |
FT?TFFF?FF?F?FFF TT-TTTT-TT-T-TTT --:-- / 10 |
FT?TFFF?FF?F?FFF TT-TTTT-TT-T-TTT --:-- / 10 |
FTTTFFFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 13 |
FTTTFFFTFFTFTFFF TTTTTTTTTTTTTTTT --:P- / 13 |
FTTTFFFTFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 13 |
FTTTFFFTFFTFTFFF TTTTTTTTTTTTTTTT --:-M / 13 |
2b T? FFFFFTFFFTFFFF (expected value) 7.00 0 6.00 6.00 6.00 7.00 6.00 6.00 7.00 6.00 6.00 7.00 6.00 6.00 6.00 6.00 (confidence rate) |
T?FFFFFTFFFTFFFF T?TTTTTTTTTTTTTT --:-- / 12 |
T?FFFFFTFFFTFFFF T?TTTTTTTTTTTTTT --:-- / 12 |
T?FFFFFTFFFTFFFF T?TTTTTTTTTTTTTT --:-- / 12 |
T?FFFFFTFFFTFFFF T?TTTTTTTTTTTTTT --:-- / 12 |
CC 0 |
T????F??F??T???? T?---T--T--T---- --:-- / 3 |
T?FFFFFTFFFTFFFF T?TTTTTTTTTTTTTT --:-- / 12 |
T?FFFFFTFFFTFFFF T?TTTTTTTTTTTTTT --:-- / 12 |
3a TTFFFFTTTFFTTFTT (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 5.00 6.00 (confidence rate) |
TTFFFFTT?FF?TF?T TTTTTTTT-TT-TT-T --:-- / 10 |
TTFFFFTTTFFTTFTT TTTTTTTTTTTTTTTT --:PM / 13 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFFFFTTTFFTTFTT TTTTTTTTTTTTTTTT --:-- / 13 |
TTFFFFTTTFFTTFTT TTTTTTTTTTTTTTTT --:-- / 13 |
TTFFFFTTTFFTTFTT TTTTTTTTTTTTTTTT --:-- / 13 |
TTFFFFTTTFFTTFTT TTTTTTTTTTTTTTTT --:-- / 13 |
3b FFFTFFTFFTFFTTFF (expected value) 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate) |
?FFTFFTFFTFFTTFF -TTTTTTTTTTTTTTT --:-- / 12 |
FFFTFFTFFTFFTTF? TTTTTTTTTTTTTTT- --:-- / 12 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
4a FFTFFFTFTFFFTFTF (expected value) 8.00 6.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 6.00 8.00 8.00 (confidence rate) |
FF?FFFTFTFFF?FTF TT-TTTTTTTTT-TTT --:-- / 11 |
FFTFFFTFTFFFTFTF TTTTTTTTTTTTTTTT --:PM / 13 |
F??FFFTFTFFF??TF T--TTTTTTTTT--TT --:-- / 10 |
F??FFFTFTFFF??TF T--TTTTTTTTT--TT --:-- / 10 |
FFTFFFTFTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTFFFTFTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTFFFTFTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTFFFTFTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
4b TFT? ? ? FTTF? TFFTF (expected value) 6.00 6.00 6.00 0 0 0 6.00 6.00 6.00 6.00 0 6.00 2.00 5.00 6.00 6.00 (confidence rate) |
TFT???FTTF?TF?TF TTT???TTTT?TT-TT --:-- / 9 |
TFT???FTTF?TFFTF TTT???TTTT?TTTTT --:-- / 10 |
TFT???FTTF?T?FTF TTT???TTTT?T-TTT --:-- / 9 |
TFT???FTTF?T?FTF TTT???TTTT?T-TTT --:-- / 9 |
CC 0 |
DNF 0 |
TFT???FTTF?T?FTF TTT???TTTT?T-TTT --:-- / 9 |
TFT???FTTF?T?FTF TTT???TTTT?T-TTT --:-- / 9 |
5a TFFFFFTFFTTTTTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 3.00 4.00 (confidence rate) |
TFFFFFTFF?T?TTFF TTTTTTTTT-T-TTTT --:-- / 11 |
TFFFFFTFFTTTTT?F TTTTTTTTTTTTTT-T --:-- / 12 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TFFFFFTFFTTTTTFF TTTTTTTTTTTTTTTT --:-M / 13 |
TFFFFFTFFTTTTTFF TTTTTTTTTTTTTTTT --:P- / 13 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
5b FFFTTFTFFFF? F? TF (expected value) 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 0 2.00 2.00 (confidence rate) |
F?FTTFTFFFF?F?TF T-TTTTTTTTT?T?TT --:-- / 10 |
?FFTTFTFFFF?F?TF -TTTTTTTTTT?T?TT --:-- / 10 |
???????????????? -----------?-?-- --:-- / 0 |
???????????????? -----------?-?-- --:-- / 0 |
CC 0 |
DNF 0 |
???????????????? -----------?-?-- --:-- / 0 |
???????????????? -----------?-?-- --:-- / 0 |
6a TTTFFFTFFTTT? FTF (expected value) 4.00 2.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 3.00 3.00 4.00 0 2.00 1.00 2.00 (confidence rate) |
T?TFFF?FF??T?F?F T-TTTT-TT--T?T-T --:-- / 8 |
T?TFFF?FFTTT?FTF T-TTTT-TTTTT?TTT --:-- / 10 |
???????????????? ------------?--- --:-- / 0 |
???????????????? ------------?--- --:-- / 0 |
TTTFFFTFFTTT???? TTTTTTTTTTTT?--- --:-- / 10 |
TTTFFFTFFTTT???? TTTTTTTTTTTT?--- --:-- / 10 |
???????????????? ------------?--- --:-- / 0 |
???????????????? ------------?--- --:-- / 0 |
6b TTTTTFFTFFFFTTF? (expected value) 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 (confidence rate) |
TTTTTFFTFFFFTTF? TTTTTTTTTTTTTTT? --:-- / 12 |
CC 0 |
TTTTTFFTFFFFTTF? TTTTTTTTTTTTTTT? --:-- / 12 |
TTTTTFFTFFFFTTF? TTTTTTTTTTTTTTT? --:-- / 12 |
CC 0 |
DNF 0 |
TTTTTFFTFFFFTTF? TTTTTTTTTTTTTTT? --:-- / 12 |
TTTTTFFTFFFFTTF? TTTTTTTTTTTTTTT? --:-- / 12 |
DNAwalker — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 143 | 142 | 119 | 119 | 144 | 144 | 119 | 119 |
Road Runner | 10 | 2 | 0 | 0 | 3 | 3 | 0 | 0 |
Camel | 10 | 5 | 0 | 0 | 1 | 1 | 1 | 0 |
01track12Block1 FFFFTTTTFTFTTTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTTTFTFTTTFT TTTTTTTTTTTTTTTT --:-- / 8 |
02track12Block2 FFFFFFTTFFTTTFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFTTFFTTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
03track12BlockBoth FFFFFTTFTTFFTFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTTFTTFFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
04track28LL TFFFFTFFFFTTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
05track28LR FFFFFFFFFTTFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 (confidence rate) |
FFFFFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFTTFFF?F TTTTTTTTTTTTTT-T --:-- / 8 |
FFFFFFFFFTTFFF?F TTTTTTTTTTTTTT-T --:-- / 8 |
FFFFFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
06track28RL TFFFTTFFFFTFTTFF (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?FFFTTFFFFTFTTFF -TTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFFFFTFTTFF TTTTTTTTTTTTTTTT --:-M / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TFFFTTFFFFTFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFFFFTFTTFF TTTTTTTTTTTTTTTT --:P- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
07track28RR TFFFFTFFTFFFTTFF (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?FFFFTFFTFFFTTFF -TTTTTTTTTTTTTTT --:-- / 8 |
TFFFFTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-M / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TFFFFTFFTFFFTTFF TTTTTTTTTTTTTTTT --:P- / 8 |
TFFFFTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
08ringLL FFFTTTFTFTTFTFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTTFTFTTFTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
09ringLR FTFFFTTTFFFTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 (confidence rate) |
FTFFFTTTFFFTF?FF TTTTTTTTTTTTT-TT --:-- / 8 |
FTFFFTTTFFFTFTFF TTTTTTTTTTTTTTTT --:-M / 8 |
FTFFFTTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTTTFFFTFTFF TTTTTTTTTTTTTTTT --:P- / 8 |
FTFFFTTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFTTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
10ringRL TFFFTFFTTTTTTFFF (expected value) 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate) |
TF?FTFFT?TTT?FFF TT-TTTTT-TTT-TTT --:-- / 7 |
TFFFTFFTTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TF?FTFFTTTTTTFFF TT-TTTTTTTTTTTTT --:-- / 8 |
TF?FTFFTTTTTTFFF TT-TTTTTTTTTTTTT --:-- / 8 |
TFFFTFFTTTTTTFFF TTTTTTTTTTTTTTTT --:P- / 8 |
TFFFTFFTTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFFTTTTTTFFF TTTTTTTTTTTTTTTT --:-M / 8 |
TFFFTFFTTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
11ringRR FTFFFFFFTFFFTTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:PM / 8 |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
12ringLLLarge FFFFFFTFFFTFTFFF (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
?FFFFFTF?FTFTFFF -TTTTTTT-TTTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFTFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
13ringRLLarge TFFTFFTTFFTFFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFTFFT?FFTFFFTT TTTTTTT-TTTTTTTT --:-- / 8 |
TFFTFFT?FFTFFFTT TTTTTTT-TTTTTTTT --:-- / 8 |
TFFTFFT?FFTFFFTT TTTTTTT-TTTTTTTT --:-- / 8 |
TFFTFFT?FFTFFFTT TTTTTTT-TTTTTTTT --:-- / 8 |
TFFTFFTTFFTFFFTT TTTTTTTTTTTTTTTT --:PM / 8 |
TFFTFFTTFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
TFFTFFT?FFTFFFTT TTTTTTT-TTTTTTTT --:-- / 8 |
TFFTFFT?FFTFFFTT TTTTTTT-TTTTTTTT --:-- / 8 |
14ringLRLarge TFFFFFFFFTTTFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFFFF?TTFFTT TTTTTTTTT-TTTTTT --:-- / 8 |
TFFFFFFFFTTTFFTT TTTTTTTTTTTTTTTT --:PM / 8 |
TFFFFFFFF?TTFFTT TTTTTTTTT-TTTTTT --:-- / 8 |
TFFFFFFFF?TTFFTT TTTTTTTTT-TTTTTT --:-- / 8 |
TFFFFFFFFTTTFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTTTFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFF?TTFFTT TTTTTTTTT-TTTTTT --:-- / 8 |
TFFFFFFFF?TTFFTT TTTTTTTTT-TTTTTT --:-- / 8 |
15ringRRLarge FFFFFTFFFFFFFFFT (expected value) 8.00 8.00 4.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFF?FFFFFFFFFT TTTTT-TTTTTTTTTT --:-- / 8 |
FFFFF?FFFFFFFFFT TTTTT-TTTTTTTTTT --:-- / 8 |
FF?FF?FFFFFFFFFT TT-TT-TTTTTTTTTT --:-- / 7 |
FF?FF?FFFFFFFFFT TT-TT-TTTTTTTTTT --:-- / 7 |
FFFFFTFFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFTFFFFFFFFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FF?FF?FFFFFFFFFT TT-TT-TTTTTTTTTT --:-- / 7 |
FF?FF?FFFFFFFFFT TT-TT-TTTTTTTTTT --:-- / 7 |
16redondantChoiceR FFFFFTTTFTFFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTT?FTFFTFFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFFFTTTFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFTT?FTFFTFFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFFFTT?FTFFTFFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFFFTT?FTFFTFFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFFFTT?FTFFTFFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFFFTT?FTFFTFFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFFFTT?FTFFTFFF TTTTTTT-TTTTTTTT --:-- / 8 |
17redondantChoiceL FFFTFFFFFTFFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFTFFF?FT?FFTFF TTTTTTT-TT-TTTTT --:-- / 7 |
FFFTFFF?FTFFFTFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFTFFF?FTFFFTFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFTFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFFF?FTFFFTFF TTTTTTT-TTTTTTTT --:-- / 8 |
FFFTFFF?FTFFFTFF TTTTTTT-TTTTTTTT --:-- / 8 |
18lozangeBlock FTFFFFTFFFFTTFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFFFTFFFFTTFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FTFFFFT?FFFTTFFT TTTTTTT-TTTTTTTT --:-- / 8 |
FTFFFFT?FFFTTFFT TTTTTTT-TTTTTTTT --:-- / 8 |
FTFFFFT?FFFTTFFT TTTTTTT-TTTTTTTT --:-- / 8 |
FTFFFFTFFFFTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFTFFFFTTFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFT?FFFTTFFT TTTTTTT-TTTTTTTT --:-- / 8 |
FTFFFFT?FFFTTFFT TTTTTTT-TTTTTTTT --:-- / 8 |
DatabaseWithMutex — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 59 | 0 | 13 | 0 | 0 | 13 | 13 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
02 FTTFFFTTFFFTTTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
DNC |
FTTFFFTTFFFTTTTT TTTTTTTTTTTTTTTT --:PM / 13 |
DNC |
FTTFFFTTFFFTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
FTTFFFTTFFFTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
FTTFFFTTFFFTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
04 FFTTTTTTF? TFFTF? (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 0 (confidence rate) |
DNC |
FFTTTTTTF?TFFTF? TTTTTTTTT?TTTTT? --:-- / 11 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
10 FTFFFFFFFFFFFFFF (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
FTFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 13 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
20 FFTFF? TFFTFFTFFF (expected value) 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
FFTFF?TFFTFFTFFF TTTTT?TTTTTTTTTT --:-- / 12 |
DNC |
???????????????? -----?---------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -----?---------- --:-- / 0 |
???????????????? -----?---------- --:-- / 0 |
40 TFFFFF? TTT? FFF? F (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 0 1.00 1.00 1.00 0 1.00 (confidence rate) |
DNC |
TFFFFF?TTT?FFF?F TTTTTT?TTT?TTT?T --:-- / 10 |
DNC |
???????????????? ------?---?---?- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ------?---?---?- --:-- / 0 |
???????????????? ------?---?---?- --:-- / 0 |
DatabaseWithMutex — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 46 | 60 | 0 | 13 | 26 | 29 | 13 | 13 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
02 FTTFFFTTTFTTTTTT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FTTFFFTTTFTTTTTT TTTTTTTTTTTTTTTT --:-M / 13 |
FTTFFFTTTFTTTTTT TTTTTTTTTTTTTTTT --:P- / 13 |
DNC |
FTTFFFTTTFTTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
FTTFFFTTTFTTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
FTTFFFTTTFTTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
FTTFFFTTTFTTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
FTTFFFTTTFTTTTTT TTTTTTTTTTTTTTTT --:-- / 13 |
04 FFTTTTTTFFFFFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTT?T?FFFFFTTF TTTTT-T-TTTTTTTT --:-- / 11 |
FFTTTTTTFFFFFTTF TTTTTTTTTTTTTTTT --:PM / 13 |
CC 0 |
CC 0 |
FFTTTTTTFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTTTTTFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
10 FTFF? FFFFFTFFFT? (expected value) 1.00 3.00 2.00 3.00 0 2.00 1.00 1.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 0 (confidence rate) |
?T?F?F??FFT?F?T? -T-T?T--TTT-T-T? --:-- / 6 |
FTFF?FFFFFTFFFT? TTTT?TTTTTTTTTT? --:-- / 11 |
CC 0 |
CC 0 |
CC 0 |
?TFF???????????? -TTT?----------? --:-- / 2 |
CC 0 |
CC 0 |
20 FFTFFFTFTTTTFTT? (expected value) 2.00 2.00 2.00 2.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 0 (confidence rate) |
FFTF??T?TTTTFTT? TTTT--T-TTTTTTT? --:-- / 10 |
FFTFFFTFTTTT?TT? TTTTTTTTTTTT-TT? --:-- / 11 |
DNC |
???????????????? ---------------? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------? --:-- / 0 |
???????????????? ---------------? --:-- / 0 |
40 TFFFFF? TTTTTTFTT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 2.00 2.00 2.00 3.00 2.00 2.00 2.00 2.00 (confidence rate) |
????????TTTTTFTT ------?-TTTTTTTT --:-- / 6 |
TFFFFF?TTTTTTFTT TTTTTT?TTTTTTTTT --:-- / 12 |
DNC |
???????????????? ------?--------- --:-- / 0 |
CC 0 |
???????????T???? ------?----T---- --:-- / 1 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
Dekker — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 105 | 109 | 36 | 36 | 95 | 95 | 36 | 36 |
Road Runner | 0 | 3 | 0 | 0 | 0 | 2 | 0 | 0 |
Camel | 0 | 3 | 0 | 0 | 1 | 1 | 0 | 0 |
010 FFFFFFFTFFTFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
015 FFTTFTFFFFFTTTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTFTFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTTFTFFFFFTTTFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
FFTTFTFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTTFTFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
020 FFTFFTTFFFTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate) |
FFTFFTTFFFTF?FFF TTTTTTTTTTTT-TTT --:-- / 18 |
FFTFFTTFFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
FFTFFTTFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFTTFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
050 TTFTFFFTFFFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 4.00 4.00 2.00 (confidence rate) |
TTFTFFFTFFF??FT? TTTTTTTTTTT--TT- --:-- / 16 |
TTFTFFFTFFF??FT? TTTTTTTTTTT--TT- --:-- / 16 |
CC 0 |
CC 0 |
TTFTFFFTFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
TTFTFFFTFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
100 FTFFFTFFFFFTFTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 2.00 (confidence rate) |
FTFFFTF?F?FTFTT? TTTTTTT-T-TTTTT- --:-- / 16 |
FTFFFTFFFFFTFTT? TTTTTTTTTTTTTTT- --:-- / 18 |
FTFFFTFFF?FTFTT? TTTTTTTTT-TTTTT- --:-- / 17 |
FTFFFTFFF?FTFTT? TTTTTTTTT-TTTTT- --:-- / 17 |
FTFFFTFFFFFTFTTF TTTTTTTTTTTTTTTT --:-M / 19 |
FTFFFTFFFFFTFTTF TTTTTTTTTTTTTTTT --:P- / 19 |
FTFFFTFFF?FTFTT? TTTTTTTTT-TTTTT- --:-- / 17 |
FTFFFTFFF?FTFTT? TTTTTTTTT-TTTTT- --:-- / 17 |
200 F? TFFFFFTFFFFTFF (expected value) 2.00 0 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
F?TFFF?FTFFFFTFF T?TTTT-TTTTTTTTT --:-- / 17 |
F?TFFFFFTFFFFTFF T?TTTTTTTTTTTTTT --:-- / 18 |
???????????????? -?-------------- --:-- / 0 |
???????????????? -?-------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -?-------------- --:-- / 0 |
???????????????? -?-------------- --:-- / 0 |
Diffusion2D — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 167 | 173 | 51 | 51 | 129 | 128 | 51 | 51 |
Road Runner | 6 | 18 | 0 | 0 | 0 | 0 | 1 | 0 |
Camel | 2 | 23 | 0 | 0 | 0 | 0 | 0 | 0 |
D05N010 FFTTFTFFFFFFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 6 |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
FFTTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
D05N050 TTFFFFFFFFFTTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:PM / 6 |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFTTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
D05N100 FFFTFFFFFFFFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFTFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FFFTFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFTFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D05N150 FTFFFFTFFFFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFFTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FTFFFFTFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FTFFFFTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FTFFFFTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D05N200 FFFFFFFFFFFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FFFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D05N250 FFFFFFTFFTFFTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFTFFTFFTFFT TTTTTTTTTTTTTTTT --:PM / 6 |
FFFFFFTFFT?FTFFT TTTTTTTTTT-TTTTT --:-- / 6 |
CC 0 |
CC 0 |
FFFFFFTFFTFFTFFT TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFFFTFFTFFTFFT TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D05N300 FTTTTFFFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FTTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D05N350 FFFTFFTFFTTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFTFFTTFFFFF TTTTTTTTTTTTTTTT --:PM / 6 |
FFFTFFTFFT?FFFFF TTTTTTTTTT-TTTTT --:-- / 6 |
CC 0 |
CC 0 |
FFFTFFTFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFTFFTFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D10N010 TFFTFFTTFFTFTTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFFTTFFTFTTFF TTTTTTTTTTTTTTTT --:-- / 6 |
TFFTFFTTFFTFTTFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
TFFTFFTTFFTFTTFF TTTTTTTTTTTTTTTT --:-- / 6 |
TFFTFFTTFFTFTTFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D10N050 TTFFFFTTFFFTFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TTFFFFTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFTTFFFTFTFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
TTFFFFTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFTTFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D10N100 FFTFTFTFFFFTFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFTFTFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 6 |
FFTFTFTFFFFTFTFT TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FFTFTFTFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 6 |
FFTFTFTFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D10N150 TFTTFFTFFFFTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
TFTTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
TFTTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
TFTTFFTFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D10N200 FFFTFFTFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFTFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FFFTFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFTFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D20N010 TFFFTTFFFFFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
TFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D20N050 FFFFTFFFFFFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FFFFTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D20N100 TFTFTFFFFFTTTFFF (expected value) 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTFTFFFFFTTTFFF TTTTTTTTTTTTTTTT --:P- / 6 |
TFTFTFFFFFTTTFFF TTTTTTTTTTTTTTTT --:-M / 6 |
CC 0 |
CC 0 |
T?TFTFFFFFTTTFFF T-TTTTTTTTTTTTTT --:-- / 6 |
T?TFTFFFFFTTTFFF T-TTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D20N150 FFFTFFFFTFTFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:P- / 6 |
FFFTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:-M / 6 |
CC 0 |
CC 0 |
FFFTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
D30N010 TFTFFTFTTFTFFFFF (expected value) 4.00 4.00 4.00 4.00 2.00 2.00 4.00 4.00 2.00 4.00 4.00 2.00 4.00 2.00 4.00 2.00 (confidence rate) |
TFTFFTFTTFTFFFFF TTTTTTTTTTTTTTTT --:P- / 6 |
TFTFFTFTTFTFFFFF TTTTTTTTTTTTTTTT --:-M / 6 |
CC 0 |
CC 0 |
TFTF??FT?FT?F?F? TTTT--TT-TT-T-T- --:-- / 4 |
TFTF??FT?FT?F?F? TTTT--TT-TT-T-T- --:-- / 4 |
CC 0 |
CC 0 |
D30N050 FTTTFTTFFTFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 2.00 (confidence rate) |
FTTTFTTFFTFTFF?F TTTTTTTTTTTTTT-T --:-- / 6 |
FTTTFTTFFTFTFFFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FTTTFTTFFTFTFF?? TTTTTTTTTTTTTT-- --:-- / 5 |
FTTTFTTFFTFTFF?? TTTTTTTTTTTTTT-- --:-- / 5 |
CC 0 |
CC 0 |
D30N100 FTFFTFFFTFFFTTFF (expected value) 1.00 2.00 2.00 4.00 2.00 2.00 2.00 2.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
?TFFTFFFTFFFTTFF -TTTTTTTTTTTTTTT --:-- / 6 |
FTFFTFFFTFFFTTFF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
???F????TF?????? ---T----TT------ --:-- / 1 |
???F???????????? ---T------------ --:-- / 0 |
CC 0 |
CC 0 |
D30N150 FTFFFTFFFFFFTFFT (expected value) 4.00 2.00 2.00 4.00 4.00 4.00 2.00 1.00 2.00 2.00 4.00 2.00 4.00 2.00 2.00 2.00 (confidence rate) |
FTFFFTF?FFFFTFFT TTTTTTT-TTTTTTTT --:-- / 6 |
FTFFFTFFFFFFTFFT TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
F??FFT????F?T??? T--TTT----T-T--- --:-- / 2 |
F??FFT????F?T??? T--TTT----T-T--- --:-- / 2 |
CC 0 |
CC 0 |
D40N010 FFFFTFFFFFTFTFFF (expected value) 8.00 6.00 8.00 4.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 3.00 (confidence rate) |
FFF?TFFFFFT?TFFF TTT-TTTTTTT-TTTT --:-- / 5 |
FFF?TFFFFFTFTFF? TTT-TTTTTTTTTTT- --:-- / 5 |
FFFFTFFFFFTFTFF? TTTTTTTTTTTTTTT- --:-- / 6 |
FFFFTFFFFFTFTFF? TTTTTTTTTTTTTTT- --:-- / 6 |
F?F???F????????F T-T---T--------T --:-- / 2 |
F?F???F????????F T-T---T--------T --:-- / 2 |
FFFFTFFFFFTFTFF? TTTTTTTTTTTTTTT- --:-- / 6 |
FFFFTFFFFFTFTFF? TTTTTTTTTTTTTTT- --:-- / 6 |
D40N050 FFT? TTTFTFTFFTFF (expected value) 2.00 4.00 2.00 0 2.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate) |
FFT?TTTFTFTFFTF? TTT?TTTTTTTTTTT- --:-- / 5 |
FFT?TTTFTFTFFTFF TTT?TTTTTTTTTTTT --:-- / 6 |
???????????????? ---?------------ --:-- / 0 |
???????????????? ---?------------ --:-- / 0 |
?F???TTF???????? -T-?-TTT-------- --:-- / 2 |
?F???TTF???????? -T-?-TTT-------- --:-- / 2 |
???????????????? ---?------------ --:-- / 0 |
???????????????? ---?------------ --:-- / 0 |
D40N100 TTFFFFFFFFFFFFFF (expected value) 8.00 8.00 6.00 6.00 8.00 8.00 6.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 6 |
TTFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 6 |
TTFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TT??FF??FFFFFFFF TT--TT--TTTTTTTT --:-- / 5 |
TT??FF??FFFFFFFF TT--TT--TTTTTTTT --:-- / 5 |
TTFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
TTFFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
D40N150 TFFTFTFFFFFTFTTT (expected value) 8.00 2.00 1.00 8.00 8.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 (confidence rate) |
T??TFTFFFFFT?TTT T--TTTTTTTTT-TTT --:-- / 5 |
TFFTFTFFFFFTFTTT TTTTTTTTTTTTTTTT --:PM / 6 |
T??TFTFFFFFTFTTT T--TTTTTTTTTTTTT --:-- / 5 |
T??TFTFFFFFTFTTT T--TTTTTTTTTTTTT --:-- / 5 |
T??TF?F????????? T--TT-T--------- --:-- / 2 |
TF?TF?F????????? TT-TT-T--------- --:-- / 2 |
T??TFTFFFFFTFTTT T--TTTTTTTTTTTTT --:-- / 5 |
T??TFTFFFFFTFTTT T--TTTTTTTTTTTTT --:-- / 5 |
D50N010 TTFFFTFFTFFFFFFF (expected value) 8.00 8.00 7.00 8.00 8.00 8.00 6.00 7.00 6.00 1.00 6.00 7.00 6.00 7.00 5.00 6.00 (confidence rate) |
TT?FFTFFT?FFFF?F TT-TTTTTT-TTTT-T --:-- / 5 |
TTFFFTFFTF?FFFFF TTTTTTTTTT-TTTTT --:-- / 6 |
TTFFFTFFT?FFFFFF TTTTTTTTT-TTTTTT --:-- / 6 |
TTFFFTFFT?FFFFFF TTTTTTTTT-TTTTTT --:-- / 6 |
TTFFFT?F??FF?F?? TTTTTT-T--TT-T-- --:-- / 4 |
TTFFFT?????????? TTTTTT---------- --:-- / 2 |
TTFFFTFFT?FFFFFF TTTTTTTTT-TTTTTT --:-- / 6 |
TTFFFTFFT?FFFFFF TTTTTTTTT-TTTTTT --:-- / 6 |
D50N050 FFFFTTTFFTTTFFFF (expected value) 6.00 6.00 1.00 6.00 7.00 6.00 7.00 3.00 6.00 6.00 6.00 6.00 2.00 6.00 6.00 5.00 (confidence rate) |
FF?FTTTFFTTTFFF? TT-TTTTTTTTTTTT- --:-- / 5 |
FFFFTTTFFTTTFFFF TTTTTTTTTTTTTTTT --:PM / 6 |
FF?FTTT?FTTT?FFF TT-TTTT-TTTT-TTT --:-- / 5 |
FF?FTTT?FTTT?FFF TT-TTTT-TTTT-TTT --:-- / 5 |
CC 0 |
????T?TF???????? ----T-TT-------- --:-- / 1 |
FF?FTTT?FTTT?FFF TT-TTTT-TTTT-TTT --:-- / 5 |
FF?FTTT?FTTT?FFF TT-TTTT-TTTT-TTT --:-- / 5 |
D50N100 TFFFFFTTFFFTTTFF (expected value) 6.00 5.00 8.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
T?F?FFTTFFFTTTFF T-T-TTTTTTTTTTTT --:-- / 5 |
TFFFFFTTFFFTTTFF TTTTTTTTTTTTTTTT --:-M / 6 |
TFFFFFTTFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 6 |
TFFFFFTTFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 6 |
??F????????????? --T------------- --:-- / 0 |
??F????????????? --T------------- --:-- / 0 |
TFFFFFTTFFFTTTFF TTTTTTTTTTTTTTTT --:P- / 6 |
TFFFFFTTFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 6 |
D50N150 FTFFFFFTFFTFFTF? (expected value) 7.00 6.00 7.00 6.00 2.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate) |
FTFF?FFT?FTFFTF? TTTT-TTT-TTTTTT? --:-- / 5 |
FTFFFFFTFFTFFTF? TTTTTTTTTTTTTTT? --:-- / 6 |
FTFF?FFT?FTFFTF? TTTT-TTT-TTTTTT? --:-- / 5 |
FTFF?FFT?FTFFTF? TTTT-TTT-TTTTTT? --:-- / 5 |
CC 0 |
F?F?F??????????? T-T-T----------? --:-- / 1 |
FTFF?FFT?FTFFTF? TTTT-TTT-TTTTTT? --:-- / 5 |
FTFF?FFT?FTFFTF? TTTT-TTT-TTTTTT? --:-- / 5 |
DrinkVendingMachine — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 19 | 14 | 15 | 15 | 15 | 22 | 27 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
02 TFFFTTFTFTFFTFFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
TFFFTTFTFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 14 |
TFFFTTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
10 TFFFF? FFFFTFTTFF (expected value) 6.00 2 2 2 2 0 2 3.00 2 2 2.00 1 2.00 2.00 1 2.00 (confidence rate) |
DNC |
T??????F??T?TT?F T----?-T--T-TT-T --:-- / 5 |
CC 0 |
T??????????????? T----?---------- --:-- / 1 |
T??????????????? T----?---------- --:-- / 1 |
T??????????????? T----?---------- --:-- / 1 |
TFFFF?FFFF?????? TTTTT?TTTT------ --:-- / 8 |
TFFFF?FFFFTFTTFF TTTTT?TTTTTTTTTT --:-- / 13 |
16 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
24 ? (expected value) 0 (confidence rate) |
DNC | CC 0 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
48 ? (expected value) 0 (confidence rate) |
DNC | CC 0 |
CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
76 ? (expected value) 0 (confidence rate) |
DNC | CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
98 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
DNF 0 |
DNF 0 |
DNF 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
DrinkVendingMachine — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 24 | 25 | 27 | 17 | 22 | 19 | 27 | 27 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
02 TFFFTTFTTTFFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:PM / 14 |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFTTFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 14 |
10 TFFFFTFFTFFTFFTT (expected value) 7.00 8.00 7.00 7.00 7.00 2.00 4.00 6.00 6.00 5.00 5.00 5.00 4.00 5.00 5.00 5.00 (confidence rate) |
?FFFF??FTFFT?FTT -TTTT--TTTTT-TTT --:-- / 10 |
TF?FF??FTFFTFFTT TT-TT--TTTTTTTTT --:-- / 11 |
TFFFF?FFTFFTFFTT TTTTT-TTTTTTTTTT --:-- / 13 |
TFF????????????? TTT------------- --:-- / 3 |
TFFFFTFFT??????? TTTTTTTTT------- --:-- / 8 |
TFFFFT?????????? TTTTTT---------- --:-- / 5 |
TFFFF?FFTFFTFFTT TTTTT-TTTTTTTTTT --:-- / 13 |
TFFFF?FFTFFTFFTT TTTTT-TTTTTTTTTT --:-- / 13 |
ERK — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 113 | 113 | 75 | 75 | 96 | 89 | 37 | 37 |
Road Runner | 2 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 4 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
000001 FFFFFTFTFFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 19 |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 19 |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
000010 FFFFFTFFFFFFTTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFTFFFFFFTTTF TTTTTTTTTTTTTTTT --:-M / 19 |
FFFFFTFFFFFFTTTF TTTTTTTTTTTTTTTT --:P- / 19 |
CC 0 |
CC 0 |
FFFFFTFFFFFFTTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFTFFFFFFTTTF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
000100 FTFFTFFTFFFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FTFFTFFT?FFFTFFF TTTTTTTT-TTTTTTT --:-- / 18 |
FTFFTFFTFFFFTFFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
FTFFTFFTFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTFFTFF?????? TTTTTTTTTT------ --:-- / 12 |
CC 0 |
CC 0 |
001000 FTTFFFFFFFFFFTFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FTTFFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:PM / 19 |
FTTFFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFFFFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
010000 TTTFFTFFFTTFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate) |
TTTFFTFFFTTFFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
TTTFFTFFFTTFFFT? TTTTTTTTTTTTTTT- --:-- / 18 |
TTTFFTFFFTTFFFT? TTTTTTTTTTTTTTT- --:-- / 18 |
TTTFFTFFFTTFFFT? TTTTTTTTTTTTTTT- --:-- / 18 |
TTTFFTFF???????? TTTTTTTT-------- --:-- / 10 |
TTTFFTFF???????? TTTTTTTT-------- --:-- / 10 |
TTTFFTFFFTTFFFT? TTTTTTTTTTTTTTT- --:-- / 18 |
TTTFFTFFFTTFFFT? TTTTTTTTTTTTTTT- --:-- / 18 |
100000 TFFTFFTFFFTFFFFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFFTFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFFTFFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
TFFTFFTFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFFTFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFFTF???????? TTTTTTTT-------- --:-- / 10 |
TFFTFFTF???????? TTTTTTTT-------- --:-- / 10 |
CC 0 |
CC 0 |
Echo — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 104 | 96 | 35 | 35 | 52 | 46 | 35 | 35 |
Road Runner | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
d02r09 FTTFTTF? FTFF? TFF (expected value) 8.00 8.00 7.00 1.00 8.00 8.00 8.00 0 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 (confidence rate) |
FTTFTTF?FTFF?TFF TTTTTTT?TTTT?TTT --:-- / 12 |
FT??TTF?FTFF?TFF TT--TTT?TTTT?TTT --:-- / 10 |
FTT?TTF?FTFF?TFF TTT-TTT?TTTT?TTT --:-- / 11 |
FTT?TTF?FTFF?TFF TTT-TTT?TTTT?TTT --:-- / 11 |
FTT?TTF?FTFF?TFF TTT-TTT?TTTT?TTT --:-- / 11 |
FTT?TTF????????? TTT-TTT?----?--- --:-- / 5 |
FTT?TTF?FTFF?TFF TTT-TTT?TTTT?TTT --:-- / 11 |
FTT?TTF?FTFF?TFF TTT-TTT?TTTT?TTT --:-- / 11 |
d02r11 TF? FTT? TFFFTFFTF (expected value) 4.00 4.00 0 4.00 4.00 4.00 0 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
TF?FTT?TFFFTFFTF TT?TTT?TTTTTTTTT --:-- / 12 |
TF?FTT?TFF?TFFTF TT?TTT?TTT-TTTTT --:-- / 11 |
???????????????? --?---?--------- --:-- / 0 |
???????????????? --?---?--------- --:-- / 0 |
TF?FTT?????????? TT?TTT?--------- --:-- / 4 |
TF?FTT?????????? TT?TTT?--------- --:-- / 4 |
???????????????? --?---?--------- --:-- / 0 |
???????????????? --?---?--------- --:-- / 0 |
d02r15 FFFTFF? FFTFTTFFT (expected value) 4.00 4.00 4.00 4.00 1.00 1.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFFTFF?FFTFTTFFT TTTTTT?TTTTTTTTT --:-- / 13 |
FFFT???FFTFTTFFT TTTT--?TTTTTTTTT --:-- / 11 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
FFFT???????????? TTTT--?--------- --:-- / 3 |
FFFT???????????? TTTT--?--------- --:-- / 3 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
d02r19 FTTTFFFTT? TFFFTT (expected value) 6.00 8.00 6.00 7.00 7.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 1.00 6.00 6.00 (confidence rate) |
FTTTFFFTT?TFF?TT TTTTTTTTT?TTT-TT --:-- / 12 |
FTTTFFFTT?TFFFTT TTTTTTTTT?TTTTTT --:-- / 13 |
FTTTFFFTT?TFF?TT TTTTTTTTT?TTT-TT --:-- / 12 |
FTTTFFFTT?TFF?TT TTTTTTTTT?TTT-TT --:-- / 12 |
?T?TF??????????? -T-TT----?------ --:-- / 3 |
?T?????????????? -T-------?------ --:-- / 1 |
FTTTFFFTT?TFF?TT TTTTTTTTT?TTT-TT --:-- / 12 |
FTTTFFFTT?TFF?TT TTTTTTTTT?TTT-TT --:-- / 12 |
d03r03 ? TT? TT? FFFTFTFFT (expected value) 0 4.00 4.00 0 4.00 4.00 0 4.00 3.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate) |
?TT?TT?FFFTFTFFT ?TT?TT?TTTTTTTTT --:-- / 11 |
?TT?TT?F?FTFTF?T ?TT?TT?T-TTTTT-T --:-- / 9 |
???????????????? ?--?--?--------- --:-- / 0 |
???????????????? ?--?--?--------- --:-- / 0 |
?TT?TT?FFFTFTF?T ?TT?TT?TTTTTTT-T --:-- / 10 |
?TT?TT?FFFTFTFFT ?TT?TT?TTTTTTTTT --:-- / 11 |
???????????????? ?--?--?--------- --:-- / 0 |
???????????????? ?--?--?--------- --:-- / 0 |
d03r05 ? FFFTTTFTT? TTT? F (expected value) 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 0 2.00 (confidence rate) |
?FFFTTTFTT?TTT?? ?TTTTTTTTT?TTT?- --:-- / 10 |
?FFFTTTFTT?TTT?F ?TTTTTTTTT?TTT?T --:-- / 11 |
???????????????? ?---------?---?- --:-- / 0 |
???????????????? ?---------?---?- --:-- / 0 |
?FFFTTTFTT?TTT?? ?TTTTTTTTT?TTT?- --:-- / 10 |
?FFFTTTFTT?TTT?F ?TTTTTTTTT?TTT?T --:-- / 11 |
???????????????? ?---------?---?- --:-- / 0 |
???????????????? ?---------?---?- --:-- / 0 |
d03r07 T? ? FTTFFFFF? FFTF (expected value) 2.00 0 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 1.00 2.00 2.00 (confidence rate) |
T??FTTFFFFF?FFTF T??TTTTTTTT?TTTT --:-- / 11 |
T??FTTFFFFF?F?TF T??TTTTTTTT?T-TT --:-- / 10 |
???????????????? -??--------?---- --:-- / 0 |
???????????????? -??--------?---- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -??--------?---- --:-- / 0 |
???????????????? -??--------?---- --:-- / 0 |
d04r03 ? TF? ? TFFTFFFTFFT (expected value) 0 4.00 4.00 0 0 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?TF??TFFTFFFTFFT ?TT??TTTTTTTTTTT --:-- / 11 |
?TF??TF?TFFFTFFT ?TT??TT-TTTTTTTT --:-- / 10 |
???????????????? ?--??----------- --:-- / 0 |
???????????????? ?--??----------- --:-- / 0 |
?TF??TFFTFFFTFFT ?TT??TTTTTTTTTTT --:-- / 11 |
?TF??TFFTFFFTFFT ?TT??TTTTTTTTTTT --:-- / 11 |
???????????????? ?--??----------- --:-- / 0 |
???????????????? ?--??----------- --:-- / 0 |
d05r03 F? FTFFFTTFTFFFF? (expected value) 6.00 0 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate) |
F?FTFFFTTFTFFFF? T?TTTTTTTTTTTTT? --:-- / 12 |
F?FT?FFTTFTFFFF? T?TT-TTTTTTTTTT? --:-- / 11 |
F?FTFFFTTFTFFFF? T?TTTTTTTTTTTTT? --:-- / 12 |
F?FTFFFTTFTFFFF? T?TTTTTTTTTTTTT? --:-- / 12 |
CC 0 |
CC 0 |
F?FTFFFTTFTFFFF? T?TTTTTTTTTTTTT? --:-- / 12 |
F?FTFFFTTFTFFFF? T?TTTTTTTTTTTTT? --:-- / 12 |
EnergyBus — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 96 | 102 | 96 | 96 | 102 | 102 | 102 | 102 |
Road Runner | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 |
none FFFTTTFFFTFFFFFF (expected value) 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
F?FTTTFFFTFFFFFF T-TTTTTTTTTTTTTT --:-- / 96 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
F?FTTTFFFTFFFFFF T-TTTTTTTTTTTTTT --:-- / 96 |
F?FTTTFFFTFFFFFF T-TTTTTTTTTTTTTT --:-- / 96 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:P- / 102 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-M / 102 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
Eratosthenes — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 104 | 105 | 0 | 0 | 114 | 114 | 0 | 0 |
Road Runner | 0 | 2 | 0 | 0 | 3 | 1 | 0 | 0 |
Camel | 2 | 0 | 0 | 0 | 3 | 1 | 0 | 0 |
010 FFTFFTFTFFFFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFFTFTFFFFFTFT TTTTTTTTTTTTTTTT --:-M / 19 |
FFTFFTFTFFFFFTFT TTTTTTTTTTTTTTTT --:P- / 19 |
CC 0 |
CC 0 |
FFTFFTFTFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFTFTFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
020 TFFTFFTFTFFTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFFTFTFFTFFFT TTTTTTTTTTTTTTTT --:-M / 19 |
TFFTFFTFTFFTFFFT TTTTTTTTTTTTTTTT --:P- / 19 |
CC 0 |
CC 0 |
TFFTFFTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFFTFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
050 FFFTTTFFFFTTFFTF (expected value) 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFT?TFFFF?TFFTF TTTT-TTTTT-TTTTT --:-- / 17 |
FFFT?TFFFF?TFFTF TTTT-TTTTT-TTTTT --:-- / 17 |
CC 0 |
CC 0 |
FFFTTTFFFFTTFFTF TTTTTTTTTTTTTTTT --:P- / 19 |
FFFTTTFFFFTTFFTF TTTTTTTTTTTTTTTT --:-M / 19 |
CC 0 |
CC 0 |
100 FTTFTFTFTTFTFTTF (expected value) 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 2.00 4.00 3.00 3.00 3.00 4.00 4.00 4.00 (confidence rate) |
FTTF?FTF?TF?FTTF TTTT-TTT-TT-TTTT --:-- / 16 |
FTTFTFTF?T?T?TTF TTTTTTTT-T-T-TTT --:-- / 16 |
CC 0 |
CC 0 |
FTTFTFTFTTFTFTTF TTTTTTTTTTTTTTTT --:PM / 19 |
FTTFTFTFTTFTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
200 TFTTTTFTFFFTFFTF (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 2.00 2.00 4.00 4.00 4.00 4.00 (confidence rate) |
?FTTTTF?FF??FFTF -TTTTTT-TT--TTTT --:-- / 15 |
TFTTTTFTFF??FFTF TTTTTTTTTT--TTTT --:-- / 17 |
CC 0 |
CC 0 |
TFTTTTFTFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
TFTTTTFTFFFTFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
500 FFFFFFTTTTTFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 3.00 (confidence rate) |
FFFFFFTTTTTFFTF? TTTTTTTTTTTTTTT- --:-- / 18 |
FFFFFFTTTTT?FT?T TTTTTTTTTTT-TT-T --:-- / 17 |
CC 0 |
CC 0 |
FFFFFFTTTTTFFTFT TTTTTTTTTTTTTTTT --:-M / 19 |
FFFFFFTTTTTFFTFT TTTTTTTTTTTTTTTT --:P- / 19 |
CC 0 |
CC 0 |
FMS — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 120 | 119 | 59 | 59 | 114 | 120 | 59 | 59 |
Road Runner | 1 | 7 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 3 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
002 FTFTFFFTTFFTFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-M / 15 |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:P- / 15 |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFTFFFTTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
005 FFTFFTFFFTFFTTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFFTFFFTFFTTTF TTTTTTTTTTTTTTTT --:-M / 15 |
FFTFFTFFFTFFTTTF TTTTTTTTTTTTTTTT --:P- / 15 |
CC 0 |
CC 0 |
FFTFFTFFFTFFTTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFTFFFTFFTTTF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
010 FTFFFFFFFFFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
FTFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFFFFFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
020 TFFFFFFTTTFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFFFTTTFFFFTF TTTTTTTTTTTTTTTT --:PM / 15 |
TFFFF?FTTTFFFFTF TTTTT-TTTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
TFFFFFFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
TFFFFFFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
050 FFTFTTFTFFTFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFTFTTFTFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTTFTFFTFFTFF TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
FFTFTTFTF??????? TTTTTTTTT------- --:-- / 9 |
FFTFTTFTFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
100 FFTFFFFFFFTTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:PM / 15 |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
200 FFTFTTTFFFFFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:PM / 15 |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTTTFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
500 FFFFFTFTFFTTTTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTFTFFTTTTFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFTFFTTTTFT TTTTTTTTTTTTTTTT --:PM / 15 |
FFFFFTFT?FTTTTFT TTTTTTTT-TTTTTTT --:-- / 14 |
FFFFFTFT?FTTTTFT TTTTTTTT-TTTTTTT --:-- / 14 |
FFFFFTFTFFTTTTFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFTFFTTTTFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFT?FTTTTFT TTTTTTTT-TTTTTTT --:-- / 14 |
FFFFFTFT?FTTTTFT TTTTTTTT-TTTTTTT --:-- / 14 |
FlexibleBarrier — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 145 | 137 | 112 | 112 | 107 | 120 | 101 | 101 |
Road Runner | 4 | 5 | 0 | 0 | 3 | 0 | 0 | 0 |
Camel | 3 | 5 | 1 | 0 | 0 | 0 | 1 | 2 |
04a FTTTFTFTTFFFTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:PM / 8 |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTTFTFTTFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
04b TFFFTFTFTFTFFTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:PM / 8 |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTFTFTFTFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
06a FFTFFFFFFTFTFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFFFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
06b FTTTFFTFFFFTFFTF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 3.00 6.00 6.00 3.00 5.00 3.00 4.00 5.00 5.00 (confidence rate) |
FTTTFFTFFF?T?FTF TTTTTTTTTT-T-TTT --:-- / 7 |
FTTTFFTFFFFTFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
FTTTFFT?FFFTFFTF TTTTTTT-TTTTTTTT --:-- / 7 |
FTTTFFT?FFFTFFTF TTTTTTT-TTTTTTTT --:-- / 7 |
FTTTFFTFFF?T??TF TTTTTTTTTT-T--TT --:-- / 6 |
FTTTFFT?FF?????? TTTTTTT-TT------ --:-- / 4 |
CC 0 |
CC 0 |
08a FTFTTFTFTTFTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 (confidence rate) |
FTFTTFTFTTFTFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
FTFTTFTFTTFTFTF? TTTTTTTTTTTTTTT- --:-- / 7 |
FTFTTFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTFTFTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
08b FTFTFFFFFTFTFTFT (expected value) 6.00 6.00 2.00 6.00 6.00 6.00 5.00 5.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate) |
FTFTFFFFFTFTFT?T TTTTTTTTTTTTTT-T --:-- / 7 |
FT?TFF?FFTFTFTFT TT-TTT-TTTTTTTTT --:-- / 7 |
FT?TFFFFFTFTFTFT TT-TTTTTTTTTTTTT --:-- / 7 |
FT?TFFFFFTFTFTFT TT-TTTTTTTTTTTTT --:-- / 7 |
FT?TFFF????????? TT-TTTT--------- --:-- / 3 |
FTFTFFFF???????? TTTTTTTT-------- --:-- / 4 |
CC 0 |
CC 0 |
10a TFFFFFFFFTFFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:P- / 8 |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFFFFFFTFFFTFF TTTTTTTTTTTTTTTT --:-M / 8 |
10b FTFFTFFFF? FFTTFT (expected value) 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 5.00 0 1.00 4.00 5.00 5.00 5.00 4.00 (confidence rate) |
FTFFTFFFF?FFTTFT TTTTTTTTT?TTTTTT --:-- / 7 |
FT?FTFFF????TTF? TT-TTTTT-?--TTT- --:-- / 5 |
FTFFTFFFF??FTTFT TTTTTTTTT?-TTTTT --:-- / 7 |
FTFFTFFFF??FTTFT TTTTTTTTT?-TTTTT --:-- / 7 |
FTFFTFFFF??????? TTTTTTTTT?------ --:-- / 4 |
FTFFTFFFF??FTTFT TTTTTTTTT?-TTTTT --:-- / 7 |
CC 0 |
CC 0 |
12a FTTFTFFTFFFFTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate) |
FTTFTFFTFFFFTFTF TTTTTTTTTTTTTTTT --:PM / 8 |
FTTFTFFT?FFF?FTF TTTTTTTT-TTT-TTT --:-- / 7 |
FTTFTFFTFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTFFTFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTFFTFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTFFTFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTFFTFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTFFTFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
12b T? FFTFTFFTTFFFFT (expected value) 8.00 0 8.00 8.00 7.00 7.00 7.00 7.00 2.00 7.00 7.00 7.00 1.00 7.00 1.00 7.00 (confidence rate) |
T?FFTFTFFTTF?FFT T?TTTTTTTTTT-TTT --:-- / 7 |
T?FFTFTF?TTFFF?T T?TTTTTT-TTTTT-T --:-- / 6 |
T?FFTFTF?TTF?F?T T?TTTTTT-TTT-T-T --:-- / 6 |
T?FFTFTF?TTF?F?T T?TTTTTT-TTT-T-T --:-- / 6 |
T?FF???????????? T?TT------------ --:-- / 1 |
T?FFTFTFFTTF?F?T T?TTTTTTTTTT-T-T --:-- / 6 |
T?FFTFTF?TTF?F?T T?TTTTTT-TTT-T-T --:-- / 6 |
T?FFTFTF?TTF?F?T T?TTTTTT-TTT-T-T --:-- / 6 |
14a FFFFTTFFFFFTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-M / 8 |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:P- / 8 |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
14b ? FFFFTT? FFFTFFFF (expected value) 0 1.00 2.00 1.00 2.00 3.00 3.00 0 1.00 3.00 2.00 2.00 3.00 1.00 3.00 2.00 (confidence rate) |
?FFFFTT??FFTFFFF ?TTTTTT?-TTTTTTT --:-- / 6 |
??F?FTT??FFTF?FF ?-T-TTT?-TTTT-TT --:-- / 5 |
???????????????? ?------?-------- --:-- / 0 |
???????????????? ?------?-------- --:-- / 0 |
CC 0 |
?????TT?FF??F?F? ?----TT?TT--T-T- --:-- / 3 |
CC 0 |
CC 0 |
16a FTFFTFTFTFTFFTFT (expected value) 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFTFTFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFTFTFTFFTFT TTTTTTTTTTTTTTTT --:PM / 8 |
FTF?TFTFTFTFFTFT TTT-TTTTTTTTTTTT --:-- / 7 |
FTF?TFTFTFTFFTFT TTT-TTTTTTTTTTTT --:-- / 7 |
FTFFTFTFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFTFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFTFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTFTFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
16b ? FTFFFFFFTTFTFFF (expected value) 0 4.00 2.00 4.00 1.00 3.00 2.00 1.00 2.00 2.00 2.00 2.00 3.00 2.00 2.00 2.00 (confidence rate) |
?FTF?FF?FTTFTFFF ?TTT-TT-TTTTTTTT --:-- / 6 |
?FTFFFFFFTTFTFFF ?TTTTTTTTTTTTTTT --:-- / 7 |
???????????????? ?--------------- --:-- / 0 |
???????????????? ?--------------- --:-- / 0 |
?F?F???????????? ?T-T------------ --:-- / 1 |
?F?F?F??????T??? ?T-T-T------T--- --:-- / 2 |
???????????????? ?--------------- --:-- / 0 |
???????????????? ?--------------- --:-- / 0 |
18a FFTFFFTTTTFFFTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate) |
FFTFFFTTTTFFFTTF TTTTTTTTTTTTTTTT --:PM / 8 |
FFTFFFTTTTFF?TTF TTTTTTTTTTTT-TTT --:-- / 7 |
FFTFFFTTTTFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTTTTFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTTTTFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTTTTFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTTTTFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFTTTTFFFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
18b FFT? FFF? FFTFTFFF (expected value) 8.00 8.00 7.00 0 6.00 6.00 6.00 0 6.00 6.00 7.00 7.00 7.00 5.00 7.00 7.00 (confidence rate) |
FFT?FFF?FFTFTFFF TTT?TTT?TTTTTTTT --:-- / 7 |
FFT?FFF?FFTFT?FF TTT?TTT?TTTTT-TT --:-- / 6 |
FFT?FFF?FFTFTFFF TTT?TTT?TTTTTTTT --:-- / 7 |
FFT?FFF?FFTFTFFF TTT?TTT?TTTTTTTT --:-- / 7 |
FF?????????????? TT-?---?-------- --:-- / 1 |
FFT???????TFT?FF TTT?---?--TTT-TT --:-- / 4 |
FFT?FFF?FFTFTFFF TTT?TTT?TTTTTTTT --:-- / 7 |
FFT?FFF?FFTFTFFF TTT?TTT?TTTTTTTT --:-- / 7 |
20a FFFFFFFFFFFFTFFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFF?FF?TFFF TTTTTTTT-TT-TTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:P- / 8 |
FFFFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-M / 8 |
20b FTTT? T? TF? TTT? T? (expected value) 4.00 2.00 2.00 2.00 0 4.00 0 2.00 2.00 0 2.00 4.00 2.00 0 4.00 0 (confidence rate) |
FTTT?T?TF?TTT?T? TTTT?T?TT?TTT?T? --:-- / 5 |
FTTT?T?TF?TTT?T? TTTT?T?TT?TTT?T? --:-- / 5 |
???????????????? ----?-?--?---?-? --:-- / 0 |
???????????????? ----?-?--?---?-? --:-- / 0 |
F????T?????T??T? T---?T?--?-T-?T? --:-- / 2 |
F????T?????T??T? T---?T?--?-T-?T? --:-- / 2 |
???????????????? ----?-?--?---?-? --:-- / 0 |
???????????????? ----?-?--?---?-? --:-- / 0 |
22a TFFTFFTTFFFTTFTF (expected value) 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
T?FTFFTTF?FTTFTF T-TTTTTTT-TTTTTT --:-- / 7 |
T?FTFFTT??FTTFTF T-TTTTTT--TTTTTT --:-- / 6 |
T?FTFFTTF?FTTFTF T-TTTTTTT-TTTTTT --:-- / 7 |
T?FTFFTTF?FTTFTF T-TTTTTTT-TTTTTT --:-- / 7 |
TFFTFFTTFFFTTFTF TTTTTTTTTTTTTTTT --:P- / 8 |
TFFTFFTTFFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFTFFTTFFFTTFTF TTTTTTTTTTTTTTTT --:-M / 8 |
TFFTFFTTFFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
22b FFFFFTFFTTF? F? F? (expected value) 1.00 3.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 0 2.00 0 (confidence rate) |
?FFFFTFFTTF?F?F? -TTTTTTTTTT?T?T? --:-- / 6 |
?FFFFTFFTTF?F?F? -TTTTTTTTTT?T?T? --:-- / 6 |
???????????????? -----------?-?-? --:-- / 0 |
???????????????? -----------?-?-? --:-- / 0 |
FF?F???????????? TT-T-------?-?-? --:-- / 1 |
CC 0 |
???????????????? -----------?-?-? --:-- / 0 |
???????????????? -----------?-?-? --:-- / 0 |
GPPP — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 129 | 135 | 70 | 70 | 114 | 127 | 62 | 62 |
Road Runner | 3 | 7 | 0 | 0 | 0 | 1 | 0 | 0 |
Camel | 4 | 5 | 0 | 0 | 0 | 2 | 0 | 0 |
C0001N0000000001 FFFFTFTFFTFFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:-M / 9 |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:P- / 9 |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTFTFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
C0001N0000000010 FFFFFFTFTFFTFTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:PM / 9 |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFFFTFTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
C0001N0000000100 FFFFTFFTTTTTFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 3.00 8.00 8.00 (confidence rate) |
FFFFTFFTT?TTF?TF TTTTTTTTT-TTT-TT --:-- / 8 |
FFFFTFFTTTTTFFTF TTTTTTTTTTTTTTTT --:P- / 9 |
FFFFT?FTT?TTF?TF TTTTT-TTT-TTT-TT --:-- / 7 |
FFFFT?FTT?TTF?TF TTTTT-TTT-TTT-TT --:-- / 7 |
FFFFTFFTTTTTFFTF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTFFTTTTTFFTF TTTTTTTTTTTTTTTT --:-M / 9 |
FFFFT?FTT?TTF?TF TTTTT-TTT-TTT-TT --:-- / 7 |
FFFFT?FTT?TTF?TF TTTTT-TTT-TTT-TT --:-- / 7 |
C0001N0000001000 TFFFTFFTTFTFTFTF (expected value) 4.00 4.00 3.00 4.00 4.00 4.00 4.00 1.00 4.00 3.00 4.00 3.00 4.00 4.00 3.00 4.00 (confidence rate) |
TF?FTFF?TFTFTFTF TT-TTTT-TTTTTTTT --:-- / 8 |
TFFFTFFTT?T?TF?F TTTTTTTTT-T-TT-T --:-- / 7 |
CC 0 |
CC 0 |
TFFFTFF?TFTFTFTF TTTTTTT-TTTTTTTT --:-- / 8 |
TFFFTFF?TFTFTFTF TTTTTTT-TTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
C0001N0000010000 FTTFFTFFFTFFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFFTFFFTFFFTFT TTTTTTTTTTTTTTTT --:PM / 9 |
FTTFFTFF?TFFFTFT TTTTTTTT-TTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
FTTFFTFFFTFFFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFTFFFTFFFTFT TTTTTTTTTTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
C0001N0000100000 FFFFFTFFFTFTFFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFT?FFTFTFFTT TTTTTT-TTTTTTTTT --:-- / 8 |
FFFFFTFFFTFTFFTT TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
FFFFFT?FFTFTFFTT TTTTTT-TTTTTTTTT --:-- / 8 |
FFFFFT?FFTFTFFTT TTTTTT-TTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
C0010N0000000010 TFTFFFFFFFTFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 (confidence rate) |
TFTFFFFFFFTFF?FF TTTTTTTTTTTTT-TT --:-- / 8 |
TFTFFFFFFFTFFTFF TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
TFTFFFFFFFTFF?FF TTTTTTTTTTTTT-TT --:-- / 8 |
TFTFFFFFFFTFF?FF TTTTTTTTTTTTT-TT --:-- / 8 |
CC 0 |
CC 0 |
C0010N0000000100 FFFFTFTFTTTTFFTF (expected value) 4.00 4.00 4.00 4.00 1.00 4.00 1.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFF?F?FTTTTFFTF TTTT-T-TTTTTTTTT --:-- / 8 |
FFFFTFT?TTTTFFTF TTTTTTT-TTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
FFFF?F?FTTTTFFTF TTTT-T-TTTTTTTTT --:-- / 8 |
FFFF?F?FTTTTFFTF TTTT-T-TTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
C0010N1000000000 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
C0100N0000000010 FFTTFFTFFFFTFTTF (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 (confidence rate) |
?FTTFFTFFFFTF?TF -TTTTTTTTTTTT-TT --:-- / 8 |
FFTTFFTFFFFTFTT? TTTTTTTTTTTTTTT- --:-- / 8 |
CC 0 |
CC 0 |
FFTTFFTFFFFTFTTF TTTTTTTTTTTTTTTT --:-- / 9 |
FFTTFFTFFFFTFTTF TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
C0100N0000000100 TFFTFTFFF? FFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 1.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
TFFTF?FFF?FFTFFF TTTTT-TTT?TTTTTT --:-- / 8 |
TFFTFTFFF?FFTFFF TTTTTTTTT?TTTTTT --:-- / 8 |
TFFTF?FFF?FFTFFF TTTTT-TTT?TTTTTT --:-- / 8 |
TFFTF?FFF?FFTFFF TTTTT-TTT?TTTTTT --:-- / 8 |
TFFTF??????????? TTTTT----?------ --:-- / 3 |
TFFTF?FFF?FFTFFF TTTTT-TTT?TTTTTT --:-- / 8 |
TFFTF?FFF?FFTFFF TTTTT-TTT?TTTTTT --:-- / 8 |
TFFTF?FFF?FFTFFF TTTTT-TTT?TTTTTT --:-- / 8 |
C0100N0000001000 TTFFTTFTFTFFTFFF (expected value) 8.00 7.00 8.00 8.00 1.00 8.00 7.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 2.00 (confidence rate) |
T?FF?TFTF?FFTFFF T-TT-TTTT-TTTTTT --:-- / 7 |
TTFFTT?TFTFFTFFF TTTTTT-TTTTTTTTT --:-- / 8 |
TTFF?TFTF?FFTFF? TTTT-TTTT-TTTTT- --:-- / 7 |
TTFF?TFTF?FFTFF? TTTT-TTTT-TTTTT- --:-- / 7 |
TTFF?TFTF?FFTFF? TTTT-TTTT-TTTTT- --:-- / 7 |
TTFF?TFTF?FFTFF? TTTT-TTTT-TTTTT- --:-- / 7 |
TTFF?TFTF?FFTFF? TTTT-TTTT-TTTTT- --:-- / 7 |
TTFF?TFTF?FFTFF? TTTT-TTTT-TTTTT- --:-- / 7 |
C0100N0000010000 FFFFTTTTTTFFFFTF (expected value) 6.00 6.00 4.00 3.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 1.00 5.00 (confidence rate) |
FFFFTTTTTTFFFF?F TTTTTTTTTTTTTT-T --:-- / 8 |
FFFFTTTTTTFFFFTF TTTTTTTTTTTTTTTT --:PM / 9 |
FFF?TTTTTTFFFF?F TTT-TTTTTTTTTT-T --:-- / 8 |
FFF?TTTTTTFFFF?F TTT-TTTTTTTTTT-T --:-- / 8 |
FF?????????????? TT-------------- --:-- / 1 |
FF?FTTTTTTFFFF?F TT-TTTTTTTTTTT-T --:-- / 8 |
CC 0 |
CC 0 |
C0100N0000100000 FTTTFFFFTFTFTFFF (expected value) 8.00 8.00 1.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FT?TFFFFTF?FTFFF TT-TTTTTTT-TTTTT --:-- / 8 |
FTTTFFFFTFTFTFFF TTTTTTTTTTTTTTTT --:PM / 9 |
FT?T?FFFTFTFTFFF TT-T-TTTTTTTTTTT --:-- / 8 |
FT?T?FFFTFTFTFFF TT-T-TTTTTTTTTTT --:-- / 8 |
FT?TFFFFTFTFTFFF TT-TTTTTTTTTTTTT --:-- / 8 |
FT?TFFFFTFTFTFFF TT-TTTTTTTTTTTTT --:-- / 8 |
FT?T?FFFTFTFTFFF TT-T-TTTTTTTTTTT --:-- / 8 |
FT?T?FFFTFTFTFFF TT-T-TTTTTTTTTTT --:-- / 8 |
C1000N0000000010 FTFFFFFFFFFTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 1.00 (confidence rate) |
FTFFFFFFFFF?FFF? TTTTTTTTTTT-TTT- --:-- / 8 |
FTFFFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:PM / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTFFFFFFFFF?FFF? TTTTTTTTTTT-TTT- --:-- / 8 |
FTFFFFFFFFF?FFF? TTTTTTTTTTT-TTT- --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
C1000N0000000100 FFTTTFFFF? FTFFFF (expected value) 7.00 8.00 8.00 1.00 1.00 6.00 6.00 6.00 6.00 0 6.00 6.00 1.00 2.00 6.00 6.00 (confidence rate) |
FFT??FFFF?FT?FFF TTT--TTTT?TT-TTT --:-- / 6 |
?FTTTFFFF?FTFFFF -TTTTTTTT?TTTTTT --:-- / 8 |
FFT??FFFF?FT??FF TTT--TTTT?TT--TT --:-- / 6 |
FFT??FFFF?FT??FF TTT--TTTT?TT--TT --:-- / 6 |
FFT????????????? TTT------?------ --:-- / 2 |
FFT????????????? TTT------?------ --:-- / 2 |
FFT??FFFF?FT??FF TTT--TTTT?TT--TT --:-- / 6 |
FFT??FFFF?FT??FF TTT--TTTT?TT--TT --:-- / 6 |
C1000N0000001000 FFFFFFFTTTFFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 3.00 (confidence rate) |
FFFFFFFTTTFFFTFF TTTTTTTTTTTTTTTT --:PM / 9 |
FFFFFFFTT?FFFTFF TTTTTTTTT-TTTTTT --:-- / 8 |
FFFFFFFTTTFFFTF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFFTTTFFFTF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFFTTTFFFTF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFFTTTFFFTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFFFFTTTFFFTF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFFTTTFFFTF? TTTTTTTTTTTTTTT- --:-- / 8 |
GlobalResAllocation — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 32 | 0 | 14 | 24 | 24 | 14 | 14 |
Road Runner | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
03 FFTFTTTFTFFFTFFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
DNC |
FFTFTTTFTFFFTFFF TTTTTTTTTTTTTTTT --:-M / 14 |
DNC |
FFTFTTTFTFFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFFFTFFF TTTTTTTTTTTTTTTT --:P- / 14 |
FFTFTTTFTFFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFFFTFFF TTTTTTTTTTTTTTTT --:-- / 14 |
05 ? TF? FFTTFF? TFFFT (expected value) 0 2.00 2.00 0 3.00 2.00 3.00 3.00 3.00 2.00 0 3.00 2.00 2.00 3.00 1.00 (confidence rate) |
DNC |
????F?TTF??T??FT ?--?T-TTT-?T--TT --:-- / 6 |
DNC |
???????????????? ?--?------?----- --:-- / 0 |
?TF?FFTTFF?TFFF? ?TT?TTTTTT?TTTT- --:-- / 10 |
?TF?FFTTFF?TFFF? ?TT?TTTTTT?TTTT- --:-- / 10 |
???????????????? ?--?------?----- --:-- / 0 |
???????????????? ?--?------?----- --:-- / 0 |
06 ? FF? FFFTTFFFFFTF (expected value) 0 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
?FF?FFFTTFFFFFTF ?TT?TTTTTTTTTTTT --:-- / 12 |
DNC |
???????????????? ?--?------------ --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ?--?------------ --:-- / 0 |
???????????????? ?--?------------ --:-- / 0 |
07 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
DNC | DNF 0 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
09 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
10 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
11 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
GlobalResAllocation — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 27 | 27 | 0 | 14 | 14 | 14 | 14 | 14 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
03 FFTFTTTFTFTTFTFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FFTFTTTFTFTTFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFTTFTFT TTTTTTTTTTTTTTTT --:PM / 14 |
DNC |
FFTFTTTFTFTTFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFTTFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFTTFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFTTFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFTFTTTFTFTTFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
05 FTFTFFTTTFTFFFTT (expected value) 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FT?TFFTTTFTFFFTT TT-TTTTTTTTTTTTT --:-- / 13 |
FTFTFFTTT?TFFFTT TTTTTTTTT-TTTTTT --:-- / 13 |
DNC |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
HexagonalGrid — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 119 | 119 | 117 | 117 | 85 | 82 | 101 | 101 |
Road Runner | 0 | 6 | 0 | 1 | 0 | 0 | 0 | 0 |
Camel | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 0 |
110 FFFFTTFFFFFFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:PM / 17 |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFTTFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
126 FFFFFFFFFTFFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 17 |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
226 FFFFFTTFFFFFTFTF (expected value) 6.00 4.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFFTTFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFTTFFFFFTFTF TTTTTTTTTTTTTTTT --:PM / 17 |
F?FFFTTFFFFFTFTF T-TTTTTTTTTTTTTT --:-- / 16 |
F?FFFTTFFFFFTFTF T-TTTTTTTTTTTTTT --:-- / 16 |
FFFFTTTFFFFFTFTF TTTTXTTTTTTTTTTT V-:-- / 14 |
FFFFTTTFFFFFTFTF TTTTXTTTTTTTTTTT V-:-- / 14 |
CC 0 |
CC 0 |
316 FFTTFFFFFFFFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 (confidence rate) |
FFTTFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:PM / 17 |
FFTTFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTFFFF?FFFTF?? TTTTTTTT-TTTTT-- --:-- / 14 |
FFTTFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFTTFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
410 FFFFFFTFFTFFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:PM / 17 |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 17 |
FFFFFFTFFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 17 |
516 TFFFTFFFFTFFTFFF (expected value) 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 2.00 (confidence rate) |
TFFFTFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTFFFFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 17 |
TFFFTFFFFTFFTFF? TTTTTTTTTTTTTTT- --:-- / 16 |
TFFFTFFFFTFFTFF? TTTTTTTTTTTTTTT- --:-- / 16 |
TFF????????????? TTT------------- --:-- / 3 |
TFF????????????? TTT------------- --:-- / 3 |
TFFFTFFFFTFFTFF? TTTTTTTTTTTTTTT- --:-- / 16 |
TFFFTFFFFTFFTFF? TTTTTTTTTTTTTTT- --:-- / 16 |
816 TFFFTTFFFFFFFFFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFFTTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 17 |
TFFFTTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTTFFFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 17 |
CC 0 |
CC 0 |
TFFFTTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
TFFFTTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 17 |
HouseConstruction — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 105 | 108 | 55 | 55 | 114 | 114 | 30 | 30 |
Road Runner | 2 | 2 | 0 | 0 | 0 | 1 | 0 | 0 |
Camel | 1 | 2 | 0 | 1 | 0 | 1 | 0 | 0 |
002 FFFTFTFFFTTFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFTFFFTTFFFFT TTTTTTTTTTTTTTTT --:PM / 15 |
FFFTFTFF?TTFFFFT TTTTTTTT-TTTTTTT --:-- / 14 |
FFFTFTFFFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTFTFFFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTFTFFFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTFTFFFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTFTFFFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTFTFFFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
005 TFTTTTTTFTFFTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTTTTTTFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 15 |
TFTTTTTTFTFFTFTF TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
TFTTTTTTFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 15 |
TFTTTTTTFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
010 TFFFTFFTTTFFTFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 (confidence rate) |
TFFFTFFTTTFFT??T TTTTTTTTTTTTT--T --:-- / 13 |
TFFFTFFTTTFFTFTT TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
TFFFTFFTTTFFTFTT TTTTTTTTTTTTTTTT --:-- / 15 |
TFFFTFFTTTFFTFTT TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
020 TFFTTFTTTFFFFTTT (expected value) 3.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?FFT?FTT?FFFFTTT -TTT-TTT-TTTTTTT --:-- / 12 |
TFFTT?TT?FFFFTTT TTTTT-TT-TTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
TFFTTFTTTFFFFTTT TTTTTTTTTTTTTTTT --:-- / 15 |
TFFTTFTTTFFFFTTT TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
050 TTTTFF? TFTFFTTTT (expected value) 3.00 4.00 3.00 1.00 4.00 4.00 0 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 (confidence rate) |
?T??FF??FTFFTTT? -T--TT?-TTTTTTT- --:-- / 10 |
TTTTFF?TFTFFTTT? TTTTTT?TTTTTTTT- --:-- / 13 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
TTT?FF?TFTFFTTTT TTT-TT?TTTTTTTTT --:-- / 13 |
TTT?FF?TFTFFTTTT TTT-TT?TTTTTTTTT --:-- / 13 |
???????????????? ------?--------- --:-- / 0 |
???????????????? ------?--------- --:-- / 0 |
100 FFFFTTTTF? TFFFFT (expected value) 5.00 6.00 3.00 6.00 6.00 6.00 6.00 1.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFTTT?F?TFFFFT TTTTTTT-T?TTTTTT --:-- / 13 |
?F?FTTTTF?TFFFFT -T-TTTTTT?TTTTTT --:-- / 12 |
FF?FTTT?F?TFFFFT TT-TTTT-T?TTTTTT --:-- / 12 |
FF?FTTT?F?TFFFFT TT-TTTT-T?TTTTTT --:-- / 12 |
FFFFTTT?F?TFFFFT TTTTTTT-T?TTTTTT --:-- / 13 |
FFFFTTT?F?TFFFFT TTTTTTT-T?TTTTTT --:-- / 13 |
CC 0 |
CC 0 |
200 FFT? ? FTFFTFFTFTT (expected value) 6.00 6.00 6.00 0 0 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 (confidence rate) |
FFT??FTFFTFFT?TT TTT??TTTTTTTT-TT --:-- / 12 |
FFT???TFFTFFTFTT TTT??-TTTTTTTTTT --:-- / 12 |
FFT??FTFFTFFTFTT TTT??TTTTTTTTTTT --:-- / 13 |
FFT??FTFFTFFTFTT TTT??TTTTTTTTTTT --:-- / 13 |
FFT??FTFFTFFTFTT TTT??TTTTTTTTTTT --:-- / 13 |
FFT??FTFFTFFTFTT TTT??TTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
500 TTFTFTTTFFTTFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate) |
TTFTFTTTFFTTFFTF TTTTTTTTTTTTTTTT --:P- / 15 |
TTFTFTTTFFTT?FTF TTTTTTTTTTTT-TTT --:-- / 14 |
TTFTFTTTFFTTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
TTFTFTTTFFTTFFTF TTTTTTTTTTTTTTTT --:-M / 15 |
TTFTFTTTFFTTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
TTFTFTTTFFTTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
TTFTFTTTFFTTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
TTFTFTTTFFTTFFTF TTTTTTTTTTTTTTTT --:-- / 15 |
HypercubeGrid — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 70 | 81 | 88 | 88 | 2 | 2 | 88 | 88 |
Road Runner | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
C3K4P4B12 FTFFFFFFFFTTFFF? (expected value) 6.00 6.00 6.00 5.00 6.00 6.00 6.00 1.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate) |
FTFFFFFFF?TTFFF? TTTTTTTTT-TTTTT? --:-- / 32 |
FTF?FFF?FFTTFFF? TTT-TTT-TTTTTTT? --:-- / 29 |
FTFFFFF?F?TTFFF? TTTTTTT-T-TTTTT? --:-- / 29 |
FTFFFFF?F?TTFFF? TTTTTTT-T-TTTTT? --:-- / 29 |
CC 0 |
CC 0 |
FTFFFFF?F?TTFFF? TTTTTTT-T-TTTTT? --:-- / 29 |
FTFFFFF?F?TTFFF? TTTTTTT-T-TTTTT? --:-- / 29 |
C4K3P3B12 FFFTFTFFTFFFFFTF (expected value) 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 2.00 6.00 5.00 6.00 6.00 6.00 (confidence rate) |
FFFTFTFFTFFFFFTF TTTTTTTTTTTTTTTT --:PM / 36 |
FFFTFTFFTFFF?FTF TTTTTTTTTTTT-TTT --:-- / 34 |
FFFTFTFFTF?FFFTF TTTTTTTTTT-TTTTT --:-- / 34 |
FFFTFTFFTF?FFFTF TTTTTTTTTT-TTTTT --:-- / 34 |
?F?????????????? -T-------------- --:-- / 2 |
?F?????????????? -T-------------- --:-- / 2 |
FFFTFTFFTF?FFFTF TTTTTTTTTT-TTTTT --:-- / 34 |
FFFTFTFFTF?FFFTF TTTTTTTTTT-TTTTT --:-- / 34 |
C5K3P3B15 F? FF? FFF? F? FFFFT (expected value) 5.00 0 5.00 5.00 0 5.00 4.00 5.00 0 4.00 0 5.00 4.00 4.00 1.00 6.00 (confidence rate) |
???????????????T -?--?---?-?----T --:-- / 2 |
F?FF?F?F???F??FT T?TT?T-T?-?T--TT --:-- / 18 |
F?FF?FFF?F?FFF?T T?TT?TTT?T?TTT-T --:-- / 25 |
F?FF?FFF?F?FFF?T T?TT?TTT?T?TTT-T --:-- / 25 |
CC 0 |
CC 0 |
F?FF?FFF?F?FFF?T T?TT?TTT?T?TTT-T --:-- / 25 |
F?FF?FFF?F?FFF?T T?TT?TTT?T?TTT-T --:-- / 25 |
HypertorusGrid — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 97 | 93 | 74 | 74 | 58 | 58 | 74 | 74 |
Road Runner | 0 | 1 | 0 | 1 | 0 | 2 | 0 | 1 |
Camel | 1 | 0 | 0 | 0 | 0 | 2 | 0 | 2 |
d2k1p8b00 TFFFFFFFFFFFTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-M / 19 |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:P- / 19 |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
d2k2p1b00 FFFFFFFFFTFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate) |
FFFFFFFFFTFFFFFF TTTTTTTTTTTTTTXT V-:-- / 16 |
FFFFFFFFFTFFFFFF TTTTTTTTTTTTTTXT V-:-- / 16 |
CC 0 |
CC 0 |
FFFFFFFFFTFFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFFFTFFFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
d2k3p2b04 FTFFTFFFFFTFFFFF (expected value) 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate) |
FFFFTFFFFFTFFFFF TXTTTTTTTTTTTTTT V-:-- / 16 |
FFFFTFFFFFTFFF?F TXTTTTTTTTTTTT-T V-:-- / 15 |
CC 0 |
CC 0 |
FTFFTFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTFFFFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
d3k3p2b06 FFFFFFFFFFFFFFTF (expected value) 7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:P- / 19 |
CC 0 |
F??????????????? T--------------- --:-- / 1 |
FFFFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-M / 19 |
d4k3p2b08 FFTFFFFTTFTFFFTF (expected value) 6.00 6.00 6.00 7.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFTFFFFTTFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFF?TTFTFFFTF TTTTTT-TTTTTTTTT --:-- / 18 |
FFTFFFFTTFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFTTFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
???F???????????? ---T------------ --:-- / 1 |
CC 0 |
FFTFFFFTTFTFFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFTTFTFFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
d5k3p2b10 FTTFTTFT? TFFFFFF (expected value) 4.00 6.00 5.00 1.00 5.00 5.00 4.00 6.00 0 5.00 5.00 4.00 4.00 4.00 5.00 5.00 (confidence rate) |
?TTFTT?T?T?????? -TTTTT-T?T------ --:-- / 8 |
?T?????T??F???FF -T-----T?-T---TT --:-- / 6 |
FTT?TTFT?TFFFFFF TTT-TTTT?TTTTTTT --:-- / 17 |
FTT?TTFT?TFFFFFF TTT-TTTT?TTTTTTT --:-- / 17 |
CC 0 |
CC 0 |
FTT?TTFT?TFFFFFF TTT-TTTT?TTTTTTT --:-- / 17 |
FTT?TTFT?TFFFFFF TTT-TTTT?TTTTTTT --:-- / 17 |
IBM319 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 102 | 102 | 102 | 102 | 102 | 102 | 102 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none FFFTTFFFTFFTFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:PM / 102 |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTTFFFTFFTFFTF TTTTTTTTTTTTTTTT --:-- / 102 |
IBM5964 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 102 | 102 | 102 | 102 | 102 | 102 | 102 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none FFFTFFFFFTFFTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:PM / 102 |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 102 |
FFFTFFFFFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 102 |
IBM703 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 102 | 102 | 102 | 102 | 102 | 102 | 102 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none FTFFFFFTTFFTTTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:PM / 102 |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFFTTFFTTTTF TTTTTTTTTTTTTTTT --:-- / 102 |
IBMB2S565S3960 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 102 | 102 | 102 | 96 | 96 | 102 | 102 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none FTFFFFTFTFTFTTFF (expected value) 8.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFFFTFTFTFTTFF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFTFTFTFTTFF TTTTTTTTTTTTTTTT --:PM / 102 |
FTFFFFTFTFTFTTFF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFTFTFTFTTFF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFF?TFTFTFTTFF TTTTT-TTTTTTTTTT --:-- / 96 |
FTFFF?TFTFTFTTFF TTTTT-TTTTTTTTTT --:-- / 96 |
FTFFFFTFTFTFTTFF TTTTTTTTTTTTTTTT --:-- / 102 |
FTFFFFTFTFTFTTFF TTTTTTTTTTTTTTTT --:-- / 102 |
IOTPpurchase — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 112 | 110 | 52 | 52 | 110 | 110 | 52 | 52 |
Road Runner | 1 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
C01M01P01D01 FFTFTTFFFFTTTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:-- / 28 |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:PM / 28 |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:-- / 28 |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:-- / 28 |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:-- / 28 |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:-- / 28 |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:-- / 28 |
FFTFTTFFFFTTTFFF TTTTTTTTTTTTTTTT --:-- / 28 |
C03M03P03D03 FTTFFTFFFFFFFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFFTFFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 28 |
FTTFFTFFFFFFFTTF TTTTTTTTTTTTTTTT --:PM / 28 |
CC 0 |
CC 0 |
FTTFFTFFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 28 |
FTTFFTFFFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
C05M04P03D02 TTFFFFFFFFTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TTFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 28 |
TTFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 28 |
CC 0 |
CC 0 |
TTFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 28 |
TTFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 28 |
CC 0 |
CC 0 |
C12M10P15D17 TFFFTFFFFFFTFFFF (expected value) 8.00 4.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFTFFFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 28 |
TFFFT?FFFFFTFFFF TTTTT-TTTTTTTTTT --:-- / 26 |
T?FFT?FFFFFTFFFF T-TTT-TTTTTTTTTT --:-- / 24 |
T?FFT?FFFFFTFFFF T-TTT-TTTTTTTTTT --:-- / 24 |
TFFFT?FFFFFTFFFF TTTTT-TTTTTTTTTT --:-- / 26 |
TFFFT?FFFFFTFFFF TTTTT-TTTTTTTTTT --:-- / 26 |
T?FFT?FFFFFTFFFF T-TTT-TTTTTTTTTT --:-- / 24 |
T?FFT?FFFFFTFFFF T-TTT-TTTTTTTTTT --:-- / 24 |
JoinFreeModules — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 106 | 105 | 0 | 0 | 88 | 90 | 0 | 0 |
Road Runner | 1 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 3 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
0003 FFFTFFTFFFFFTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFTFFFFFTFTF TTTTTTTTTTTTTTTT --:-M / 11 |
FFFTFFTFFFFFTFTF TTTTTTTTTTTTTTTT --:P- / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTFFTFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFTFFTFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0004 FFFFFFFFFFTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-M / 11 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:P- / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0005 FFFFFTFFTFFTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFTFFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFTFFTFFTFFFT TTTTTTTTTTTTTTTT --:PM / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFTFFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFTFFTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0010 TTFTTFFFFFFFTTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TTFTTFFFFFFFTTFT TTTTTTTTTTTTTTTT --:PM / 11 |
TTFTTFFF?FFFTTFT TTTTTTTT-TTTTTTT --:-- / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFTTFFFFF?FTTFT TTTTTTTTTT-TTTTT --:-- / 10 |
TTFTTFFFFFFFTTFT TTTTTTTTTTTTTTTT --:-- / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0020 FTFTTTFFFFTFFFTF (expected value) 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate) |
FTFTTTFFF?TFFFTF TTTTTTTTT-TTTTTT --:-- / 10 |
FT?TTTFFF?TFFFT? TT-TTTTTT-TTTTT- --:-- / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FT?TTTFFFFTFFFTF TT-TTTTTTTTTTTTT --:-- / 10 |
FT?TTTFFF?TFFFTF TT-TTTTTT-TTTTTT --:-- / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0050 FFFFFTFFFFFTFFFF (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFT?FFFFTFFFF TTTTTT-TTTTTTTTT --:-- / 10 |
?FFFFT?FFF?TFFFF -TTTTT-TTT-TTTTT --:-- / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFTF?FF?TFFFF TTTTTTT-TT-TTTTT --:-- / 10 |
FFFFFTF?FF?TFFFF TTTTTTT-TT-TTTTT --:-- / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0100 ? FFFFFFFFFFF? FTF (expected value) 0 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 2.00 0 2.00 2.00 2.00 (confidence rate) |
?F?FFFFFFFF??FTF ?T-TTTTTTTT-?TTT --:-- / 8 |
?FFFFFFFF?F??FTF ?TTTTTTTT-T-?TTT --:-- / 8 |
???????????????? ?-----------?--- --:-- / 0 |
???????????????? ?-----------?--- --:-- / 0 |
?FFFFFFFF?FF???? ?TTTTTTTT-TT?--- --:-- / 7 |
?FFFFFFFF?FF???? ?TTTTTTTT-TT?--- --:-- / 7 |
???????????????? ?-----------?--- --:-- / 0 |
???????????????? ?-----------?--- --:-- / 0 |
0200 ? TFTTTFTFFF? TFFF (expected value) 0 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 0 4.00 4.00 4.00 4.00 (confidence rate) |
?TFTTTFTFFF?TFFF ?TTTTTTTTTT?TTTT --:-- / 10 |
?T?TTTFTFF??TFFF ?T-TTTTTTT-?TTTT --:-- / 8 |
???????????????? ?----------?---- --:-- / 0 |
???????????????? ?----------?---- --:-- / 0 |
?T?TTTFTFFF?TFFF ?T-TTTTTTTT?TTTT --:-- / 9 |
?T?TTTFTFFF?TFFF ?T-TTTTTTTT?TTTT --:-- / 9 |
???????????????? ?----------?---- --:-- / 0 |
???????????????? ?----------?---- --:-- / 0 |
0500 F? F? FFTTFFFTF? FF (expected value) 3.00 0 4.00 0 2.00 3.00 2.00 4.00 4.00 2.00 3.00 4.00 4.00 0 3.00 2.00 (confidence rate) |
F?F?FFTTFFFTF?FF T?T?TTTTTTTTT?TT --:-- / 9 |
F?F?F?TTFF?TF?FF T?T?T-TTTT-TT?TT --:-- / 8 |
???????????????? -?-?---------?-- --:-- / 0 |
???????????????? -?-?---------?-- --:-- / 0 |
??F??F?TF?FTF??? -?T?-T-TT-TTT?-- --:-- / 5 |
F?F??F?TF?FTF?F? T?T?-T-TT-TTT?T- --:-- / 6 |
???????????????? -?-?---------?-- --:-- / 0 |
???????????????? -?-?---------?-- --:-- / 0 |
1000 T? TFTFTTTFFTFTTF (expected value) 4.00 0 2.00 2.00 2.00 1.00 2.00 2.00 4.00 2.00 3.00 4.00 3.00 2.00 2.00 2.00 (confidence rate) |
T?TFT?TTT??T?TTF T?TTT-TTT--T-TTT --:-- / 8 |
T?TFTFTTT?FTFTTF T?TTTTTTT-TTTTTT --:-- / 10 |
???????????????? -?-------------- --:-- / 0 |
???????????????? -?-------------- --:-- / 0 |
T???????TFFTF??? T?------TTTTT--- --:-- / 4 |
T???????TFFTF??? T?------TTTTT--- --:-- / 4 |
???????????????? -?-------------- --:-- / 0 |
???????????????? -?-------------- --:-- / 0 |
2000 FTFF? F? FFFTFFFTT (expected value) 1.00 2.00 1.00 2.00 0 1.00 0 1.00 1.00 2.00 2.00 1.00 1.00 1.00 2.00 2.00 (confidence rate) |
?T?F?????FT???TT -T-T?-?--TT---TT --:-- / 4 |
FTFF?F?FFFTFFFTT TTTT?T?TTTTTTTTT --:-- / 10 |
???????????????? ----?-?--------- --:-- / 0 |
???????????????? ----?-?--------- --:-- / 0 |
DNF 0 |
DNF 0 |
???????????????? ----?-?--------- --:-- / 0 |
???????????????? ----?-?--------- --:-- / 0 |
5000 ? ? ? TF? ? T? ? ? ? ? ? FT (expected value) 0 0 0 1.00 1.00 0 0 1.00 0 0 0 0 0 0 1.00 1.00 (confidence rate) |
???TF??T??????FT ???TT??T??????TT --:-- / 3 |
CC 0 |
???????????????? ???--??-??????-- --:-- / 0 |
???????????????? ???--??-??????-- --:-- / 0 |
DNF 0 |
DNF 0 |
???????????????? ???--??-??????-- --:-- / 0 |
???????????????? ???--??-??????-- --:-- / 0 |
Kanban — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 119 | 116 | 45 | 45 | 103 | 104 | 30 | 30 |
Road Runner | 3 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 4 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
0005 FFFFTTFFTTFFFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:-M / 15 |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:P- / 15 |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTTFFTTFFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
0010 TFFTTFFFFTFTFFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTTFFFFTFTFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
TFFTTFFFFTFTFFTT TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
TFFTTFFFFTFTFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
TFFTTFFFFTFTFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
0020 FFFFTFFFFTFTFFFF (expected value) 4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:PM / 15 |
F?FF?FFFFTFTFFFF T-TT-TTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
FFFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
0050 FFFTFFFTFTFFFTFF (expected value) 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFTFFFTFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTFFFTFTFFFTFF TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
FFFTFFFTFTFFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFT???????????? TTTT------------ --:-- / 4 |
CC 0 |
CC 0 |
0100 TFFTFFFFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 2.00 (confidence rate) |
TFFTFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 15 |
TFFTFFFFFFFFFFF? TTTTTTTTTTTTTTT- --:-- / 14 |
CC 0 |
CC 0 |
TFFTFFFFFFF????? TTTTTTTTTTT----- --:-- / 10 |
TFFTFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
0200 FFTFFFFFTFFFTFFT (expected value) 4.00 2.00 4.00 4.00 4.00 4.00 3.00 2.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFTFFFFFTFFFTFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFFFFFTFFFTFFT TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
F?TFFF?????????? T-TTTT---------- --:-- / 5 |
F?TFFFF?TF?FTFFT T-TTTTT-TT-TTTTT --:-- / 12 |
CC 0 |
CC 0 |
0500 FFFFTTFFTFFTFTFF (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 3.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFTT?FTFFTFTFF TTTTTT-TTTTTTTTT --:-- / 14 |
FFFFTTFFTFFTFTFF TTTTTTTTTTTTTTTT --:PM / 15 |
FFFFTTFFTFFTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTTFFTFFTFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTT??TFFTFTFF TTTTTT--TTTTTTTT --:-- / 13 |
FFFFTT??TFFTFTFF TTTTTT--TTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
1000 FTTTFTFFTFFFFFFT (expected value) 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTTFTFFTFFFFFFT TTTTTTTTTTTTTTTT --:PM / 15 |
FT?TFTFFTFFFFFFT TT-TTTTTTTTTTTTT --:-- / 14 |
FTTTFTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FTTTFTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FTTTFTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FTTTFTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FTTTFTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
FTTTFTFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
LamportFastMutEx — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 67 | 10 | 29 | 58 | 58 | 20 | 20 |
Road Runner | 0 | 4 | 0 | 0 | 0 | 0 | 1 | 0 |
Camel | 0 | 4 | 0 | 0 | 0 | 0 | 1 | 0 |
2 FFFFFTFFFTTTTFFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FFFFFTFFFTTTTFFF TTTTTTTTTTTTTTTT --:PM / 10 |
FFFFFTFFFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFFTTTTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
3 TFFTFFFTFFFFFFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TFFTFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
TFFTFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFTFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
4 TFFTFTFFFFFFFFTT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TFFTFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
TFFTFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 10 |
TFFTFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
5 FFTFFTTFTFFFTFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FFTFFTTFTFFFTFFF TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
FFTFFTTFTFFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFTFFTTFTFFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
6 FTFFFFFTFTTTFF? T (expected value) 3.00 3.00 3.00 1.00 3.00 2.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 (confidence rate) |
DNC |
FTFFF?FTFTTTFF?T TTTTT-TTTTTTTT?T --:-- / 9 |
CC 0 |
CC 0 |
FTF?FFF????????? TTT-TTT-------?- --:-- / 4 |
FTF?FFF????????? TTT-TTT-------?- --:-- / 4 |
CC 0 |
CC 0 |
7 FFFFFFTFFTFFTTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate) |
DNC |
FFFFFFTF?TFFTTFF TTTTTTTT-TTTTTTT --:-- / 9 |
???????????????? ---------------- --:-- / 0 |
FFFFFFTFFTFF?TFF TTTTTTTTTTTT-TTT --:-- / 9 |
FFFFFFTF???????? TTTTTTTT-------- --:-- / 5 |
FFFFFFTF???????? TTTTTTTT-------- --:-- / 5 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
8 FFFFFTTTTFFTFTFT (expected value) 4.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
DNC |
FFFFFTTTTF?TFTFT TTTTTTTTTT-TTTTT --:-- / 9 |
???????????????? ---------------- --:-- / 0 |
FFFFFTTTTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
?FF?FTTTTFFTFTFT -TT-TTTTTTTTTTTT --:-- / 9 |
?FF?FTTTTFFTFTFT -TT-TTTTTTTTTTTT --:-- / 9 |
FFFFFTTTTFFTFTFT TTTTTTTTTTTTTTTT --:PM / 10 |
FFFFFTTTTFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
LamportFastMutEx — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 61 | 69 | 25 | 25 | 52 | 64 | 16 | 16 |
Road Runner | 0 | 6 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 6 | 0 | 0 | 0 | 0 | 0 | 0 |
2 FFFFFTFFTTTFTTTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:PM / 10 |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFTTTFTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
3 TFFTFFFTTFTTTTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFFFTTFTTTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFTFFFTTFTTTTFF TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
TFFTFFFTTFTTTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFTFFFTTFTTTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
4 TFFTFTFFTTFTTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFTFFTTFTTFFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFFTFTFFTTFTTFFT TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
TFFTFTFFTTFTTFFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFFTFTFFTTFTTFFT TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
5 FFTFFTTFTTFTFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 1.00 4.00 4.00 (confidence rate) |
FFTFFTTFTTF?F?FT TTTTTTTTTTT-T-TT --:-- / 9 |
FFTFFTTFTTFTFTFT TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
FFTFFTTFTTF?F?FT TTTTTTTTTTT-T-TT --:-- / 9 |
FFTFFTTFTTF?F?FT TTTTTTTTTTT-T-TT --:-- / 9 |
CC 0 |
CC 0 |
6 FTFFFFFTFFFFFTFF (expected value) 4.00 4.00 4.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FTFF?F??FFFFFTFF TTTT-T--TTTTTTTT --:-- / 8 |
FTFFF?FTFFFFFTFF TTTTT-TTTTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
FTF?FFF????????? TTT-TTT--------- --:-- / 4 |
FTFFFFF?FFFFFTFF TTTTTTT-TTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
7 FFFFFFTFFTTFTTFT (expected value) 6.00 5.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate) |
F?F?FF?FFTTFTTF? T-T-TT-TTTTTTTT- --:-- / 7 |
FFFFFFTFFTTFTTFT TTTTTTTTTTTTTTTT --:PM / 10 |
FFFFFFTFFTTFTTF? TTTTTTTTTTTTTTT- --:-- / 9 |
FFFFFFTFFTTFTTF? TTTTTTTTTTTTTTT- --:-- / 9 |
FFFFFFTFFTTFTTF? TTTTTTTTTTTTTTT- --:-- / 9 |
FFFFFFTFFTTFTTF? TTTTTTTTTTTTTTT- --:-- / 9 |
CC 0 |
CC 0 |
8 FFFFFTTTTFTTTFTT (expected value) 6.00 7.00 7.00 6.00 7.00 7.00 6.00 6.00 7.00 7.00 1.00 1.00 3.00 2.00 3.00 3.00 (confidence rate) |
FFFFFT??TF??TFTT TTTTTT--TT--TTTT --:-- / 7 |
FFFFFTTTTFTTTFTT TTTTTTTTTTTTTTTT --:PM / 10 |
FFFFFTTTTF?????? TTTTTTTTTT------ --:-- / 6 |
FFFFFTTTTF?????? TTTTTTTTTT------ --:-- / 6 |
CC 0 |
?FF?FTTTTF??T?TT -TT-TTTTTT--T-TT --:-- / 7 |
FFFFFTTTTF?????? TTTTTTTTTT------ --:-- / 6 |
FFFFFTTTTF?????? TTTTTTTTTT------ --:-- / 6 |
MAPK — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 119 | 103 | 20 | 20 | 75 | 102 | 20 | 20 |
Road Runner | 2 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 3 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
008 FFFTFFTFTTTFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:-M / 20 |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:P- / 20 |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 20 |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 20 |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 20 |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 20 |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 20 |
FFFTFFTFTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 20 |
020 FTFFFFFFTFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FTFFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 20 |
FTFFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:PM / 20 |
CC 0 |
CC 0 |
FTFFFFFFTF?????? TTTTTTTTTT------ --:-- / 13 |
FTFFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 20 |
CC 0 |
CC 0 |
040 TTFTFTTFFFFTTFFT (expected value) 4.00 3.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 3.00 3.00 3.00 (confidence rate) |
TTFTFTTFFFFTTFFT TTTTTTTTTTTTTTTT --:PM / 20 |
T??TF?TFF??TT??? T--TT-TTT--TT--- --:-- / 10 |
CC 0 |
CC 0 |
TTFTFTTFFFFTTFFT TTTTTTTTTTTTTTTT --:-- / 20 |
TTFTFTTFFFFTTFFT TTTTTTTTTTTTTTTT --:-- / 20 |
CC 0 |
CC 0 |
080 FTTFFFFFFFFFFFFT (expected value) 2.00 4.00 4.00 4.00 4.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 (confidence rate) |
FTTFFFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 20 |
FTTFFFFFFFFFFFFT TTTTTTTTTTTTTTTT --:PM / 20 |
CC 0 |
CC 0 |
?TTFFF?FFFFFFF?? -TTTTT-TTTTTTT-- --:-- / 15 |
?TTFF??????????? -TTTT----------- --:-- / 5 |
CC 0 |
CC 0 |
160 FFTFTFFTFFFFFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 1.00 1.00 3.00 3.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 (confidence rate) |
FFTFTFFTFFFFFTTF TTTTTTTTTTTTTTTT --:PM / 20 |
FFTFT??TFF?F?TTF TTTTT--TTT-T-TTT --:-- / 15 |
CC 0 |
CC 0 |
FFTFT??????????? TTTTT----------- --:-- / 6 |
FFTFT??TFFFFFTTF TTTTT--TTTTTTTTT --:-- / 18 |
CC 0 |
CC 0 |
320 FFTFFTFTFFFFTFFT (expected value) 4.00 1.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
F?TFFTFTFFFFTFFT T-TTTTTTTTTTTTTT --:-- / 19 |
F?TFFT?TFFFFTFFT T-TTTT-TTTTTTTTT --:-- / 18 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
F??????????????? T--------------- --:-- / 1 |
FFTFFT?TFFFFTFFT TTTTTT-TTTTTTTTT --:-- / 19 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
MultiwaySync — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 102 | 102 | 102 | 102 | 102 | 102 | 102 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none TFFFFFFTFFTFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 102 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
TFFFFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 102 |
NeighborGrid — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 113 | 113 | 115 | 115 | 92 | 90 | 115 | 115 |
Road Runner | 1 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 4 | 0 | 1 | 0 | 0 | 0 | 0 |
d2n3m1c12 FFFTTTFFFFFFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 23 |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFFTTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
d2n3m1t12 FFTFTTFFTFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:PM / 23 |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FFTFTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
d3n3m1t11 FFFFTFFFFFFTFTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:PM / 23 |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 23 |
d4n3m2c23 FTFFFFFTFTFTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 7.00 (confidence rate) |
FTFFFFFTFTFTFFFF TTTTTTTTTTTTTTTT --:P- / 23 |
FTFFFFFTFTFTF?FF TTTTTTTTTTTTT-TT --:-- / 21 |
FTFFFFFTFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FTFFFFFTFTFTFFFF TTTTTTTTTTTTTTTT --:-M / 23 |
FTFFFFFTFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FTFFFFFTFTFTFFF? TTTTTTTTTTTTTTT- --:-- / 21 |
FTFFFFFTFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FTFFFFFTFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
d5n4m1t35 FFFFFTFTFTFTTFFT (expected value) 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFF?TFTFTFTTFFT TTTT-TTTTTTTTTTT --:-- / 21 |
FFFFFTFTFTFTTFFT TTTTTTTTTTTTTTTT --:PM / 23 |
FFFFFTFTFTFTTFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFTFTFTFTTFFT TTTTTTTTTTTTTTTT --:-- / 23 |
CC 0 |
CC 0 |
FFFFFTFTFTFTTFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFTFTFTFTTFFT TTTTTTTTTTTTTTTT --:-- / 23 |
NeoElection — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 66 | 10 | 10 | 25 | 25 | 10 | 10 |
Road Runner | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
2 TFTTTTTTFTTFFFFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
TFTTTTTTFTTFFFFT TTTTTTTTTTTTTTTT --:PM / 10 |
TFTTTTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTFTTFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
3 TTFFFFFTFTFTTTTF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TTFFFFFTFTFTTTTF TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
TTFFFFFTFTFTTTTF TTTTTTTTTTTTTTTT --:-- / 10 |
TTFFFFFTFTFTTTTF TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
4 FTFFFTFTFTTTTTTF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
FTFFFTFTFTTTTTTF TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
FTFFFTF????????? TTTTTTT--------- --:-- / 4 |
FTFFFTF????????? TTTTTTT--------- --:-- / 4 |
CC 0 |
CC 0 |
5 TTF? TFFTT? FFFFFT (expected value) 3.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TTF?TFFTT?FFFFFT TTT?TTTTT?TTTTTT --:-- / 9 |
CC 0 |
CC 0 |
T??????????????? T--?-----?------ --:-- / 1 |
T??????????????? T--?-----?------ --:-- / 1 |
CC 0 |
CC 0 |
6 TFFTFTFFTFTFFFTT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TFFTFTFFTFTFFFTT TTTTTTTTTTTTTTTT --:PM / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
7 ? TFTTTFF? ? TTTFFF (expected value) 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 0 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
?TFTTTFF??TTTFFF ?TTTTTTT??TTTTTT --:-- / 8 |
???????????????? ?-------??------ --:-- / 0 |
???????????????? ?-------??------ --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ?-------??------ --:-- / 0 |
???????????????? ?-------??------ --:-- / 0 |
8 FTFFFFTTFFFTF? FT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 (confidence rate) |
DNC |
FTFFFFTTFFFTF?FT TTTTTTTTTTTTT?TT --:-- / 9 |
???????????????? -------------?-- --:-- / 0 |
???????????????? -------------?-- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -------------?-- --:-- / 0 |
???????????????? -------------?-- --:-- / 0 |
NeoElection — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 41 | 67 | 10 | 10 | 33 | 33 | 10 | 10 |
Road Runner | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
2 TFTTTTTTTTTTTTTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 10 |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
3 TTFFFFFTTTTTTTTT (expected value) 3.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?TFFF??TTTTTTTTT -TTTT--TTTTTTTTT --:-- / 8 |
TTFFFFFTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
TTFFFFFTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
TTFFFFFTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
4 FTFFFTFTTTTTTTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 1.00 4.00 3.00 3.00 4.00 (confidence rate) |
FTFFFTF?TTT?T??T TTTTTTT-TTT-T--T --:-- / 7 |
FTFFFTFTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
FTFFFTF?TTT?TTTT TTTTTTT-TTT-TTTT --:-- / 9 |
FTFFFTF?TTT?TTTT TTTTTTT-TTT-TTTT --:-- / 9 |
CC 0 |
CC 0 |
5 TTF? TFFTTTTTTTTT (expected value) 3.00 1.00 1.00 0 4.00 1.00 4.00 4.00 2.00 2.00 2.00 4.00 4.00 1.00 1.00 1.00 (confidence rate) |
????T?FTTTTTT??? ---?T-TTTTTTT--- --:-- / 5 |
TTF?TFFTTTTTTTTT TTT?TTTTTTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
T???T?FT???TT??? T--?T-TT---TT--- --:-- / 4 |
T???T?FT???TT??? T--?T-TT---TT--- --:-- / 4 |
CC 0 |
CC 0 |
6 TFFTFTFFTTT? TTTT (expected value) 1.00 2.00 2.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 0 2.00 1.00 2.00 1.00 (confidence rate) |
?FF??TF?????T?T? -TT--TT----?T-T- --:-- / 4 |
TFFTFTFFTTT?TTTT TTTTTTTTTTT?TTTT --:-- / 9 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
7 ? TFTTTFFTTTTTTTT (expected value) 0 1.00 1.00 2.00 1.00 2.00 2.00 2.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
???T?TFF?TT????? ?--T-TTT-TT----- --:-- / 4 |
?TFTTTFFTTTTTTTT ?TTTTTTTTTTTTTTT --:-- / 9 |
???????????????? ?--------------- --:-- / 0 |
???????????????? ?--------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ?--------------- --:-- / 0 |
???????????????? ?--------------- --:-- / 0 |
8 FTFFFFTTTTTTTTTT (expected value) 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 2.00 2.00 (confidence rate) |
?????F?????TT?TT -----T-----TT-TT --:-- / 3 |
FTFFFFTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
PaceMaker — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 96 | 96 | 0 | 0 | 96 | 96 | 0 | 0 |
Road Runner | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
none FTFFFTTTTTFFTFTF (expected value) 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 (confidence rate) |
FTFFFTTTTTFF?FTF TTTTTTTTTTTT-TTT --:-- / 96 |
FTFF?TTTTTFFTFTF TTTT-TTTTTTTTTTT --:-- / 96 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTFFFTTTTTFF?FTF TTTTTTTTTTTT-TTT --:-- / 96 |
FTFFFTTTTTFF?FTF TTTTTTTTTTTT-TTT --:-- / 96 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
ParamProductionCell — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 112 | 113 | 0 | 0 | 114 | 114 | 0 | 0 |
Road Runner | 1 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
0 FFTFFFFFTFTFFTFF (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
F?TFFFFFTFTFFTFF T-TTTTTTTTTTTTTT --:-- / 18 |
FFTFFFFFTFTFFTFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
FFTFFFFFTFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFFTFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
1 TFFFFTFTTFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFTFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFTFTTFFFFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
TFFFFTFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFFTFTTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
2 FTTFFFFTFFFFTFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFFFFTFFFFTFTT TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFFFFTFFFFTFTT TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
FTTFFFFTFFFFTFTT TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFFFFTFFFFTFTT TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
3 FTFFFTTFFTTTFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFTTFFTTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFFTTFFTTTFTTF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
FTFFFTTFFTTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFFTTFFTTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
4 FFFFFFTTFTFTFFTF (expected value) 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFTTFTFTFFTF TTTTTTTTTTTTTTTT --:PM / 19 |
FFFF?FTTFTFTFFTF TTTT-TTTTTTTTTTT --:-- / 18 |
CC 0 |
CC 0 |
FFFFFFTTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFFFFTTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
5 FFTFFFTFTFTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFFF?FTFTFFFFF TTTTTT-TTTTTTTTT --:-- / 18 |
FFTFFFTFTFTFFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
CC 0 |
CC 0 |
FFTFFFTFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFTFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
Parking — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 99 | 104 | 35 | 35 | 102 | 105 | 35 | 35 |
Road Runner | 0 | 1 | 0 | 0 | 3 | 1 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 1 | 2 | 0 | 0 |
104 FFFTTFFFFFTFTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:PM / 19 |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTTFFFFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 19 |
208 FFFFTFFFFFFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 2.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFTFF?FFF?FFFT TTTTTTT-TTT-TTTT --:-- / 17 |
FFFFTFFFF?F?FFFT TTTTTTTTT-T-TTTT --:-- / 17 |
CC 0 |
CC 0 |
FFFFTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:P- / 19 |
FFFFTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-M / 19 |
CC 0 |
CC 0 |
416 TFFFTTTFFFFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate) |
TFFFTTTFFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 18 |
TFFFTTTFFFFFFFFT TTTTTTTTTTTTTTTT --:-M / 19 |
CC 0 |
CC 0 |
TFFFTTTFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
TFFFTTTFFFFFFFFT TTTTTTTTTTTTTTTT --:P- / 19 |
CC 0 |
CC 0 |
432 TFTFFFFFTFFTFFFF (expected value) 4.00 3.00 4.00 2.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
T?T?FF?FTFFTFFFF T-T-TT-TTTTTTTTT --:-- / 16 |
TFT?FF?FTFFTFFFF TTT-TT-TTTTTTTTT --:-- / 17 |
CC 0 |
CC 0 |
TFTFFFFFTFFTFFFF TTTTTTTTTTTTTTTT --:P- / 19 |
TFTFFFFFTFFTFFFF TTTTTTTTTTTTTTTT --:-M / 19 |
CC 0 |
CC 0 |
832 TFFFFTFFFFFFFTFT (expected value) 4.00 4.00 4.00 3.00 2.00 4.00 4.00 4.00 2.00 3.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate) |
TFF??TFF??FFFT?T TTT--TTT--TTTT-T --:-- / 13 |
TFFF?TFF?FFFFT?T TTTT-TTT-TTTTT-T --:-- / 16 |
CC 0 |
CC 0 |
TFFFFTFFFFFFFTFT TTTTTTTTTTTTTTTT --:PM / 19 |
TFFFFTFFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 19 |
CC 0 |
CC 0 |
864 FFFTT? TFFTFF? ? FT (expected value) 8.00 8.00 8.00 8.00 8.00 0 8.00 7.00 7.00 6.00 6.00 6.00 0 0 6.00 6.00 (confidence rate) |
FFFTT?TFFTFF??FT TTTTT?TTTTTT??TT --:-- / 16 |
FFFTT?TFFTFF??FT TTTTT?TTTTTT??TT --:-- / 16 |
FFFTT?TFFTFF??FT TTTTT?TTTTTT??TT --:-- / 16 |
FFFTT?TFFTFF??FT TTTTT?TTTTTT??TT --:-- / 16 |
FFFTT?T????????? TTTTT?T-----??-- --:-- / 7 |
FFFTT?TFF??????? TTTTT?TTT---??-- --:-- / 10 |
FFFTT?TFFTFF??FT TTTTT?TTTTTT??TT --:-- / 16 |
FFFTT?TFFTFF??FT TTTTT?TTTTTT??TT --:-- / 16 |
PermAdmissibility — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 57 | 11 | 60 | 42 | 34 | 60 | 60 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
01 TTTFFTFTTTTFFTFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
TTTFFTFTTTTFFTFF TTTTTTTTTTTTTTTT --:PM / 11 |
TTTFFTFTTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTTTTFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
02 FFFTF? TTFTFFTTFF (expected value) 6.00 6.00 6.00 6.00 6.00 0 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
FFFTF?TTFTFFTTFF TTTTT?TTTTTTTTTT --:-- / 10 |
CC 0 |
FFFTF?TTFTFFTTFF TTTTT?TTTTTTTTTT --:-- / 10 |
FFFTF?TTFTFFTTFF TTTTT?TTTTTTTTTT --:-- / 10 |
FFFTF??????????? TTTTT?---------- --:-- / 3 |
FFFTF?TTFTFFTTFF TTTTT?TTTTTTTTTT --:-- / 10 |
FFFTF?TTFTFFTTFF TTTTT?TTTTTTTTTT --:-- / 10 |
05 TFTFFFFFT? FFTT? T (expected value) 6.00 6.00 6.00 6.00 6.00 3.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 0 6.00 (confidence rate) |
DNC |
TFTFFFFFT?FFTT?T TTTTTTTTT?TTTT?T --:-- / 10 |
CC 0 |
TFTFF?FFT?FFTT?T TTTTT-TTT?TTTT?T --:-- / 9 |
TFTFFFFFT?FFTT?T TTTTTTTTT?TTTT?T --:-- / 10 |
TFTFFFFFT?FFTT?T TTTTTTTTT?TTTT?T --:-- / 10 |
TFTFF?FFT?FFTT?T TTTTT-TTT?TTTT?T --:-- / 9 |
TFTFF?FFT?FFTT?T TTTTT-TTT?TTTT?T --:-- / 9 |
10 FTFFTTT? FFTFTT? F (expected value) 5.00 5.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 (confidence rate) |
DNC |
FTFFTTT?FFTFTT?F TTTTTTT?TTTTTT?T --:-- / 10 |
CC 0 |
FTFFTTT?FFTFTT?F TTTTTTT?TTTTTT?T --:-- / 10 |
FT?????????????? TT-----?------?- --:-- / 1 |
CC 0 |
FTFFTTT?FFTFTT?F TTTTTTT?TTTTTT?T --:-- / 10 |
FTFFTTT?FFTFTT?F TTTTTTT?TTTTTT?T --:-- / 10 |
20 TFFTTTFFFTFFTFT? (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate) |
DNC |
TFFTTTFFFTFFTFT? TTTTTTTTTTTTTTT? --:-- / 10 |
CC 0 |
TFFTTTFFFTFFTFT? TTTTTTTTTTTTTTT? --:-- / 10 |
TFFTTT?FFTFFTFT? TTTTTT-TTTTTTTT? --:-- / 10 |
TFFTTT?FFTFFTFT? TTTTTT-TTTTTTTT? --:-- / 10 |
TFFTTTFFFTFFTFT? TTTTTTTTTTTTTTT? --:-- / 10 |
TFFTTTFFFTFFTFT? TTTTTTTTTTTTTTT? --:-- / 10 |
50 FFFT? FFFTFTT? FFF (expected value) 3.00 4.00 3.00 4.00 0 3.00 4.00 4.00 4.00 4.00 4.00 4.00 0 3.00 3.00 3.00 (confidence rate) |
DNC |
?F?T??FFTFTT???? -T-T?-TTTTTT?--- --:-- / 6 |
CC 0 |
FFFT?FFFTFTT?FFF TTTT?TTTTTTT?TTT --:-- / 10 |
CC 0 |
CC 0 |
FFFT?FFFTFTT?FFF TTTT?TTTTTTT?TTT --:-- / 10 |
FFFT?FFFTFTT?FFF TTTT?TTTTTTT?TTT --:-- / 10 |
PermAdmissibility — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 59 | 58 | 11 | 42 | 30 | 26 | 42 | 42 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
01 TTTFFTFTFTTTFTTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:PM / 11 |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 11 |
02 FFFTF? TTT? TTTF? F (expected value) 5.00 5.00 5.00 5.00 5.00 0 5.00 5.00 5.00 0 5.00 5.00 5.00 5.00 0 5.00 (confidence rate) |
FFFTF?TTT?TTTF?F TTTTT?TTT?TTTT?T --:-- / 9 |
FFFTF?TTT?TTTF?F TTTTT?TTT?TTTT?T --:-- / 9 |
CC 0 |
FFFTF?TTT?TTTF?F TTTTT?TTT?TTTT?T --:-- / 9 |
CC 0 |
CC 0 |
FFFTF?TTT?TTTF?F TTTTT?TTT?TTTT?T --:-- / 9 |
FFFTF?TTT?TTTF?F TTTTT?TTT?TTTT?T --:-- / 9 |
05 TFTFFFFFT? TFFTTT (expected value) 7.00 7.00 7.00 7.00 7.00 4.00 7.00 7.00 7.00 0 7.00 2.00 1.00 3.00 3.00 3.00 (confidence rate) |
TFTFFFFFT?TFFTTT TTTTTTTTT?TTTTTT --:-- / 10 |
TFTFFFFFT?TF?TTT TTTTTTTTT?TT-TTT --:-- / 10 |
CC 0 |
TFTFF?FFT?T????? TTTTT-TTT?T----- --:-- / 6 |
TFTFFFFFT?T??TTT TTTTTTTTT?T--TTT --:-- / 9 |
TFTFFFFFT?T????? TTTTTTTTT?T----- --:-- / 7 |
TFTFF?FFT?T????? TTTTT-TTT?T----- --:-- / 6 |
TFTFF?FFT?T????? TTTTT-TTT?T----- --:-- / 6 |
10 FTFFTTTF? TTFTTTF (expected value) 7.00 7.00 5.00 7.00 7.00 7.00 7.00 1.00 0 6.00 6.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FTFFTTTF?TTFTTTF TTTTTTTT?TTTTTTT --:-- / 10 |
FTFFTTT??TTFTTTF TTTTTTT-?TTTTTTT --:-- / 10 |
CC 0 |
FTFFTTT??TT????? TTTTTTT-?TT----- --:-- / 6 |
FT?FTTT??TT????? TT-TTTT-?TT----- --:-- / 6 |
FT?FTTT????????? TT-TTTT-?------- --:-- / 4 |
FTFFTTT??TT????? TTTTTTT-?TT----- --:-- / 6 |
FTFFTTT??TT????? TTTTTTT-?TT----- --:-- / 6 |
20 TFFTTTFF? FTTTFFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 5.00 5.00 0 5.00 5.00 5.00 5.00 2.00 5.00 5.00 (confidence rate) |
TFFTTTFF?FTTTFFT TTTTTTTT?TTTTTTT --:-- / 10 |
TFFTTTFF?FTTTFFT TTTTTTTT?TTTTTTT --:-- / 10 |
CC 0 |
TFFTTTFF?FTTT?FT TTTTTTTT?TTTT-TT --:-- / 10 |
TFFTTT?????????? TTTTTT--?------- --:-- / 4 |
TFFTTT?????????? TTTTTT--?------- --:-- / 4 |
TFFTTTFF?FTTT?FT TTTTTTTT?TTTT-TT --:-- / 10 |
TFFTTTFF?FTTT?FT TTTTTTTT?TTTT-TT --:-- / 10 |
50 FFFT? FFFTFF? T? FF (expected value) 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 1.00 2.00 0 2.00 0 2.00 1.00 (confidence rate) |
FFFT?FFFTFF?T?FF TTTT?TTTTTT?T?TT --:-- / 9 |
FFFT?FFFT?F?T?F? TTTT?TTTT-T?T?T- --:-- / 8 |
CC 0 |
???????????????? ----?------?-?-- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ----?------?-?-- --:-- / 0 |
???????????????? ----?------?-?-- --:-- / 0 |
Peterson — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 65 | 21 | 31 | 24 | 40 | 21 | 31 |
Road Runner | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
2 FTFTFTTTTTFFFFFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FTFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:PM / 11 |
FTFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTTTFFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
3 FTFTFFFTFFFFFTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTFTFFFTFFFFFTFF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
FTFTFFFTFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFFFTFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
4 FFTTFFFFFTTTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 1.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FFTTFFFFFTTTFFFT TTTTTTTTTTTTTTTT --:PM / 11 |
???????????????? ---------------- --:-- / 0 |
FFTTFFFFF??TFFFT TTTTTTTTT--TTTTT --:-- / 10 |
CC 0 |
FFTTFFFFF??????? TTTTTTTTT------- --:-- / 6 |
???????????????? ---------------- --:-- / 0 |
FFTTFFFFF??TFFFT TTTTTTTTT--TTTTT --:-- / 10 |
5 TFTTFTTFFTFTTFFT (expected value) 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
DNC |
TFTTFTTFFTFTTFFT TTTTTTTTTTTTTTTT --:PM / 11 |
TFTTFTTFF?FTTFFT TTTTTTTTT-TTTTTT --:-- / 10 |
TFTTFTTFF?FTTFFT TTTTTTTTT-TTTTTT --:-- / 10 |
CC 0 |
TFTTFT?FF?FTTFFT TTTTTT-TT-TTTTTT --:-- / 10 |
TFTTFTTFF?FTTFFT TTTTTTTTT-TTTTTT --:-- / 10 |
TFTTFTTFF?FTTFFT TTTTTTTTT-TTTTTT --:-- / 10 |
6 ? FFT? FTFFFFTFFFF (expected value) 0 3.00 3.00 3.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
?FFT?FTFFFFTFFFF ?TTT?TTTTTTTTTTT --:-- / 10 |
???????????????? ?---?----------- --:-- / 0 |
???????????????? ?---?----------- --:-- / 0 |
?FFT???????????? ?TTT?----------- --:-- / 2 |
?FFT???????????? ?TTT?----------- --:-- / 2 |
???????????????? ?---?----------- --:-- / 0 |
???????????????? ?---?----------- --:-- / 0 |
7 TTFFFTFFFFTTFTFF (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TTFFFTFFFFTTFTFF TTTTTTTTTTTTTTTT --:PM / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
Peterson — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 43 | 62 | 31 | 31 | 43 | 34 | 31 | 31 |
Road Runner | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
2 FTFTFTTTFFFFFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:PM / 11 |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFTTTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
3 FTFTFFFTFTTFTTFF (expected value) 4.00 3.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
F?FTF??TFTTFTTFF T-TTT--TTTTTTTTT --:-- / 9 |
FTFTFFFTFTTFTTFF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
FTFTFFFTFTTFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTFTFFFTFTTFTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
4 FFTTFFFFFTFTFTTT (expected value) 2.00 3.00 3.00 2.00 2.00 2.00 2.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
?FT????F?TFTFTTT -TT----T-TTTTTTT --:-- / 7 |
FFTTFFFFFTFTFTTT TTTTTTTTTTTTTTTT --:PM / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFTTFFFF?TFTFTTT TTTTTTTT-TTTTTTT --:-- / 10 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
5 TFTTFTTFFTTTFFT? (expected value) 8.00 8.00 7.00 7.00 7.00 8.00 5.00 8.00 1.00 7.00 7.00 7.00 5.00 1.00 7.00 0 (confidence rate) |
TF???T?F?TTT??T? TT---T-T-TTT--T? --:-- / 6 |
TFTTFTTFFTTTFFT? TTTTTTTTTTTTTTT? --:-- / 10 |
TFTTFTTF?TTTF?T? TTTTTTTT-TTTT-T? --:-- / 9 |
TFTTFTTF?TTTF?T? TTTTTTTT-TTTT-T? --:-- / 9 |
TFTTFT?F?TTT??T? TTTTTT-T-TTT--T? --:-- / 8 |
TFTTFT?F???????? TTTTTT-T-------? --:-- / 5 |
TFTTFTTF?TTTF?T? TTTTTTTT-TTTT-T? --:-- / 9 |
TFTTFTTF?TTTF?T? TTTTTTTT-TTTT-T? --:-- / 9 |
6 ? FFT? FTFTTTT? TT? (expected value) 0 3.00 3.00 3.00 0 3.00 1.00 1.00 2.00 2.00 2.00 2.00 0 2.00 2.00 0 (confidence rate) |
????????TTTT?TT? ?---?---TTTT?TT? --:-- / 4 |
?FFT?FTFTTTT?TT? ?TTT?TTTTTTT?TT? --:-- / 8 |
???????????????? ?---?-------?--? --:-- / 0 |
???????????????? ?---?-------?--? --:-- / 0 |
?FFT?F?????????? ?TTT?T------?--? --:-- / 3 |
?FFT?F?????????? ?TTT?T------?--? --:-- / 3 |
???????????????? ?---?-------?--? --:-- / 0 |
???????????????? ?---?-------?--? --:-- / 0 |
7 TTFFFTFFTTTTTFTT (expected value) 6.00 6.00 5.00 5.00 5.00 5.00 6.00 5.00 6.00 6.00 7.00 6.00 6.00 7.00 7.00 6.00 (confidence rate) |
????????TTTTTFTT --------TTTTTTTT --:-- / 6 |
TTFFFTFFTTTTTFTT TTTTTTTTTTTTTTTT --:PM / 11 |
TTFFFTFFTTTTTFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFFTFFTTTTTFTT TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
TT????F???T??FT? TT----T---T--TT- --:-- / 4 |
TTFFFTFFTTTTTFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFFTFFTTTTTFTT TTTTTTTTTTTTTTTT --:-- / 11 |
PhaseVariation — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 121 | 113 | 55 | 55 | 60 | 60 | 55 | 55 |
Road Runner | 1 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
D02CS010 FFFFTTFFFFFFFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 13 |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFTTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
D02CS100 TFFTFTFFFFFFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFTFFFFFFFTFF TTTTTTTTTTTTTTTT --:PM / 13 |
TFFTFTFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
TFFTFTFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
TFFTFTFFFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
D05CS010 FFFFFFFTFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 13 |
CC 0 |
CC 0 |
FFFFFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
D05CS100 FTTFTTT? TFTFFFTF (expected value) 2.00 2.00 2.00 1.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FTTFTTT?TFTFFFTF TTTTTTT?TTTTTTTT --:-- / 12 |
FTT?TTT?TFTFFFTF TTT-TTT?TTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
D10CS010 FFT? FTFFFTFTTFFT (expected value) 8.00 1.00 8.00 0 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFT?FTFFFTFTTFFT TTT?TTTTTTTTTTTT --:-- / 12 |
F?T?FTFFFTFTTFFT T-T?TTTTTTTTTTTT --:-- / 11 |
F?T?FTFFFTFTTFFT T-T?TTTTTTTTTTTT --:-- / 11 |
F?T?FTFFFTFTTFFT T-T?TTTTTTTTTTTT --:-- / 11 |
F?T?FTFFFTFTTFFT T-T?TTTTTTTTTTTT --:-- / 11 |
F?T?FTFFFTFTTFFT T-T?TTTTTTTTTTTT --:-- / 11 |
F?T?FTFFFTFTTFFT T-T?TTTTTTTTTTTT --:-- / 11 |
F?T?FTFFFTFTTFFT T-T?TTTTTTTTTTTT --:-- / 11 |
D10CS100 FFFFFFTFFFFFFTFF (expected value) 8.00 8.00 6.00 3.00 2.00 8.00 8.00 8.00 2.00 6.00 6.00 5.00 6.00 6.00 1.00 6.00 (confidence rate) |
FFF?FFTFFFF?FTFF TTT-TTTTTTT-TTTT --:-- / 11 |
FFFFFFTFFFFFFT?F TTTTTTTTTTTTTT-T --:-- / 12 |
FFF??FTF?FFFFT?F TTT--TTT-TTTTT-T --:-- / 10 |
FFF??FTF?FFFFT?F TTT--TTT-TTTTT-T --:-- / 10 |
FF?F?FTF???????? TT-T-TTT-------- --:-- / 5 |
FF?F?FTF???????? TT-T-TTT-------- --:-- / 5 |
FFF??FTF?FFFFT?F TTT--TTT-TTTTT-T --:-- / 10 |
FFF??FTF?FFFFT?F TTT--TTT-TTTTT-T --:-- / 10 |
D20CS010 FTTTFTFF? FFFFTTF (expected value) 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 2.00 (confidence rate) |
FTTTFTFF?FFFFTTF TTTTTTTT?TTTTTTT --:-- / 12 |
FTTTFTFF?FFFFTTF TTTTTTTT?TTTTTTT --:-- / 12 |
FTTTFTFF?FFFFTT? TTTTTTTT?TTTTTT- --:-- / 11 |
FTTTFTFF?FFFFTT? TTTTTTTT?TTTTTT- --:-- / 11 |
F??????????????? T-------?------- --:-- / 1 |
F??????????????? T-------?------- --:-- / 1 |
FTTTFTFF?FFFFTT? TTTTTTTT?TTTTTT- --:-- / 11 |
FTTTFTFF?FFFFTT? TTTTTTTT?TTTTTT- --:-- / 11 |
D20CS100 FFFFFTFTFT? FFFTF (expected value) 8.00 1.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 0 6.00 1.00 6.00 6.00 6.00 (confidence rate) |
FFFFFTFTFT?FFFTF TTTTTTTTTT?TTTTT --:-- / 12 |
F?FFFTFTFT?F?FTF T-TTTTTTTT?T-TTT --:-- / 10 |
F?FFFTFTFT?F?FTF T-TTTTTTTT?T-TTT --:-- / 10 |
F?FFFTFTFT?F?FTF T-TTTTTTTT?T-TTT --:-- / 10 |
F?FFFT?????????? T-TTTT----?----- --:-- / 4 |
F?FFFT?????????? T-TTTT----?----- --:-- / 4 |
F?FFFTFTFT?F?FTF T-TTTTTTTT?T-TTT --:-- / 10 |
F?FFFTFTFT?F?FTF T-TTTTTTTT?T-TTT --:-- / 10 |
D30CS010 FFFFFFTFFFTF? FTF (expected value) 2.00 2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 (confidence rate) |
FFFFFFTFFFTF?FTF TTTTTTTTTTTT?TTT --:-- / 12 |
FF?FFFT?FFTF?FTF TT-TTTT-TTTT?TTT --:-- / 10 |
???????????????? ------------?--- --:-- / 0 |
???????????????? ------------?--- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ------------?--- --:-- / 0 |
???????????????? ------------?--- --:-- / 0 |
D30CS100 FFFTFFFFTFF? FFFF (expected value) 2.00 2.00 2.00 2.00 1.00 1.00 2.00 2.00 2.00 2.00 1.00 0 1.00 1.00 2.00 1.00 (confidence rate) |
FFFTFFFFTFF?F?FF TTTTTTTTTTT?T-TT --:-- / 11 |
FFFT??FFTF???FF? TTTT--TTTT-?-TT- --:-- / 8 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
Philosophers — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 67 | 8 | 8 | 46 | 46 | 8 | 8 |
Road Runner | 0 | 4 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 0 | 4 | 0 | 0 | 1 | 0 | 0 | 0 |
000005 FTFTTTFFTFFFTTFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FTFTTTFFTFFFTTFF TTTTTTTTTTTTTTTT --:PM / 8 |
FTFTTTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
000010 FTFFTTFFTFTFFFFT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTFFTTFFTFTFFFFT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTFFTTFFTFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTTFFTFTFFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000020 FFFTFTFFFFFFFFTF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FFFTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FFFTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFTFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000050 FFTFFFFTFFFFFFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 (confidence rate) |
DNC |
FFTFFFFTFFFFF?FF TTTTTTTTTTTTT-TT --:-- / 7 |
CC 0 |
CC 0 |
FFTFFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFTFFFFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000100 FFFFF? FTFT? TFFTF (expected value) 3.00 2.00 3.00 3.00 3.00 0 3.00 3.00 1.00 3.00 0 3.00 3.00 3.00 3.00 2.00 (confidence rate) |
DNC |
F?FFF?FTFT?TFFT? T-TTT?TTTT?TTTT- --:-- / 6 |
CC 0 |
CC 0 |
FFFFF?FT?T?TFFTF TTTTT?TT-T?TTTTT --:-- / 6 |
FFFFF?FT?T?TFFTF TTTTT?TT-T?TTTTT --:-- / 6 |
CC 0 |
CC 0 |
000200 FFFFTFFFFT? ? TF? ? (expected value) 2.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 1.00 1.00 0 0 1.00 1.00 0 0 (confidence rate) |
DNC |
?FFFTFFFFT??TF?? -TTTTTTTTT??TT?? --:-- / 5 |
CC 0 |
CC 0 |
FFFFTF?????????? TTTTTT----??--?? --:-- / 3 |
FFFFTF?????????? TTTTTT----??--?? --:-- / 3 |
CC 0 |
CC 0 |
000500 TTFFFTFFFFTFFTTF (expected value) 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TTFFFTFFFFTFFTTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TTF??????F?????? TTT------T------ --:-- / 2 |
TTF??????F?????? TTT------T------ --:-- / 2 |
CC 0 |
CC 0 |
001000 FTTTTTFFFF? T? F? F (expected value) 3.00 3.00 1.00 3.00 3.00 3.00 1.00 1.00 2.00 1.00 0 3.00 0 1.00 0 2.00 (confidence rate) |
DNC |
FTTTTTFFFF?T?F?F TTTTTTTTTT?T?T?T --:-- / 6 |
CC 0 |
CC 0 |
FT?TTT??F??T???? TT-TTT--T-?T?-?- --:-- / 3 |
FT?TTT?????T???F TT-TTT----?T?-?T --:-- / 3 |
CC 0 |
CC 0 |
002000 FTT? ? ? ? TTTFT? FTF (expected value) 1.00 1.00 1.00 0 0 0 0 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 (confidence rate) |
DNC |
FTT????TTTFT?FTF TTT????TTTTT?TTT --:-- / 5 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
005000 ? TFFTFF? ? ? ? F? F? ? (expected value) 0 1.00 1.00 1.00 1.00 1.00 1.00 0 0 0 0 1.00 0 1.00 0 0 (confidence rate) |
DNC |
?TFFTFF????F?F?? ?TTTTTT????T?T?? --:-- / 4 |
???????????????? ?------????-?-?? --:-- / 0 |
???????????????? ?------????-?-?? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ?------????-?-?? --:-- / 0 |
???????????????? ?------????-?-?? --:-- / 0 |
010000 ? F? ? ? TFF? ? ? ? ? ? ? T (expected value) 0 1.00 0 0 0 1.00 1.00 1.00 0 0 0 0 0 0 0 1.00 (confidence rate) |
DNC |
?F???TFF???????T ?T???TTT???????T --:-- / 2 |
???????????????? ?-???---???????- --:-- / 0 |
???????????????? ?-???---???????- --:-- / 0 |
CC 0 |
DNF 0 |
???????????????? ?-???---???????- --:-- / 0 |
???????????????? ?-???---???????- --:-- / 0 |
050000 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
100000 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
Philosophers — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 51 | 77 | 8 | 8 | 41 | 48 | 8 | 8 |
Road Runner | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 0 |
000005 FTFTTTFFFFTFFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:PM / 8 |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
FTFTTTFFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
000010 FTFFTTFFTFFTTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFTTFFTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTTFFTFFTTFTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTFFTTFFTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTTFFTFFTTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000020 FFFTFTFFFTFFFTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFTFFFTFFFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFTFFFTFFFTTT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FFFTFTFFFTFFFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTFTFFFTFFFTTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000050 FFTFFFFTFFFTTTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
????????FFFTTTFF --------TTTTTTTT --:-- / 4 |
FFTFFFFTFFFTTTFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FFTFFFFTFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFTFFFFTFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000100 FFFFFFFTFFTFFTTF (expected value) 3.00 1.00 3.00 3.00 3.00 1.00 3.00 3.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
????????FFTFFTTF --------TTTTTTTT --:-- / 4 |
FFFFFFFTFFTFFTTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
F?FFF?FTFFT????? T-TTT-TTTTT----- --:-- / 4 |
F?FFF?FTFFT????? T-TTT-TTTTT----- --:-- / 4 |
CC 0 |
CC 0 |
000200 FFFFTFFFTFTTTFTF (expected value) 1.00 3.00 1.00 2.00 2.00 2.00 2.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
????????TFTTTFTF --------TTTTTTTT --:-- / 4 |
FFFFTFFFTFTTTFTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
?F?????????????? -T-------------- --:-- / 0 |
?F?FTFFFTFTTTFTF -T-TTTTTTTTTTTTT --:-- / 7 |
CC 0 |
CC 0 |
000500 TTF? FTFFTFFFTFTT (expected value) 3.00 3.00 3.00 0 1.00 1.00 1.00 1.00 2.00 4.00 4.00 1.00 2.00 2.00 2.00 2.00 (confidence rate) |
????????TFFFTFTT ---?----TTTTTTTT --:-- / 4 |
TTF?FTFFTFF?TFTT TTT?TTTTTTT-TTTT --:-- / 7 |
CC 0 |
CC 0 |
TTF??????FF????? TTT?-----TT----- --:-- / 2 |
TTF??????FF????? TTT?-----TT----- --:-- / 2 |
CC 0 |
CC 0 |
001000 FTTTTTFFFFTTTTTT (expected value) 3.00 3.00 1.00 3.00 3.00 3.00 1.00 1.00 3.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
????????FFTTTTTT --------TTTTTTTT --:-- / 4 |
FTTTTTFFFFTTTTTT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FT?TTT??FF?????? TT-TTT--TT------ --:-- / 3 |
FT?TTT???F?????? TT-TTT---T------ --:-- / 3 |
CC 0 |
CC 0 |
002000 FTT? ? ? ? TTFFTFFTF (expected value) 1.00 1.00 1.00 0 0 0 0 1.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate) |
????????TFFTF?TF ---????-TTTTT-TT --:-- / 3 |
FTT????TTFFTFFTF TTT????TTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
005000 ? TFFTFF? FF? ? ? FFF (expected value) 0 1.00 1.00 1.00 1.00 1.00 1.00 0 2.00 2.00 0 0 0 2.00 2.00 1.00 (confidence rate) |
????????FF???FF? ?------?TT???TT- --:-- / 2 |
?TFFTFF?FF???FFF ?TTTTTT?TT???TTT --:-- / 5 |
???????????????? ?------?--???--- --:-- / 0 |
???????????????? ?------?--???--- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ?------?--???--- --:-- / 0 |
???????????????? ?------?--???--- --:-- / 0 |
010000 ? ? F? ? T? FTTT? TT? ? (expected value) 0 0 1.00 0 0 1.00 0 1.00 2.00 2.00 2.00 0 2.00 1.00 0 0 (confidence rate) |
????????TTT?TT?? ??-??-?-TTT?TT?? --:-- / 2 |
??F??T?FTTT?T??? ??T??T?TTTT?T-?? --:-- / 3 |
???????????????? ??-??-?----?--?? --:-- / 0 |
???????????????? ??-??-?----?--?? --:-- / 0 |
DNF 0 |
DNF 0 |
???????????????? ??-??-?----?--?? --:-- / 0 |
???????????????? ??-??-?----?--?? --:-- / 0 |
PhilosophersDyn — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 45 | 30 | 30 | 0 | 0 | 30 | 30 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 1 |
Camel | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
03 FFTFTFFTTFTFFTFT (expected value) 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
FFTFTFFTTFTFFTFT TTTTTTTTTTTTTTTT --:PM / 15 |
FFTFTFFTTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
FFTFTFFTTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 15 |
10 FFFFTTTFFFTFFFTT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
FFFFTTTFFFTFFFTT TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
20 FFFTTTTFFFFFTFTF (expected value) 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
FFFTTTTFFFFFTFTF TTTTTTTTTTTTTTTT --:-M / 15 |
FFFTTTTFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTTTTFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
FFFTTTTFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTTTTFFFFFTFTF TTTTTTTTTTTTTTTT --:P- / 15 |
50 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
80 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
PhilosophersDyn — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 40 | 45 | 30 | 30 | 30 | 30 | 30 | 30 |
Road Runner | 0 | 2 | 0 | 1 | 0 | 0 | 0 | 0 |
Camel | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
03 FFTFTFFTTFTFFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:PM / 15 |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
FFTFTFFTTFTFFFTT TTTTTTTTTTTTTTTT --:-- / 15 |
10 FFFFTTTFTTTFFTTF (expected value) 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFF?TTTFTTTFFTTF TTT-TTTTTTTTTTTT --:-- / 14 |
FFFFTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:PM / 15 |
CC 0 |
CC 0 |
FFFFTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
20 FFFTTTTFTTTFFTTF (expected value) 5.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 5.00 6.00 (confidence rate) |
?FFTTT?FTT?FFT?F -TTTTT-TTT-TTT-T --:-- / 11 |
FFFTTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:-M / 15 |
FFFTTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:P- / 15 |
CC 0 |
CC 0 |
FFFTTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTTTTFTTTFFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
Planning — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 83 | 89 | 32 | 32 | 89 | 89 | 32 | 32 |
Road Runner | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
none FFFFTTFTTTFFFTFT (expected value) 8.00 8.00 8.00 4.00 8.00 8.00 4.00 4.00 1.00 4.00 4.00 4.00 2.00 4.00 3.00 1.00 (confidence rate) |
FFFFTTFT?TFF?TF? TTTTTTTT-TTT-TT- --:-- / 83 |
FFFFTTFTTTFF?T?T TTTTTTTTTTTT-T-T --:-- / 89 |
FFF?TT?????????? TTT-TT---------- --:-- / 32 |
FFF?TT?????????? TTT-TT---------- --:-- / 32 |
FFFFTTFT?TFFFTF? TTTTTTTT-TTTTTT- --:-- / 89 |
FFFFTTFT?TFFFTF? TTTTTTTT-TTTTTT- --:-- / 89 |
FFF?TT?????????? TTT-TT---------- --:-- / 32 |
FFF?TT?????????? TTT-TT---------- --:-- / 32 |
PolyORBLF — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 90 | 46 | 54 | 65 | 65 | 49 | 47 |
Road Runner | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 3 |
Camel | 0 | 3 | 1 | 0 | 0 | 0 | 0 | 0 |
S02J04T06 FTTFTFFFFFTTFTTF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-M / 6 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:P- / 6 |
S02J04T08 FFTTFFFFFFFFFTF? (expected value) 3.00 1.00 3.00 3.00 3.00 3.00 3.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 (confidence rate) |
DNC |
FFTTFFFFFFFFFTF? TTTTTTTTTTTTTTT? --:-- / 5 |
CC 0 |
CC 0 |
F?TTFFF?FFFFFTF? T-TTTTT-TTTTTTT? --:-- / 4 |
F?TTFFF????????? T-TTTTT--------? --:-- / 2 |
CC 0 |
CC 0 |
S02J04T10 FTTFFTFTFFTFFFTF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTTFFTFTFFTFFFTF TTTTTTTTTTTTTTTT --:PM / 6 |
CC 0 |
CC 0 |
FTTFFTFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
FTTFFTFTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
S02J06T06 FFF? FFFTFFFTFFFF (expected value) 3.00 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FFF?FFFTFFFTFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
FFF?FFFTFFFTFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
FFF?FFFTFFFTFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
S02J06T08 FTF? FFTTFFTTFFFF (expected value) 7.00 7.00 3.00 0 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FTF?FFTTFF?TFFFF TTT?TTTTTT-TTTTT --:-- / 5 |
FT??FFTTFFTTFFFF TT-?TTTTTTTTTTTT --:-- / 5 |
FT??FFTTFFTTFFFF TT-?TTTTTTTTTTTT --:-- / 5 |
FTF?FFTTFFTTFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
FTF?FFTTFFTTFFFF TTT?TTTTTTTTTTTT --:-- / 5 |
FT??FFTTFFTTFFFF TT-?TTTTTTTTTTTT --:-- / 5 |
FT??FFTTFFTTFFFF TT-?TTTTTTTTTTTT --:-- / 5 |
S02J06T10 FFFFTFFTFFTFFFFF (expected value) 7.00 7.00 5.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
DNC |
FFFFTFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-M / 6 |
FFFFTFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFTFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FF?FTFFTFF?????? TT-TTTTTTT------ --:-- / 3 |
FFFFTFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 6 |
FF?FTFFTFFTFFFFF TT-TTTTTTTTTTTTT --:-- / 5 |
FFFFTFFTFFTFFFFF TTTTTTTTTTTTTTTT --:P- / 6 |
S04J04T06 FTF? FFFTTTFFTFTF (expected value) 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 5.00 5.00 1.00 7.00 2.00 6.00 (confidence rate) |
DNC |
FTF?FFFTTTFFTF?F TTT?TTTTTTTTTT-T --:-- / 5 |
FTF?FFFTTTFF?F?F TTT?TTTTTTTT-T-T --:-- / 4 |
FTF?FFFTTTFF?FTF TTT?TTTTTTTT-TTT --:-- / 5 |
FTF?FFFTTT???F?F TTT?TTTTTT---T-T --:-- / 4 |
FTF?FFFTTT???F?? TTT?TTTTTT---T-- --:-- / 3 |
FTF?FFFTTTFF?F?F TTT?TTTTTTTT-T-T --:-- / 4 |
FTF?FFFTTTFF?FTF TTT?TTTTTTTT-TTT --:-- / 5 |
S04J04T08 FFFFFFFTFTFFTFFF (expected value) 4.00 4.00 4.00 2.00 2.00 4.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
FFFF?FFTFTFFTFFF TTTT-TTTTTTTTTTT --:-- / 5 |
???????????????? ---------------- --:-- / 0 |
FFFF?F?????????? TTTT-T---------- --:-- / 2 |
FFF?FFFTFTF????? TTT-TTTTTTT----- --:-- / 3 |
FFF?FFFTFTF????? TTT-TTTTTTT----- --:-- / 3 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
S04J04T10 FFF? FT? T? ? ? FFFTF (expected value) 3.00 3.00 3.00 0 3.00 3.00 0 2.00 0 0 0 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
DNC |
FFF?FT?T???FFFTF TTT?TT?T???TTTTT --:-- / 4 |
???????????????? ---?--?-???----- --:-- / 0 |
???????????????? ---?--?-???----- --:-- / 0 |
FFF?FT?T???FFFTF TTT?TT?T???TTTTT --:-- / 4 |
FFF?FT?????????? TTT?TT?-???----- --:-- / 2 |
???????????????? ---?--?-???----- --:-- / 0 |
???????????????? ---?--?-???----- --:-- / 0 |
S04J06T06 TTT? TFFFFTFFTFTT (expected value) 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
TTT?TFFFFTFFTFTT TTT?TTTTTTTTTTTT --:-- / 5 |
TTT?TFFFFTFFTFTT TTT?TTTTTTTTTTTT --:-- / 5 |
TTT?TFFFFTFFTFTT TTT?TTTTTTTTTTTT --:-- / 5 |
TTT?TFFFFTFFTFTT TTT?TTTTTTTTTTTT --:-- / 5 |
TTT?TFFFFTFFTFTT TTT?TTTTTTTTTTTT --:-- / 5 |
TTT?TFFFFT?FTFTT TTT?TTTTTT-TTTTT --:-- / 5 |
TTT?TFFFFTFFTFTT TTT?TTTTTTTTTTTT --:-- / 5 |
S04J06T08 TFFFFFTTTTFT? FFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 0 1.00 1.00 1.00 (confidence rate) |
DNC |
TFFFFFTTTTFT?FFF TTTTTTTTTTTT?TTT --:-- / 5 |
???????????????? ------------?--- --:-- / 0 |
???????????????? ------------?--- --:-- / 0 |
TFFFFFTTTTF????? TTTTTTTTTTT-?--- --:-- / 4 |
TFFFFFTTTTF????? TTTTTTTTTTT-?--- --:-- / 4 |
???????????????? ------------?--- --:-- / 0 |
???????????????? ------------?--- --:-- / 0 |
S04J06T10 FFFFFFTTTF? FFFTF (expected value) 7.00 7.00 7.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
FFFFFFTTTF?FFFTF TTTTTTTTTT?TTTTT --:-- / 5 |
FFFFFFTTTF?FFFTF TTTTTTTTTT?TTTTT --:-- / 5 |
FFFFFFTTTF?FFFTF TTTTTTTTTT?TTTTT --:-- / 5 |
FFF????????????? TTT-------?----- --:-- / 1 |
FFF????????????? TTT-------?----- --:-- / 1 |
FFFFFFTTTF?FFFTF TTTTTTTTTT?TTTTT --:-- / 5 |
FFFFFFTTTF?FFFTF TTTTTTTTTT?TTTTT --:-- / 5 |
S06J04T04 FFTFFFTF? FFFFFFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 5.00 7.00 (confidence rate) |
DNC |
FFTFFFTF?FFFFFFF TTTTTTTT?TTTTTTT --:-- / 5 |
FFTFFFTF?FFFFFFF TTTTTTTT?TTTTTTT --:-- / 5 |
FFTFFFTF?FFFFFFF TTTTTTTT?TTTTTTT --:-- / 5 |
FFTFFFTF?FFFFF?F TTTTTTTT?TTTTT-T --:-- / 5 |
FFTFFFTF?FFFFF?F TTTTTTTT?TTTTT-T --:-- / 5 |
FFTFFFTF?FFFFFFF TTTTTTTT?TTTTTTT --:-- / 5 |
FFTFFFTF?FFFFFFF TTTTTTTT?TTTTTTT --:-- / 5 |
S06J04T06 F? TFFFFFFTFF? FFT (expected value) 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 0 1.00 1.00 1.00 (confidence rate) |
DNC |
F?TFFFFFFTFF?FFT T?TTTTTTTTTT?TTT --:-- / 5 |
???????????????? -?----------?--- --:-- / 0 |
???????????????? -?----------?--- --:-- / 0 |
F?TFFFFFFTF????? T?TTTTTTTTT-?--- --:-- / 3 |
F?TFFFFFFTF????? T?TTTTTTTTT-?--- --:-- / 3 |
???????????????? -?----------?--- --:-- / 0 |
???????????????? -?----------?--- --:-- / 0 |
S06J04T08 TFFTFT? F? F? F? T? F (expected value) 3.00 3.00 3.00 3.00 3.00 2.00 0 1.00 0 1.00 0 1.00 0 1.00 0 1.00 (confidence rate) |
DNC |
TFFTFT?F?F?F?T?F TTTTTT?T?T?T?T?T --:-- / 4 |
???????????????? ------?-?-?-?-?- --:-- / 0 |
???????????????? ------?-?-?-?-?- --:-- / 0 |
TFFTF??????????? TTTTT-?-?-?-?-?- --:-- / 2 |
TFFTFT?????????? TTTTTT?-?-?-?-?- --:-- / 2 |
???????????????? ------?-?-?-?-?- --:-- / 0 |
???????????????? ------?-?-?-?-?- --:-- / 0 |
S06J06T04 FFFTFFFFFFTFFTF? (expected value) 7.00 7.00 1.00 1.00 6.00 6.00 6.00 6.00 5.00 5.00 5.00 5.00 2.00 5.00 5.00 0 (confidence rate) |
DNC |
FFFTFFFFFFTFFTF? TTTTTTTTTTTTTTT? --:-- / 5 |
FF??FFFFFFTF?TF? TT--TTTTTTTT-TT? --:-- / 4 |
FF??FFFFFFTFFTF? TT--TTTTTTTTTTT? --:-- / 4 |
FF?????????????? TT-------------? --:-- / 1 |
FF??FFFF???????? TT--TTTT-------? --:-- / 2 |
FF??FFFFFFTF?TF? TT--TTTTTTTT-TT? --:-- / 4 |
FF??FFFFFFTF?TF? TT--TTTTTTTT-TT? --:-- / 4 |
S06J06T06 FFFFFTFTTFFTFFFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
FFFFFTFTT?FTFFFT TTTTTTTTT-TTTTTT --:-- / 5 |
FFFFFTFTTFFTFFFT TTTTTTTTTTTTTTTT --:-M / 6 |
FFFFFTFTTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFFTFTTFF????? TTTTTTTTTTT----- --:-- / 4 |
FFFFFTFTTFF????? TTTTTTTTTTT----- --:-- / 4 |
FFFFFTFTTFFTFFFT TTTTTTTTTTTTTTTT --:-- / 6 |
FFFFFTFTTFFTFFFT TTTTTTTTTTTTTTTT --:P- / 6 |
S06J06T08 FFFF? FFF? FTFFFFF (expected value) 4.00 3.00 5.00 4.00 0 4.00 3.00 3.00 0 2.00 3.00 2.00 3.00 3.00 2.00 3.00 (confidence rate) |
DNC |
FFFF?FFF??T?FFFF TTTT?TTT?-T-TTTT --:-- / 4 |
???????????????? ----?---?------- --:-- / 0 |
FFFF?FFF?FTFFFFF TTTT?TTT?TTTTTTT --:-- / 5 |
??F????????????? --T-?---?------- --:-- / 0 |
F?FF?F?????????? T-TT?T--?------- --:-- / 1 |
FFFF?FFF?FTFFF?F TTTT?TTT?TTTTT-T --:-- / 4 |
???????????????? ----?---?------- --:-- / 0 |
PolyORBLF — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 84 | 88 | 38 | 38 | 35 | 35 | 38 | 38 |
Road Runner | 1 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
S02J04T06 FTTFTFFFTTFFTFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTFTFFFT?FFTFTT TTTTTTTTT-TTTTTT --:-- / 5 |
FTTFTFFFTTFFTFTT TTTTTTTTTTTTTTTT --:PM / 6 |
FTTFTFFFT?FFTFTT TTTTTTTTT-TTTTTT --:-- / 5 |
FTTFTFFFT?FFTFTT TTTTTTTTT-TTTTTT --:-- / 5 |
FTTFTFFFT?FFTFTT TTTTTTTTT-TTTTTT --:-- / 5 |
FTTFTFFFT?FFTFTT TTTTTTTTT-TTTTTT --:-- / 5 |
FTTFTFFFT?FFTFTT TTTTTTTTT-TTTTTT --:-- / 5 |
FTTFTFFFT?FFTFTT TTTTTTTTT-TTTTTT --:-- / 5 |
S02J04T08 FFTTFFFF? FFTTTFF (expected value) 4.00 2.00 4.00 4.00 4.00 3.00 4.00 2.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTF?FF?FFTTTFF TTTTT-TT?TTTTTTT --:-- / 5 |
FFTTFFFF?FFTTTFF TTTTTTTT?TTTTTTT --:-- / 5 |
CC 0 |
CC 0 |
F?TTFFF??FFTTTFF T-TTTTT-?TTTTTTT --:-- / 4 |
F?TTFFF??FFTTTFF T-TTTTT-?TTTTTTT --:-- / 4 |
CC 0 |
CC 0 |
S02J04T10 FTTFFTFTFTTTFTTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:PM / 6 |
FTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
FTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 6 |
FTTFFTFTFTTTFTTT TTTTTTTTTTTTTTTT --:-- / 6 |
CC 0 |
CC 0 |
S02J06T06 FFF? FFFT? TT? TTF? (expected value) 4.00 3.00 4.00 0 4.00 4.00 4.00 4.00 0 4.00 4.00 0 2.00 2.00 2.00 0 (confidence rate) |
FFF?FFFT?TT?TTF? TTT?TTTT?TT?TTT? --:-- / 4 |
F?F?FFFT?TT?TTF? T-T?TTTT?TT?TTT? --:-- / 4 |
CC 0 |
CC 0 |
FFF?FFFT?TT????? TTT?TTTT?TT?---? --:-- / 3 |
FFF?FFFT?TT????? TTT?TTTT?TT?---? --:-- / 3 |
CC 0 |
CC 0 |
S02J06T08 FTF? FFTTFTTTFTTT (expected value) 8.00 8.00 4.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FTF?FFTTFTTTFTTT TTT?TTTTTTTTTTTT --:-- / 5 |
FTF?FFTTFTTTFTTT TTT?TTTTTTTTTTTT --:-- / 5 |
FT??FFTTFTTTFTTT TT-?TTTTTTTTTTTT --:-- / 5 |
FT??FFTTFTTTFTTT TT-?TTTTTTTTTTTT --:-- / 5 |
FTF????????????? TTT?------------ --:-- / 1 |
FTF????????????? TTT?------------ --:-- / 1 |
FT??FFTTFTTTFTTT TT-?TTTTTTTTTTTT --:-- / 5 |
FT??FFTTFTTTFTTT TT-?TTTTTTTTTTTT --:-- / 5 |
S02J06T10 FFFFTFFTFT? TTF? ? (expected value) 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 0 7.00 7.00 6.00 0 0 (confidence rate) |
FF?FTFFTFT?TTF?? TT-TTTTTTT?TTT?? --:-- / 4 |
FFFFTFFTFT?TTF?? TTTTTTTTTT?TTT?? --:-- / 4 |
FFFFTFFTFT?TTF?? TTTTTTTTTT?TTT?? --:-- / 4 |
FFFFTFFTFT?TTF?? TTTTTTTTTT?TTT?? --:-- / 4 |
FF?FTFFTF??????? TT-TTTTTT-?---?? --:-- / 3 |
FF?FTFFT?T?TT??? TT-TTTTT-T?TT-?? --:-- / 3 |
FFFFTFFTFT?TTF?? TTTTTTTTTT?TTT?? --:-- / 4 |
FFFFTFFTFT?TTF?? TTTTTTTTTT?TTT?? --:-- / 4 |
S04J04T06 FTF? FFFTFFFTTFFT (expected value) 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate) |
FTF?FFFTFFFTTFFT TTT?TTTTTTTTTTTT --:-- / 5 |
FTF?FFFTFFFT?FFT TTT?TTTTTTTT-TTT --:-- / 5 |
???????????????? ---?------------ --:-- / 0 |
???????????????? ---?------------ --:-- / 0 |
FTF?FFFT???????? TTT?TTTT-------- --:-- / 2 |
FTF?FFFT???????? TTT?TTTT-------- --:-- / 2 |
???????????????? ---?------------ --:-- / 0 |
???????????????? ---?------------ --:-- / 0 |
S04J04T08 FFFFFFFTFTTTFTFT (expected value) 4.00 4.00 4.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FFFF?FFTFTTTFTFT TTTT-TTTTTTTTTTT --:-- / 5 |
FFFFFFFTFTTTFTFT TTTTTTTTTTTTTTTT --:PM / 6 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFF?F??????????? TTT-T----------- --:-- / 1 |
FFF?F??????????? TTT-T----------- --:-- / 1 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
S04J04T10 FFF? FT? TFT? TFFFF (expected value) 4.00 3.00 3.00 0 3.00 3.00 0 3.00 3.00 3.00 0 2.00 3.00 2.00 2.00 2.00 (confidence rate) |
FFF?FT?TFT?TFFFF TTT?TT?TTT?TTTTT --:-- / 4 |
FFF?FT?TFT?TFFFF TTT?TT?TTT?TTTTT --:-- / 4 |
???????????????? ---?--?---?----- --:-- / 0 |
???????????????? ---?--?---?----- --:-- / 0 |
FFF?FT?TFT??F??? TTT?TT?TTT?-T--- --:-- / 3 |
F??????????????? T--?--?---?----- --:-- / 0 |
???????????????? ---?--?---?----- --:-- / 0 |
???????????????? ---?--?---?----- --:-- / 0 |
S04J06T06 TTT? TFFF? T? F? TT? (expected value) 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 0 2.00 0 2.00 0 2.00 2.00 0 (confidence rate) |
TTT?TFFF?T?F?TT? TTT?TTTT?T?T?TT? --:-- / 4 |
TTT?TFFF?T?F?TT? TTT?TTTT?T?T?TT? --:-- / 4 |
???????????????? ---?----?-?-?--? --:-- / 0 |
???????????????? ---?----?-?-?--? --:-- / 0 |
TTT?TFFF???????? TTT?TTTT?-?-?--? --:-- / 2 |
TTT?TFFF???????? TTT?TTTT?-?-?--? --:-- / 2 |
???????????????? ---?----?-?-?--? --:-- / 0 |
???????????????? ---?----?-?-?--? --:-- / 0 |
S04J06T08 TFFFFFTT? TFFTTTT (expected value) 8.00 8.00 7.00 6.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFFFFTT?TFFTTTT TTTTTTTT?TTTTTTT --:-- / 5 |
TFFFFFTT?TFFTTTT TTTTTTTT?TTTTTTT --:-- / 5 |
TFFFFFTT?TFFTTTT TTTTTTTT?TTTTTTT --:-- / 5 |
TFFFFFTT?TFFTTTT TTTTTTTT?TTTTTTT --:-- / 5 |
TFF????????????? TTT-----?------- --:-- / 1 |
TF?????????????? TT------?------- --:-- / 1 |
TFFFFFTT?TFFTTTT TTTTTTTT?TTTTTTT --:-- / 5 |
TFFFFFTT?TFFTTTT TTTTTTTT?TTTTTTT --:-- / 5 |
S04J06T10 FFFFFFTTTFT? FTTF (expected value) 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate) |
FFF?FFTTTFT?FTTF TTT-TTTTTTT?TTTT --:-- / 5 |
FFFFFFTTTFT?FTTF TTTTTTTTTTT?TTTT --:-- / 5 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
S06J04T04 FFTFFFTFTFF? FFFF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 2.00 0 3.00 3.00 2.00 3.00 (confidence rate) |
FFTFFFTFTFF?FFFF TTTTTTTTTTT?TTTT --:-- / 5 |
FFTFFFTFTFF?FFFF TTTTTTTTTTT?TTTT --:-- / 5 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
FFTFF??????????? TTTTT------?---- --:-- / 2 |
FFTFFFTFTF??FF?F TTTTTTTTTT-?TT-T --:-- / 4 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
S06J04T06 F? TFFFFFFTTFTTTF (expected value) 7.00 0 6.00 6.00 7.00 7.00 7.00 7.00 6.00 7.00 6.00 6.00 6.00 6.00 6.00 7.00 (confidence rate) |
F?T?FFFFFTTFTTTF T?T-TTTTTTTTTTTT --:-- / 5 |
F?TFFFFFFTTFTTTF T?TTTTTTTTTTTTTT --:-- / 5 |
F?TFFFFFFTTFTTTF T?TTTTTTTTTTTTTT --:-- / 5 |
F?TFFFFFFTTFTTTF T?TTTTTTTTTTTTTT --:-- / 5 |
CC 0 |
F??FFFFF?T?????F T?-TTTTT-T-----T --:-- / 3 |
F?TFFFFFFTTFTTTF T?TTTTTTTTTTTTTT --:-- / 5 |
F?TFFFFFFTTFTTTF T?TTTTTTTTTTTTTT --:-- / 5 |
S06J04T08 TFFTFTFFFTTFFTF? (expected value) 2.00 2.00 2.00 2.00 2.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 0 (confidence rate) |
TFFTF?FF?TTFFTF? TTTTT-TT-TTTTTT? --:-- / 4 |
TFFTFT?FFTTFFTF? TTTTTT-TTTTTTTT? --:-- / 5 |
???????????????? ---------------? --:-- / 0 |
???????????????? ---------------? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------? --:-- / 0 |
???????????????? ---------------? --:-- / 0 |
S06J06T04 FFFTFFFFFTTTFFTT (expected value) 6.00 7.00 1.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFF?FFFFFTTTFFTT TTT-TTTTTTTTTTTT --:-- / 5 |
F??TFFFFFTTTFFTT T--TTTTTTTTTTTTT --:-- / 5 |
FF??FFFFFTTTFFTT TT--TTTTTTTTTTTT --:-- / 5 |
FF??FFFFFTTTFFTT TT--TTTTTTTTTTTT --:-- / 5 |
?F?????????????? -T-------------- --:-- / 0 |
?F?????????????? -T-------------- --:-- / 0 |
FF??FFFFFTTTFFTT TT--TTTTTTTTTTTT --:-- / 5 |
FF??FFFFFTTTFFTT TT--TTTTTTTTTTTT --:-- / 5 |
S06J06T06 FFFFFTFTTTTTT? FF (expected value) 8.00 7.00 6.00 5.00 6.00 7.00 6.00 5.00 7.00 6.00 6.00 6.00 7.00 0 6.00 6.00 (confidence rate) |
FFF??TF?TTTTT?FF TTT--TT-TTTTT?TT --:-- / 4 |
FFFFFTFTTTTTT?FF TTTTTTTTTTTTT?TT --:-- / 5 |
FFFFFTFTTTTTT?FF TTTTTTTTTTTTT?TT --:-- / 5 |
FFFFFTFTTTTTT?FF TTTTTTTTTTTTT?TT --:-- / 5 |
FF??FT??T???T??? TT--TT--T---T?-- --:-- / 2 |
F??????????????? T------------?-- --:-- / 0 |
FFFFFTFTTTTTT?FF TTTTTTTTTTTTT?TT --:-- / 5 |
FFFFFTFTTTTTT?FF TTTTTTTTTTTTT?TT --:-- / 5 |
S06J06T08 FFFF? FFFTFFTFTTT (expected value) 5.00 5.00 6.00 6.00 0 6.00 6.00 6.00 6.00 1.00 6.00 6.00 1.00 6.00 6.00 6.00 (confidence rate) |
?FFF?FFFTFFT?TTT -TTT?TTTTTTT-TTT --:-- / 4 |
F?FF?FFFT?FTFTTT T-TT?TTTT-TTTTTT --:-- / 4 |
FFFF?FFFT?FT?TTT TTTT?TTTT-TT-TTT --:-- / 4 |
FFFF?FFFT?FT?TTT TTTT?TTTT-TT-TTT --:-- / 4 |
CC 0 |
CC 0 |
FFFF?FFFT?FT?TTT TTTT?TTTT-TT-TTT --:-- / 4 |
FFFF?FFFT?FT?TTT TTTT?TTTT-TT-TTT --:-- / 4 |
PolyORBNT — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 69 | 43 | 39 | 36 | 35 | 41 | 41 |
Road Runner | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
S05J20 FTFF? FFFTFFTFFTF (expected value) 7.00 1.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
DNC |
FTFF?FFFTFFTFFTF TTTT?TTTTTTTTTTT --:-- / 7 |
F?FF?FFFTFFTFFTF T-TT?TTTTTTTTTTT --:-- / 7 |
F?FF?FFFTFFTFFTF T-TT?TTTTTTTTTTT --:-- / 7 |
F?FF?FFFTFFTFFTF T-TT?TTTTTTTTTTT --:-- / 7 |
F??????????????? T---?----------- --:-- / 0 |
F?FF?FFFTFFTFFTF T-TT?TTTTTTTTTTT --:-- / 7 |
F?FF?FFFTFFTFFTF T-TT?TTTTTTTTTTT --:-- / 7 |
S05J30 FFTFF? TFTFTFT? FF (expected value) 7.00 7.00 7.00 7.00 7.00 0 7.00 6.00 7.00 5.00 5.00 5.00 5.00 0 5.00 5.00 (confidence rate) |
DNC |
FFTFF?TFTFTFT?FF TTTTT?TTTTTTT?TT --:-- / 7 |
FFTFF?TFTFTFT?FF TTTTT?TTTTTTT?TT --:-- / 7 |
FFTFF?T?TFTFT?FF TTTTT?T-TTTTT?TT --:-- / 6 |
FFTFF?TFT??????? TTTTT?TTT----?-- --:-- / 4 |
FFTFF?TFT??????? TTTTT?TTT----?-- --:-- / 4 |
FFTFF?TFTFTFT?FF TTTTT?TTTTTTT?TT --:-- / 7 |
FFTFF?TFTFTFT?FF TTTTT?TTTTTTT?TT --:-- / 7 |
S05J40 FTFTFFFF? FTFFFFF (expected value) 4.00 4.00 2.00 4.00 4.00 4.00 2.00 3.00 0 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate) |
DNC |
FT?TFF?F?FTFFFFF TT-TTT-T?TTTTTTT --:-- / 6 |
FTFTFF?????????? TTTTTT--?------- --:-- / 3 |
???????????????? --------?------- --:-- / 0 |
FT?TFFFF???????? TT-TTTTT?------- --:-- / 3 |
FTFTFFFF?FTFFFF? TTTTTTTT?TTTTTT- --:-- / 7 |
???????????????? --------?------- --:-- / 0 |
???????????????? --------?------- --:-- / 0 |
S05J60 TFFTTTFFTTFFTF? ? (expected value) 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 0 (confidence rate) |
DNC |
TFFTTTFFTTFFTF?? TTTTTTTTTTTTTT?? --:-- / 7 |
T?FTTTFFTTFFTF?? T-TTTTTTTTTTTT?? --:-- / 6 |
TFFTTTFFTTFFTF?? TTTTTTTTTTTTTT?? --:-- / 7 |
CC 0 |
CC 0 |
TFFTTTFFTTFFTF?? TTTTTTTTTTTTTT?? --:-- / 7 |
TFFTTTFFTTFFTF?? TTTTTTTTTTTTTT?? --:-- / 7 |
S05J80 TTFTFTFTFF? FF? FT (expected value) 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 0 2.00 2.00 0 2.00 2.00 (confidence rate) |
DNC |
TTFTFTFTFF?FF?FT TTTTTTTTTT?TT?TT --:-- / 7 |
???????????????? ----------?--?-- --:-- / 0 |
???????????????? ----------?--?-- --:-- / 0 |
?TFTFTFTF??????? -TTTTTTTT-?--?-- --:-- / 4 |
?TFTFTFTF??FF?FT -TTTTTTTT-?TT?TT --:-- / 6 |
???????????????? ----------?--?-- --:-- / 0 |
???????????????? ----------?--?-- --:-- / 0 |
S10J20 FF? FFFF? T? FTFFTF (expected value) 7.00 7.00 0 3.00 7.00 7.00 5.00 0 7.00 0 7.00 7.00 7.00 3.00 7.00 1.00 (confidence rate) |
DNC |
FF?FFFF?T?FTFFTF TT?TTTT?T?TTTTTT --:-- / 6 |
FF??FFF?T?FTF?T? TT?-TTT?T?TTT-T- --:-- / 5 |
FF??FFF?T?FTF?T? TT?-TTT?T?TTT-T- --:-- / 5 |
FF?FFF??T?FTFFT? TT?TTT-?T?TTTTT- --:-- / 5 |
FF?FFF??T?FTFFT? TT?TTT-?T?TTTTT- --:-- / 5 |
FF??FFF?T?FTF?T? TT?-TTT?T?TTT-T- --:-- / 5 |
FF??FFF?T?FTF?T? TT?-TTT?T?TTT-T- --:-- / 5 |
S10J30 FFFFTTTFTFTT? TFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0 1.00 5.00 3.00 (confidence rate) |
DNC |
FFFFTTTFTFTT?TF? TTTTTTTTTTTT?TT- --:-- / 7 |
FFFFTTTFTFTT??FF TTTTTTTTTTTT?-TT --:-- / 7 |
FFFFTTTFTFTT??F? TTTTTTTTTTTT?-T- --:-- / 6 |
FFFFTTTFTFTT???? TTTTTTTTTTTT?--- --:-- / 6 |
FFFFTTTFTFTT???? TTTTTTTTTTTT?--- --:-- / 6 |
FFFFTTTFTFTT??FF TTTTTTTTTTTT?-TT --:-- / 7 |
FFFFTTTFTFTT??FF TTTTTTTTTTTT?-TT --:-- / 7 |
S10J40 FFFTTFTFFFTFFTFT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 5.00 5.00 5.00 (confidence rate) |
DNC |
FFFTTFTFFFTFFTFT TTTTTTTTTTTTTTTT --:-M / 8 |
FFFTTFTFFFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTFTFFFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTFTFFFTFF??? TTTTTTTTTTTTT--- --:-- / 6 |
FFFTTFTFFFTF???? TTTTTTTTTTTT---- --:-- / 6 |
FFFTTFTFFFTFFTFT TTTTTTTTTTTTTTTT --:P- / 8 |
FFFTTFTFFFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
S10J60 TFTTTFFTFFF? TFFF (expected value) 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TFTTTFFTFFF?TFFF TTTTTTTTTTT?TTTT --:-- / 7 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
TFT????????????? TTT--------?---- --:-- / 1 |
TFT????????????? TTT--------?---- --:-- / 1 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
S10J80 F? FTTTFFFFFFTTFF (expected value) 3.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
F?FTTTFFFFFFTTFF T?TTTTTTTTTTTTTT --:-- / 7 |
???????????????? -?-------------- --:-- / 0 |
???????????????? -?-------------- --:-- / 0 |
F??????????????? T?-------------- --:-- / 0 |
F??????????????? T?-------------- --:-- / 0 |
???????????????? -?-------------- --:-- / 0 |
???????????????? -?-------------- --:-- / 0 |
PolyORBNT — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 61 | 67 | 20 | 20 | 21 | 18 | 20 | 20 |
Road Runner | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
S05J20 FTFFFFFFTTFTFFF? (expected value) 6.00 1.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate) |
F?FFFFFFTTFTFFF? T-TTTTTTTTTTTTT? --:-- / 7 |
FTFF?FFFTTFTFFF? TTTT-TTTTTTTTTT? --:-- / 7 |
F?FF?FFFTTFTFFF? T-TT-TTTTTTTTTT? --:-- / 6 |
F?FF?FFFTTFTFFF? T-TT-TTTTTTTTTT? --:-- / 6 |
CC 0 |
CC 0 |
F?FF?FFFTTFTFFF? T-TT-TTTTTTTTTT? --:-- / 6 |
F?FF?FFFTTFTFFF? T-TT-TTTTTTTTTT? --:-- / 6 |
S05J30 FFTFF? TFTFFFFTTF (expected value) 3.00 3.00 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 3.00 1.00 2.00 2.00 2.00 2.00 (confidence rate) |
??TFF?TFTFF?FTTF --TTT?TTTTT-TTTT --:-- / 6 |
FFTFF?TFTFFFFTTF TTTTT?TTTTTTTTTT --:-- / 7 |
???????????????? -----?---------- --:-- / 0 |
???????????????? -----?---------- --:-- / 0 |
FFTFF?TFTFF????? TTTTT?TTTTT----- --:-- / 5 |
FFTFF?TFTF?????? TTTTT?TTTT------ --:-- / 4 |
???????????????? -----?---------- --:-- / 0 |
???????????????? -----?---------- --:-- / 0 |
S05J40 FTFTFFFFTTFTTTFF (expected value) 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 2.00 (confidence rate) |
FTF???F?TTFTTTFF TTT---T-TTTTTTTT --:-- / 6 |
FTFTFF?FTT?TTTFF TTTTTT-TTT-TTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTFTFFFFTT?TTTF? TTTTTTTTTT-TTTT- --:-- / 7 |
FTFTFFFFTT?TTTF? TTTTTTTTTT-TTTT- --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
S05J60 TFFTTTFFFTT? TFFF (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 1.00 4.00 4.00 0 3.00 3.00 1.00 3.00 (confidence rate) |
TFFTTTF??TT?TFFF TTTTTTT--TT?TTTT --:-- / 6 |
T?FTTTFF?TT?TF?F T-TTTTTT-TT?TT-T --:-- / 6 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
TFFTTTFFFTT?TF?F TTTTTTTTTTT?TT-T --:-- / 7 |
TFFTTTFF?TT????? TTTTTTTT-TT?---- --:-- / 5 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
S05J80 TTFTFTFTFTTTFFFT (expected value) 1.00 4.00 3.00 4.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate) |
?T?T??FTFTTTFFFT -T-T--TTTTTTTTTT --:-- / 6 |
TTFTFTFTFTTTF?FT TTTTTTTTTTTTT-TT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
?TFT???????????? -TTT------------ --:-- / 1 |
?TFT???????????? -TTT------------ --:-- / 1 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
S10J20 FF? FFFF? FTFF? FFT (expected value) 8.00 8.00 0 3.00 6.00 6.00 6.00 0 6.00 6.00 6.00 5.00 0 6.00 6.00 6.00 (confidence rate) |
FF?FFFF?FTF??FFT TT?TTTT?TTT-?TTT --:-- / 6 |
FF?FFFF?FTFF?FFT TT?TTTT?TTTT?TTT --:-- / 6 |
FF??FFF?FTFF?FFT TT?-TTT?TTTT?TTT --:-- / 6 |
FF??FFF?FTFF?FFT TT?-TTT?TTTT?TTT --:-- / 6 |
FF?F???????????? TT?T---?----?--- --:-- / 1 |
FF?????????????? TT?----?----?--- --:-- / 1 |
FF??FFF?FTFF?FFT TT?-TTT?TTTT?TTT --:-- / 6 |
FF??FFF?FTFF?FFT TT?-TTT?TTTT?TTT --:-- / 6 |
S10J30 FFFFTTTFTTT? FFTT (expected value) 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 1.00 2.00 2.00 2.00 (confidence rate) |
FFFFTTTFTTT?FFTT TTTTTTTTTTT?TTTT --:-- / 7 |
FFFFTTTFTTT??FTT TTTTTTTTTTT?-TTT --:-- / 7 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
F??????????????? T----------?---- --:-- / 0 |
F??????????????? T----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
S10J40 FFFTTFTFFTTTTTTT (expected value) 6.00 6.00 6.00 5.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFF??FTFFTTTTTTT TTT--TTTTTTTTTTT --:-- / 7 |
FFFTTFTFFTTTTTTT TTTTTTTTTTTTTTTT --:-M / 8 |
FFFTTFTFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTFTFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
FFFTTFTFFTTTTTTT TTTTTTTTTTTTTTTT --:-- / 8 |
FFFTTFTFFTTTTTTT TTTTTTTTTTTTTTTT --:P- / 8 |
S10J60 TFTTTFFT? FT? ? TTT (expected value) 2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 0 1.00 2.00 0 0 2.00 2.00 2.00 (confidence rate) |
T?TTTF?T?FT??TTT T-TTTT-T?TT??TTT --:-- / 5 |
TFTTTFFT??T??TTT TTTTTTTT?-T??TTT --:-- / 6 |
???????????????? --------?--??--- --:-- / 0 |
???????????????? --------?--??--- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? --------?--??--- --:-- / 0 |
???????????????? --------?--??--- --:-- / 0 |
S10J80 F? FTTTFFT? TTT? TF (expected value) 2.00 0 2.00 1.00 2.00 2.00 2.00 1.00 2.00 0 2.00 2.00 2.00 0 2.00 1.00 (confidence rate) |
F?F?TTF?T?TTT?TF T?T-TTT-T?TTT?TT --:-- / 5 |
F?FTTTFFT?TTT?T? T?TTTTTTT?TTT?T- --:-- / 6 |
???????????????? -?-------?---?-- --:-- / 0 |
???????????????? -?-------?---?-- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -?-------?---?-- --:-- / 0 |
???????????????? -?-------?---?-- --:-- / 0 |
ProductionCell — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 119 | 119 | 119 | 119 | 119 | 119 | 119 | 119 |
Road Runner | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none FFFFFFFTFTFFTTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:-- / 119 |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:-M / 119 |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:-- / 119 |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:-- / 119 |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:P- / 119 |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:-- / 119 |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:-- / 119 |
FFFFFFFTFTFFTTFF TTTTTTTTTTTTTTTT --:-- / 119 |
QuasiCertifProtocol — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 55 | 10 | 10 | 47 | 47 | 10 | 10 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
02 FFFFFTTFFTFFFFFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FFFFFTTFFTFFFFFF TTTTTTTTTTTTTTTT --:PM / 10 |
FFFFFTTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
06 FTFFFTFFTFFTTTFT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTFFFTFFTFFTTTFT TTTTTTTTTTTTTTTT --:PM / 10 |
CC 0 |
CC 0 |
FTFFFTFFTFFTTTFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFFTFFTFFTTTFT TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
10 ? ? ? TFF? FTFFTFTFF (expected value) 0 0 0 3.00 3.00 3.00 0 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
???TFF?FTFFTFTFF ???TTT?TTTTTTTTT --:-- / 7 |
DNF 0 |
???????????????? ???---?--------- --:-- / 0 |
???TFF??TFFTFTFF ???TTT?-TTTTTTTT --:-- / 7 |
???TFF??TFFTFTFF ???TTT?-TTTTTTTT --:-- / 7 |
???????????????? ???---?--------- --:-- / 0 |
???????????????? ???---?--------- --:-- / 0 |
18 FTF? TTTFTF? FFT? F (expected value) 1.00 3.00 3.00 0 3.00 3.00 3.00 1.00 1.00 3.00 0 1.00 1.00 1.00 0 1.00 (confidence rate) |
DNC |
FTF?TTTFTF??FT?F TTT?TTTTTT?-TT?T --:-- / 7 |
CC 0 |
???????????????? ---?------?---?- --:-- / 0 |
?TF?TTT??F?F???? -TT?TTT--T?T--?- --:-- / 4 |
?TF?TTT??F?????? -TT?TTT--T?---?- --:-- / 4 |
???????????????? ---?------?---?- --:-- / 0 |
???????????????? ---?------?---?- --:-- / 0 |
22 TTF? FF? F? TTFTFF? (expected value) 3.00 3.00 3.00 0 3.00 3.00 0 3.00 0 3.00 3.00 1.00 3.00 3.00 3.00 0 (confidence rate) |
DNC |
TTF?FF?F?TTFTFF? TTT?TT?T?TTTTTT? --:-- / 7 |
CC 0 |
???????????????? ---?--?-?------? --:-- / 0 |
TTF?FF?F?TT?TFF? TTT?TT?T?TT-TTT? --:-- / 7 |
TTF?FF?F?TT?TFF? TTT?TT?T?TT-TTT? --:-- / 7 |
???????????????? ---?--?-?------? --:-- / 0 |
???????????????? ---?--?-?------? --:-- / 0 |
28 FFFF? FFF? F? FFF? F (expected value) 3.00 3.00 3.00 3.00 0 3.00 1.00 3.00 0 3.00 0 3.00 3.00 3.00 0 1.00 (confidence rate) |
DNC |
FFFF?FFF?F?FFF?F TTTT?TTT?T?TTT?T --:-- / 7 |
CC 0 |
???????????????? ----?---?-?---?- --:-- / 0 |
FFFF?F?F?F?FFF?? TTTT?T-T?T?TTT?- --:-- / 6 |
FFFF?F?F?F?FFF?? TTTT?T-T?T?TTT?- --:-- / 6 |
???????????????? ----?---?-?---?- --:-- / 0 |
???????????????? ----?---?-?---?- --:-- / 0 |
32 FTFTFFF? ? ? TFF? FF (expected value) 3.00 3.00 1.00 3.00 3.00 1.00 3.00 0 0 0 1.00 1.00 1.00 0 1.00 1.00 (confidence rate) |
DNC |
FTFTFFF???TFF?FF TTTTTTT???TTT?TT --:-- / 7 |
CC 0 |
???????????????? -------???---?-- --:-- / 0 |
FT?TF?F????????? TT-TT-T???---?-- --:-- / 3 |
FT?TF?F????????? TT-TT-T???---?-- --:-- / 3 |
???????????????? -------???---?-- --:-- / 0 |
???????????????? -------???---?-- --:-- / 0 |
QuasiCertifProtocol — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 47 | 55 | 10 | 18 | 39 | 39 | 18 | 18 |
Road Runner | 1 | 0 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
02 FFFFFTTFTTTTFTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:P- / 10 |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:-M / 10 |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTTFTTTTFTTF TTTTTTTTTTTTTTTT --:-- / 10 |
06 FTFFFTFFFTTTTTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 4.00 (confidence rate) |
FTFFFTFFFT?TTT?F TTTTTTTTTT-TTT-T --:-- / 9 |
FTFFFTFFFTTTTTTF TTTTTTTTTTTTTTTT --:-M / 10 |
CC 0 |
CC 0 |
FTFFFTFFFTTTTTTF TTTTTTTTTTTTTTTT --:P- / 10 |
FTFFFTFFFTTTTTTF TTTTTTTTTTTTTTTT --:-- / 10 |
CC 0 |
CC 0 |
10 ? ? ? TFF? FTTTTFFFT (expected value) 0 0 0 4.00 4.00 3.00 0 1.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 2.00 (confidence rate) |
???TF???TTTTF??T ???TT-?-TTTTT--T --:-- / 5 |
???TFF?FTTTTFFFT ???TTT?TTTTTTTTT --:-- / 7 |
CC 0 |
???????????????? ???---?--------- --:-- / 0 |
???TFF?????????? ???TTT?--------- --:-- / 2 |
???TFF?????????? ???TTT?--------- --:-- / 2 |
???????????????? ???---?--------- --:-- / 0 |
???????????????? ???---?--------- --:-- / 0 |
18 FTF? TTTFF? ? TTT? T (expected value) 1.00 4.00 3.00 0 4.00 4.00 4.00 1.00 4.00 0 0 2.00 2.00 2.00 0 2.00 (confidence rate) |
?T??TTT?F??TTT?T -T-?TTT-T??TTT?T --:-- / 6 |
FTF?TTTFF??TTT?T TTT?TTTTT??TTT?T --:-- / 7 |
CC 0 |
???????????????? ---?-----??---?- --:-- / 0 |
?TF?TTT?F??????? -TT?TTT-T??---?- --:-- / 4 |
?TF?TTT?F??????? -TT?TTT-T??---?- --:-- / 4 |
???????????????? ---?-----??---?- --:-- / 0 |
???????????????? ---?-----??---?- --:-- / 0 |
22 TTF? FF? F? ? T? F? TT (expected value) 4.00 4.00 4.00 0 4.00 3.00 0 4.00 0 0 4.00 0 3.00 0 4.00 4.00 (confidence rate) |
TTF?F??F??T?F?TT TTT?T-?T??T?T?TT --:-- / 6 |
TTF?FF?F??T?F?TT TTT?TT?T??T?T?TT --:-- / 6 |
CC 0 |
???????????????? ---?--?-??-?-?-- --:-- / 0 |
TTF?FF?F??T???TT TTT?TT?T??T?-?TT --:-- / 6 |
TTF?FF?F??T?F?TT TTT?TT?T??T?T?TT --:-- / 6 |
???????????????? ---?--?-??-?-?-- --:-- / 0 |
???????????????? ---?--?-??-?-?-- --:-- / 0 |
28 FFFF? FFF? F? TTTTT (expected value) 7.00 6.00 7.00 7.00 0 6.00 5.00 7.00 0 4.00 0 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
F?FF??FF???TTTTT T-TT?-TT?-?TTTTT --:-- / 6 |
FFFF?FFF?F?TTTTT TTTT?TTT?T?TTTTT --:-- / 8 |
CC 0 |
FFFF?FFF?F?TTTTT TTTT?TTT?T?TTTTT --:-- / 8 |
FFFF?F?F???????? TTTT?T-T?-?----- --:-- / 4 |
FFFF?F?F???????? TTTT?T-T?-?----- --:-- / 4 |
FFFF?FFF?F?TTTTT TTTT?TTT?T?TTTTT --:-- / 8 |
FFFF?FFF?F?TTTTT TTTT?TTT?T?TTTTT --:-- / 8 |
32 FTFTFFF? ? ? ? TT? TT (expected value) 4.00 4.00 1.00 4.00 4.00 1.00 3.00 0 0 0 0 2.00 2.00 0 2.00 2.00 (confidence rate) |
FT?TF??????TT?TT TT-TT--????TT?TT --:-- / 5 |
FTFTFFF????TT?TT TTTTTTT????TT?TT --:-- / 7 |
CC 0 |
???????????????? -------????--?-- --:-- / 0 |
FT?TF?F????????? TT-TT-T????--?-- --:-- / 3 |
FT?TF?F????????? TT-TT-T????--?-- --:-- / 3 |
???????????????? -------????--?-- --:-- / 0 |
???????????????? -------????--?-- --:-- / 0 |
Raft — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 124 | 116 | 39 | 39 | 126 | 126 | 56 | 56 |
Road Runner | 2 | 0 | 0 | 0 | 5 | 2 | 0 | 0 |
Camel | 4 | 2 | 0 | 0 | 0 | 2 | 0 | 1 |
02 FFFFFFTFFFTTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-M / 14 |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:P- / 14 |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFFFFTFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 14 |
03 FFFTTFTFFFFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTTFTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFTFFFFTFFFF TTTTTTTTTTTTTTTT --:-M / 14 |
CC 0 |
CC 0 |
FFFTTFTFFFFTFFFF TTTTTTTTTTTTTTTT --:P- / 14 |
FFFTTFTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
04 TFFFFTFTFFFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFTF?FFFTFFFF TTTTTTT-TTTTTTTT --:-- / 13 |
TFFFFTF?FFFTFFFF TTTTTTT-TTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
TFFFFTFTFFFTFFFF TTTTTTTTTTTTTTTT --:P- / 14 |
TFFFFTFTFFFTFFFF TTTTTTTTTTTTTTTT --:-M / 14 |
CC 0 |
CC 0 |
05 TTFFFFFTFTFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate) |
TTFFFFFTFTFFFFFF TTTTTTTTTTTTTTTT --:-M / 14 |
TTFFFFFTFTFFFFF? TTTTTTTTTTTTTTT- --:-- / 13 |
CC 0 |
CC 0 |
TTFFFFFTFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TTFFFFFTFTFFFFFF TTTTTTTTTTTTTTTT --:P- / 14 |
CC 0 |
CC 0 |
06 TFFTTFFFFFFFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate) |
TFFTTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-M / 14 |
TFFTTFFFFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 13 |
CC 0 |
CC 0 |
TFFTTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 14 |
TFFTTFFFFFFFFFFT TTTTTTTTTTTTTTTT --:P- / 14 |
CC 0 |
CC 0 |
07 FTFFFFFTTTFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFF?TTTFFFFFF TTTTTT-TTTTTTTTT --:-- / 13 |
FTFFFF?TTT?FFFFF TTTTTT-TTT-TTTTT --:-- / 12 |
CC 0 |
CC 0 |
FTFFFFFTTTFFFFFF TTTTTTTTTTTTTTTT --:P- / 14 |
FTFFFFFTTTFFFFFF TTTTTTTTTTTTTTTT --:-M / 14 |
CC 0 |
CC 0 |
08 FFFFFFFFFFFFFTFT (expected value) 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFFFFFFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFFF?FFFFFF?FTFT TTTT-TTTTTT-TTTT --:-- / 12 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFFFFFFFFFTFT TTTTTTTTTTTTTTTT --:P- / 14 |
FFFFFFFFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFFFFFFFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFFFFFFFFFFFFTFT TTTTTTTTTTTTTTTT --:-M / 14 |
09 FFFTFFTFFFFFFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFTFFFFFFFTT TTTTTTTTTTTTTTTT --:PM / 14 |
FFFTFFTFFF?FFFTT TTTTTTTTTT-TTTTT --:-- / 13 |
FFFTFFTFFF?FFFTT TTTTTTTTTT-TTTTT --:-- / 13 |
FFFTFFTFFF?FFFTT TTTTTTTTTT-TTTTT --:-- / 13 |
FFFTFFTFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTFFTFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTFFTFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTFFTFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
10 TFTFFFTTFFTFFFFF (expected value) 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTFFFTTFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 14 |
T?TFFFTTF?TFFFFF T-TTTTTTT-TTTTTT --:-- / 12 |
T?TFFFTTF?TFFFFF T-TTTTTTT-TTTTTT --:-- / 12 |
T?TFFFTTF?TFFFFF T-TTTTTTT-TTTTTT --:-- / 12 |
TFTFFFTTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFTFFFTTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFTFFFTTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFTFFFTTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
Railroad — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 113 | 82 | 82 | 84 | 88 | 82 | 82 |
Road Runner | 1 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
005 TTTFFTTFFFFTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:P- / 23 |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:-M / 23 |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
TTTFFTTFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
010 FFFFFTTFFTFTFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate) |
FFFFFT?FFTFTF?TF TTTTTT-TTTTTT-TT --:-- / 20 |
FFFFFTTFFTFTFTTF TTTTTTTTTTTTTTTT --:PM / 23 |
CC 0 |
CC 0 |
FFFFFTTFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFTTFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 23 |
CC 0 |
CC 0 |
020 FFTFTTFTFFFFTFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 7.00 7.00 7.00 (confidence rate) |
FFTFTTFTFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 21 |
FFTFTTFTFFFFTFFT TTTTTTTTTTTTTTTT --:PM / 23 |
FFTFTTFTFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 21 |
FFTFTTFTFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 21 |
FFTFTTFTFFFF???? TTTTTTTTTTTT---- --:-- / 17 |
FFTFTTFTFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 21 |
FFTFTTFTFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 21 |
FFTFTTFTFFFF?FFT TTTTTTTTTTTT-TTT --:-- / 21 |
050 TTFFTFFFFTFFFTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 (confidence rate) |
TTFFTFFFFTFFF?FT TTTTTTTTTTTTT-TT --:-- / 21 |
TTFFTFFFFTFFFTFT TTTTTTTTTTTTTTTT --:PM / 23 |
TTFFTFFFFTFFF?FT TTTTTTTTTTTTT-TT --:-- / 21 |
TTFFTFFFFTFFF?FT TTTTTTTTTTTTT-TT --:-- / 21 |
TTFFTFFFFTFFF?FT TTTTTTTTTTTTT-TT --:-- / 21 |
TTFFTFFFFTFFF?FT TTTTTTTTTTTTT-TT --:-- / 21 |
TTFFTFFFFTFFF?FT TTTTTTTTTTTTT-TT --:-- / 21 |
TTFFTFFFFTFFF?FT TTTTTTTTTTTTT-TT --:-- / 21 |
100 FFF? TTFTFTTFTFFF (expected value) 6.00 6.00 6.00 0 1.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 (confidence rate) |
FFF??TF?FTTFT?FF TTT?-TT-TTTTT-TT --:-- / 17 |
FFF?TTFTFTTFTFFF TTT?TTTTTTTTTTTT --:-- / 21 |
FFF??TF?FTTFT?FF TTT?-TT-TTTTT-TT --:-- / 17 |
FFF??TF?FTTFT?FF TTT?-TT-TTTTT-TT --:-- / 17 |
CC 0 |
CC 0 |
FFF??TF?FTTFT?FF TTT?-TT-TTTTT-TT --:-- / 17 |
FFF??TF?FTTFT?FF TTT?-TT-TTTTT-TT --:-- / 17 |
Referendum — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 62 | 26 | 26 | 66 | 66 | 44 | 44 |
Road Runner | 0 | 0 | 0 | 0 | 4 | 2 | 0 | 0 |
Camel | 0 | 0 | 0 | 1 | 2 | 0 | 3 | 0 |
0010 FTTFFFFFFFFFTTFF (expected value) 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FTT?FFFFFFF?TTFF TTT-TTTTTTT-TTTT --:-- / 8 |
FTTFFFFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFFTTFF TTTTTTTTTTTTTTTT --:-M / 9 |
FTTFFFFFFFFFTTFF TTTTTTTTTTTTTTTT --:P- / 9 |
FTTFFFFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
0015 FFFFTTFFTFFFFTFF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
FFFFTTFFTFFFFTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFFFTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFFFTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFFFTFF TTTTTTTTTTTTTTTT --:P- / 9 |
FFFFTTFFTFFFFTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFFFTFF TTTTTTTTTTTTTTTT --:-M / 9 |
FFFFTTFFTFFFFTFF TTTTTTTTTTTTTTTT --:-- / 9 |
0020 FFFTTTFFFTFFFFFF (expected value) 7.00 7.00 7.00 7.00 4.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 4.00 (confidence rate) |
DNC |
FFFT?TFFFTFFF?F? TTTT-TTTTTTTT-T- --:-- / 7 |
FFFT?TFFFTFFFFF? TTTT-TTTTTTTTTT- --:-- / 8 |
FFFT?TFFFTFFFFF? TTTT-TTTTTTTTTT- --:-- / 8 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:P- / 9 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-M / 9 |
FFFTTTFFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 9 |
0050 FFFTFFFFFTTTTTTF (expected value) 5.00 5.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate) |
DNC |
FFF?FFFFFTTTTTTF TTT-TTTTTTTTTTTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTFFFFFTTTTTTF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFTFFFFFTTTTTTF TTTTTTTTTTTTTTTT --:P- / 9 |
FFFTFFFFFTTTTTTF TTTTTTTTTTTTTTTT --:-M / 9 |
FFFTFFFFFTTTTTTF TTTTTTTTTTTTTTTT --:-- / 9 |
0100 FFFTTFFTFFFFFFTF (expected value) 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
?FFTTFFTFFFFFFTF -TTTTTTTTTTTTTTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTTFFTFFFFFFTF TTTTTTTTTTTTTTTT --:-M / 9 |
FFFTTFFTFFFFFFTF TTTTTTTTTTTTTTTT --:P- / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0200 TTFTFTFFTTTTTFFF (expected value) 5.00 5.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 3.00 3.00 (confidence rate) |
DNC |
TTF?FTFFTTTTTFFF TTT-TTTTTTTTTTTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFTFTFFTTTTTFFF TTTTTTTTTTTTTTTT --:PM / 9 |
TTFTFTFFTTTTTFFF TTTTTTTTTTTTTTTT --:-- / 9 |
TTFTFTFFTTTTTF?? TTTTTTTTTTTTTT-- --:-- / 8 |
TTFTFTFFTTTTTF?? TTTTTTTTTTTTTT-- --:-- / 8 |
0500 ? ? TFFFTF? FFTFTTT (expected value) 0 0 3.00 2.00 1.00 3.00 3.00 3.00 0 1.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
??T?FFTF?F?TFTTT ??T-TTTT?T-TTTTT --:-- / 6 |
???????????????? ??------?------- --:-- / 0 |
???????????????? ??------?------- --:-- / 0 |
??TF?FTF??FTFTTT ??TT-TTT?-TTTTTT --:-- / 6 |
??TF?FTF??FTFTTT ??TT-TTT?-TTTTTT --:-- / 6 |
???????????????? ??------?------- --:-- / 0 |
???????????????? ??------?------- --:-- / 0 |
1000 FFFTF? TTT? FFFFFF (expected value) 3.00 3.00 3.00 3.00 3.00 0 3.00 3.00 3.00 0 3.00 3.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
FFFTF?TTT?FFFFFF TTTTT?TTT?TTTTTT --:-- / 8 |
???????????????? -----?---?------ --:-- / 0 |
???????????????? -----?---?------ --:-- / 0 |
FFFTF?TTT?FF???? TTTTT?TTT?TT---- --:-- / 6 |
FFFTF?TTT?FF???? TTTTT?TTT?TT---- --:-- / 6 |
???????????????? -----?---?------ --:-- / 0 |
???????????????? -----?---?------ --:-- / 0 |
Referendum — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 45 | 61 | 18 | 18 | 64 | 64 | 45 | 45 |
Road Runner | 0 | 0 | 0 | 0 | 4 | 2 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 1 | 1 | 3 |
0010 FTTFFFFFFFFTTTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:-M / 9 |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:P- / 9 |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
FTTFFFFFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
0015 FFFFTTFFTFFTFTTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTTFF?FFTFTTT TTTTTTTT-TTTTTTT --:-- / 8 |
FFFFTTFFTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFTFTTT TTTTTTTTTTTTTTTT --:P- / 9 |
FFFFTTFFTFFTFTTT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFFTTFFTFFTFTTT TTTTTTTTTTTTTTTT --:-M / 9 |
0020 FFFTTTFFTFTTFFFT (expected value) 6.00 6.00 6.00 6.00 4.00 6.00 6.00 6.00 4.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFFT?TFF?FT?FFFT TTTT-TTT-TT-TTTT --:-- / 7 |
FFFT?TFF??TTFFFT TTTT-TTT--TTTTTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTTTFFTFTTFFFT TTTTTTTTTTTTTTTT --:P- / 9 |
FFFTTTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFTTTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 9 |
FFFTTTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-M / 9 |
0050 FFFTFFFFFFTTTTTF (expected value) 5.00 5.00 5.00 4.00 5.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 4.00 (confidence rate) |
??????F?FFTTTT?? ------T-TTTTTT-- --:-- / 4 |
FFF?FFFFFFTTTT?? TTT-TTTTTTTTTT-- --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTFFFFFFTTTTTF TTTTTTTTTTTTTTTT --:P- / 9 |
FFFTFFFFFFTTTTTF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFTFFFFFFTTTTTF TTTTTTTTTTTTTTTT --:-- / 9 |
FFFTFFFFFFTTTTTF TTTTTTTTTTTTTTTT --:-M / 9 |
0100 FFFTTFFTTTTFFFTT (expected value) 2.00 4.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 2.00 4.00 4.00 3.00 4.00 4.00 (confidence rate) |
?F?????TTT?FF?TT -T-----TTT-TT-TT --:-- / 5 |
?FFTTFFTTT?FFFTT -TTTTTTTTT-TTTTT --:-- / 8 |
CC 0 |
CC 0 |
FFFTTFFTTTTFFFTT TTTTTTTTTTTTTTTT --:P- / 9 |
FFFTTFFTTTTFFFTT TTTTTTTTTTTTTTTT --:-M / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
0200 TTFTFTFFTFTFTFFF (expected value) 5.00 6.00 5.00 4.00 5.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 4.00 6.00 5.00 6.00 (confidence rate) |
?T???T?FTFTF?F?F -T---T-TTTTT-T-T --:-- / 5 |
TTF?FTFFT?TF?FFF TTT-TTTTT-TT-TTT --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TTFTFTFFTFTFTFFF TTTTTTTTTTTTTTTT --:P- / 9 |
TTFTFTFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 9 |
TTFTFTFFTFTFTFFF TTTTTTTTTTTTTTTT --:-M / 9 |
TTFTFTFFTFTFTFFF TTTTTTTTTTTTTTTT --:-- / 9 |
0500 ? ? TFFFTFTTTFTTTT (expected value) 0 0 3.00 3.00 1.00 4.00 3.00 3.00 4.00 3.00 4.00 2.00 4.00 4.00 4.00 4.00 (confidence rate) |
?????F??TTT?TTTT ??---T--TTT-TTTT --:-- / 5 |
??TFFFTFT?TFTTTT ??TTTTTTT-TTTTTT --:-- / 7 |
???????????????? ??-------------- --:-- / 0 |
???????????????? ??-------------- --:-- / 0 |
??TF?FTFTTT?TTTT ??TT-TTTTTT-TTTT --:-- / 7 |
??TF?FTFTTTFTTTT ??TT-TTTTTTTTTTT --:-- / 7 |
???????????????? ??-------------- --:-- / 0 |
???????????????? ??-------------- --:-- / 0 |
1000 FFFTF? TTFF? TF? ? F (expected value) 3.00 4.00 3.00 3.00 1.00 0 4.00 3.00 1.00 1.00 0 2.00 1.00 0 0 2.00 (confidence rate) |
?F????T????T???F -T---?T---?T-??T --:-- / 2 |
FFFTF?TTFF?TF??F TTTTT?TTTT?TT??T --:-- / 7 |
???????????????? -----?----?--??- --:-- / 0 |
???????????????? -----?----?--??- --:-- / 0 |
FFFT??TT???????? TTTT-?TT--?--??- --:-- / 3 |
FFFT??TT???????? TTTT-?TT--?--??- --:-- / 3 |
???????????????? -----?----?--??- --:-- / 0 |
???????????????? -----?----?--??- --:-- / 0 |
ResAllocation — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 159 | 157 | 60 | 60 | 159 | 158 | 61 | 61 |
Road Runner | 7 | 0 | 0 | 0 | 5 | 1 | 0 | 0 |
Camel | 4 | 9 | 0 | 0 | 0 | 0 | 0 | 0 |
R002C002 FFFFFFTFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 11 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R003C002 FFFFFTTTFFTFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFTTTFFTFFFTF TTTTTTTTTTTTTTTT --:P- / 11 |
FFFFFTTTFFTFFFTF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FFFFFTTTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFTTTFFTFFFTF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R003C003 FTFFFTFFFFTFTTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFTFFFFTFTTTF TTTTTTTTTTTTTTTT --:P- / 11 |
FTFFFTFFFFTFTTTF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FTFFFTFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 11 |
FTFFFTFFFFTFTTTF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R003C005 TFFTFTFTTFTTFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFTFTTFTTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFTFTFTTFTTFTFF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
TFFTFTFTTFTTFTFF TTTTTTTTTTTTTTTT --:P- / 11 |
TFFTFTFTTFTTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R003C010 FFFFTFFFFFFTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:P- / 11 |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:-M / 11 |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFTFFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
R003C015 FFFFFFTFTFTFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 (confidence rate) |
FFFFFFTFTFTFFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
FFFFFFTFTFTFF?FF TTTTTTTTTTTTT-TT --:-- / 10 |
FFFFFFT?TFTFF?FF TTTTTTT-TTTTT-TT --:-- / 10 |
FFFFFFT?TFTFF?FF TTTTTTT-TTTTT-TT --:-- / 10 |
FFFFFFTFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFTFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFT?TFTFF?FF TTTTTTT-TTTTT-TT --:-- / 10 |
FFFFFFT?TFTFF?FF TTTTTTT-TTTTT-TT --:-- / 10 |
R003C020 FFFFTFFFFFTFTFFF (expected value) 8.00 5.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-M / 11 |
F?FFTFFFFFTFTFFF T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFTFF?FFTFTFFF T-TTTTT-TTTTTTTT --:-- / 10 |
F?FFTFF?FFTFTFFF T-TTTTT-TTTTTTTT --:-- / 10 |
FFFFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:P- / 11 |
FFFFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFTFFFFFTFTFFF TTTTTTTTTTTTTTTT --:-- / 11 |
R003C050 FFFTFFTFFFFFFFTF (expected value) 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFTFFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 11 |
FFFT?FTFFFFFFFTF TTTT-TTTTTTTTTTT --:-- / 10 |
FFFT?FTFFFFFFFTF TTTT-TTTTTTTTTTT --:-- / 10 |
FFFT?FTFFFFFFFTF TTTT-TTTTTTTTTTT --:-- / 10 |
FFFT?FTFF?FFFFTF TTTT-TTTT-TTTTTT --:-- / 10 |
FFFT?FTFFFFFFFTF TTTT-TTTTTTTTTTT --:-- / 10 |
FFFT?FTFFFFFFFTF TTTT-TTTTTTTTTTT --:-- / 10 |
FFFT?FTFFFFFFFTF TTTT-TTTTTTTTTTT --:-- / 10 |
R003C100 FFFFFFTFFFFTFFFF (expected value) 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFTFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
F?FFFFTFFFFTFFFF T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFFFTFFFFTFFFF T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFFFTFFFFTFFFF T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFFFTFFFFTFFFF T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFFFTFFFFTFFFF T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFFFTFFFFTFFFF T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFFFTFFFFTFFFF T-TTTTTTTTTTTTTT --:-- / 10 |
R005C002 FTTFFFTFFTFTTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFFFTFFTFTTFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFFFTFFTFTTFFT TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FTTFFFTFFTFTTFFT TTTTTTTTTTTTTTTT --:P- / 11 |
FTTFFFTFFTFTTFFT TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R010C002 TTFFFFTFFFFFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TTFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
TTFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:P- / 11 |
TTFFFFTFFFFFFTFT TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R015C002 FFTTFTFFFFTFFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTFTFFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFTFFFFTFFFFT TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FFTTFTFFFFTFFFFT TTTTTTTTTTTTTTTT --:P- / 11 |
FFTTFTFFFFTFFFFT TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R020C002 FFTFTTFTTTFTFTFF (expected value) 4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate) |
FF??TTFTTTFTF?FF TT--TTTTTTTTT-TT --:-- / 9 |
FFTFTTFTTTFTFTFF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FFTFTTFTTTFTFTFF TTTTTTTTTTTTTTTT --:P- / 11 |
FFTFTTFTTTFTFTFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
R050C002 FTFFTTFFFFTTFFFF (expected value) 4.00 4.00 1.00 4.00 4.00 4.00 1.00 4.00 1.00 4.00 1.00 4.00 2.00 1.00 4.00 4.00 (confidence rate) |
FTFFTT?F?F?TFFFF TTTTTT-T-T-TTTTT --:-- / 9 |
FT?FTTFFFFTT??FF TT-TTTTTTTTT--TT --:-- / 9 |
CC 0 |
CC 0 |
FT?FTT?F?F?TF?FF TT-TTT-T-T-TT-TT --:-- / 8 |
FT?FTT?F?F?T??FF TT-TTT-T-T-T--TT --:-- / 7 |
CC 0 |
CC 0 |
R100C002 TFFTFTFFFFFFFTFF (expected value) 8.00 8.00 2.00 8.00 3.00 8.00 8.00 8.00 2.00 7.00 8.00 8.00 8.00 8.00 8.00 5.00 (confidence rate) |
TF?TFTFF?FFFFTF? TT-TTTTT-TTTTTT- --:-- / 9 |
TF?T?TFF?FFFFTFF TT-T-TTT-TTTTTTT --:-- / 9 |
TF?T?TFF?FFFFTFF TT-T-TTT-TTTTTTT --:-- / 9 |
TF?T?TFF?FFFFTFF TT-T-TTT-TTTTTTT --:-- / 9 |
TFFTFTFFFFFFFTF? TTTTTTTTTTTTTTT- --:-- / 10 |
TFFTFTFFF?FFFTF? TTTTTTTTT-TTTTT- --:-- / 10 |
TF?T?TFF?FFFFTFF TT-T-TTT-TTTTTTT --:-- / 9 |
TF?T?TFF?FFFFTFF TT-T-TTT-TTTTTTT --:-- / 9 |
Ring — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 149 | 149 | 149 | 149 | 149 | 149 | 149 | 149 |
Road Runner | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
none FFFFFTTFFFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 149 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 149 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 149 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 149 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 149 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 149 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 149 |
FFFFFTTFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 149 |
RobotManipulation — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 130 | 130 | 120 | 120 | 126 | 114 | 120 | 120 |
Road Runner | 3 | 8 | 0 | 0 | 0 | 2 | 0 | 0 |
Camel | 4 | 8 | 0 | 0 | 0 | 0 | 0 | 1 |
00001 TFTFFTFTFTFTFFTF (expected value) 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTFFTFTFTFTFFTF TTTTTTTTTTTTTTTT --:PM / 10 |
?FTFFTFTFTFTFFTF -TTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTFTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTFTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTFTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTFTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTFTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTFTFTFTFFTF TTTTTTTTTTTTTTTT --:-- / 10 |
00002 TTTTTFTTFFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:-M / 10 |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:P- / 10 |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTTTTFTTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
00005 FFTFFTFFTFTTFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:PM / 10 |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFTFFTFFTFTTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
00010 TFTFFTTTFFFTFTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTFFT?TFFFTFTFT TTTTTT-TTTTTTTTT --:-- / 10 |
TFTFFTTTFFFTFTFT TTTTTTTTTTTTTTTT --:PM / 10 |
TFTFFTTTFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTTTFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTTTFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTTTFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTTTFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFTTTFFFTFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
00020 TFFFFTFTFTFFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 10 |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFFFFTFTFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 10 |
00050 FTTTFFTTTFFFFTFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:PM / 10 |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTTTFFTTTFFFFTFT TTTTTTTTTTTTTTTT --:-- / 10 |
00100 TFTFTFTFTTTTFFFT (expected value) 8.00 6.00 8.00 8.00 8.00 4.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTFTFTFTTTTFFFT TTTTTTTTTTTTTTTT --:PM / 10 |
TFTFTFTF?TTTFFFT TTTTTTTT-TTTTTTT --:-- / 10 |
TFTFT?TFTTTTFFFT TTTTT-TTTTTTTTTT --:-- / 10 |
TFTFT?TFTTTTFFFT TTTTT-TTTTTTTTTT --:-- / 10 |
T?TFTFTFTTTTFFFT T-TTTTTTTTTTTTTT --:-- / 10 |
T?TFTFTFTTTTFFFT T-TTTTTTTTTTTTTT --:-- / 10 |
TFTFT?TFTTTTFFFT TTTTT-TTTTTTTTTT --:-- / 10 |
TFTFT?TFTTTTFFFT TTTTT-TTTTTTTTTT --:-- / 10 |
00200 FTFFFFTTFFFFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:PM / 10 |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFFFTTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
00500 FFFFFTFFFFFFTFTT (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFTFFFFFFTFTT TTTTTTTTTTTTTTTT --:-M / 10 |
?FFFFTFFFFFFTFTT -TTTTTTTTTTTTTTT --:-- / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFTFFFFFFTFTT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFTFFFFFFTFTT TTTTTTTTTTTTTTTT --:P- / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
01000 FFFFFFFFFFFTFFFT (expected value) 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FFFFFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:P- / 10 |
FFFFFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-M / 10 |
FFFFFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
F?FFFFFFFFFTFFFT T-TTTTTTTTTTTTTT --:-- / 10 |
F?FFFFFF???????? T-TTTTTT-------- --:-- / 5 |
FFFFFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
FFFFFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 10 |
02000 TTFTFTTFTFFFTTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TTFTFTTFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTFTFTTFTFFFTTFF TTTTTTTTTTTTTTTT --:PM / 10 |
TTFTFTTFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTFTFTTFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTFTFTTFTF?????? TTTTTTTTTT------ --:-- / 6 |
TTFTFTTFTF?????? TTTTTTTTTT------ --:-- / 6 |
TTFTFTTFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
TTFTFTTFTFFFTTFF TTTTTTTTTTTTTTTT --:-- / 10 |
05000 FTFFTFFFFFFFTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
FTFFTFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFTFFFFFFFTFTF TTTTTTTTTTTTTTTT --:PM / 10 |
FTFFTFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFTFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFT?FFFFFFTFTF TTTTT-TTTTTTTTTT --:-- / 10 |
FTFFT??????????? TTTTT----------- --:-- / 3 |
FTFFTFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 10 |
FTFFTFFFFFFFTFTF TTTTTTTTTTTTTTTT --:-- / 10 |
10000 TFTFFFFFTFFFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFF?FTFFFFFFF TTTTTT-TTTTTTTTT --:-- / 10 |
TFTFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:P- / 10 |
TFTFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 10 |
TFTFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-M / 10 |
RwMutex — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 126 | 128 | 41 | 41 | 89 | 91 | 41 | 41 |
Road Runner | 2 | 6 | 0 | 0 | 0 | 1 | 0 | 0 |
Camel | 1 | 8 | 0 | 0 | 0 | 0 | 0 | 0 |
r0010w0010 TTFFTFFFFTFTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
TTFFTFFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
r0010w0020 FFTTFFFFFTTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
FFTTFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFTTFFFFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
r0010w0050 FFFFFFTFFFFTTTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFTFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFTFFFFTTTFF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
FFFFFFTFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFFFFTFFFFTTTFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
r0010w0100 FFFTTFFFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
FFFTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
r0010w0500 TFTFTTFFTFTFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTFTTFFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTFTTFFTFTFFTFT TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
TFTFTTFFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTFTTFFTFTFFTFT TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
r0010w1000 TFFFFFTTFTFFTFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate) |
TFFFFFTTFTFFTFTF TTTTTTTTTTTTTTTT --:PM / 11 |
TFFFFFTTFTFFT?TF TTTTTTTTTTTTT-TT --:-- / 10 |
CC 0 |
CC 0 |
TFFFFFTTFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 11 |
TFFFFFTTFTFFTFTF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
r0010w2000 FTFFFFTFTFFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FTFFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:P- / 11 |
FTFFFFTFTFFFFFTF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FTFFF??????????? TTTTT----------- --:-- / 3 |
FTFFF??????????? TTTTT----------- --:-- / 3 |
CC 0 |
CC 0 |
r0020w0010 FTTFTTFFFTFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
FTTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FTTFTTFFFTFTFFFF TTTTTTTTTTTTTTTT --:P- / 11 |
CC 0 |
CC 0 |
r0100w0010 FFFTFFFTFFFFFTTF (expected value) 8.00 8.00 8.00 1.00 6.00 6.00 6.00 6.00 2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
FFF?FFFTFFFFFTTF TTT-TTTTTTTTTTTT --:-- / 10 |
FFFTFFFTFFFFFTTF TTTTTTTTTTTTTTTT --:PM / 11 |
FFF?FFFT?FFFFTTF TTT-TTTT-TTTTTTT --:-- / 10 |
FFF?FFFT?FFFFTTF TTT-TTTT-TTTTTTT --:-- / 10 |
FFF????????????? TTT------------- --:-- / 2 |
FFF????????????? TTT------------- --:-- / 2 |
FFF?FFFT?FFFFTTF TTT-TTTT-TTTTTTT --:-- / 10 |
FFF?FFFT?FFFFTTF TTT-TTTT-TTTTTTT --:-- / 10 |
r0500w0010 FFTFFFFFFFFFFFTF (expected value) 4.00 4.00 4.00 1.00 4.00 4.00 2.00 3.00 2.00 1.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate) |
FFT?FF?FF?FF?FTF TTT-TT-TT-TT-TTT --:-- / 8 |
FFTFFFFF?FFFFFTF TTTTTTTT-TTTTTTT --:-- / 10 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFT?FF?????????? TTT-TT---------- --:-- / 3 |
FFT?FFFFF??????? TTT-TTTTT------- --:-- / 6 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
r1000w0010 TFFTFFFTTFFTTFTF (expected value) 8.00 4.00 8.00 7.00 1.00 6.00 6.00 6.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFTFFFTTF?TTFTF TTTTTTTTTT-TTTTT --:-- / 10 |
TFFT?FFT?FFTTFTF TTTT-TTT-TTTTTTT --:-- / 10 |
T?FT?FFTTFFTTFTF T-TT-TTTTTTTTTTT --:-- / 10 |
T?FT?FFTTFFTTFTF T-TT-TTTTTTTTTTT --:-- / 10 |
TFFT???????????? TTTT------------ --:-- / 3 |
TFF????????????? TTT------------- --:-- / 2 |
T?FT?FFTTFFTTFTF T-TT-TTTTTTTTTTT --:-- / 10 |
T?FT?FFTTFFTTFTF T-TT-TTTTTTTTTTT --:-- / 10 |
r2000w0010 TFTFFFTFTFTFFFFF (expected value) 6.00 6.00 6.00 6.00 5.00 6.00 8.00 5.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 (confidence rate) |
TFTF?FT?TFTFFFFF TTTT-TT-TTTTTTTT --:-- / 10 |
TFTFFFTFTFTF?FFF TTTTTTTTTTTT-TTT --:-- / 10 |
TFTFFFTFTFTF?FFF TTTTTTTTTTTT-TTT --:-- / 10 |
TFTFFFTFTFTF?FFF TTTTTTTTTTTT-TTT --:-- / 10 |
??????T????????? ------T--------- --:-- / 1 |
??????T????????? ------T--------- --:-- / 1 |
TFTFFFTFTFTF?FFF TTTTTTTTTTTT-TTT --:-- / 10 |
TFTFFFTFTFTF?FFF TTTTTTTTTTTT-TTT --:-- / 10 |
SafeBus — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 59 | 20 | 20 | 40 | 39 | 20 | 20 |
Road Runner | 0 | 3 | 0 | 0 | 0 | 1 | 0 | 0 |
Camel | 0 | 3 | 0 | 0 | 0 | 0 | 1 | 0 |
03 TFTTFFFTFFFFFTTF (expected value) 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 (confidence rate) |
DNC |
TFTTF?FTFFFFFT?F TTTTT-TTTTTTTT-T --:-- / 10 |
TFTTFFFTFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTFFFFFTTF TTTTTTTTTTTTTTTT --:P- / 11 |
TFTTFFFTFFFFFTTF TTTTTTTTTTTTTTTT --:-M / 11 |
TFTTFFFTFFFFFTTF TTTTTTTTTTTTTTTT --:-- / 11 |
06 FFFTFTTFFTTFFFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FFFTFTTFFTTFFFFF TTTTTTTTTTTTTTTT --:PM / 11 |
CC 0 |
CC 0 |
FFFTFTTFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
FFFTFTTFFTTFFFFF TTTTTTTTTTTTTTTT --:-- / 11 |
CC 0 |
CC 0 |
10 FFFFFTTTFTFTTTFF (expected value) 3.00 3.00 1.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 (confidence rate) |
DNC |
FFFFFTTTFTFTTTFF TTTTTTTTTTTTTTTT --:PM / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FF?FFTT?FTFTTT?? TT-TTTT-TTTTTT-- --:-- / 8 |
FF?FFTT?FTFTTT?? TT-TTTT-TTTTTT-- --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
15 TFFTFTTFTFTFTTFF (expected value) 1.00 2.00 3.00 3.00 3.00 1.00 1.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 2.00 3.00 (confidence rate) |
DNC |
TFFTFTTFTFTFTTFF TTTTTTTTTTTTTTTT --:PM / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
?FFTF??FT?TFTTFF -TTTT--TT-TTTTTT --:-- / 8 |
??FTF??FT?TFTT?F --TTT--TT-TTTT-T --:-- / 7 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
20 TTFF? FTF? TFTTFFF (expected value) 7.00 7.00 7.00 5.00 0 5.00 5.00 5.00 0 5.00 5.00 5.00 1.00 5.00 5.00 5.00 (confidence rate) |
DNC |
TTFF?FTF?TFTTFFF TTTT?TTT?TTTTTTT --:-- / 10 |
TTFF?FTF?TFT?FFF TTTT?TTT?TTT-TTT --:-- / 9 |
TTFF?FTF?TFT?FFF TTTT?TTT?TTT-TTT --:-- / 9 |
TTF????????????? TTT-?---?------- --:-- / 2 |
TTF????????????? TTT-?---?------- --:-- / 2 |
TTFF?FTF?TFT?FFF TTTT?TTT?TTT-TTT --:-- / 9 |
TTFF?FTF?TFT?FFF TTTT?TTT?TTT-TTT --:-- / 9 |
50 ? ? F? FF? F? FTF? FT? (expected value) 0 0 1.00 0 1.00 1.00 0 1.00 0 1.00 1.00 1.00 0 1.00 1.00 0 (confidence rate) |
DNC |
??F?FF?F?FTF?FT? ??T?TT?T?TTT?TT? --:-- / 6 |
???????????????? ??-?--?-?---?--? --:-- / 0 |
???????????????? ??-?--?-?---?--? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ??-?--?-?---?--? --:-- / 0 |
???????????????? ??-?--?-?---?--? --:-- / 0 |
80 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
SafeBus — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 45 | 51 | 19 | 19 | 31 | 31 | 19 | 19 |
Road Runner | 0 | 2 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 0 | 1 | 0 | 0 |
03 TFTTFFFTTFTTFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:PM / 11 |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
TFTTFFFTTFTTFFTT TTTTTTTTTTTTTTTT --:-- / 11 |
06 FFFTFTTFTTTTTTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFT??TTTTTTTF TTTTTT--TTTTTTTT --:-- / 10 |
FFFTFTTFT?TTTTTF TTTTTTTTT-TTTTTT --:-- / 10 |
CC 0 |
CC 0 |
FFFTFTTFTTTTTTTF TTTTTTTTTTTTTTTT --:P- / 11 |
FFFTFTTFTTTTTTTF TTTTTTTTTTTTTTTT --:-M / 11 |
CC 0 |
CC 0 |
10 FFFFFTTTTTFTTT? F (expected value) 4.00 4.00 1.00 4.00 4.00 4.00 3.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 0 2.00 (confidence rate) |
FF?FFT???TFTTT?F TT-TTT---TTTTT?T --:-- / 8 |
FFFFFTTTTTFTTT?F TTTTTTTTTTTTTT?T --:-- / 10 |
???????????????? --------------?- --:-- / 0 |
???????????????? --------------?- --:-- / 0 |
FF?FFTT????????? TT-TTTT-------?- --:-- / 4 |
FF?FFTT????????? TT-TTTT-------?- --:-- / 4 |
CC 0 |
CC 0 |
15 TFFTFTTFTFTTTFTT (expected value) 1.00 4.00 4.00 4.00 4.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate) |
?FFTF??FTFTTTF?T -TTTT--TTTTTTT-T --:-- / 8 |
TFFTFTTFTFTTTFTT TTTTTTTTTTTTTTTT --:PM / 11 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
?FFTF??????????? -TTTT----------- --:-- / 3 |
?FFTF??????????? -TTTT----------- --:-- / 3 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
20 TTFF? FTF? TTTFTF? (expected value) 8.00 8.00 8.00 6.00 0 5.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 1.00 0 (confidence rate) |
TTFF??TF?TTTFT?? TTTT?-TT?TTTTT-? --:-- / 8 |
TTFF?FTF?TTTFTF? TTTT?TTT?TTTTTT? --:-- / 9 |
TTFF?FTF?TTTFT?? TTTT?TTT?TTTTT-? --:-- / 8 |
TTFF?FTF?TTTFT?? TTTT?TTT?TTTTT-? --:-- / 8 |
TTF????????????? TTT-?---?------? --:-- / 2 |
TTF????????????? TTT-?---?------? --:-- / 2 |
TTFF?FTF?TTTFT?? TTTT?TTT?TTTTT-? --:-- / 8 |
TTFF?FTF?TTTFT?? TTTT?TTT?TTTTT-? --:-- / 8 |
SharedMemory — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 37 | 8 | 8 | 26 | 29 | 8 | 8 |
Road Runner | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
000005 TTFFTFFFFFTTFTTF (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
TTFFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:PM / 8 |
TTFFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 8 |
000010 FTTFTTTFTFTFTTTF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTTFTTTFTFTFTTTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTTFTTTFTFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTTTFTFTFTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000020 FTTFTFFTFFFFFTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
FTTFTFFTFFFFFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTTFTFFTFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTFFTFFFFFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000050 FFTFFTTTFFTF? FFF (expected value) 3.00 3.00 2.00 3.00 3.00 2.00 2.00 2.00 1.00 1.00 1.00 2.00 0 1.00 2.00 1.00 (confidence rate) |
DNC |
FFTFFTTTFFTF?FFF TTTTTTTTTTTT?TTT --:-- / 7 |
CC 0 |
CC 0 |
FF?FF??????????? TT-TT-------?--- --:-- / 2 |
FFTFFTTT???F??F? TTTTTTTT---T?-T- --:-- / 5 |
CC 0 |
CC 0 |
000100 TTFFT? T? F? TTFFFF (expected value) 1.00 1.00 1.00 1.00 1.00 0 1.00 0 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TTFFT?T?F?TTFFFF TTTTT?T?T?TTTTTT --:-- / 6 |
???????????????? -----?-?-?------ --:-- / 0 |
???????????????? -----?-?-?------ --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -----?-?-?------ --:-- / 0 |
???????????????? -----?-?-?------ --:-- / 0 |
000200 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
000500 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
001000 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
002000 ? (expected value) 0 (confidence rate) |
DNC | CC 0 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
005000 ? (expected value) 0 (confidence rate) |
DNC | CC 0 |
CC 0 |
CC 0 |
DNF 0 |
CC 0 |
CC 0 |
CC 0 |
010000 ? (expected value) 0 (confidence rate) |
DNC | CC 0 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
020000 ? (expected value) 0 (confidence rate) |
DNC | CC 0 |
CC 0 |
CC 0 |
DNF 0 |
DNF 0 |
CC 0 |
CC 0 |
050000 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
100000 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
SharedMemory — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 25 | 35 | 8 | 8 | 24 | 21 | 8 | 8 |
Road Runner | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
000005 TTFFTFFFFFFTTTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:PM / 8 |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTFFTFFFFFFTTTTF TTTTTTTTTTTTTTTT --:-- / 8 |
000010 FTTFTTTFTTTFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFTTTFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTTTFTTTFFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTTFTTTFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTTFTTTFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
000020 FTTFTFFTTFTFFTFT (expected value) 4.00 4.00 3.00 4.00 1.00 4.00 4.00 1.00 4.00 1.00 1.00 1.00 2.00 3.00 3.00 3.00 (confidence rate) |
FT?F?FF?T????TFT TT-T-TT-T----TTT --:-- / 4 |
FTTFTFFTT?TFFTFT TTTTTTTTT-TTTTTT --:-- / 7 |
CC 0 |
CC 0 |
FTTF?FF?TF??FTFT TTTT-TT-TT--TTTT --:-- / 6 |
FTTF?FF?T??????? TTTT-TT-T------- --:-- / 3 |
CC 0 |
CC 0 |
000050 FFTFFTTTTTT? TFTF (expected value) 3.00 3.00 1.00 3.00 4.00 1.00 1.00 1.00 2.00 2.00 2.00 0 2.00 1.00 2.00 1.00 (confidence rate) |
????F???TTT?TFT? ----T---TTT?TTT- --:-- / 3 |
FFTFFTTTTTT?T?TF TTTTTTTTTTT?T-TT --:-- / 7 |
CC 0 |
CC 0 |
FF?FF??????????? TT-TT------?---- --:-- / 2 |
FF?FF??????????? TT-TT------?---- --:-- / 2 |
CC 0 |
CC 0 |
000100 TTFFT? T? TFFT? ? ? ? (expected value) 1.00 2.00 1.00 1.00 1.00 0 2.00 0 2.00 1.00 1.00 2.00 0 0 0 0 (confidence rate) |
?T????T?T??T???? -T---?T?T--T???? --:-- / 2 |
TTFFT?T?TFFT???? TTTTT?T?TTTT???? --:-- / 5 |
???????????????? -----?-?----???? --:-- / 0 |
???????????????? -----?-?----???? --:-- / 0 |
CC 0 |
CC 0 |
???????????????? -----?-?----???? --:-- / 0 |
???????????????? -----?-?----???? --:-- / 0 |
000200 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
SimpleLoadBal — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 115 | 115 | 69 | 69 | 113 | 113 | 69 | 69 |
Road Runner | 1 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
02 TFTFFFFFTTFTFFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:PM / 23 |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
TFTFFFFFTTFTFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
05 FTFTFFFFFFFTFFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FTFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:PM / 23 |
CC 0 |
CC 0 |
FTFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FTFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
CC 0 |
CC 0 |
10 FFFFFFFFFFFTFFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFFFFFFFFFTFFTT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFFFFFTFFTT TTTTTTTTTTTTTTTT --:PM / 23 |
CC 0 |
CC 0 |
FFFFFFFFFFFTFFTT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFFFFFTFFTT TTTTTTTTTTTTTTTT --:-- / 23 |
CC 0 |
CC 0 |
15 FFFFFFFTFFFFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:PM / 23 |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
FFFFFFFTFFFFFFFT TTTTTTTTTTTTTTTT --:-- / 23 |
20 FTTFFFFFFFFFFFFF (expected value) 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 23 |
FTTFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FTTFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FTTFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FTT?FFFFFFFFFFFF TTT-TTTTTTTTTTTT --:-- / 21 |
FTT?FFFFFFFFFFFF TTT-TTTTTTTTTTTT --:-- / 21 |
FTTFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
FTTFFFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
SmallOperatingSystem — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 150 | 150 | 39 | 39 | 126 | 126 | 39 | 39 |
Road Runner | 1 | 14 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 14 | 0 | 0 | 0 | 0 | 0 | 0 |
MT0016DC0008 TFTTFTTTFFTTFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:PM / 8 |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTFTTTFFTTFFFT TTTTTTTTTTTTTTTT --:-- / 8 |
MT0032DC0008 FTFFFFFFFTFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFFFFFFTFFTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0032DC0016 TFFTFFTFTFTTTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFTFFTFTFTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFTFFTFTFTTTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TFFTFFTFTFTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFFTFFTFTFTTTFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0064DC0016 TTTTTFFTTTFFFFTF (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
T?TTTFFTTTFFFFTF T-TTTTTTTTTTTTTT --:-- / 8 |
TTTTTFFTTTFFFFTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TTTTTFFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
TTTTTFFTTTFFFFTF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0064DC0032 TFFFTTFFTTTFTFTT (expected value) 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?FFFTTFFTTTFTFTT -TTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFFTTTFTFTT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TFFFTTFFTTTFTFTT TTTTTTTTTTTTTTTT --:-- / 8 |
TFFFTTFFTTTFTFTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0128DC0032 TFTTTFFFFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
TFTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
TFTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
TFTTTFFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0128DC0064 TFTFFFFTFTFFFFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTFFFFTFTFFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTFFFFTFTFFFFTT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TFTFFFFTFTFFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
TFTFFFFTFTFFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0256DC0064 FTFFTTFTFFTFTFTF (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
F?FFTTFTFFTFTFTF T-TTTTTTTTTTTTTT --:-- / 8 |
FTFFTTFTFFTFTFTF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FTFFTTFTFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
FTFFTTFTFFTFTFTF TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0256DC0128 TTFFFTFFTTFTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
TTFFF?FFT?FTFFFF TTTTT-TTT-TTTTTT --:-- / 7 |
TTFFFTFFTTFTFFFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TTFFFTFFTT?????? TTTTTTTTTT------ --:-- / 5 |
TTFFFTFFTT?????? TTTTTTTTTT------ --:-- / 5 |
CC 0 |
CC 0 |
MT0512DC0128 FFFTFFFFFFTFFTFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 (confidence rate) |
FFFTFFFFFFTFFTF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFTFFFFFFTFFTFT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FFFTFF?????????? TTTTTT---------- --:-- / 3 |
FFFTFFFFFFTFFTFT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT0512DC0256 TFFFFFTFFFTFFFTT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
TFFFFFTFF?TFFFTT TTTTTTTTT-TTTTTT --:-- / 8 |
TFFFFFTFFFTFFFTT TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
TFFFFFTFF??????? TTTTTTTTT------- --:-- / 5 |
TFFFFFTFFFTFFFTT TTTTTTTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
MT1024DC0256 FFFFTFTTFFFFTTFF (expected value) 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFFTFTTFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFTFTTFFFFTTFF TTTTTTTTTTTTTTTT --:PM / 8 |
CC 0 |
CC 0 |
FFFFTFTTFFFFTTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFT??????????? TTTTT----------- --:-- / 3 |
CC 0 |
CC 0 |
MT1024DC0512 FTTTTFFFFTFFFT? T (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 0 4.00 (confidence rate) |
FTTTTFFFFTFFF??T TTTTTTTTTTTTT-?T --:-- / 7 |
FTTTTFFFFTFFFT?T TTTTTTTTTTTTTT?T --:-- / 8 |
CC 0 |
CC 0 |
FTTTTFFFFTFFF??T TTTTTTTTTTTTT-?T --:-- / 7 |
FTTTTFFFFTFFF??T TTTTTTTTTTTTT-?T --:-- / 7 |
CC 0 |
CC 0 |
MT2048DC0512 FTTFTTFTTFTTFTFF (expected value) 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
?TTFTTFTTFTTFTFF -TTTTTTTTTTTTTTT --:-- / 8 |
?TTFTTFTTFTTFTFF -TTTTTTTTTTTTTTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FTTFTTFTT?TTFTFF TTTTTTTTT-TTTTTT --:-- / 8 |
FTTFTTFTT?TTFTFF TTTTTTTTT-TTTTTT --:-- / 8 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
MT2048DC1024 FTFFFFFFFTF? FTFT (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 3.00 4.00 (confidence rate) |
FTFFFFFFFTF?FTFT TTTTTTTTTTT?TTTT --:-- / 8 |
F?FFFFFFFTF?FT?T T-TTTTTTTTT?TT-T --:-- / 7 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
FTFFFFFFFTF?FTFT TTTTTTTTTTT?TTTT --:-- / 8 |
FTFFFFFFFTF?FTFT TTTTTTTTTTT?TTTT --:-- / 8 |
???????????????? -----------?---- --:-- / 0 |
???????????????? -----------?---- --:-- / 0 |
MT4096DC1024 FFFFFFFFFFTTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 (confidence rate) |
FFFFFFFFFFTT?TFF TTTTTTTTTTTT-TTT --:-- / 8 |
FFFFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFF?????????? TTTTTT---------- --:-- / 3 |
FFFFFF?????????? TTTTTT---------- --:-- / 3 |
FFFFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
FFFFFFFFFFTTFTFF TTTTTTTTTTTTTTTT --:-- / 8 |
MT4096DC2048 FFTFTFTFFFTFTFFF (expected value) 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 (confidence rate) |
FFTF?FTFFFTFTFFF TTTT-TTTTTTTTTTT --:-- / 8 |
FFTFTFTFFFTFTFFF TTTTTTTTTTTTTTTT --:PM / 8 |
FFTF?FTFFFTFTFFF TTTT-TTTTTTTTTTT --:-- / 8 |
FFTF?FTFFFTFTFFF TTTT-TTTTTTTTTTT --:-- / 8 |
FFTF?FTFFFTFT?FF TTTT-TTTTTTTT-TT --:-- / 7 |
FFTF?FTFFFTFT?FF TTTT-TTTTTTTT-TT --:-- / 7 |
FFTF?FTFFFTFTFFF TTTT-TTTTTTTTTTT --:-- / 8 |
FFTF?FTFFFTFTFFF TTTT-TTTTTTTTTTT --:-- / 8 |
MT8192DC2048 FFFFTFTTFTFTFFFF (expected value) 8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 1.00 6.00 5.00 6.00 6.00 1.00 6.00 6.00 (confidence rate) |
FFFFTFTTFTFTF?FF TTTTTTTTTTTTT-TT --:-- / 8 |
FFFFTFTT?T?TFFFF TTTTTTTT-T-TTTTT --:-- / 7 |
FFFFTFTT?TFTF?FF TTTTTTTT-TTTT-TT --:-- / 7 |
FFFFTFTT?TFTF?FF TTTTTTTT-TTTT-TT --:-- / 7 |
F??????????????? T--------------- --:-- / 1 |
FFFFTFTT???????? TTTTTTTT-------- --:-- / 4 |
FFFFTFTT?TFTF?FF TTTTTTTT-TTTT-TT --:-- / 7 |
FFFFTFTT?TFTF?FF TTTTTTTT-TTTT-TT --:-- / 7 |
MT8192DC4096 FFFFFFTFTFFTTFFT (expected value) 8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 1.00 (confidence rate) |
FFFFFFTFTFFTTFF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFTFTFFTTFFT TTTTTTTTTTTTTTTT --:PM / 8 |
FFFFFFTFTFFTTFF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFTFTFFTTFF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFTFTFFTTF?? TTTTTTTTTTTTTT-- --:-- / 7 |
F??????????????? T--------------- --:-- / 1 |
FFFFFFTFTFFTTFF? TTTTTTTTTTTTTTT- --:-- / 8 |
FFFFFFTFTFFTTFF? TTTTTTTTTTTTTTT- --:-- / 8 |
Solitaire — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 114 | 114 | 114 | 114 | 114 | 114 | 114 | 114 |
Road Runner | 1 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 1 | 5 | 0 | 0 | 0 | 0 | 0 | 0 |
EngCT7x7 FFTFFFFFFFFFTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:PM / 19 |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFTFFFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 19 |
EngNC7x7 FFFTFFFFFFFTFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:PM / 19 |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFFFFFFFTFFFT TTTTTTTTTTTTTTTT --:-- / 19 |
FrnCT7x7 FTFFTTFFTFTFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FTFFTTFFTFTFFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FrnNC7x7 FTTFTFFFFFTTFTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:PM / 19 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
FTTFTFFFFFTTFTTF TTTTTTTTTTTTTTTT --:-- / 19 |
SqrCT5x5 FFFTFTFFFFFTFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:PM / 19 |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
FFFTFTFFFFFTFFFF TTTTTTTTTTTTTTTT --:-- / 19 |
SqrNC5x5 TFFTFTTFFFTFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:PM / 19 |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
TFFTFTTFFFTFFTFF TTTTTTTTTTTTTTTT --:-- / 19 |
SquareGrid — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 115 | 107 | 42 | 42 | 58 | 35 | 42 | 42 |
Road Runner | 4 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 4 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
020102 FFTFFFFFFFFFFFTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:PM / 23 |
FFTFFFFFFFF?FFTF TTTTTTTTTTT-TTTT --:-- / 21 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFTFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
FFTFFFFFFFFFFFTF TTTTTTTTTTTTTTTT --:-- / 23 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
040204 FFFFFFFFTFFFFFFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:PM / 23 |
FFFFFFFFTFF?FFFF TTTTTTTTTTT-TTTT --:-- / 21 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFFFFFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 23 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
080408 TFFFFFTFFTFFFFFF (expected value) 8.00 8.00 8.00 8.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFFFFTFFTFFFFFF TTTTTTTTTTTTTTTT --:PM / 23 |
TFFFF?TFFTFFFFFF TTTTT-TTTTTTTTTT --:-- / 21 |
TFFFF?TFFTFFFFFF TTTTT-TTTTTTTTTT --:-- / 21 |
TFFFF?TFFTFFFFFF TTTTT-TTTTTTTTTT --:-- / 21 |
TFFF???????????? TTTT------------ --:-- / 6 |
TFFF???????????? TTTT------------ --:-- / 6 |
TFFFF?TFFTFFFFFF TTTTT-TTTTTTTTTT --:-- / 21 |
TFFFF?TFFTFFFFFF TTTTT-TTTTTTTTTT --:-- / 21 |
100510 TTTTFFFTTFFFFTFF (expected value) 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate) |
TTTTFFFTTFFFFTFF TTTTTTTTTTTTTTTT --:PM / 23 |
TTTTFFFTTFFFFTF? TTTTTTTTTTTTTTT- --:-- / 21 |
TTTTFFFTTFFFFTF? TTTTTTTTTTTTTTT- --:-- / 21 |
TTTTFFFTTFFFFTF? TTTTTTTTTTTTTTT- --:-- / 21 |
TTTT???????????? TTTT------------ --:-- / 6 |
TTTT???????????? TTTT------------ --:-- / 6 |
TTTTFFFTTFFFFTF? TTTTTTTTTTTTTTT- --:-- / 21 |
TTTTFFFTTFFFFTF? TTTTTTTTTTTTTTT- --:-- / 21 |
130613 FTFFTFFTFFFFFFTT (expected value) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
FTFFTFFTFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 23 |
FTFFTFFTFFFFFFTT TTTTTTTTTTTTTTTT --:PM / 23 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
SwimmingPool — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 129 | 128 | 26 | 26 | 107 | 121 | 26 | 26 |
Road Runner | 2 | 7 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 3 | 6 | 0 | 0 | 0 | 1 | 0 | 0 |
01 FFTTFTFFFTTFFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:PM / 13 |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTFTFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
02 FFFTFFFFFTTFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFFFFFTTFFTFF TTTTTTTTTTTTTTTT --:-M / 13 |
FFFTFFFFFTTFFTFF TTTTTTTTTTTTTTTT --:P- / 13 |
CC 0 |
CC 0 |
FFFTFFFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFTFFFFFTTFFTFF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
03 TFTFFTTFTFFFTFFT (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 (confidence rate) |
TFTFFTTFTFFFTFF? TTTTTTTTTTTTTTT- --:-- / 12 |
TFTFFTTFTF?FTFFT TTTTTTTTTT-TTTTT --:-- / 12 |
CC 0 |
CC 0 |
TFTFFTTFTFFFTFFT TTTTTTTTTTTTTTTT --:P- / 13 |
TFTFFTTFTFFFTFFT TTTTTTTTTTTTTTTT --:-M / 13 |
CC 0 |
CC 0 |
04 FTFTFFTFFTFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTFTFFTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 13 |
FTFTFFTFFTFFFFFF TTTTTTTTTTTTTTTT --:PM / 13 |
CC 0 |
CC 0 |
FTFTFFTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 13 |
FTFTFFTFFTFFFFFF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
05 FFTTFFFFTFFFFTTF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFTTFFFFTFFFFTTF TTTTTTTTTTTTTTTT --:PM / 13 |
FFTTFFFFTFFFFTTF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
FFTTFFFFTFFFFTTF TTTTTTTTTTTTTTTT --:-- / 13 |
FFTTFFFFTFFFFTTF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
06 FFFFFFFFTFFTTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 13 |
FFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:PM / 13 |
CC 0 |
CC 0 |
FFFFFF?????????? TTTTTT---------- --:-- / 5 |
FFFFFFFFTFFTTFFF TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
07 FFTFTTFFFTFFFTFT (expected value) 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFTFTTFFFTFFFTFT TTTTTTTTTTTTTTTT --:-- / 13 |
FFTFTTFFFTFFFTFT TTTTTTTTTTTTTTTT --:PM / 13 |
CC 0 |
CC 0 |
FFT????????????? TTT------------- --:-- / 2 |
FFTFTTFFFTFFFTFT TTTTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
08 TFFFFFTTFTTTTFTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:PM / 13 |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
TFFFFFTTFTTTTFTF TTTTTTTTTTTTTTTT --:-- / 13 |
09 FFTFFFFTTFTTTFFT (expected value) 4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFTFFFFTTFTTTFFT TTTTTTTTTTTTTTTT --:-- / 13 |
FFTFFFFTTFTTTFFT TTTTTTTTTTTTTTTT --:PM / 13 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFTFFFFTTFTTTFFT TTTTTTTTTTTTTTTT --:-- / 13 |
FFTF?F?????????? TTTT-T---------- --:-- / 4 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
10 FFFTFTFFFTTFFFTF (expected value) 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
FFFTFTFFFTTFFFTF TTTTTTTTTTTTTTTT --:PM / 13 |
FF?TFTFFFTTFFFTF TT-TTTTTTTTTTTTT --:-- / 12 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
FFFTFTFFFTT????? TTTTTTTTTTT----- --:-- / 9 |
FFFTFTFFFTTFFFTF TTTTTTTTTTTTTTTT --:-- / 13 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TCPcondis — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 125 | 121 | 82 | 82 | 124 | 123 | 82 | 82 |
Road Runner | 5 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 5 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
05 TFFFFTFFFFFFFFTT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:PM / 14 |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFFTFFFFFFFFTT TTTTTTTTTTTTTTTT --:-- / 14 |
10 TFFFFTFTFFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 14 |
TFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
TFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TFFFFTFTFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
15 FFFTFTFFFTFFFFFT (expected value) 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTFTFFFTFFFFFT TTTTTTTTTTTTTTTT --:PM / 14 |
F?FTFTFFFTFFFFFT T-TTTTTTTTTTTTTT --:-- / 13 |
CC 0 |
CC 0 |
FFFTFTFFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTFTFFFTFFFFFT TTTTTTTTTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
20 FTFFFFTTFTTTFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate) |
FTFFFFTTFTTTFFFF TTTTTTTTTTTTTTTT --:PM / 14 |
FTFFFFTTFTTT?FFF TTTTTTTTTTTT-TTT --:-- / 13 |
CC 0 |
CC 0 |
FTFFFFTTFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FTFFFFTTFTTTFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
25 FFFFTFFFFFFTFTFT (expected value) 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 (confidence rate) |
FFFFTFFFFFFTFTFT TTTTTTTTTTTTTTTT --:PM / 14 |
FFF?TFFFFFFTFT?T TTT-TTTTTTTTTT-T --:-- / 12 |
FFF?TFFFFFFTFTFT TTT-TTTTTTTTTTTT --:-- / 13 |
FFF?TFFFFFFTFTFT TTT-TTTTTTTTTTTT --:-- / 13 |
FFF?TFFFFFFTFTFT TTT-TTTTTTTTTTTT --:-- / 13 |
FFF?TFFFFFFTFTFT TTT-TTTTTTTTTTTT --:-- / 13 |
FFF?TFFFFFFTFTFT TTT-TTTTTTTTTTTT --:-- / 13 |
FFF?TFFFFFFTFTFT TTT-TTTTTTTTTTTT --:-- / 13 |
30 FTTFFFFFFFTFFFFF (expected value) 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTTFFFFFFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 14 |
FTT?FFFFFFTFFFFF TTT-TTTTTTTTTTTT --:-- / 13 |
FTTFFFFF?FTFFFFF TTTTTTTT-TTTTTTT --:-- / 13 |
FTTFFFFF?FTFFFFF TTTTTTTT-TTTTTTT --:-- / 13 |
FTTFFFFF?FTFFFFF TTTTTTTT-TTTTTTT --:-- / 13 |
FTTFFFFF?FTFFFFF TTTTTTTT-TTTTTTT --:-- / 13 |
FTTFFFFF?FTFFFFF TTTTTTTT-TTTTTTT --:-- / 13 |
FTTFFFFF?FTFFFFF TTTTTTTT-TTTTTTT --:-- / 13 |
35 FFFTTFFFFTTFFTTF (expected value) 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFT?FFFFTTFFTTF TTTT-TTTTTTTTTTT --:-- / 13 |
FFFTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:PM / 14 |
FFFTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFFTTFFTTF TTTTTTTTTTTTTTTT --:-- / 14 |
40 FFTTFFFTFFTFFFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:PM / 14 |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFTTFFFTFFTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
50 FFFTTFFFTTTFFFFF (expected value) 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFTTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:PM / 14 |
FFFTTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
?FFTTFFFTTTFFFFF -TTTTTTTTTTTTTTT --:-- / 13 |
FFFTTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
FFFTTFFFTTTFFFFF TTTTTTTTTTTTTTTT --:-- / 14 |
TokenRing — Colored | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 0 | 63 | 9 | 9 | 36 | 36 | 9 | 9 |
Road Runner | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 0 |
005 TTTTTTTTTTTTTTTT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate) |
DNC |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
010 TTTTTTTTTTTTTTTT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
015 TTTTTTTTTTTTTTTT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
020 TTTTTTTTTTTTTTTT (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate) |
DNC |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
030 TTTTTTTTTTTTTTTT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
040 TTTTTTTTTTTTTTTT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
050 TTTTTTTTTTTTTTTT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate) |
DNC |
TTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
100 ? (expected value) 0 (confidence rate) |
DNC | DNF 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
200 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
DNF 0 |
DNF 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
500 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate) |
DNC | CC 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
CC 0 |
DNF 0 |
???????????????? ???????????????? --:-- / 0 |
???????????????? ???????????????? --:-- / 0 |
TokenRing — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 27 | 60 | 9 | 9 | 20 | 20 | 9 | 9 |
Road Runner | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 4 | 0 | 0 | 0 | 0 | 0 | 0 |
005 TTTTTTTTTFTTTFTT (expected value) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
????????TFTTTFTT --------TTTTTTTT --:-- / 4 |
TTTTTTTTTFTTTFTT TTTTTTTTTTTTTTTT --:PM / 9 |
TTTTTTTTTFTTTFTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTFTTTFTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTFTTTFTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTFTTTFTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTFTTTFTT TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTTFTTTFTT TTTTTTTTTTTTTTTT --:-- / 9 |
010 TTTTTTTTFTTTTTFF (expected value) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
????????FTTTTTFF --------TTTTTTTT --:-- / 4 |
TTTTTTTTFTTTTTFF TTTTTTTTTTTTTTTT --:PM / 9 |
CC 0 |
CC 0 |
TTTTTTTTFTTTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
TTTTTTTTFTTTTTFF TTTTTTTTTTTTTTTT --:-- / 9 |
CC 0 |
CC 0 |
015 TTTTTTTTTTTT? ? FT (expected value) 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 0 0 2.00 2.00 (confidence rate) |
????????TTTT??FT --------TTTT??TT --:-- / 3 |
TTTTTTTTTTTT??FT TTTTTTTTTTTT??TT --:-- / 8 |
CC 0 |
CC 0 |
??T????????????? --T---------??-- --:-- / 1 |
??T????????????? --T---------??-- --:-- / 1 |
CC 0 |
CC 0 |
020 TTTTTTTTTFTFTTT? (expected value) 1.00 1.00 3.00 1.00 1.00 2.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 (confidence rate) |
????????TFTFTTT? --------TTTTTTT? --:-- / 4 |
TTTTT?TTTFTFTTT? TTTTT-TTTTTTTTT? --:-- / 8 |
CC 0 |
CC 0 |
??T??T?????????? --T--T---------? --:-- / 1 |
??T??T?????????? --T--T---------? --:-- / 1 |
CC 0 |
CC 0 |
030 TTTT? TTTFTTTTTTT (expected value) 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
????????FTTTTTTT ----?---TTTTTTTT --:-- / 4 |
TTTT?TTTFTTTTTTT TTTT?TTTTTTTTTTT --:-- / 8 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
CC 0 |
040 TTTTTTTTTFFFTTFT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate) |
????????TFFFTTFT --------TTTTTTTT --:-- / 4 |
TTTTTTTTTFFFTTFT TTTTTTTTTTTTTTTT --:PM / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
050 TTTTTTTTTTFFTTTT (expected value) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate) |
????????TTFFTTT? --------TTTTTTT- --:-- / 4 |
TTTTTTTTTTFFTTTT TTTTTTTTTTTTTTTT --:PM / 9 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
CC 0 |
CC 0 |
???????????????? ---------------- --:-- / 0 |
???????????????? ---------------- --:-- / 0 |
TriangularGrid — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 119 | 113 | 57 | 57 | 99 | 99 | 57 | 57 |
Road Runner | 5 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 4 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
1200 FFFFFTFFFTFTFTTF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:PM / 15 |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFFFTFFFTFTFTTF TTTTTTTTTTTTTTTT --:-- / 15 |
1500 TFTFFFFFTFFFFFFT (expected value) 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFTFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:PM / 15 |
TF?FFFFFTFFFFFFT TT-TTTTTTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
TFTFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
TFTFFFFFTFFFFFFT TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
2011 FFFTTTFFTFFFFFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 (confidence rate) |
FFFTTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:PM / 15 |
FFFTTTFFTFF?FFFF TTTTTTTTTTT-TTTT --:-- / 14 |
CC 0 |
CC 0 |
FFFTTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FFFTTTFFTFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
3011 FTTFTTFFTFTFFTFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
FTTFTTFFTFTFFTFF TTTTTTTTTTTTTTTT --:PM / 15 |
FTTFTT?FTFTFFTFF TTTTTT-TTTTTTTTT --:-- / 14 |
CC 0 |
CC 0 |
FTTFTTFFTFTFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
FTTFTTFFTFTFFTFF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
3026 TFFFTFFFFFFFTFFF (expected value) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate) |
TFFFTFFFFFFFTFFF TTTTTTTTTTTTTTTT --:P- / 15 |
TFFFTFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-M / 15 |
CC 0 |
CC 0 |
TFFFTFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 15 |
TFFFTFFFFFFFTFFF TTTTTTTTTTTTTTTT --:-- / 15 |
CC 0 |
CC 0 |
4022 FTFFFTFFFFFFFFFF (expected value) 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
FTFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:PM / 15 |
FTFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FTTFFTFFFFFFFFFF TTXTTTTTTTTTTTTT V-:-- / 12 |
FTTFFTFFFFFFFFFF TTXTTTTTTTTTTTTT V-:-- / 12 |
FTFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
FTFFFTFFFFFFFFFF TTTTTTTTTTTTTTTT --:-- / 15 |
5020 FFFFFFFTFFFFFFFT (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 6.00 1.00 6.00 1.00 6.00 6.00 6.00 (confidence rate) |
FFFFFFFT?FFFFFFT TTTTTTTT-TTTTTTT --:-- / 14 |
FFFFFFFT?F?F?FFT TTTTTTTT-T-T-TTT --:-- / 12 |
FFFFFFFTFF?F?FFT TTTTTTTTTT-T-TTT --:-- / 13 |
FFFFFFFTFF?F?FFT TTTTTTTTTT-T-TTT --:-- / 13 |
FFFFFFFT???????? TTTTTTTT-------- --:-- / 8 |
FFFFFFFT???????? TTTTTTTT-------- --:-- / 8 |
FFFFFFFTFF?F?FFT TTTTTTTTTT-T-TTT --:-- / 13 |
FFFFFFFTFF?F?FFT TTTTTTTTTT-T-TTT --:-- / 13 |
5046 TFFTFFTFFFTTFFFT (expected value) 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate) |
TFFTFFTFFFTTFFFT TTTTTTTTTTTTTTTT --:PM / 15 |
TFFTFFTFF?TTFFFT TTTTTTTTT-TTTTTT --:-- / 14 |
TFFTFFTFF?TTFFFT TTTTTTTTT-TTTTTT --:-- / 14 |
TFFTFFTFF?TTFFFT TTTTTTTTT-TTTTTT --:-- / 14 |
TFFT???????????? TTTT------------ --:-- / 4 |
TFFT???????????? TTTT------------ --:-- / 4 |
TFFTFFTFF?TTFFFT TTTTTTTTT-TTTTTT --:-- / 14 |
TFFTFFTFF?TTFFFT TTTTTTTTT-TTTTTT --:-- / 14 |
UtahNoC — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 102 | 102 | 102 | 102 | 102 | 102 | 102 | 102 |
Road Runner | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Camel | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
none TTFFFTFFFFFTFTFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate) |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:P- / 102 |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 102 |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 102 |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:-M / 102 |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 102 |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 102 |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 102 |
TTFFFTFFFFFTFTFF TTTTTTTTTTTTTTTT --:-- / 102 |
Vasy2003 — P/T | ||||||||
LTSMin | LoLA | M4M.full | M4M.struct | ITS-Tools | ITS-Tools.L | Irma.full | Irma.struct | |
Score | 96 | 96 | 89 | 89 | 102 | 102 | 89 | 89 |
Road Runner | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 |
Camel | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 |
none FFTFFFFTTFFTTFFF (expected value) 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 2.00 8.00 (confidence rate) |
FFTFFFFTTFFTTF?F TTTTTTTTTTTTTT-T --:-- / 96 |
FFTFFFFTTFFTTF?F TTTTTTTTTTTTTT-T --:-- / 96 |
FFTFFFFTTF?TTF?F TTTTTTTTTT-TTT-T --:-- / 89 |
FFTFFFFTTF?TTF?F TTTTTTTTTT-TTT-T --:-- / 89 |
FFTFFFFTTFFTTFFF TTTTTTTTTTTTTTTT --:P- / 102 |
FFTFFFFTTFFTTFFF TTTTTTTTTTTTTTTT --:-M / 102 |
FFTFFFFTTF?TTF?F TTTTTTTTTT-TTT-T --:-- / 89 |
FFTFFFFTTF?TTF?F TTTTTTTTTT-TTT-T --:-- / 89 |