fond
Model Checking Contest 2018
8th edition, Bratislava, Slovakia, June 26, 2018
Results for LTLCardinality
Last Updated
June 26, 2018

Introduction

Please find here the computed results for the LTLCardinality examination. The table is organized as follows:

The information for a model instance is summarized in a «line» where:

The structure of a table cell is always the same. In black, you have the output provided by the tool followed by the interpretation mask stating if the tool did computed something corresponding to the expected values (T means that it is the expected result, ? means that no tool computed the corresponding value and X means that the value is not the expected one). Then, three consistency flags are displayed : V means that at least one value was wrong (i.e. at least one X in the result mask), C means that the tool was not consistent between the colored Petri net and the P/T equivalent one. This part is displayed in green when some points was considered, in orange when it was not possible («unsafe» values estimated for example) and red when the result is discarded due to an error.

Then a second group of flags outline the fastest tool (P) and the tool having the smallest memory footprint (M). These tools get a +1 bonus that is always considered for green and orange results. These two flags are followed by the score (without bonus) and a link to the execution report containing: a summary of results, a chart reporting memory and CPU evolution over the execution, a full execution log and the commands applied to the tool for this run.

You will note that DNC means «Do Not Compete» and CC means «Cannot Compute». Results are labelled CC only when no output was produced for this execution and the tool reported a problem. DNF (Did Not Finished) is displayed when no output was produced within the 1 hour time confinement.

The Results

They are displayed in the table below, together with scores (total, sum per category of model and sum per model).

Summary of Results for LTLCardinality
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Total Points 12979 14885 4620 4834 11337 11248 4755 4780

All «Surprise» models
 
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Total Points 5472 6052 0 0 4144 4136 0 0
Road Runner 17 40 0 0 14 7 0 0
Camel 12 49 0 0 12 5 0 0
ASLink — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 532 520 0 0 196 272 0 0
Road Runner 4 2 0 0 0 0 0 0
Camel 2 4 0 0 0 0 0 0
01a

FFFFFFFFFTTTTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:P- / 32
FFFFFFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:-M / 32
CC

0
CC

0
FFFFFFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFFFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
01b

TFFFFFTFFFFTFFFF (expected value)

4.00 2.00 4.00 4.00 2.00 4.00 1.00 2.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 (confidence rate)

TFFFFF?FFFFTFFFF
TTTTTT-TTTTTTTTT
--:-- / 28
TFFFFFTFFFFTF?FF
TTTTTTTTTTTTT-TT
--:-- / 28
CC

0
CC

0
T?FF?F??????????
T-TT-T----------
--:-- / 8
T?FF?F??FFFTF?FF
T-TT-T--TTTTT-TT
--:-- / 20
CC

0
CC

0
02a

FTTFFFTTFTFTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFFFTTFTFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 32
FTTFF?TTFTFTFFFT
TTTTT-TTTTTTTTTT
--:-- / 28
CC

0
CC

0
FTTFFFTTFTFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 32
FTTFFFTTFTFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
02b

TFFFT? TFFTFFFFFF (expected value)

4.00 4.00 2.00 4.00 4.00 0 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate)

TFFFT?TF?TFFFFFF
TTTTT?TT-TTTTTTT
--:-- / 28
TFFFT?TFFTFFFFF?
TTTTT?TTTTTTTTT-
--:-- / 28
CC

0
CC

0
TF?FT???????????
TT-TT?----------
--:-- / 8
TF?FT???????????
TT-TT?----------
--:-- / 8
CC

0
CC

0
03a

TTFTFFTTFFFTFTFF (expected value)

4.00 4.00 4.00 4.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 1.00 2.00 (confidence rate)

TTFTF?TTFFFTFT?F
TTTTT-TTTTTTTT-T
--:-- / 28
TTFTFFTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TTFT????????????
TTTT------------
--:-- / 8
TTFTF?TTFFFTF???
TTTTT-TTTTTTT---
--:-- / 24
CC

0
CC

0
03b

TTFFFTFF? FTT? F? F (expected value)

4.00 4.00 3.00 4.00 3.00 3.00 2.00 2.00 0 2.00 2.00 2.00 0 2.00 0 2.00 (confidence rate)

TTFFFTFF?FTT?F?F
TTTTTTTT?TTT?T?T
--:-- / 24
TTFFFTFF?FTT?F?F
TTTTTTTT?TTT?T?T
--:-- / 24
CC

0
CC

0
TTFFFT??????????
TTTTTT--?---?-?-
--:-- / 12
TT?F????????????
TT-T----?---?-?-
--:-- / 4
CC

0
CC

0
04a

FFFTFTFFTFFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 3.00 1.00 (confidence rate)

FFFTFTFFTFFF?FT?
TTTTTTTTTTTT-TT-
--:-- / 28
FFFTFTFFTFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFFTFTFFTFFF????
TTTTTTTTTTTT----
--:-- / 24
FFFTFTFFTFFFFFT?
TTTTTTTTTTTTTTT-
--:-- / 28
CC

0
CC

0
04b

TF? FF? TFFFFFFF? F (expected value)

2.00 4.00 0 3.00 1.00 0 2.00 2.00 1.00 2.00 2.00 1.00 2.00 1.00 0 2.00 (confidence rate)

TF?FF?TFFFFFFF?F
TT?TT?TTTTTTTT?T
--:-- / 24
TF?F??TF?FF?F??F
TT?T-?TT-TT-T-?T
--:-- / 16
CC

0
CC

0
?F??????????????
-T?--?--------?-
--:-- / 0
?F?F????????????
-T?T-?--------?-
--:-- / 4
CC

0
CC

0
05a

FFTFTFFFFTTFTTFT (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFTFTFFFFTTFTTFT
TTTTTTTTTTTTTTTT
--:PM / 32
?FTFTFFFFTTFTTFT
-TTTTTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
FFTFTFFFF???????
TTTTTTTTT-------
--:-- / 16
FFTFTFFFFTTFTTFT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
05b

? TFFTTFTTFFFFTFF (expected value)

0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

?TFFTTFTTFFFFTFF
?TTTTTTTTTTTTTTT
--:-- / 28
?TFFTTFTTF?FFTFF
?TTTTTTTTT-TTTTT
--:-- / 28
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
06a

? FF? FFTFTTFTFFFF (expected value)

0 4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?FF?FFTFTTFTFFFF
?TT?TTTTTTTTTTTT
--:-- / 28
?FF?FFTFTTFTFFFF
?TT?TTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
?FF?FFTFTTFTFFFF
?TT?TTTTTTTTTTTT
--:-- / 28
?FF?FFTFTTFTFFFF
?TT?TTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
06b

TTTFFFFFTTFFFFFF (expected value)

2.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate)

TTTFFF?FTTFFFFFF
TTTTTT-TTTTTTTTT
--:-- / 28
TTTF?FFFTTFFF?FF
TTTT-TTTTTTTT-TT
--:-- / 28
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
07a

FF? F? ? F? TTTFTF? T (expected value)

1.00 4.00 0 1.00 0 0 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 0 3.00 (confidence rate)

?F????F?TTTFTF?T
-T?-??T?TTTTTT?T
--:-- / 16
FF?F??F?TTTFTF?T
TT?T??T?TTTTTT?T
--:-- / 20
CC

0
CC

0
?F??????????????
-T?-??-?------?-
--:-- / 0
?F????F?TTTFTF?T
-T?-??T?TTTTTT?T
--:-- / 16
CC

0
CC

0
07b

FF? FFTFFFT? ? F? FF (expected value)

4.00 3.00 0 2.00 2.00 2.00 2.00 3.00 3.00 2.00 0 0 3.00 0 1.00 3.00 (confidence rate)

FF?FFTFFFT??F??F
TT?TTTTTTT??T?-T
--:-- / 20
FF?FFTFFFT??F?FF
TT?TTTTTTT??T?TT
--:-- / 24
CC

0
CC

0
FF?????FF???F??F
TT?----TT-??T?-T
--:-- / 12
F???????????????
T-?-------??-?--
--:-- / 0
CC

0
CC

0
08a

FFFF? ? FFTTFTTFTF (expected value)

4.00 4.00 4.00 4.00 0 0 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFFF??FFTTFTTFTF
TTTT??TTTTTTTTTT
--:-- / 28
FFFF??FFTTFTTFTF
TTTT??TTTTTTTTTT
--:-- / 28
CC

0
CC

0
FFFF????????????
TTTT??----------
--:-- / 8
FFFF??F?????????
TTTT??T---------
--:-- / 8
CC

0
CC

0
08b

FTFTF? FFTFTF? FTF (expected value)

2.00 2.00 3.00 3.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 (confidence rate)

FTFTF?FFTFTF?FTF
TTTTT?TTTTTT?TTT
--:-- / 28
FTFTF?FFTFTF?FTF
TTTTT?TTTTTT?TTT
--:-- / 28
CC

0
CC

0
CC

0
??FT????????????
--TT-?------?---
--:-- / 4
CC

0
CC

0
09a

TTTFFFFTFF? FTTFF (expected value)

4.00 4.00 4.00 3.00 3.00 2.00 2.00 3.00 2.00 3.00 0 2.00 3.00 2.00 2.00 1.00 (confidence rate)

TTTFFFFTFF?FTTFF
TTTTTTTTTT?TTTTT
--:-- / 28
TTTFFFFTFF?FTTF?
TTTTTTTTTT?TTTT-
--:-- / 28
CC

0
CC

0
TTT?????????????
TTT-------?-----
--:-- / 4
TTTFF??T?F??T???
TTTTT--T-T?-T---
--:-- / 16
CC

0
CC

0
09b

FFT? TT? ? ? F? ? FF? ? (expected value)

4.00 1.00 3.00 0 1.00 1.00 0 0 0 1.00 0 0 2.00 1.00 0 0 (confidence rate)

FFT?TT???F??FF??
TTT?TT???T??TT??
--:-- / 16
F???????????F???
T--?--???-??T-??
--:-- / 4
CC

0
CC

0
F?T?????????????
T-T?--???-??--??
--:-- / 4
F?T?????????????
T-T?--???-??--??
--:-- / 4
CC

0
CC

0
10a

FTFFFTTFFTTFFFTF (expected value)

2.00 4.00 2.00 3.00 3.00 2.00 3.00 3.00 2.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FTFFFTTFFTTFFFTF
TTTTTTTTTTTTTTTT
--:P- / 32
FTFFFTTFFTTFFFTF
TTTTTTTTTTTTTTTT
--:-M / 32
CC

0
CC

0
?T??????????????
-T--------------
--:-- / 0
?T?FF?TF??T?????
-T-TT-TT--T-----
--:-- / 12
CC

0
CC

0
10b

TFF? T? T? TFTTFTFF (expected value)

4.00 2.00 2.00 0 2.00 0 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

TFF?T?T?TFTTFTFF
TTT?T?T?TTTTTTTT
--:-- / 24
TFF?T?T?TFTTFTFF
TTT?T?T?TTTTTTTT
--:-- / 24
CC

0
CC

0
T???????????????
T--?-?-?--------
--:-- / 0
T???????????????
T--?-?-?--------
--:-- / 0
CC

0
CC

0
BusinessProcesses — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 568 572 0 0 572 536 0 0
Road Runner 2 5 0 0 8 0 0 0
Camel 2 6 0 0 6 1 0 0
01

FFTFTFFFFTTTFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 1.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate)

FFTFTF?FFTTTF?TF
TTTTTT-TTTTTT-TT
--:-- / 28
FFTFTF?FFTTTFFTF
TTTTTT-TTTTTTTTT
--:-- / 28
CC

0
CC

0
FFTFTFFFFTTTFFTF
TTTTTTTTTTTTTTTT
--:PM / 32
FFTFT??F?TTTFFTF
TTTTT--T-TTTTTTT
--:-- / 24
CC

0
CC

0
02

FTFTFFTFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate)

FTFTFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 32
FTFTFFTFFFFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 28
CC

0
CC

0
FTFTFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FTFTFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
03

FFTTFTFTFFFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTFTFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFTTFTFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFTTFTFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFTTFTFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
04

TFFFTFTFFTFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFTFTFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
TFFFTFTFFTFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TFFFTFTFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
TFFFT?TFFTFTFFFF
TTTTT-TTTTTTTTTT
--:-- / 28
CC

0
CC

0
05

FFFTTTFFTTTFTFFT (expected value)

4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 4.00 (confidence rate)

FFF?TTFFTTTFTFFT
TTT-TTTTTTTTTTTT
--:-- / 28
FFFTTTFFTTTFTF?T
TTTTTTTTTTTTTT-T
--:-- / 28
CC

0
CC

0
FFFTTTFFTTTFTFFT
TTTTTTTTTTTTTTTT
--:PM / 32
FFFTTTFFTTT?TFFT
TTTTTTTTTTT-TTTT
--:-- / 28
CC

0
CC

0
06

FFFFFFFFTFFTFTTT (expected value)

4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFF?FFF?FFTFTTT
TTTT-TTT-TTTTTTT
--:-- / 28
FFFFFFFFTF?TFTTT
TTTTTTTTTT-TTTTT
--:-- / 28
CC

0
CC

0
FFFFFFFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 32
FFFFFF??????????
TTTTTT----------
--:-- / 12
CC

0
CC

0
07

FFFFFFFTFTFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 3.00 (confidence rate)

FFFFFFFTFTFFF?TF
TTTTTTTTTTTTT-TT
--:-- / 28
FFFFFFFTFTFFFFTF
TTTTTTTTTTTTTTTT
--:-M / 32
CC

0
CC

0
FFFFFFFTFTFFFFTF
TTTTTTTTTTTTTTTT
--:P- / 32
FFFFFFFTFTFFF???
TTTTTTTTTTTTT---
--:-- / 24
CC

0
CC

0
08

FFFFFTTTFTFFTFFF (expected value)

4.00 4.00 3.00 4.00 4.00 1.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFF?T?FTFFTFFF
TTTTT-T-TTTTTTTT
--:-- / 28
FFFFF?TTTTFFTFFF
TTTTT-TTXTTTTTTT
V-:-- / 24
CC

0
CC

0
FFFFFTTTFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 32
FF?FF?TTFTFFTFFF
TT-TT-TTTTTTTTTT
--:-- / 28
CC

0
CC

0
09

FFFFFTTFFTT? FFFT (expected value)

4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 3.00 4.00 4.00 (confidence rate)

FFFFFTTFFTT?F?FT
TTTTTTTTTTT?T-TT
--:-- / 28
FFFFFTTFFTT?FFFT
TTTTTTTTTTT?TTTT
--:-- / 28
CC

0
CC

0
FF?FFTTFFTT?FFFT
TT-TTTTTTTT?TTTT
--:-- / 28
FF?FFTTFFTT?FFFT
TT-TTTTTTTT?TTTT
--:-- / 28
CC

0
CC

0
10

FFTTTTTFFTFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTTTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 32
FFTTTTT?FTFFFFFF
TTTTTTT-TTTTTTTT
--:-- / 28
CC

0
CC

0
FFTTTTT?FTFFFFFF
TTTTTTT-TTTTTTTT
--:-- / 28
FFTTTTT?FTFFFFFF
TTTTTTT-TTTTTTTT
--:-- / 28
CC

0
CC

0
11

FTFFTTFFTFFFFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate)

FTFFTT?FTFFFFTTF
TTTTTT-TTTTTTTTT
--:-- / 28
FTFFTTFFTFFFF?TF
TTTTTTTTTTTTT-TT
--:-- / 28
CC

0
CC

0
FTFFTTFFTFFFFTTF
TTTTTTTTTTTTTTTT
--:P- / 32
FTFFTTFFTFFFFTTF
TTTTTTTTTTTTTTTT
--:-M / 32
CC

0
CC

0
12

FFTTFTTFFFFTFFTF (expected value)

2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 2.00 4.00 4.00 (confidence rate)

?FTTFTTFFFFTF?TF
-TTTTTTTTTTTT-TT
--:-- / 28
FFTTFTTFFFFT?TTF
TTTTTTTTTTTT-XTT
V-:-- / 24
CC

0
CC

0
FFTTFTTFFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 32
?FTTFTTFFFFTFFTF
-TTTTTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
13

FTFFTF? FFFFFTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFTF?FFF?FTFTF
TTTTTT?TTT-TTTTT
--:-- / 28
FTFFTF?FFF?FTFTF
TTTTTT?TTT-TTTTT
--:-- / 28
CC

0
CC

0
FTFFTF?FFF?FTFTF
TTTTTT?TTT-TTTTT
--:-- / 28
FTFFTF?FFFFFTFTF
TTTTTT?TTTTTTTTT
--:-- / 28
CC

0
CC

0
14

FTFTTTFTTTTTFTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 1.00 4.00 4.00 (confidence rate)

FTFTTTFTTTTT??TT
TTTTTTTTTTTT--TT
--:-- / 28
FTFTTTFTTTTTFTTT
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FTFTTTFTTTTT??TT
TTTTTTTTTTTT--TT
--:-- / 28
FTFTTTFTTTTT??TT
TTTTTTTTTTTT--TT
--:-- / 28
CC

0
CC

0
15

FTFFFTTFFFFFFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFTTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 32
FTFFFTTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FTFFFTTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 32
FTFFFTTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
16

TFTFFFFFFTTTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 4.00 1.00 3.00 4.00 4.00 4.00 (confidence rate)

TFTFF?FFFTT??FFT
TTTTT-TTTTT--TTT
--:-- / 24
TFTFFFFFF?TTFFFT
TTTTTTTTT-TTTTTT
--:-- / 28
CC

0
CC

0
TFTFFFFFFTT?FFFT
TTTTTTTTTTT-TTTT
--:-- / 28
TFTFFFFFFTT?FFFT
TTTTTTTTTTT-TTTT
--:-- / 28
CC

0
CC

0
17

TFTFFFFTFTFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 2.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 (confidence rate)

TFTFFFF?FTFFTFF?
TTTTTTT-TTTTTTT-
--:-- / 28
TFTFFFFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TFTFF?F?FTFFTFF?
TTTTT-T-TTTTTTT-
--:-- / 24
TFTFF?F?FTFFTFF?
TTTTT-T-TTTTTTT-
--:-- / 24
CC

0
CC

0
18

TFFFTTFFFTTFFFFF (expected value)

4.00 3.00 4.00 4.00 4.00 1.00 4.00 4.00 2.00 4.00 1.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

TFFFT?FFFT?FFFFF
TTTTT-TTTT-TTTTT
--:-- / 28
T?FFTTFFFTTFFFFF
T-TTTTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
TFFFT?FF?T??????
TTTTT-TT-T------
--:-- / 16
TFFFT?FF?T?FFFFF
TTTTT-TT-T-TTTTT
--:-- / 24
CC

0
CC

0
19

FTTTTFFFFFFTTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTTTFFFF?FTTFFF
TTTTTTTTT-TTTTTT
--:-- / 28
FTTTTFFFF?FTTFFF
TTTTTTTTT-TTTTTT
--:-- / 28
CC

0
CC

0
FTTTTFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:PM / 32
FTTTTFFFF?FTTFFF
TTTTTTTTT-TTTTTT
--:-- / 28
CC

0
CC

0
20

TFTFFF? TTTF? ? FFF (expected value)

4.00 4.00 1.00 4.00 4.00 4.00 0 3.00 3.00 3.00 3.00 0 0 3.00 3.00 1.00 (confidence rate)

TF?FFF?TTTF??FF?
TT-TTT?TTTT??TT-
--:-- / 20
TFTFFF?TTTF??FFF
TTTTTT?TTTT??TTT
--:-- / 24
CC

0
CC

0
TF?FFF??????????
TT-TTT?----??---
--:-- / 8
TF?FFF?TTTF??FF?
TT-TTT?TTTT??TT-
--:-- / 20
CC

0
CC

0
DLCflexbar — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 460 476 0 0 244 252 0 0
Road Runner 0 2 0 0 3 2 0 0
Camel 0 3 0 0 3 1 0 0
2a

FTFFTTFTFTTFTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate)

FTFFT?F?FTTFTF?F
TTTTT-T-TTTTTT-T
--:-- / 32
FTFFTTFT?TTFTF?F
TTTTTTTT-TTTTT-T
--:-- / 36
CC

0
CC

0
FTFFTTFTFTTFTFTF
TTTTTTTTTTTTTTTT
--:-M / 40
FTFFTTFTFTTFTFTF
TTTTTTTTTTTTTTTT
--:P- / 40
CC

0
CC

0
2b

FFFFTFFF? FFFFF? F (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 0 2.00 (confidence rate)

FFFFTFFF?FFFFF?F
TTTTTTTT?TTTTT?T
--:-- / 36
FFFFTFFF?FFFFF?F
TTTTTTTT?TTTTT?T
--:-- / 36
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
3a

FFTFFTFTFTTTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 2.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFF?FTFT??FFFF
TTTTT-TTTT--TTTT
--:-- / 32
FFTFFTFTFTT?FFFF
TTTTTTTTTTT-TTTT
--:-- / 36
CC

0
CC

0
FFTFFTFTFTTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 40
FFTFFTFTFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 40
CC

0
CC

0
3b

FFT? TFTT? FTTFF? F (expected value)

3.00 3.00 3.00 0 3.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 0 2.00 (confidence rate)

FFT?TFTT?FTTFF?F
TTT?TTTT?TTTTT?T
--:-- / 32
FFT?TFTT?FTTFF?F
TTT?TTTT?TTTTT?T
--:-- / 32
CC

0
CC

0
CC

0
FFT?T???????????
TTT?T---?-----?-
--:-- / 8
CC

0
CC

0
4a

FFFFFTTFFFFFFFFF (expected value)

4.00 4.00 3.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FF?FFT?FFFFFFFFF
TT-TTT-TTTTTTTTT
--:-- / 36
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 40
CC

0
CC

0
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 40
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 40
CC

0
CC

0
4b

FTF? FTFF? TFFFFFT (expected value)

2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FTF?FTFF?TFFFFFT
TTT?TTTT?TTTTTTT
--:-- / 36
FTF?FTFF?TFFFFFT
TTT?TTTT?TTTTTTT
--:-- / 36
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
5a

FTTFFTFFTFTTFFTF (expected value)

4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 (confidence rate)

FT?FFTFF?FT?FFTF
TT-TTTTT-TT-TTTT
--:-- / 32
FTTFFTFFTFT?FFTF
TTTTTTTTTTT-TTTT
--:-- / 36
CC

0
CC

0
FTTFFTFFTFTTFFTF
TTTTTTTTTTTTTTTT
--:PM / 40
FTTFFTFFTFTTFFTF
TTTTTTTTTTTTTTTT
--:-- / 40
CC

0
CC

0
5b

FFFF? FTTFFTFTFFF (expected value)

2.00 2.00 2.00 1.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate)

FFF??FTTFFTFTFF?
TTT-?TTTTTTTTTT-
--:-- / 32
FFFF?FTTFFTFTFFF
TTTT?TTTTTTTTTTT
--:-- / 36
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
6a

TFFFTFFFTTTTTFFF (expected value)

3.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?FFF?FFFT?TTTFFF
-TTT-TTTT-TTTTTT
--:-- / 32
TFFFTFFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:PM / 40
CC

0
CC

0
TFFFTFFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 40
TFFFTFFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 40
CC

0
CC

0
6b

FTT? FFFT? FTFFFFT (expected value)

1.00 2.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

?TT?FFFT?FTFFFFT
-TT?TTTT?TTTTTTT
--:-- / 32
FTT?FFFT?FTFFFFT
TTT?TTTT?TTTTTTT
--:-- / 36
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
7a

FFFFTTTFTTTTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 2.00 4.00 (confidence rate)

FFFFTTTFTTT?FF?T
TTTTTTTTTTT-TT-T
--:-- / 36
FFFFTTTFTTTT?F?T
TTTTTTTTTTTT-T-T
--:-- / 36
CC

0
CC

0
FFFFTTTFTTTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 40
FFFFTTTFTTTTFFFT
TTTTTTTTTTTTTTTT
--:PM / 40
CC

0
CC

0
7b

TTF? FFFTTFFFTFTT (expected value)

2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate)

TTF?FFFTTFFFT?TT
TTT?TTTTTTTTT-TT
--:-- / 36
TTF?FFFTTFFFTFTT
TTT?TTTTTTTTTTTT
--:-- / 36
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
8a

TFFTTFFFTFFTTTTF (expected value)

3.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate)

?F?TTFFFTFF?TTTF
-T-TTTTTTTT-TTTT
--:-- / 32
TFFTTFFFTFFTTTTF
TTTTTTTTTTTTTTTT
--:PM / 40
CC

0
CC

0
T???????????????
T---------------
--:-- / 4
T???????????????
T---------------
--:-- / 4
CC

0
CC

0
8b

? T? FTT? ? ? FFTFT? F (expected value)

0 1.00 0 1.00 1.00 1.00 0 0 0 1.00 1.00 1.00 1.00 1.00 0 1.00 (confidence rate)

?T?FTT???FFTFT?F
?T?TTT???TTTTT?T
--:-- / 24
CC

0
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
DiscoveryGPU — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 620 612 0 0 640 640 0 0
Road Runner 1 13 0 0 3 3 0 0
Camel 1 14 0 0 3 2 0 0
06a

FFTFFFFFFTTFTFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFFFFFFTTFTFTT
TTTTTTTTTTTTTTTT
--:-- / 32
FFTFFFFFFTTFTFTT
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFTFFFFFFTTFTFTT
TTTTTTTTTTTTTTTT
--:-- / 32
FFTFFFFFFTTFTFTT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
06b

FFTFTFFTFFFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFTFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:P- / 32
FFTFTFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:-M / 32
CC

0
CC

0
FFTFTFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FFTFTFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
07a

TFTTTFFTFFFFFTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTTTFFTFFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 32
TFTTTFFTFFFFFTTT
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TFTTTFFTFFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 32
TFTTTFFTFFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
07b

TTFFFFTFTFFFTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TTFFFFTFTFFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 32
TTFFFFTFTFFFTFFT
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TTFFFFTFTFFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 32
TTFFFFTFTFFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
08a

TFTTFTTTTTFTTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTTFTTTTTFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
TFTTFTTTTTFTTFFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TFTTFTTTTTFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
TFTTFTTTTTFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
08b

FFTFTFFFTFFFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate)

FFTFTFFFTFFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 28
FFTFTFF?TFFFFTFF
TTTTTTT-TTTTTTTT
--:-- / 28
CC

0
CC

0
FFTFTFFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-M / 32
FFTFTFFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:P- / 32
CC

0
CC

0
09a

FFFTFFTTFFFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFTFFTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFFTFFTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFTFFTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
09b

FFFFFFFFFFFFTTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFFFFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFFFFFFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFFFFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
10a

FFFFFFFTFFFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:-M / 32
FFFFFFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
FFFFFFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:P- / 32
FFFFFFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
10b

FFFFFFFFFFTFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFFFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFFFFFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFFFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
11a

FFTFTTFFFTFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FFTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FFTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
11b

FFFFFFTFFFFFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
12a

FTFFTTTTFFFFFTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 (confidence rate)

FTFFTTTTFFFFF?TT
TTTTTTTTTTTTT-TT
--:-- / 28
FTFFTTTTFFFFF?TT
TTTTTTTTTTTTT-TT
--:-- / 28
CC

0
CC

0
FTFFTTTTFFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 32
FTFFTTTTFFFFFTTT
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
12b

FFFFTFTFFFFFFFTF (expected value)

4.00 4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFT?TFFFFFFFTF
TTTTT-TTTTTTTTTT
--:-- / 28
FF?FTFTFFFFFFFTF
TT-TTTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
FFFFTFTFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-M / 32
FFFFTFTFFFFFFFTF
TTTTTTTTTTTTTTTT
--:P- / 32
CC

0
CC

0
13a

TFFFTFFTTFFFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFTFFTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 32
TFFFTFFTTFFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TFFFTFFTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 32
TFFFTFFTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
13b

TFTTFTFTTFTFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTTFTFTTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
TFTTFTFTTFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
TFTTFTFTTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
TFTTFTFTTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
14a

FFFFTFFFFTTTTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFTFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFTFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FFFFTFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 32
FFFFTFFFFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
14b

TTFFFFFTTTTFTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate)

TTFFFFFTTTTFTF?T
TTTTTTTTTTTTTT-T
--:-- / 28
TTFFF??TTTTFTF?T
TTTTT--TTTTTTT-T
--:-- / 24
CC

0
CC

0
TTFFFFFTTTTFTFFT
TTTTTTTTTTTTTTTT
--:PM / 32
TTFFFFFTTTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
15a

FFFFFFFFFFFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 (confidence rate)

FFFFFFFFFFFFFFF?
TTTTTTTTTTTTTTT-
--:-- / 28
FFFFF?FF?FFFFFF?
TTTTT-TT-TTTTTT-
--:-- / 24
CC

0
CC

0
FFFFFFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:P- / 32
FFFFFFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-M / 32
CC

0
CC

0
15b

FTFTFTFFFFTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFTFTFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FTFTFTFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 32
CC

0
CC

0
FTFTFTFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
FTFTFTFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 32
CC

0
CC

0
DoubleExponent — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 420 436 0 0 360 324 0 0
Road Runner 0 3 0 0 0 0 0 0
Camel 0 3 0 0 0 0 0 0
001

FFTFFFTTTTFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFFFTTTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 60
FFTFFFTTTTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 60
CC

0
CC

0
FFTFFFTTTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 60
FFTFFFTTTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 60
CC

0
CC

0
002

TFFTFFTFFFFTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
TFFTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 60
CC

0
CC

0
TFFTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
TFFTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
CC

0
CC

0
003

TTFFFFFTFFTFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TTFFFFFTFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 60
TTFFFFFTFFTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 60
CC

0
CC

0
TTFFFFFTFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 60
TTFFFFFTFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 60
CC

0
CC

0
004

TF? TTFFTFTTF? FFT (expected value)

4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 (confidence rate)

TF?TTFFTFTTF?FFT
TT?TTTTTTTTT?TTT
--:-- / 52
TF?TTFFTFTTF?FFT
TT?TTTTTTTTT?TTT
--:-- / 52
CC

0
CC

0
TF?TTFFTFTTF?FFT
TT?TTTTTTTTT?TTT
--:-- / 52
TF?TTFFTFTTF?FFT
TT?TTTTTTTTT?TTT
--:-- / 52
CC

0
CC

0
010

FTTTTFFFFT? ? FFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 0 4.00 4.00 4.00 4.00 (confidence rate)

FTTTTFFFFT??FFFF
TTTTTTTTTT??TTTT
--:-- / 52
FTTTTFFFFT??FFFF
TTTTTTTTTT??TTTT
--:-- / 52
CC

0
CC

0
FTTTTFFFFT??FFFF
TTTTTTTTTT??TTTT
--:-- / 52
FTTTTFFFFT??FFFF
TTTTTTTTTT??TTTT
--:-- / 52
CC

0
CC

0
020

TF? TFF? F? TFF? TFF (expected value)

4.00 4.00 0 3.00 3.00 3.00 0 3.00 0 3.00 3.00 3.00 0 2.00 2.00 1.00 (confidence rate)

TF?TFF?F?TFF?TF?
TT?TTT?T?TTT?TT-
--:-- / 40
TF?TFF?F?TFF?TFF
TT?TTT?T?TTT?TTT
--:-- / 44
CC

0
CC

0
TF?TFF?F?TFF????
TT?TTT?T?TTT?---
--:-- / 36
TF??????????????
TT?---?-?---?---
--:-- / 8
CC

0
CC

0
100

FTFFFTFTTTFFT? TT (expected value)

4.00 2.00 2.00 2.00 4.00 2.00 1.00 4.00 2.00 3.00 3.00 2.00 1.00 0 1.00 1.00 (confidence rate)

FTFFFTFTTTFF????
TTTTTTTTTTTT-?--
--:-- / 44
FTFFFT?TTTFFT?TT
TTTTTT-TTTTTT?TT
--:-- / 52
CC

0
CC

0
F???F??T?TF?????
T---T--T-TT--?--
--:-- / 20
F???F??T????????
T---T--T-----?--
--:-- / 12
CC

0
CC

0
200

? TFFTTFFFTFFFFFT (expected value)

0 4.00 2.00 4.00 4.00 1.00 2.00 4.00 2.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

?TFFT?FFFTFFFFFT
?TTTT-TTTTTTTTTT
--:-- / 52
?TFFTTFFFTFFFFFT
?TTTTTTTTTTTTTTT
--:-- / 56
CC

0
CC

0
?T?FT??F?T??????
?T-TT--T-T------
--:-- / 20
?T?FT??F?T??????
?T-TT--T-T------
--:-- / 20
CC

0
CC

0
EGFr — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 368 424 0 0 396 396 0 0
Road Runner 0 2 0 0 0 0 0 0
Camel 0 2 0 0 0 0 0 0
02010

FTFFTFTTTFTFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFTFTTTFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 144
FTFFTFTTTFTFFFTF
TTTTTTTTTTTTTTTT
--:PM / 144
CC

0
CC

0
FTFFTFTTTFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 144
FTFFTFTTTFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 144
CC

0
CC

0
10420

TTTFTFTTFFFFFFFF (expected value)

1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 4.00 4.00 4.00 (confidence rate)

?TTFTFTTFFF??FFF
-TTTTTTTTTT--TTT
--:-- / 116
TTTFTFTTFFF?FFFF
TTTTTTTTTTT-TTTT
--:-- / 136
CC

0
CC

0
?TTFTFTTFFFFFFFF
-TTTTTTTTTTTTTTT
--:-- / 136
?TTFTFTTFFFFFFFF
-TTTTTTTTTTTTTTT
--:-- / 136
CC

0
CC

0
10421

FFFTFFTFTTTFFTTT (expected value)

4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 1.00 4.00 3.00 4.00 4.00 1.00 4.00 4.00 (confidence rate)

FFF?FFTF?T?FF?TT
TTT-TTTT-T-TT-TT
--:-- / 108
FFFTFFTFTTTFFTTT
TTTTTTTTTTTTTTTT
--:PM / 144
CC

0
CC

0
FFF?FFTF?TTFF?TT
TTT-TTTT-TTTT-TT
--:-- / 116
FFF?FFTF?TTFF?TT
TTT-TTTT-TTTT-TT
--:-- / 116
CC

0
CC

0
HospitalTriage — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 408 408 0 0 408 408 0 0
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
none

TFFFFFTFFTTTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFFTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 408
TFFFFFTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 408
CC

0
CC

0
TFFFFFTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 408
TFFFFFTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 408
CC

0
CC

0
MAPKbis — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 396 408 0 0 424 424 0 0
Road Runner 1 0 0 0 0 1 0 0
Camel 1 1 0 0 0 0 0 0
5310

FFFFFFFFTFFTFFFF (expected value)

4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFFTFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 212
FFFF?FFFTFFTFFFF
TTTT-TTTTTTTTTTT
--:-- / 196
CC

0
CC

0
FFFFFFFFTFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 212
FFFFFFFFTFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 212
CC

0
CC

0
5320

FTTFTFFFFFTFTFFF (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate)

F?TFTFFFFFTF?FFF
T-TTTTTTTTTT-TTT
--:-- / 184
FTTFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-M / 212
CC

0
CC

0
FTTFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 212
FTTFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:P- / 212
CC

0
CC

0
NQueens — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 464 444 0 0 400 400 0 0
Road Runner 2 4 0 0 0 0 0 0
Camel 1 5 0 0 0 0 0 0
05

TFFFFFFFTFFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
TFFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 60
CC

0
CC

0
TFFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
TFFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
CC

0
CC

0
08

FFTFTTFFTFFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFTTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
FFTFTTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 60
CC

0
CC

0
FFTFTTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
FFTFTTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 60
CC

0
CC

0
10

FFFTFFFFFFFFTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:P- / 60
FFFTFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-M / 60
CC

0
CC

0
FFFTFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 60
FFFTFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 60
CC

0
CC

0
12

TFFFFFFTFFTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 60
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 60
CC

0
CC

0
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 60
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 60
CC

0
CC

0
15

FFFFFFFFFFFFFFFF (expected value)

4.00 2.00 4.00 2.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 2.00 3.00 (confidence rate)

FFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 60
F?F?FFFFFFFFF??F
T-T-TTTTTTTTT--T
--:-- / 44
CC

0
CC

0
F?F?FFFFFFFFFF??
T-T-TTTTTTTTTT--
--:-- / 44
FFFFFFF?FFFFFFFF
TTTTTTT-TTTTTTTT
--:-- / 56
CC

0
CC

0
20

FFFFTFTTFFFFFFFF (expected value)

4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 1.00 4.00 (confidence rate)

F?FFTFTTFFFFFF?F
T-TTTTTTTTTTTT-T
--:-- / 52
FFFFTFTTFFFFF??F
TTTTTTTTTTTTT--T
--:-- / 52
CC

0
CC

0
FFFFTFTTFFFFF?FF
TTTTTTTTTTTTT-TT
--:-- / 56
F?FFTFTTFFFFF??F
T-TTTTTTTTTTT--T
--:-- / 48
CC

0
CC

0
25

FFFFFFFTTTTTFFFF (expected value)

4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFFFFFFTTTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 60
FFFFFFFTTTTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 60
CC

0
CC

0
F???????????????
T---------------
--:-- / 4
F???????????????
T---------------
--:-- / 4
CC

0
CC

0
30

FTFFFFTFTFFFFFFF (expected value)

2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 1.00 4.00 3.00 3.00 (confidence rate)

?TFFFFTFTFFF?FFF
-TTTTTTTTTTT-TTT
--:-- / 52
?TFFFFTFTFF?FFF?
-TTTTTTTTTT-TTT-
--:-- / 48
CC

0
CC

0
FTFFFFTFTFFF?FFF
TTTTTTTTTTTT-TTT
--:-- / 56
FTFFFFTFTFFF?F?F
TTTTTTTTTTTT-T-T
--:-- / 52
CC

0
CC

0
RERS17pb113 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 448 416 0 0 0 0 0 0
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
1

FFFFFF? TT? FFTF? F (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 (confidence rate)

FFFFFF?TT?FFTF?F
TTTTTT?TT?TTTT?T
--:-- / 44
FFFFFF?TT?FFTF?F
TTTTTT?TT?TTTT?T
--:-- / 44
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
2

? TFFFFFTTTFFFFFF (expected value)

0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate)

?TFFFFFTTTFFFFFF
?TTTTTTTTTTTTTTT
--:-- / 52
?TFFFFFTTTF?FFFF
?TTTTTTTTTT-TTTT
--:-- / 48
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
3

TF? F? TTTTTFFFTFF (expected value)

2.00 2.00 0 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate)

TF?F?TTTTTFFFTFF
TT?T?TTTTTTTTTTT
--:-- / 48
TF?F?TTTTTFF?TFF
TT?T?TTTTTTT-TTT
--:-- / 44
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
4

FFTTFFTF? FFF? TFF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 0 2.00 2.00 2.00 (confidence rate)

FFTTFFTF?FFF?TFF
TTTTTTTT?TTT?TTT
--:-- / 48
FFTTFFTF?FFF?TFF
TTTTTTTT?TTT?TTT
--:-- / 48
CC

0
CC

0
DNF

0
CC

0
CC

0
CC

0
5

? FFFTFFFFTTFFFFF (expected value)

0 2.00 1.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

?FFFTFFFFTTFFFFF
?TTTTTTTTTTTTTTT
--:-- / 52
?F??TFFF?TTFFFFF
?T--TTTT-TTTTTTT
--:-- / 40
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
6

FFFTFFFF? ? FTF? FF (expected value)

2.00 2.00 2.00 2.00 1.00 1.00 2.00 2.00 0 0 2.00 2.00 2.00 0 2.00 2.00 (confidence rate)

FFFTFFFF??FTF?FF
TTTTTTTT??TTT?TT
--:-- / 44
FFFT??FF??FTF?FF
TTTT--TT??TTT?TT
--:-- / 36
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
7

FT? FTFFTFFFFFTFT (expected value)

2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FT?FTFFTFFFFFTFT
TT?TTTTTTTTTTTTT
--:-- / 52
FT?FTFFTFFFFFTFT
TT?TTTTTTTTTTTTT
--:-- / 52
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
8

FFTFFFF? FTTFTFFF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 1.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFTFFFF?FTTFTFFF
TTTTTTT?TTTTTTTT
--:-- / 52
FFTFFF??FTTFTFFF
TTTTTT-?TTTTTTTT
--:-- / 48
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
9

FFFFFFTFFFFTFFTF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFFFFFTFFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 56
FFFFFFTFFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 56
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
RERS17pb114 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 480 460 0 0 0 0 0 0
Road Runner 6 1 0 0 0 0 0 0
Camel 4 3 0 0 0 0 0 0
1

FFFFFFFFTTFFFTFF (expected value)

1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFFFFFFFTTFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 56
?FFFFFFFTTFFFTFF
-TTTTTTTTTTTTTTT
--:-- / 52
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
2

FFTTFFFFFFFFFTTF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFTTFFFFFFFFFTTF
TTTTTTTTTTTTTTTT
--:P- / 56
FFTTFFFFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-M / 56
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
3

TFTTTFTTFFTTFTFT (expected value)

2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate)

TFTTTFTTFFTTFTFT
TTTTTTTTTTTTTTTT
--:PM / 56
TFTTT?TTF?TTFT?T
TTTTT-TTT-TTTT-T
--:-- / 44
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
4

FFFFFTFTTFFTFFFT (expected value)

2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 (confidence rate)

FF?FFTFTTFFT?F?T
TT-TTTTTTTTT-T-T
--:-- / 44
FFFFFTFTTFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 56
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
5

FFFFFTFFTFFFF? F? (expected value)

1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 0 (confidence rate)

FFFFFTFFTFFFF?F?
TTTTTTTTTTTTT?T?
--:-- / 48
??FFFTFFTFFFF?F?
--TTTTTTTTTTT?T?
--:-- / 40
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
6

TTFFFFTFTFFTFFFT (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate)

TTFFFFTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 56
TTFFFFTFTFFTF?FT
TTTTTTTTTTTTT-TT
--:-- / 52
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
7

TFFTFTTTFFFFFFFF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

TFFTFTTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 56
TFFTFTTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 56
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
8

FF? FFFFFFFTFFFFF (expected value)

2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FF?FFFFFFFTFFFFF
TT?TTTTTTTTTTTTT
--:-- / 52
FF?FFFFFFFTFFFFF
TT?TTTTTTTTTTTTT
--:-- / 52
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
9

TFFFFTTFTTFTTFFF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate)

TFFFFTTFTTFTTFFF
TTTTTTTTTTTTTTTT
--:PM / 56
TFFFFTTFTTF?TFFF
TTTTTTTTTTT-TTTT
--:-- / 52
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
RERS17pb115 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 240 372 0 0 0 0 0 0
Road Runner 0 0 0 0 0 0 0 0
Camel 0 0 0 0 0 0 0 0
1

? FF? FF? FTTTFTFTT (expected value)

0 1.00 2.00 0 1.00 2.00 0 1.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 2.00 (confidence rate)

??F??F??TTT?T?TT
?-T?-T?-TTT-T-TT
--:-- / 28
?FF?FF?FTTTFTFTT
?TT?TT?TTTTTTTTT
--:-- / 44
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
2

FFFFFTFT? FFTTTT? (expected value)

1.00 1.00 1.00 1.00 1.00 2.00 1.00 2.00 0 1.00 1.00 2.00 2.00 2.00 2.00 0 (confidence rate)

?????TFT???TTTT?
-----TTT?--TTTT?
--:-- / 24
FFFFFT?T?FFTTTT?
TTTTTT-T?TTTTTT?
--:-- / 44
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
3

TFTF? T? FFF? FFTFF (expected value)

2.00 1.00 2.00 2.00 0 2.00 0 1.00 1.00 1.00 0 1.00 1.00 2.00 1.00 2.00 (confidence rate)

T?TF?T???????T?F
T-TT?T?---?--T-T
--:-- / 20
TFTF?T?FFF?FFTFF
TTTT?T?TTT?TTTTT
--:-- / 44
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
4

TTFTFTTTFFF? FFT? (expected value)

2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 1.00 0 1.00 2.00 2.00 0 (confidence rate)

TTFT?TTTFF???FT?
TTTT-TTTTT-?-TT?
--:-- / 36
TTFTFTTTFFF?FFT?
TTTTTTTTTTT?TTT?
--:-- / 48
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
5

FFTFFTTTTTTFFFFF (expected value)

1.00 2.00 2.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 1.00 1.00 1.00 (confidence rate)

FFT??TTTTTTFF??F
TTT--TTTTTTTT--T
--:-- / 40
?FTFFTTTTTT?FFF?
-TTTTTTTTTT-TTT-
--:-- / 44
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
6

FFFT? FT? TF? ? F? ? F (expected value)

2.00 2.00 1.00 2.00 0 1.00 2.00 0 2.00 2.00 0 0 1.00 0 0 2.00 (confidence rate)

FF?T??T?TF?????F
TT-T?-T?TT??-??T
--:-- / 24
FFFT?FT?TF??F??F
TTTT?TT?TT??T??T
--:-- / 36
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
7

FTFFFFFT? F? ? ? TFF (expected value)

2.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 0 1.00 0 0 0 2.00 2.00 1.00 (confidence rate)

FTFF?F?T?????TF?
TTTT-T-T?-???TT-
--:-- / 28
FTFFFFFT?F???TFF
TTTTTTTT?T???TTT
--:-- / 40
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
8

FFF? ? F? FT? FFT? FT (expected value)

2.00 1.00 1.00 0 0 1.00 0 1.00 2.00 0 1.00 1.00 2.00 0 1.00 2.00 (confidence rate)

FF?????FT???T??T
TT-??-?TT?--T?-T
--:-- / 20
F?F??F??T?FFT?FT
T-T??T?-T?TTT?TT
--:-- / 32
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
9

T? FTFT? FFFF? FFFF (expected value)

2.00 0 1.00 2.00 1.00 2.00 0 1.00 1.00 1.00 1.00 0 1.00 1.00 2.00 2.00 (confidence rate)

T??T?T???????FFF
T?-T-T?----?-TTT
--:-- / 20
T?FTFT?FFFF?F?FF
T?TTTT?TTTT?T-TT
--:-- / 40
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
RefineWMG — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 68 504 0 0 504 484 0 0
Road Runner 1 6 0 0 0 1 0 0
Camel 1 6 0 0 0 1 0 0
002002

TFFFFFFFTFFFFTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
----------------
--:-- / 0
TFFFFFFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 36
CC

0
CC

0
TFFFFFFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 36
TFFFFFFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 36
CC

0
CC

0
002003

FFFTTFFFTFFFFFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
----------------
--:-- / 0
FFFTTFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 36
CC

0
CC

0
FFFTTFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 36
FFFTTFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 36
CC

0
CC

0
005005

TFFFFTFFFFFTFTTT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
----------------
--:-- / 0
TFFFFTFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 36
CC

0
CC

0
TFFFFTFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 36
TFFFFTFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 36
CC

0
CC

0
005006

TTFTFTFTFFTFFFTT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
----------------
--:-- / 0
TTFTFTFTFFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 36
CC

0
CC

0
TTFTFTFTFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 36
TTFTFTFTFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 36
CC

0
CC

0
007007

TFFTFFFFFTTFTTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
----------------
--:-- / 0
TFFTFFFFFTTFTTFF
TTTTTTTTTTTTTTTT
--:PM / 36
CC

0
CC

0
TFFTFFFFFTTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 36
TFFTFFFFFTTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 36
CC

0
CC

0
007008

TFFFTFFFFFFFTTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
----------------
--:-- / 0
TFFFTFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 36
CC

0
CC

0
TFFFTFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 36
TFFFTFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 36
CC

0
CC

0
010010

FFTFFFFFTFFTFF? F (expected value)

3.00 3.00 3.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 1.00 (confidence rate)

????????????????
--------------?-
--:-- / 0
FFTFFFFFTFFTFF??
TTTTTTTTTTTTTT?-
--:-- / 32
CC

0
CC

0
FFTFFFFFTFFTFF?F
TTTTTTTTTTTTTT?T
--:-- / 32
FFTFF???????????
TTTTT---------?-
--:-- / 12
CC

0
CC

0
010011

FFFF? TTFFFFFFF? F (expected value)

3.00 3.00 3.00 3.00 0 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 1.00 (confidence rate)

????????????????
----?---------?-
--:-- / 0
FFFF?TTFFFFFFF?F
TTTT?TTTTTTTTT?T
--:-- / 32
CC

0
CC

0
FFFF?TT?????????
TTTT?TT-------?-
--:-- / 12
FFFF?TTFFFFFFF??
TTTT?TTTTTTTTT?-
--:-- / 28
CC

0
CC

0
015015

FFFFFTFTFTFFFTTT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 1.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 (confidence rate)

????????????????
----------------
--:-- / 0
FFFFFT?T?T?F?TTT
TTTTTT-T-T-T-TTT
--:-- / 28
CC

0
CC

0
FFFFFTFT?TFFFTTT
TTTTTTTT-TTTTTTT
--:-- / 32
FFFFFTFTFTFFFTTT
TTTTTTTTTTTTTTTT
--:PM / 36
CC

0
CC

0
015016

FTFTF? ? FFFTTTFFT (expected value)

3.00 3.00 3.00 3.00 2.00 0 0 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate)

????????????????
-----??---------
--:-- / 0
FTFTF??FFFTTT?FT
TTTTT??TTTTTT-TT
--:-- / 28
CC

0
CC

0
FTFTF??FFFTTTFFT
TTTTT??TTTTTTTTT
--:-- / 32
FTFT????????????
TTTT-??---------
--:-- / 8
CC

0
CC

0
025025

TFFFFTTFFFFT? FTF (expected value)

3.00 3.00 2.00 2.00 3.00 3.00 3.00 1.00 2.00 1.00 2.00 3.00 0 2.00 3.00 3.00 (confidence rate)

????????????????
------------?---
--:-- / 0
TF??FTT????T?FTF
TT--TTT----T?TTT
--:-- / 20
CC

0
CC

0
TFFFFTTFFFFT??TF
TTTTTTTTTTTT?-TT
--:-- / 32
TFFFFTT?F?FT?FTF
TTTTTTT-T-TT?TTT
--:-- / 28
CC

0
CC

0
025026

FF? FT? FTFTTFFFFF (expected value)

3.00 3.00 0 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
--?--?----------
--:-- / 0
FF?FT?FTFTTFFFFF
TT?TT?TTTTTTTTTT
--:-- / 32
CC

0
CC

0
FF?FT?FTFTTFFFFF
TT?TT?TTTTTTTTTT
--:-- / 32
FF?FT?FTFTTFFFFF
TT?TT?TTTTTTTTTT
--:-- / 32
CC

0
CC

0
050050

FFTTF? ? ? TTTFFTFF (expected value)

3.00 3.00 3.00 3.00 1.00 0 0 0 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
-----???--------
--:-- / 0
FFTTF???TTT?FTFF
TTTTT???TTT-TTTT
--:-- / 28
CC

0
CC

0
FFTT????TTT?FTFF
TTTT-???TTT-TTTT
--:-- / 24
FFTT????TTTFFTFF
TTTT-???TTTTTTTT
--:-- / 28
CC

0
CC

0
050051

FTTFTFTTF? FFFTFF (expected value)

3.00 3.00 3.00 1.00 3.00 1.00 3.00 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????????????
---------?------
--:-- / 0
FTTTT?TTF?FFFTFF
TTTXT-TTT?TTTTTT
V-:-- / 24
CC

0
CC

0
FTT?T?TTF?FFFTFF
TTT-T-TTT?TTTTTT
--:-- / 28
FTTFTFTTF?FFFTFF
TTTTTTTTT?TTTTTT
--:-- / 32
CC

0
CC

0
100100

TFTFFF? TFFFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 0 4.00 1.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate)

TFTFFF?T?FFTFFFF
TTTTTT?T-TTTTTTT
--:-- / 32
TFTFFF?TFFFTFFFF
TTTTTT?TTTTTTTTT
--:-- / 32
CC

0
CC

0
TFTFFF?T?FFTFF?F
TTTTTT?T-TTTTT-T
--:-- / 28
TFTFF??T?FFTFF?F
TTTTT-?T-TTTTT-T
--:-- / 28
CC

0
CC

0
100101

FTFFTFFTTFFTFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFTFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 36
FTFFTFF?TFFTFFTF
TTTTTTT-TTTTTTTT
--:-- / 32
CC

0
CC

0
FTFFTFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 36
FTFFTFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 36
CC

0
CC

0

All «Known» models
 
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Total Points 7507 8833 4620 4834 7193 7112 4755 4780
Road Runner 102 289 2 3 59 42 4 10
Camel 95 334 4 6 18 23 13 18
ARMCacheCoherence — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 89 102 102 102 102 102 102
Road Runner 0 0 1 0 0 0 0 0
Camel 0 0 1 0 0 0 0 0
none

FFFTFTTFTFFTFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFTTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFTT??FFTFFFT
TTTTTTT--TTTTTTT
--:-- / 89
FFFTFTTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 102
FFFTFTTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFTTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFTTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFTTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFTTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 102
AirplaneLD — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 65 15 15 56 56 31 31
Road Runner 0 1 0 0 3 3 0 0
Camel 0 3 0 0 0 2 1 1
0010

FFTFFFTFFFFFFTTF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FFTFFFTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 8
FFTFFFTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
0020

FTTFFFFTFTFFFTTF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTTFFFFTFTFFFTTF
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
FTTFFFFTFTFFFTTF
TTTTTTTTTTTTTTTT
--:P- / 8
FTTFFFFTFTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
0050

FFTFFFFFTFFFTFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FFTFFFFFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
FFTFFFFFTFFFTFFF
TTTTTTTTTTTTTTTT
--:P- / 8
FFTFFFFFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
0100

FTTTFFFTTFFFFFFF (expected value)

3.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FT?TFFFTTFFFFFFF
TT-TTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
FTTTFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 8
FTTTFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
0200

FTTFTTFFFFTFFFFT (expected value)

5.00 4.00 5.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC F?TF?TFFFFTFFFFT
T-TT-TTTTTTTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTTFTTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:P- / 8
FTTFTTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-M / 8
0500

TTFTTTTFFTFTTFTF (expected value)

4.00 4.00 5.00 4.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC ??F?T?TFFTFTTFTF
--T-T-TTTTTTTTTT
--:-- / 6
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFTTTTFFTFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFTTTTFFTFTTFTF
TTTTTTTTTTTTTTTT
--:P- / 8
TTFTTTTFFTFTTFTF
TTTTTTTTTTTTTTTT
--:-M / 8
TTFTTTTFFTFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
1000

FTTFFTFTFFTTFFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 3.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTTFFT??FFT?FFFF
TTTTTT--TTT-TTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTTFFTFTFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFFTFTFFTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
2000

? TFF? ? F? FFFFFFTF (expected value)

0 1.00 1.00 1.00 0 0 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC ?TFF??F?FFFFFFTF
?TTT??T?TTTTTTTT
--:-- / 6
????????????????
?---??-?--------
--:-- / 0
????????????????
?---??-?--------
--:-- / 0
CC

0
CC

0
????????????????
?---??-?--------
--:-- / 0
????????????????
?---??-?--------
--:-- / 0
4000

FFFFFFFFFF? FFTF? (expected value)

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 5.00 5.00 5.00 5.00 0 (confidence rate)

DNC FFFFFFFFFF?FFTF?
TTTTTTTTTT?TTTT?
--:-- / 7
FFFFFFFFFF?FFTF?
TTTTTTTTTT?TTTT?
--:-- / 7
FFFFFFFFFF?FFTF?
TTTTTTTTTT?TTTT?
--:-- / 7
CC

0
CC

0
FFFFFFFFFF?FFTF?
TTTTTTTTTT?TTTT?
--:-- / 7
FFFFFFFFFF?FFTF?
TTTTTTTTTT?TTTT?
--:-- / 7
AirplaneLD — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 51 66 22 22 56 56 38 38
Road Runner 0 0 0 0 2 5 0 0
Camel 0 4 0 0 1 0 2 0
0010

FFTFFFTFTFFFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-M / 8
FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:P- / 8
FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
0020

FTTFFFFTTFFTTTFT (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

F?TFFFFTTFFTTTFT
T-TTTTTTTTTTTTTT
--:-- / 8
FTTFFFFTTFFTTTFT
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
FTTFFFFTTFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFFFFTTFFTTTFT
TTTTTTTTTTTTTTTT
--:P- / 8
CC

0
CC

0
0050

FFTFFFFFTFFFTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate)

FFTFF?FF?FFFTFF?
TTTTT-TT-TTTTTT-
--:-- / 7
FFTFFFFFTFFFTFFT
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
FFTFFFFFTFFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFFTFFFTFFT
TTTTTTTTTTTTTTTT
--:P- / 8
CC

0
CC

0
0100

FTTTFFFTTTFFTTTT (expected value)

3.00 3.00 3.00 3.00 4.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 (confidence rate)

????F????TFFT??T
----T----TTTT--T
--:-- / 3
FTTTFFFTTTFFTTTT
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
FTTTFFFTTTFFTTTT
TTTTTTTTTTTTTTTT
--:P- / 8
FTTTFFFTTTFFTTTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
0200

FTTFTTFFTTTTTFFF (expected value)

6.00 4.00 5.00 6.00 4.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 5.00 (confidence rate)

F??F?T?FTTTT?FF?
T--T-T-TTTTT-TT-
--:-- / 5
F?TF?TFFTTTTTFFF
T-TT-TTTTTTTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTTFTTFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTTFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:P- / 8
FTTFTTFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:-M / 8
FTTFTTFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
0500

TTFTTTTFTTTTTFTF (expected value)

4.00 4.00 5.00 4.00 5.00 4.00 5.00 6.00 6.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate)

???????FT?T?TFTF
-------TT-T-TTTT
--:-- / 4
??F?T?TFTTTTTFTF
--T-T-TTTTTTTTTT
--:-- / 6
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFTTTTFTTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFTTTTFTTTTTFTF
TTTTTTTTTTTTTTTT
--:P- / 8
TTFTTTTFTTTTTFTF
TTTTTTTTTTTTTTTT
--:-M / 8
TTFTTTTFTTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
1000

FTTFFTFTFFFTFFTF (expected value)

7.00 8.00 8.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 (confidence rate)

?TTFFTF?FFFTFFTF
-TTTTTT-TTTTTTTT
--:-- / 7
FTTFFTF?FFFTFFTF
TTTTTTT-TTTTTTTT
--:-- / 8
FTTFFTF?FFFT?FTF
TTTTTTT-TTTT-TTT
--:-- / 7
FTTFFTF?FFFT?FTF
TTTTTTT-TTTT-TTT
--:-- / 7
FTTFFTFTFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
FTTFFTFTFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFFTF?FFFT?FTF
TTTTTTT-TTTT-TTT
--:-- / 7
FTTFFTF?FFFT?FTF
TTTTTTT-TTTT-TTT
--:-- / 7
2000

? TFFF? F? ? F? TFTTF (expected value)

0 2.00 2.00 2.00 2.00 0 2.00 0 0 1.00 0 2.00 2.00 2.00 2.00 1.00 (confidence rate)

?TFFF?F????TFTTF
?TTTT?T??-?TTTTT
--:-- / 5
?TFFF?F??F?TFTT?
?TTTT?T??T?TTTT-
--:-- / 5
????????????????
?----?-??-?-----
--:-- / 0
????????????????
?----?-??-?-----
--:-- / 0
CC

0
CC

0
????????????????
?----?-??-?-----
--:-- / 0
????????????????
?----?-??-?-----
--:-- / 0
4000

FFFFFFFFFTTF? TFF (expected value)

6.00 5.00 6.00 6.00 6.00 5.00 5.00 5.00 6.00 6.00 5.00 5.00 0 1.00 6.00 6.00 (confidence rate)

F?FFF???FT????FF
T-TTT---TT--?-TT
--:-- / 4
FFFFFFFFFTTF?TFF
TTTTTTTTTTTT?TTT
--:-- / 8
FFFFFFFFFTTF??FF
TTTTTTTTTTTT?-TT
--:-- / 7
FFFFFFFFFTTF??FF
TTTTTTTTTTTT?-TT
--:-- / 7
CC

0
DNF

0
FFFFFFFFFTTF??FF
TTTTTTTTTTTT?-TT
--:-- / 7
FFFFFFFFFTTF??FF
TTTTTTTTTTTT?-TT
--:-- / 7
Angiogenesis — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 118 119 84 84 119 119 53 53
Road Runner 4 1 0 0 2 0 0 0
Camel 3 4 0 0 0 0 0 0
01

FFFFFFFFFFTFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-M / 17
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:P- / 17
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
05

FFFFTFFFFFFFFTTT (expected value)

4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFF?FFFFFFFFTTT
TTTT-TTTTTTTTTTT
--:-- / 16
FFFFTFFFFFFFFTTT
TTTTTTTTTTTTTTTT
--:PM / 17
CC

0
CC

0
FFFFTFFFFFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTFFFFFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 17
CC

0
CC

0
10

FFFFFTTFFTTTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFTTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:P- / 17
FFFFFTTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-M / 17
CC

0
CC

0
FFFFFTTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFTTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
CC

0
CC

0
15

TFFFFTTTFTTFFFFT (expected value)

8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFFFTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:PM / 17
TFFFFTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 17
TF??????????????
TT--------------
--:-- / 2
TF??????????????
TT--------------
--:-- / 2
20

FFTTTFFFTFTFTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:PM / 17
FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTTFFFTFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
25

TFFFFFTFFFTFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:P- / 17
TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-M / 17
TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
50

FFFTTFFFFFFTTFFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFTTFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-M / 17
FFFTTFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFTTFF?FFFTTFFF
TTTTTTT-TTTTTTTT
--:-- / 16
FFFTTFF?FFFTTFFF
TTTTTTT-TTTTTTTT
--:-- / 16
FFFTTFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:P- / 17
FFFTTFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
DNF

0
CC

0
AutoFlight — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 142 148 65 65 125 115 53 53
Road Runner 2 4 0 0 2 4 0 0
Camel 1 10 0 0 1 0 0 0
01a

TFTFFTTTFFFTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 8
TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 8
TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTFFTTTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
01b

FFFFTFTFFFFFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
02a

FFFTFTFFFTFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
FFFTFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 8
FFFTFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
02b

FFTFTFFFFFFFFTFT (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFTFFFF?F?FTFT
TTTTTTTTT-T-TTTT
--:-- / 7
F?TFTFFFFFFFFTFT
T-TTTTTTTTTTTTTT
--:-- / 7
CC

0
CC

0
FFTFTFFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 8
FFTFTFFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
03a

TTFFFFFFTTTFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TTFFFFFFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-M / 8
TTFFFFFFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
TTFFFFFFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFFTTTFFTFF
TTTTTTTTTTTTTTTT
--:P- / 8
CC

0
CC

0
03b

TFFFFFFFFFFFFFFF (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 (confidence rate)

T?FFFFFFFFFFFF?F
T-TTTTTTTTTTTT-T
--:-- / 7
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TFFFFFFFFFFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 7
TFFFFFFFFFFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 7
CC

0
CC

0
04a

FFFFTFTTFFFFTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFT?T?FFFFTFFT
TTTTT-T-TTTTTTTT
--:-- / 7
FFFFTFTTFFFFTFFT
TTTTTTTTTTTTTTTT
--:-M / 8
CC

0
CC

0
FFFFTFTTFFFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTTFFFFTFFT
TTTTTTTTTTTTTTTT
--:P- / 8
CC

0
CC

0
04b

FFFFTFTFTTFTFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 3.00 4.00 2.00 4.00 (confidence rate)

FFFFTFTF?TFT?TFT
TTTTTTTT-TTT-TTT
--:-- / 7
FFFFTFTFTTFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FFFFTFTF?TFTFT?T
TTTTTTTT-TTTTT-T
--:-- / 7
FFFFTFTF?TFTFT?T
TTTTTTTT-TTTTT-T
--:-- / 7
CC

0
CC

0
05a

FTFTTTTFFFTFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:P- / 8
FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-M / 8
FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTTFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
05b

TFF? FTTTFFTFFTFF (expected value)

6.00 2.00 4.00 0 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 (confidence rate)

T?F??TTTFFTFFTFF
T-T?-TTTTTTTTTTT
--:-- / 6
TFF?FTTTFFTFFTF?
TTT?TTTTTTTTTTT-
--:-- / 7
DNF

0
DNF

0
TFF??TTTFFTFFT?F
TTT?-TTTTTTTTT-T
--:-- / 6
T?F?????????????
T-T?------------
--:-- / 1
T???????????????
T--?------------
--:-- / 0
T???????????????
T--?------------
--:-- / 0
06a

TFFTFFTFFFTFTFTF (expected value)

8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFF?FFTFFFTFTFTF
TTT-TTTTTTTTTTTT
--:-- / 7
TFFTFFTFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-M / 8
TFF?FFTFFFTFTFTF
TTT-TTTTTTTTTTTT
--:-- / 7
TFF?FFTFFFTFTFTF
TTT-TTTTTTTTTTTT
--:-- / 7
TFFTFFTFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFTFFTFFFTFTFTF
TTTTTTTTTTTTTTTT
--:P- / 8
TFFTFFTFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFTFFTFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
06b

TFTFTFFFFFFTFFTF (expected value)

6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFTFT?FFFFFTFFTF
TTTTT-TTTTTTTTTT
--:-- / 7
TFTFTFFFFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
TFTFT?FFFFFTFFTF
TTTTT-TTTTTTTTTT
--:-- / 7
TFTFT?FFFFFTFFTF
TTTTT-TTTTTTTTTT
--:-- / 7
TFTFT?FFFFFTFFTF
TTTTT-TTTTTTTTTT
--:-- / 7
TFTFT?FFFFFTFFTF
TTTTT-TTTTTTTTTT
--:-- / 7
CC

0
CC

0
12a

FTFFTFFTTFFTTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 (confidence rate)

FTFFTFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:P- / 8
FTFFTFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:-M / 8
FTFFTFFTTFFTTFF?
TTTTTTTTTTTTTTT-
--:-- / 7
FTFFTFFTTFFTTFF?
TTTTTTTTTTTTTTT-
--:-- / 7
FTFFTFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
12b

FFFTFFTFFT? FTTFF (expected value)

6.00 6.00 3.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 5.00 5.00 5.00 5.00 5.00 (confidence rate)

FF?TFFTFFT?FTTFF
TT-TTTTTTT?TTTTT
--:-- / 7
FFFTFFTFFT?FTTFF
TTTTTTTTTT?TTTTT
--:-- / 7
FFFTFFTFFT?FTTFF
TTTTTTTTTT?TTTTT
--:-- / 7
FFFTFFTFFT?FTTFF
TTTTTTTTTT?TTTTT
--:-- / 7
FF?TFFTFFT?FTTFF
TT-TTTTTTT?TTTTT
--:-- / 7
FF?TFFTFFT??????
TT-TTTTTTT?-----
--:-- / 4
CC

0
CC

0
24a

FF? TFFTTFFFFTFTF (expected value)

4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate)

FF?TFFTTFFFFTFTF
TT?TTTTTTTTTTTTT
--:-- / 7
FF?TFFTTFFFFTFTF
TT?TTTTTTTTTTTTT
--:-- / 7
????????????????
--?-------------
--:-- / 0
????????????????
--?-------------
--:-- / 0
FF?TFFTTFFFFTFT?
TT?TTTTTTTTTTTT-
--:-- / 7
FF?TFFTTFFFFTFTF
TT?TTTTTTTTTTTTT
--:-- / 7
CC

0
CC

0
24b

? TTTTFF? ? ? FF? FTT (expected value)

0 2.00 2.00 2.00 2.00 2.00 2.00 0 0 0 2.00 2.00 0 2.00 2.00 2.00 (confidence rate)

?TTTTFF???FF?FTT
?TTTTTT???TT?TTT
--:-- / 5
?TTTTFF???FF?FTT
?TTTTTT???TT?TTT
--:-- / 5
????????????????
?------???--?---
--:-- / 0
????????????????
?------???--?---
--:-- / 0
CC

0
CC

0
CC

0
CC

0
48a

TTFTFFTFTFTFTFFF (expected value)

2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 (confidence rate)

?TFTFFTFTFTFTF?F
-TTTTTTTTTTTTT-T
--:-- / 7
?TFTFFTFTFTFTFFF
-TTTTTTTTTTTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFTFFTFTFTFTF?F
TTTTTTTTTTTTTT-T
--:-- / 7
TTFTFFTFTFTFTF?F
TTTTTTTTTTTTTT-T
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
48b

? FFTTFTFFTT? TTFT (expected value)

0 4.00 4.00 2.00 4.00 2.00 3.00 3.00 2.00 2.00 2.00 0 2.00 2.00 1.00 2.00 (confidence rate)

?FFTTFTFFTT?TTFT
?TTTTTTTTTT?TTTT
--:-- / 7
?FFTTFTFFTT?TT?T
?TTTTTTTTTT?TT-T
--:-- / 6
????????????????
?----------?----
--:-- / 0
????????????????
?----------?----
--:-- / 0
?FF?T?TF????????
?TT-T-TT---?----
--:-- / 2
?FF?T???????????
?TT-T------?----
--:-- / 1
????????????????
?----------?----
--:-- / 0
????????????????
?----------?----
--:-- / 0
96a

FTFFFFTFFFFFF? FF (expected value)

8.00 8.00 7.00 5.00 8.00 8.00 7.00 1.00 6.00 6.00 6.00 6.00 6.00 0 6.00 2.00 (confidence rate)

FT??FFT?FFFFF?FF
TT--TTT-TTTTT?TT
--:-- / 6
FTFFFFTFFFFFF?FF
TTTTTTTTTTTTT?TT
--:-- / 7
FTFFFFT?FFFFF?F?
TTTTTTT-TTTTT?T-
--:-- / 6
FTFFFFT?FFFFF?F?
TTTTTTT-TTTTT?T-
--:-- / 6
FTF?FFT?????????
TTT-TTT------?--
--:-- / 3
FTF?FF??????????
TTT-TT-------?--
--:-- / 2
FTFFFFT?FFFFF?F?
TTTTTTT-TTTTT?T-
--:-- / 6
FTFFFFT?FFFFF?F?
TTTTTTT-TTTTT?T-
--:-- / 6
96b

TFTFFFFTFTTFFF? T (expected value)

8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 6.00 (confidence rate)

TFTFFFFTFTTFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
TFTFFFFTFTTFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
TFTFFFFTFTTFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
TFTFFFFTFTTFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
T???????????????
T-------------?-
--:-- / 0
T???????????????
T-------------?-
--:-- / 0
TFTFFFFTFTTFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
TFTFFFFTFTTFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
BART — Colored (first 8 formulas disabled + no check between colored and P/T)
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 0 0 0 44 42 0 0
Road Runner 0 0 0 0 2 2 0 0
Camel 0 0 0 0 2 2 0 0
002

TTFFTFTTTTTTFTTT (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

DNC CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFFTFTTTTTTFTTT
TTTTTTTTTTTTTTTT
--:P- / 9
TTFFTFTTTTTTFTTT
TTTTTTTTTTTTTTTT
--:-M / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
005

TTTTTTTTTTFFFTTF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

DNC CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTTTTTTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
010

TTFTTTTTTTTFTTTF (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

DNC CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFTTTTTTTTFTTTF
TTTTTTTTTTTTTTTT
--:-M / 9
TTFTTTTTTTTFTTTF
TTTTTTTTTTTTTTTT
--:P- / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
020

TTTTTFTTTTFTFTTT (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate)

DNC CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTTTTFTTTTFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 9
TTTTTFTTTTFT?TTT
TTTTTTTTTTTT-TTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
030

TTTTFTTTTTTTTT? ? (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 0 0 (confidence rate)

DNC CC

0
????????????????
--------------??
--:-- / 0
????????????????
--------------??
--:-- / 0
TTTTFTTTTTTTTT??
TTTTTTTTTTTTTT??
--:-- / 8
TTTTFTTTTT??????
TTTTTTTTTT----??
--:-- / 6
????????????????
--------------??
--:-- / 0
????????????????
--------------??
--:-- / 0
040

TT? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

1.00 1.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
--??????????????
--:-- / 0
????????????????
--??????????????
--:-- / 0
CC

0
TT??????????????
TT??????????????
--:-- / 1
????????????????
--??????????????
--:-- / 0
????????????????
--??????????????
--:-- / 0
050

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
CC

0
CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
060

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
CC

0
CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
BART — P/T (first 8 formulas disabled + no check between colored and P/T)
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 26 25 9 9 10 10 9 9
Road Runner 0 1 0 0 0 1 0 0
Camel 0 1 0 0 0 1 0 0
002

TTFFTFTTTTTFTFTF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

???????TTTTFTFTF
--------TTTTTTTT
--:-- / 5
TTFFTFTTTTTFTFTF
--------TTTTTTTT
--:PM / 5
TTFFTFTTTTTFTFTF
--------TTTTTTTT
--:-- / 5
TTFFTFTTTTTFTFTF
--------TTTTTTTT
--:-- / 5
TTFFTFTTTTTFTFTF
--------TTTTTTTT
--:-- / 5
TTFFTFTTTTTFTFTF
--------TTTTTTTT
--:-- / 5
TTFFTFTTTTTFTFTF
--------TTTTTTTT
--:-- / 5
TTFFTFTTTTTFTFTF
--------TTTTTTTT
--:-- / 5
005

TTTTTTTTTFFTTTFF (expected value)

7.00 8.00 7.00 7.00 7.00 7.00 7.00 7.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

?T??????T?FTTTFF
--------T-TTTTTT
--:-- / 4
TTTTTTTTT?FTTTFF
--------T-TTTTTT
--:-- / 4
TTTTTTTTT?FTTTFF
--------T-TTTTTT
--:-- / 4
TTTTTTTTT?FTTTFF
--------T-TTTTTT
--:-- / 4
TTTTTTTTTFFTTTFF
--------TTTTTTTT
--:-- / 5
TTTTTTTTTFFTTTFF
--------TTTTTTTT
--:PM / 5
TTTTTTTTT?FTTTFF
--------T-TTTTTT
--:-- / 4
TTTTTTTTT?FTTTFF
--------T-TTTTTT
--:-- / 4
010

TTFTTTTTFTFTT? T? (expected value)

3.00 3.00 3.00 4.00 1.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 0 2.00 0 (confidence rate)

???T???TFTFTT?T?
--------TTTTT?T?
--:-- / 3
TTFTTTTT?TFTT?T?
---------TTTT?T?
--:-- / 3
????????????????
-------------?-?
--:-- / 0
????????????????
-------------?-?
--:-- / 0
TTFT????????????
-------------?-?
--:-- / 0
TTFT????????????
-------------?-?
--:-- / 0
????????????????
-------------?-?
--:-- / 0
????????????????
-------------?-?
--:-- / 0
020

TTTTTFTTF? T? FT? T (expected value)

1.00 3.00 1.00 2.00 4.00 1.00 2.00 1.00 2.00 0 2.00 0 1.00 2.00 0 2.00 (confidence rate)

???TT?T?F?T?FT?T
--------T?T?TT?T
--:-- / 3
TTTTTFTTF?T??T?T
--------T?T?-T?T
--:-- / 2
????????????????
---------?-?--?-
--:-- / 0
????????????????
---------?-?--?-
--:-- / 0
?T??T???????????
---------?-?--?-
--:-- / 0
?T??T???????????
---------?-?--?-
--:-- / 0
????????????????
---------?-?--?-
--:-- / 0
????????????????
---------?-?--?-
--:-- / 0
030

TTTTFTTTTT? TTTFT (expected value)

1.00 1.00 3.00 2.00 1.00 1.00 2.00 1.00 2.00 2.00 0 2.00 2.00 2.00 1.00 2.00 (confidence rate)

???T??T?TT?TTT?T
--------TT?TTT-T
--:-- / 3
TTTTFTTTTT?TTTFT
--------TT?TTTTT
--:-- / 4
????????????????
----------?-----
--:-- / 0
????????????????
----------?-----
--:-- / 0
??T?????????????
----------?-----
--:-- / 0
??T?????????????
----------?-----
--:-- / 0
????????????????
----------?-----
--:-- / 0
????????????????
----------?-----
--:-- / 0
040

TTTTTTTTTTTT? ? F? (expected value)

1.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 0 0 1.00 0 (confidence rate)

?T??????TTTT??F?
--------TTTT??T?
--:-- / 3
TTTTTTTTTTTT????
--------TTTT??-?
--:-- / 2
????????????????
------------??-?
--:-- / 0
????????????????
------------??-?
--:-- / 0
?T??????????????
------------??-?
--:-- / 0
?T??????????????
------------??-?
--:-- / 0
????????????????
------------??-?
--:-- / 0
????????????????
------------??-?
--:-- / 0
050

TTTTTTTTTTFFT? ? ? (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 0 0 0 (confidence rate)

??????T?TTFFT???
--------TTTTT???
--:-- / 3
TTTTTTTTTTFFT???
--------TTTTT???
--:-- / 3
????????????????
-------------???
--:-- / 0
????????????????
-------------???
--:-- / 0
CC

0
CC

0
????????????????
-------------???
--:-- / 0
????????????????
-------------???
--:-- / 0
060

TTTTTTTT? ? T? ? TTF (expected value)

2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 0 2.00 0 0 1.00 2.00 2.00 (confidence rate)

T?????????T???TF
--------??T??-TT
--:-- / 2
TTTTTTTT??T??TTF
--------??T??TTT
--:-- / 2
????????????????
--------??-??---
--:-- / 0
????????????????
--------??-??---
--:-- / 0
CC

0
CC

0
????????????????
--------??-??---
--:-- / 0
????????????????
--------??-??---
--:-- / 0
BridgeAndVehicles — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 92 44 48 84 81 46 47
Road Runner 0 4 0 0 0 0 1 0
Camel 0 4 0 1 0 0 0 0
V04P05N02

FFTTTFFFFFFTTTFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FFTTTFFFFFFTTTFT
TTTTTTTTTTTTTTTT
--:PM / 5
FFTTTFFFFFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 5
V10P10N10

TFFTFFTFTTFTTTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TFFTFFTFTTFTTTFF
TTTTTTTTTTTTTTTT
--:PM / 5
CC

0
CC

0
TFFTFFTFTTFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 5
TFFTFFTFTTFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 5
CC

0
CC

0
V20P10N10

TFFFFFTFFTFFTTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 (confidence rate)

DNC TFFFFFTFFTFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 5
CC

0
CC

0
TFFFFFTFFTFFT?FF
TTTTTTTTTTTTT-TT
--:-- / 5
TFFFFFTFFTFFT?FF
TTTTTTTTTTTTT-TT
--:-- / 5
CC

0
CC

0
V20P10N20

FTFFFFFFTFFTFTTT (expected value)

3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 (confidence rate)

DNC FTFFFFFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 5
CC

0
CC

0
F?FFFFFF?FF?FT?T
T-TTTTTT-TT-TT-T
--:-- / 4
F?FFFFFF?FF?FT?T
T-TTTTTT-TT-TT-T
--:-- / 4
CC

0
CC

0
V20P10N50

FFTFTTTF? FTTTFTF (expected value)

3.00 3.00 3.00 2.00 3.00 1.00 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FFT?TTTF?FTTTFTF
TTT-TTTT?TTTTTTT
--:-- / 5
CC

0
CC

0
FFTFT?TF?FTTTFTF
TTTTT-TT?TTTTTTT
--:-- / 5
FFTFT?TF?FTTTFTF
TTTTT-TT?TTTTTTT
--:-- / 5
CC

0
CC

0
V20P20N10

TTTTTFFFTTTFFFFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 4.00 (confidence rate)

DNC TTTTTFFFTTTFFFF?
TTTTTTTTTTTTTTT-
--:-- / 5
TTTTTFFFTTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 5
TTTTTFFFTTTFFFFT
TTTTTTTTTTTTTTTT
--:-M / 5
TTTTTFFFTTTFFFF?
TTTTTTTTTTTTTTT-
--:-- / 5
TTTTTFFFTTTFFFF?
TTTTTTTTTTTTTTT-
--:-- / 5
TTTTTFFFTTTFFFFT
TTTTTTTTTTTTTTTT
--:P- / 5
TTTTTFFFTTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 5
V20P20N20

TTFTFTFTTTFFTTFF (expected value)

7.00 1.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 1.00 7.00 7.00 (confidence rate)

DNC TTFTFTFTTTFFT?FF
TTTTTTTTTTTTT-TT
--:-- / 5
T?FTFTFTTTFFT?FF
T-TTTTTTTTTTT-TT
--:-- / 5
T?FTFTFTTTFFTTFF
T-TTTTTTTTTTTTTT
--:-- / 5
T?FTFTFTTTFFT?FF
T-TTTTTTTTTTT-TT
--:-- / 5
T?FTFTFTTTFFT?FF
T-TTTTTTTTTTT-TT
--:-- / 5
T?FTFTFTTTFFT?FF
T-TTTTTTTTTTT-TT
--:-- / 5
T?FTFTFTTTFFT?FF
T-TTTTTTTTTTT-TT
--:-- / 5
V20P20N50

TTF? FFFFTTTFFFFF (expected value)

7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC TTF?FFFFTTTFFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
TTF?FFFFTTTFFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
TTF?FFFFTTTFFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
TTF?FFFFTTTFFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
TTF?FFFFTTTFFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
TTF?FFFFTTTFFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
TTF?FFFFTTTFFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
V50P20N10

? ? FFF? FT? F? ? TFFF (expected value)

0 0 2.00 2.00 2.00 0 2.00 2.00 0 1.00 0 0 1.00 2.00 2.00 2.00 (confidence rate)

DNC ??FFF?FT????TFFF
??TTT?TT?-??TTTT
--:-- / 3
????????????????
??---?--?-??----
--:-- / 0
????????????????
??---?--?-??----
--:-- / 0
??FFF?FT?F???FFF
??TTT?TT?T??-TTT
--:-- / 3
DNF

0
????????????????
??---?--?-??----
--:-- / 0
????????????????
??---?--?-??----
--:-- / 0
V50P20N20

TFFT? FFFTT? FFF? ? (expected value)

7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 0 0 (confidence rate)

DNC TFFT?FFFTT?FFF??
TTTT?TTTTT?TTT??
--:-- / 4
TFFT?FFFTT?FFF??
TTTT?TTTTT?TTT??
--:-- / 4
TFFT?FFFTT?FFF??
TTTT?TTTTT?TTT??
--:-- / 4
TFFT?FFFTT?FFF??
TTTT?TTTTT?TTT??
--:-- / 4
TFFT?FFFTT?FFF??
TTTT?TTTTT?TTT??
--:-- / 4
TFFT?FFFTT?FFF??
TTTT?TTTTT?TTT??
--:-- / 4
TFFT?FFFTT?FFF??
TTTT?TTTTT?TTT??
--:-- / 4
V50P20N50

FFFFFT? ? FFT? ? F? F (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 0 0 3.00 3.00 3.00 0 0 3.00 0 1.00 (confidence rate)

DNC FFFFFT??FFT??F?F
TTTTTT??TTT??T?T
--:-- / 4
????????????????
------??---??-?-
--:-- / 0
FFFFFT??????????
TTTTTT??---??-?-
--:-- / 2
FFFFFT??FFT??F??
TTTTTT??TTT??T?-
--:-- / 3
FFFFFT??FFT??F??
TTTTTT??TTT??T?-
--:-- / 3
????????????????
------??---??-?-
--:-- / 0
????????????????
------??---??-?-
--:-- / 0
V50P50N10

FTFT? FFTFTFF? ? FT (expected value)

7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0 0 5.00 1.00 (confidence rate)

DNC FTFT?FFTFTFF??FT
TTTT?TTTTTTT??TT
--:-- / 4
FTFT?FFTFTFF??F?
TTTT?TTTTTTT??T-
--:-- / 4
FTFT?FFTFTFF??F?
TTTT?TTTTTTT??T-
--:-- / 4
FTFT?FFTFTFF????
TTTT?TTTTTTT??--
--:-- / 4
FTFT?FFTFTFF????
TTTT?TTTTTTT??--
--:-- / 4
FTFT?FFTFTFF??F?
TTTT?TTTTTTT??T-
--:-- / 4
FTFT?FFTFTFF??F?
TTTT?TTTTTTT??T-
--:-- / 4
V50P50N20

? FTTFFFFFTTTTFFF (expected value)

0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC ?FTTFFFFFTTTTFFF
?TTTTTTTTTTTTTTT
--:-- / 5
????????????????
?---------------
--:-- / 0
????????????????
?---------------
--:-- / 0
?FTTFFFFFTTTTFFF
?TTTTTTTTTTTTTTT
--:-- / 5
?FTTFFFFFTTTTFFF
?TTTTTTTTTTTTTTT
--:-- / 5
????????????????
?---------------
--:-- / 0
????????????????
?---------------
--:-- / 0
V50P50N50

FFTTFT? FTFFFFTTF (expected value)

3.00 4.00 2.00 4.00 4.00 4.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC ?FTTFT?FTFFFFTTF
-TTTTT?TTTTTTTTT
--:-- / 5
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
FF?TFT?FTFFFFTTF
TT-TTT?TTTTTTTTT
--:-- / 5
FF?TFT?FTFFFFTTF
TT-TTT?TTTTTTTTT
--:-- / 5
????????????????
------?---------
--:-- / 0
FFTTFT??????????
TTTTTT?---------
--:-- / 2
V80P20N10

TTTFFTFFF? ? ? TFFF (expected value)

3.00 3.00 1.00 3.00 1.00 3.00 3.00 1.00 3.00 0 0 0 3.00 3.00 3.00 3.00 (confidence rate)

DNC TTTFFTFFF???TFFF
TTTTTTTTT???TTTT
--:-- / 4
????????????????
---------???----
--:-- / 0
????????????????
---------???----
--:-- / 0
TT?F?TF?F???TFFF
TT-T-TT-T???TTTT
--:-- / 3
TT?F?TF?F???TFFF
TT-T-TT-T???TTTT
--:-- / 3
????????????????
---------???----
--:-- / 0
????????????????
---------???----
--:-- / 0
V80P20N20

FFTFFTFFFFFT? TTT (expected value)

7.00 7.00 1.00 7.00 7.00 1.00 7.00 7.00 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 (confidence rate)

DNC FFTFFTFFFFFT?TTT
TTTTTTTTTTTT?TTT
--:-- / 5
FF?FF?FFFFFT?TTT
TT-TT-TTTTTT?TTT
--:-- / 4
FF?FF?FFFFFT?TTT
TT-TT-TTTTTT?TTT
--:-- / 4
FF?FF?FFFFFT?TTT
TT-TT-TTTTTT?TTT
--:-- / 4
FF?FF?FFFFFT?TTT
TT-TT-TTTTTT?TTT
--:-- / 4
FF?FF?FFFFFT?TTT
TT-TT-TTTTTT?TTT
--:-- / 4
FF?FF?FFFFFT?TTT
TT-TT-TTTTTT?TTT
--:-- / 4
V80P20N50

FFFTFTF? TFTFTFFF (expected value)

7.00 7.00 4.00 7.00 7.00 7.00 7.00 0 4.00 7.00 7.00 5.00 7.00 5.00 1.00 7.00 (confidence rate)

DNC FFFTFTF?TFTFTFFF
TTTTTTT?TTTTTTTT
--:-- / 5
FFFTFTF??FTFTF?F
TTTTTTT?-TTTTT-T
--:-- / 4
FFFTFTF?TFTFTF?F
TTTTTTT?TTTTTT-T
--:-- / 5
FF?TFTF??FT?T??F
TT-TTTT?-TT-T--T
--:-- / 3
FF?TFTF??FT?T??F
TT-TTTT?-TT-T--T
--:-- / 3
FFFTFTF?TFTFTF?F
TTTTTTT?TTTTTT-T
--:-- / 5
FF?TFTF?TFTFTF?F
TT-TTTT?TTTTTT-T
--:-- / 4
V80P50N10

FTTF? TFFFFFFT? F? (expected value)

7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 5.00 7.00 7.00 7.00 7.00 0 7.00 0 (confidence rate)

DNC FTTF?TFFFFFFT?F?
TTTT?TTTTTTTT?T?
--:-- / 4
FTTF?TFFFFFFT?F?
TTTT?TTTTTTTT?T?
--:-- / 4
FTTF?TFFFFFFT?F?
TTTT?TTTTTTTT?T?
--:-- / 4
FTTF?TFF?FFFT?F?
TTTT?TTT-TTTT?T?
--:-- / 4
FTTF?TFF?FFFT?F?
TTTT?TTT-TTTT?T?
--:-- / 4
FTTF?TFFFFFFT?F?
TTTT?TTTTTTTT?T?
--:-- / 4
FTTF?TFFFFFFT?F?
TTTT?TTTTTTTT?T?
--:-- / 4
V80P50N20

TF? TFF? FTFF? TTFT (expected value)

3.00 3.00 0 3.00 3.00 3.00 0 3.00 3.00 3.00 3.00 0 3.00 3.00 3.00 1.00 (confidence rate)

DNC TF?TFF?FTFF?TTFT
TT?TTT?TTTT?TTTT
--:-- / 4
????????????????
--?---?----?----
--:-- / 0
????????????????
--?---?----?----
--:-- / 0
TF?TFF?FTFF?TTF?
TT?TTT?TTTT?TTT-
--:-- / 4
TF?TFF?FTFF?TTF?
TT?TTT?TTTT?TTT-
--:-- / 4
????????????????
--?---?----?----
--:-- / 0
????????????????
--?---?----?----
--:-- / 0
V80P50N50

FFFF? FFFFF? FFFTT (expected value)

7.00 7.00 7.00 7.00 0 7.00 7.00 5.00 5.00 7.00 0 5.00 5.00 5.00 7.00 7.00 (confidence rate)

DNC FFFF?FFFFF?FFFTT
TTTT?TTTTT?TTTTT
--:-- / 5
FFFF?FFFFF?F?FTT
TTTT?TTTTT?T-TTT
--:-- / 4
FFFF?FFFFF?FFFTT
TTTT?TTTTT?TTTTT
--:-- / 5
FFFF?FF??F??F?TT
TTTT?TT--T?-T-TT
--:-- / 3
FFFF?FF??F????TT
TTTT?TT--T?---TT
--:-- / 3
FFFF?FFFFF?FFFTT
TTTT?TTTTT?TTTTT
--:-- / 5
FFFF?FFFFF?FFFTT
TTTT?TTTTT?TTTTT
--:-- / 5
BridgeAndVehicles — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 81 90 24 24 61 60 24 24
Road Runner 2 3 1 0 0 0 0 1
Camel 1 6 0 0 0 0 0 0
V04P05N02

FFTTTFFFFTTFFTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:PM / 5
FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 5
FFTTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 5
V10P10N10

TFFTFFTFTTFTFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:P- / 5
TFFTFFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-M / 5
CC

0
CC

0
TFFTFFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 5
TFFTFFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 5
CC

0
CC

0
V20P10N10

TFFFFFTFTTTFTTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFFTF?TTFTTTT
TTTTTTTT-TTTTTTT
--:-- / 5
TFFFFFTFTTTFTTTT
TTTTTTTTTTTTTTTT
--:PM / 5
CC

0
CC

0
TFFFFFTFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
TFFFFFTFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
CC

0
CC

0
V20P10N20

FTFFFFFFTTTFTTTT (expected value)

4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 1.00 4.00 4.00 (confidence rate)

F?FFFFFFT?TFT?TT
T-TTTTTTT-TTT-TT
--:-- / 4
FTFFFFFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:PM / 5
CC

0
CC

0
F?FFFFFFT?TFT?TT
T-TTTTTTT-TTT-TT
--:-- / 4
F?FFFFFFT?TFT?TT
T-TTTTTTT-TTT-TT
--:-- / 4
CC

0
CC

0
V20P10N50

FFTFTTTFTTTFTTTF (expected value)

4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFTTTFTTTFTTTF
TTTTTTTTTTTTTTTT
--:PM / 5
FFTFTTTFTTTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 5
CC

0
CC

0
FFTFT?TFTTTFTTTF
TTTTT-TTTTTTTTTT
--:-- / 5
FFTFT?TFTTTFTTTF
TTTTT-TTTTTTTTTT
--:-- / 5
CC

0
CC

0
V20P20N10

TTTTTFFFFTTTTTTT (expected value)

7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

?TTTTFFFF?TTTTTT
-TTTTTTTT-TTTTTT
--:-- / 5
TTTTTFFFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-M / 5
TTTTTFFFFTTTTTTT
TTTTTTTTTTTTTTTT
--:P- / 5
TTTTTFFFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
TTTTTFFFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
TTTTTFFFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
TTTTTFFFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
TTTTTFFFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
V20P20N20

TTFTFTFTTTTTTTTT (expected value)

8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 5.00 8.00 (confidence rate)

T?FTFTFTTT?TTT?T
T-TTTTTTTT-TTT-T
--:-- / 4
TTFTFTFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-M / 5
TTFTFTFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
TTFTFTFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
T?FTFTFTTT?TTT?T
T-TTTTTTTT-TTT-T
--:-- / 4
T?FTFTFTTT?TTT?T
T-TTTTTTTT-TTT-T
--:-- / 4
TTFTFTFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 5
TTFTFTFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:P- / 5
V20P20N50

TTF? FFFFTTFTTT? T (expected value)

8.00 8.00 8.00 0 8.00 8.00 8.00 7.00 4.00 8.00 8.00 8.00 8.00 5.00 0 4.00 (confidence rate)

TTF?FFFF?TFTT???
TTT?TTTT-TTTT-?-
--:-- / 4
TTF?FFFF?TFTTT??
TTT?TTTT-TTTTT?-
--:-- / 4
TTF?FFFFTTFTTT?T
TTT?TTTTTTTTTT?T
--:-- / 5
TTF?FFFFTTFTTT?T
TTT?TTTTTTTTTT?T
--:-- / 5
TTF?FFFF?TFTT???
TTT?TTTT-TTTT-?-
--:-- / 4
TTF?FFF??TFTT???
TTT?TTT--TTTT-?-
--:-- / 3
TTF?FFFFTTFTTT?T
TTT?TTTTTTTTTT?T
--:-- / 5
TTF?FFFFTTFTTT?T
TTT?TTTTTTTTTT?T
--:-- / 5
V50P20N10

? ? FFF? FT? TT? FTTT (expected value)

0 0 2.00 1.00 2.00 0 1.00 2.00 0 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate)

??F?F??T?TT?FTTT
??T-T?-T?TT?TTTT
--:-- / 3
??FFF?FT?TT?FTTT
??TTT?TT?TT?TTTT
--:-- / 4
????????????????
??---?--?--?----
--:-- / 0
????????????????
??---?--?--?----
--:-- / 0
CC

0
CC

0
????????????????
??---?--?--?----
--:-- / 0
????????????????
??---?--?--?----
--:-- / 0
V50P20N20

TFFT? FFFTTTT? ? TT (expected value)

8.00 7.00 8.00 8.00 0 8.00 8.00 6.00 8.00 8.00 8.00 8.00 0 0 6.00 6.00 (confidence rate)

T?FT?FFFTTTT??TT
T-TT?TTTTTTT??TT
--:-- / 4
TFFT?FFFTTTT??TT
TTTT?TTTTTTT??TT
--:-- / 4
TFFT?FFFTTTT??TT
TTTT?TTTTTTT??TT
--:-- / 4
TFFT?FFFTTTT??TT
TTTT?TTTTTTT??TT
--:-- / 4
TFFT?FF?TTTT????
TTTT?TT-TTTT??--
--:-- / 3
TFFT?FF?TTTT????
TTTT?TT-TTTT??--
--:-- / 3
TFFT?FFFTTTT??TT
TTTT?TTTTTTT??TT
--:-- / 4
TFFT?FFFTTTT??TT
TTTT?TTTTTTT??TT
--:-- / 4
V50P20N50

FFFFFT? ? FFTFFTTT (expected value)

4.00 4.00 3.00 4.00 3.00 3.00 0 0 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFFF????FFTFFTTT
TTTT--??TTTTTTTT
--:-- / 4
FF?FFT??FFTFFTTT
TT-TTT??TTTTTTTT
--:-- / 4
????????????????
------??--------
--:-- / 0
????????????????
------??--------
--:-- / 0
FFFFFT??F???????
TTTTTT??T-------
--:-- / 2
FFFFFT??????????
TTTTTT??--------
--:-- / 2
????????????????
------??--------
--:-- / 0
????????????????
------??--------
--:-- / 0
V50P50N10

FTFT? FFTTF? ? ? TF? (expected value)

2.00 2.00 3.00 2.00 0 2.00 2.00 1.00 2.00 2.00 0 0 0 2.00 2.00 0 (confidence rate)

??FT?FF?TF???TF?
--TT?TT-TT???TT?
--:-- / 3
FTFT?FFTTF???TF?
TTTT?TTTTT???TT?
--:-- / 4
????????????????
----?-----???--?
--:-- / 0
????????????????
----?-----???--?
--:-- / 0
CC

0
FTF?????????????
TTT-?-----???--?
--:-- / 1
????????????????
----?-----???--?
--:-- / 0
????????????????
----?-----???--?
--:-- / 0
V50P50N20

? FTTFFFFTTT? ? TFF (expected value)

0 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 0 2.00 3.00 3.00 (confidence rate)

?F?TFFFFTTT??TFF
?T-TTTTTTTT??TTT
--:-- / 4
?FTTFFFFTTT???FF
?TTTTTTTTTT??-TT
--:-- / 4
????????????????
?----------??---
--:-- / 0
????????????????
?----------??---
--:-- / 0
?FTTFFFFTTT??TFF
?TTTTTTTTTT??TTT
--:-- / 4
?FTTFFFFTTT?????
?TTTTTTTTTT??---
--:-- / 3
????????????????
?----------??---
--:-- / 0
????????????????
?----------??---
--:-- / 0
V50P50N50

FFTTFT? FFTFFFFFT (expected value)

2.00 2.00 1.00 4.00 4.00 4.00 0 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate)

FF?TFT??FTFFFFFT
TT-TTT?-TTTTTTTT
--:-- / 4
?FTTFT?FFTFFFF?T
-TTTTT?TTTTTTT-T
--:-- / 4
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
F??TFT??????????
T--TTT?---------
--:-- / 1
???TFT??????????
---TTT?---------
--:-- / 1
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
V80P20N10

TTTFFTFF? FFTT? T? (expected value)

4.00 3.00 1.00 4.00 1.00 4.00 3.00 2.00 0 2.00 2.00 2.00 2.00 0 2.00 0 (confidence rate)

T??F?T?F?FFTT?T?
T--T-T-T?TTTT?T?
--:-- / 3
TTTFFTFF?FFTT?T?
TTTTTTTT?TTTT?T?
--:-- / 4
????????????????
--------?----?-?
--:-- / 0
????????????????
--------?----?-?
--:-- / 0
TT?F?TF?????????
TT-T-TT-?----?-?
--:-- / 2
TT?F?TF?????????
TT-T-TT-?----?-?
--:-- / 2
????????????????
--------?----?-?
--:-- / 0
????????????????
--------?----?-?
--:-- / 0
V80P20N20

FFTFFTFFTTT? TTTT (expected value)

4.00 4.00 1.00 4.00 4.00 1.00 4.00 3.00 4.00 4.00 3.00 0 2.00 2.00 2.00 2.00 (confidence rate)

FF?FF?F?TTT?TTTT
TT-TT-T-TTT?TTTT
--:-- / 4
FFTFFTFFTTT?TTTT
TTTTTTTTTTT?TTTT
--:-- / 5
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
FF?FF?FFTT??????
TT-TT-TTTT-?----
--:-- / 3
FF?FF?FFTTT?????
TT-TT-TTTTT?----
--:-- / 3
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
V80P20N50

FFFTFTF? FTFFTTTT (expected value)

3.00 2.00 2.00 3.00 3.00 4.00 4.00 0 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 (confidence rate)

?FF??TF?FTF?TTTT
-TT--TT?TTT-TTTT
--:-- / 4
FFFTFTF?FTFFTTTT
TTTTTTT?TTTTTTTT
--:-- / 5
????????????????
-------?--------
--:-- / 0
????????????????
-------?--------
--:-- / 0
F??TFTF?????????
T--TTTT?--------
--:-- / 2
F??TFTF?????????
T--TTTT?--------
--:-- / 2
????????????????
-------?--------
--:-- / 0
????????????????
-------?--------
--:-- / 0
V80P50N10

FTTF? TFFTF? ? ? TFT (expected value)

4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 2.00 0 0 0 2.00 2.00 2.00 (confidence rate)

FTTF?TFFTF???TFT
TTTT?TTTTT???TTT
--:-- / 4
FTTF?TFFTF???TFT
TTTT?TTTTT???TTT
--:-- / 4
????????????????
----?-----???---
--:-- / 0
????????????????
----?-----???---
--:-- / 0
FTTF?TFFT???????
TTTT?TTTT-???---
--:-- / 3
FTTF?TFFT???????
TTTT?TTTT-???---
--:-- / 3
????????????????
----?-----???---
--:-- / 0
????????????????
----?-----???---
--:-- / 0
V80P50N20

TF? TFF? F? TTTTTTT (expected value)

4.00 4.00 0 4.00 3.00 3.00 0 3.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

TF?T?????TTTTTTT
TT?T--?-?TTTTTTT
--:-- / 3
TF?TFF?F?TTTTTTT
TT?TTT?T?TTTTTTT
--:-- / 4
????????????????
--?---?-?-------
--:-- / 0
????????????????
--?---?-?-------
--:-- / 0
TF?TFF?F????????
TT?TTT?T?-------
--:-- / 2
TF?TFF?F????????
TT?TTT?T?-------
--:-- / 2
????????????????
--?---?-?-------
--:-- / 0
????????????????
--?---?-?-------
--:-- / 0
V80P50N50

FFFF? FFFTTT? TTTF (expected value)

3.00 1.00 3.00 4.00 0 4.00 4.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate)

???F?FFFTTT?TTTF
---T?TTTTTT?TTTT
--:-- / 4
FFFF?FFFTTT?TTTF
TTTT?TTTTTT?TTTT
--:-- / 5
????????????????
----?------?----
--:-- / 0
????????????????
----?------?----
--:-- / 0
F?FF?FF?????????
T-TT?TT----?----
--:-- / 2
F?FF?FF?????????
T-TT?TT----?----
--:-- / 2
????????????????
----?------?----
--:-- / 0
????????????????
----?------?----
--:-- / 0
CSRepetitions — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 59 0 33 52 46 22 33
Road Runner 0 5 0 0 0 0 0 1
Camel 0 5 0 0 0 0 0 1
02

FFTTFFTTFFFFFFFT (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

DNC FFTTFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 11
DNC FFTTFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
03

TFFFFFFFTTTTFTTF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TFFFFFFFTTTTFTTF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
TFFFFFFFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFFFFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
04

TFFFFTFFFFTTFTFT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TFFFFTFFFFTTFTFT
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
TFFFFTFFFFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFTFFFFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
05

FFTTFFFFFFTFFFTT (expected value)

5.00 5.00 5.00 5.00 5.00 4.00 5.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

DNC FFTTF?F?????????
TTTTT-T---------
--:-- / 4
DNC FFTTFFFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFF?FFTFFFTT
TTTTTTT-TTTTTTTT
--:-- / 10
????????????????
----------------
--:-- / 0
FFTTFFFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 11
07

FTFFFTTFFTTFTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

DNC FTFFFTTFFTTFTFFT
TTTTTTTTTTTTTTTT
--:PM / 11
DNC FTFFFTTFFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
FTFFFTTFFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFFFTTFFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 11
10

TFFTFFFFFTFFFFFF (expected value)

3.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 (confidence rate)

DNC TFFTFFFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
DNC ????????????????
----------------
--:-- / 0
TF?T?FFF?TFFFF??
TT-T-TTT-TTTTT--
--:-- / 8
TF?T?F??????????
TT-T-T----------
--:-- / 3
DNF

0
????????????????
----------------
--:-- / 0
CSRepetitions — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 50 56 0 11 54 56 11 11
Road Runner 0 2 0 0 0 2 0 0
Camel 0 2 0 0 2 0 0 0
02

FFTTFFTTFTTTTFFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FFTTFFTTFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFTTTTFFF
TTTTTTTTTTTTTTTT
--:PM / 11
DNC FFTTFFTTFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFTTFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
03

TFFFFFFFFFFTFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFFFFFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFFFFFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
TFFFFFFFFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFFFFFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
04

TFFFFTFFFTFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate)

TFFFFT?FFTFFFFTF
TTTTTT-TTTTTTTTT
--:-- / 10
TFFFFTFF?TFFFF?F
TTTTTTTT-TTTTT-T
--:-- / 10
CC

0
CC

0
TFFFFTFFFTFFFFTF
TTTTTTTTTTTTTTTT
--:-M / 11
TFFFFTFFFTFFFFTF
TTTTTTTTTTTTTTTT
--:P- / 11
CC

0
CC

0
05

FFTTFFFFFTFTTFTF (expected value)

4.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 3.00 4.00 2.00 4.00 4.00 3.00 4.00 3.00 (confidence rate)

FFTT??FFFT?TTFTF
TTTT--TTTT-TTTTT
--:-- / 9
FFTTFFFF?T?TT?T?
TTTTTTTT-T-TT-T-
--:-- / 8
DNC ????????????????
----------------
--:-- / 0
FFTTFFFFFTFTTFTF
TTTTTTTTTTTTTTTT
--:-M / 11
FFTTFFFFFTFTTFTF
TTTTTTTTTTTTTTTT
--:P- / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
07

FTFFFTTFT? F? FF? T (expected value)

3.00 4.00 1.00 3.00 3.00 3.00 4.00 2.00 4.00 0 4.00 0 3.00 1.00 0 3.00 (confidence rate)

?T????TFT?F?F??T
-T----TTT?T?T-?T
--:-- / 5
FTFFFTTFT?F?F??T
TTTTTTTTT?T?T-?T
--:-- / 8
DNC ????????????????
---------?-?--?-
--:-- / 0
FT?FFTT?T?F?????
TT-TTTT-T?T?--?-
--:-- / 6
FT?FFTT?T?F?FF?T
TT-TTTT-T?T?TT?T
--:-- / 8
????????????????
---------?-?--?-
--:-- / 0
????????????????
---------?-?--?-
--:-- / 0
10

TFFTFFFF? TT? ? TF? (expected value)

3.00 4.00 1.00 3.00 1.00 3.00 4.00 3.00 0 2.00 2.00 0 0 2.00 2.00 0 (confidence rate)

?F????F??TT??TF?
-T----T-?TT??TT?
--:-- / 4
TFFTFFFF?TT??TF?
TTTTTTTT?TT??TT?
--:-- / 8
DNC ????????????????
--------?--??--?
--:-- / 0
TF?T?FFF????????
TT-T-TTT?--??--?
--:-- / 4
TF?T?FFF????????
TT-T-TTT?--??--?
--:-- / 4
????????????????
--------?--??--?
--:-- / 0
????????????????
--------?--??--?
--:-- / 0
CircadianClock — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 112 111 55 55 100 83 55 55
Road Runner 1 4 0 0 0 0 0 0
Camel 2 3 0 0 0 0 0 0
000001

TFFFFFFFFFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
000010

TFFTTFFFFFTTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
TFFTTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
000100

TFFFTTTFFTFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFTTTFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFTTTFFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
TFFFTTTFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFTTTFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
001000

FTFFTFTTFFFTFFTF (expected value)

8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFTFTTFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
FT?FTFTTFFFTFFTF
TT-TTTTTTTTTTTTT
--:-- / 18
FT?FTFTTFFFTFFTF
TT-TTTTTTTTTTTTT
--:-- / 18
FT?FTFTTFFFTFFTF
TT-TTTTTTTTTTTTT
--:-- / 18
FTFFTFTTFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTFTTFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FT?FTFTTFFFTFFTF
TT-TTTTTTTTTTTTT
--:-- / 18
FT?FTFTTFFFTFFTF
TT-TTTTTTTTTTTTT
--:-- / 18
010000

FFFFFFFFFTTFTFFT (expected value)

4.00 4.00 3.00 3.00 3.00 1.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFF??FFFTTFTFFT
TTTT--TTTTTTTTTT
--:-- / 17
FFF?FF?FFTTFTFFT
TTT-TT-TTTTTTTTT
--:-- / 17
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFF??FFTTFTFFT
TTTTT--TTTTTTTTT
--:-- / 17
FF?FF???????????
TT-TT-----------
--:-- / 5
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
100000

FFFFTFFFFTFFTFFF (expected value)

8.00 8.00 3.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFTFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-M / 19
FFFFTFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:P- / 19
FF?FTFFFFTFFTFFF
TT-TTTTTTTTTTTTT
--:-- / 18
FF?FTFFFFTFFTFFF
TT-TTTTTTTTTTTTT
--:-- / 18
FFFFTF??????????
TTTTTT----------
--:-- / 7
FF??????????????
TT--------------
--:-- / 2
FF?FTFFFFTFFTFFF
TT-TTTTTTTTTTTTT
--:-- / 18
FF?FTFFFFTFFTFFF
TT-TTTTTTTTTTTTT
--:-- / 18
CircularTrains — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 113 113 48 48 85 85 48 48
Road Runner 1 4 0 0 0 0 0 0
Camel 1 4 0 0 0 0 0 0
012

TFFFTFFFFFFFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 17
TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 17
024

FFFFFFTFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 17
CC

0
CC

0
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
CC

0
CC

0
048

FFFFTFFFTTTFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate)

FFFFTFFFT?TFFFF?
TTTTTTTTT-TTTTT-
--:-- / 15
FFFFTFFFTTTFFFFT
TTTTTTTTTTTTTTTT
--:PM / 17
CC

0
CC

0
FFFFTFFFTTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTFFFTTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 17
CC

0
CC

0
096

FFTFTFFTFFFTFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate)

FFTFTFFTFFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 17
FFTFTFFTFFFTFT?T
TTTTTTTTTTTTTT-T
--:-- / 16
CC

0
CC

0
FFTFTFFT????????
TTTTTTTT--------
--:-- / 9
FFTFTFFT????????
TTTTTTTT--------
--:-- / 9
CC

0
CC

0
192

TFFTFT? TTTFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 1.00 2.00 1.00 2.00 2.00 2.00 (confidence rate)

TFFTFT?TTTFFFFFT
TTTTTT?TTTTTTTTT
--:-- / 16
TFFTFT?TTT?F?FFT
TTTTTT?TTT-T-TTT
--:-- / 14
CC

0
CC

0
TFFTFT?TTT??????
TTTTTT?TTT------
--:-- / 10
TFFTFT?TTT??????
TTTTTT?TTT------
--:-- / 10
CC

0
CC

0
384

TFFFTFTFF? FFTFFF (expected value)

5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 0 8.00 8.00 8.00 7.00 8.00 6.00 (confidence rate)

?FFFTFTFF?FFTFFF
-TTTTTTTT?TTTTTT
--:-- / 15
TFFFTFTFF?FFT?FF
TTTTTTTTT?TTT-TT
--:-- / 15
TFFFTFTFF?FFTFFF
TTTTTTTTT?TTTTTT
--:-- / 16
TFFFTFTFF?FFTFFF
TTTTTTTTT?TTTTTT
--:-- / 16
?FFFTFTFF?FFTFF?
-TTTTTTTT?TTTTT-
--:-- / 14
?FFFTFTFF?FFTFF?
-TTTTTTTT?TTTTT-
--:-- / 14
TFFFTFTFF?FFTFFF
TTTTTTTTT?TTTTTT
--:-- / 16
TFFFTFTFF?FFTFFF
TTTTTTTTT?TTTTTT
--:-- / 16
768

TFTTTFTTFTFTTTFT (expected value)

8.00 6.00 6.00 6.00 6.00 2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate)

TFTTTFTTFTFTTTF?
TTTTTTTTTTTTTTT-
--:-- / 16
TFTTTFTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:PM / 17
TFTTT?TTFTFTTTF?
TTTTT-TTTTTTTTT-
--:-- / 15
TFTTT?TTFTFTTTF?
TTTTT-TTTTTTTTT-
--:-- / 15
T???????????????
T---------------
--:-- / 1
T???????????????
T---------------
--:-- / 1
TFTTT?TTFTFTTTF?
TTTTT-TTTTTTTTT-
--:-- / 15
TFTTT?TTFTFTTTF?
TTTTT-TTTTTTTTT-
--:-- / 15
ClientsAndServers — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 148 148 141 141 115 118 125 125
Road Runner 4 8 0 0 0 0 0 1
Camel 2 8 1 1 0 0 0 1
N0001P0

FFFTFFFTFFFTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
N0002P0

FFFTFFFFFFTFTTTF (expected value)

8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:PM / 8
F?FTFFFFFFTFTTTF
T-TTTTTTTTTTTTTT
--:-- / 7
FFFTFFFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
N0002P1

TFFFTTFTFFTFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
N0005P0

FFFFFTFFFTFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
N0005P1

FFFTFFFFFFTTFFFF (expected value)

8.00 8.00 8.00 1.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFF?F?FFFFTTFFFF
TTT-T-TTTTTTTTTT
--:-- / 7
FFFTFFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFF?FFFFFFTTFFFF
TTT-TTTTTTTTTTTT
--:-- / 7
FFF?FFFFFFTTFFFF
TTT-TTTTTTTTTTTT
--:-- / 7
FFF?FFFFFFTTFFFF
TTT-TTTTTTTTTTTT
--:-- / 7
FFF?FFFFFFTTFFFF
TTT-TTTTTTTTTTTT
--:-- / 7
FFF?FFFFFFTTFFFF
TTT-TTTTTTTTTTTT
--:-- / 7
FFF?FFFFFFTTFFFF
TTT-TTTTTTTTTTTT
--:-- / 7
N0010P0

FTFFFFTFFFF? FFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 1.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 1.00 (confidence rate)

FTFFFF?FFFF?FFF?
TTTTTT-TTTT?TTT-
--:-- / 6
FTFFFFTFFFF?FFFT
TTTTTTTTTTT?TTTT
--:-- / 7
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
FTFFFF??????????
TTTTTT-----?----
--:-- / 3
FTFFFF??????????
TTTTTT-----?----
--:-- / 3
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
N0010P1

FFFFTTFTFFTTTTFF (expected value)

8.00 7.00 7.00 7.00 7.00 1.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 (confidence rate)

FFFFT?FTFFTTTTFF
TTTTT-TTTTTTTTTT
--:-- / 7
FFFFTTFTFFTTTTF?
TTTTTTTTTTTTTTT-
--:-- / 7
FFFFT?FTFFTTTTFF
TTTTT-TTTTTTTTTT
--:-- / 7
FFFFT?FTFFTTTTFF
TTTTT-TTTTTTTTTT
--:-- / 7
F???????????????
T---------------
--:-- / 0
FFFFT?FTFFTTTTFF
TTTTT-TTTTTTTTTT
--:-- / 7
FFFFT?FTFFTTTTFF
TTTTT-TTTTTTTTTT
--:-- / 7
FFFFT?FTFFTTTTFF
TTTTT-TTTTTTTTTT
--:-- / 7
N0010P2

FTFFFFFFFFTTFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 (confidence rate)

FTFFFFFFFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFFTTFFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FTFFFFFFFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFFTTFF??
TTTTTTTTTTTTTT--
--:-- / 7
FTFFFFFFFFTTFF??
TTTTTTTTTTTTTT--
--:-- / 7
FTFFFFFFFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
N0020P0

FFFTTTFTTFFFTTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 7.00 8.00 7.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFTTTFT?FFFTTFT
TTTTTTTT-TTTTTTT
--:-- / 7
FFFTTTFTTF?FTTFT
TTTTTTTTTT-TTTTT
--:-- / 7
FFFTTTFTTFFFTTFT
TTTTTTTTTTTTTTTT
--:-M / 8
FFFTTTFTTFFFTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTT?TTFF?????
TTTTTT-TTTT-----
--:-- / 5
FFFTTT?TTFF?????
TTTTTT-TTTT-----
--:-- / 5
FFFTTTFTTFFFTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTTFFFTTFT
TTTTTTTTTTTTTTTT
--:P- / 8
N0020P1

TFTTFTFTTFTFFFTT (expected value)

8.00 8.00 7.00 7.00 1.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 5.00 (confidence rate)

TF??FTF?TFTFFFT?
TT--TTT-TTTTTTT-
--:-- / 6
TFTT?TFTTFTFFFTT
TTTT-TTTTTTTTTTT
--:-- / 7
TFTT?TF?TFTFFFTT
TTTT-TT-TTTTTTTT
--:-- / 7
TFTT?TF?TFTFFFTT
TTTT-TT-TTTTTTTT
--:-- / 7
TFTT?TF?TFTFFFT?
TTTT-TT-TTTTTTT-
--:-- / 6
TFTT?TF?TFTFF???
TTTT-TT-TTTTT---
--:-- / 5
TFTT?TF?TFTFFFTT
TTTT-TT-TTTTTTTT
--:-- / 7
TFTT?TF?TFTFFFTT
TTTT-TT-TTTTTTTT
--:-- / 7
N0020P2

FFFFFFFTFFTFFTTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 (confidence rate)

FFFFFFF?FFTFFT?T
TTTTTTT-TTTTTT-T
--:-- / 7
FFFFFFFTFFTFFTTT
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFFF?FFTFFTTT
TTTTTTT-TTTTTTTT
--:-- / 7
FFFFFFF?FFTFFTTT
TTTTTTT-TTTTTTTT
--:-- / 7
FFFFFFF?FFTFFT?T
TTTTTTT-TTTTTT-T
--:-- / 7
FFFFFFF?FFTFFT?T
TTTTTTT-TTTTTT-T
--:-- / 7
FFFFFFF?FFTFFTTT
TTTTTTT-TTTTTTTT
--:-- / 7
FFFFFFF?FFTFFTTT
TTTTTTT-TTTTTTTT
--:-- / 7
N0020P3

FFFFTTFTTFFTTFTF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFTTFTTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFTTFFTTFTF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFTTFTTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFTTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFTTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFTTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
DNF

0
DNF

0
N0020P4

TTFFFFFTTFFTFTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFFFFTTFFTFTFT
TTTTTTTTTTTTTTTT
--:P- / 8
TTFFFFFTT?FTFTFT
TTTTTTTTT-TTTTTT
--:-- / 7
TTFFFFFTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-M / 8
N0050P0

FFFFFFFFFFFFTTFF (expected value)

8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 1.00 (confidence rate)

FFFFFFFFFFFFTTF?
TTTTTTTTTTTTTTT-
--:-- / 7
FFFF?FFFFFFFTTF?
TTTT-TTTTTTTTTT-
--:-- / 7
FFFFFFFFFFFFTTF?
TTTTTTTTTTTTTTT-
--:-- / 7
FFFFFFFFFFFFTTF?
TTTTTTTTTTTTTTT-
--:-- / 7
FFFFFFFFF?FFTTFF
TTTTTTTTT-TTTTTT
--:-- / 7
FFFFFFFFF?FFTTF?
TTTTTTTTT-TTTTT-
--:-- / 7
FFFFFFFFFFFFTTF?
TTTTTTTTTTTTTTT-
--:-- / 7
FFFFFFFFFFFFTTF?
TTTTTTTTTTTTTTT-
--:-- / 7
N0100P0

TFTTTFFFTTFFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTTFFFTTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
N0200P0

FTFFTFFTFFFFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FTFFTFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
FTFFTFFT?FFFFTFF
TTTTTTTT-TTTTTTT
--:-- / 7
FTFFTFFT?FFFFTFF
TTTTTTTT-TTTTTTT
--:-- / 7
FTFFTFFT?FFFFTFF
TTTTTTTT-TTTTTTT
--:-- / 7
FTFFTFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFFTFFF?????
TTTTTTTTTTT-----
--:-- / 5
FTFFTFFT?FFFFTFF
TTTTTTTT-TTTTTTT
--:-- / 7
FTFFTFFT?FFFFTFF
TTTTTTTT-TTTTTTT
--:-- / 7
N0500P0

FFFFFFTF? TFFTFFF (expected value)

8.00 4.00 2.00 6.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FF?FFFTF?TFFTFFF
TT-TTTTT?TTTTTTT
--:-- / 7
FFFFFFTF?TFFTFFF
TTTTTTTT?TTTTTTT
--:-- / 7
F??FFFTF?TFFTFFF
T--TTTTT?TTTTTTT
--:-- / 6
F??FFFTF?TFFTFFF
T--TTTTT?TTTTTTT
--:-- / 6
FF??????????????
TT------?-------
--:-- / 1
FFF?????????????
TTT-----?-------
--:-- / 1
F??FFFTF?TFFTFFF
T--TTTTT?TTTTTTT
--:-- / 6
F??FFFTF?TFFTFFF
T--TTTTT?TTTTTTT
--:-- / 6
N1000P0

TFFFFFFFFTTTFFFF (expected value)

6.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFFFFFTTTFFFF
TTTTTTTTTTTTTTTT
--:P- / 8
TFFFFFFFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTTTFFFF
TTTTTTTTTTTTTTTT
--:-M / 8
T???????????????
T---------------
--:-- / 0
T???????????????
T---------------
--:-- / 0
CC

0
CC

0
N2000P0

FTFFFTTFT? FFFFFF (expected value)

8.00 8.00 2.00 7.00 7.00 7.00 7.00 7.00 1.00 0 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FTFFFTTF??FFFFFF
TTTTTTTT-?TTTTTT
--:-- / 7
FT?FFTTFT?FFFFFF
TT-TTTTTT?TTTTTT
--:-- / 7
FT?FFTTF??FFFFFF
TT-TTTTT-?TTTTTT
--:-- / 6
FT?FFTTF??FFFFFF
TT-TTTTT-?TTTTTT
--:-- / 6
FT??????????????
TT-------?------
--:-- / 1
FTFFFTTF????????
TTTTTTTT-?------
--:-- / 4
FT?FFTTF??FFFFFF
TT-TTTTT-?TTTTTT
--:-- / 6
FT?FFTTF??FFFFFF
TT-TTTTT-?TTTTTT
--:-- / 6
N5000P0

TFFFTTFF? FFFFFFT (expected value)

8.00 7.00 8.00 8.00 8.00 8.00 7.00 8.00 0 2.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

TFFFTTFF?FFFFFFT
TTTTTTTT?TTTTTTT
--:-- / 7
T?FFTT?F??FFFFFT
T-TTTT-T?-TTTTTT
--:-- / 6
TFFFTTFF??FFFFFT
TTTTTTTT?-TTTTTT
--:-- / 7
TFFFTTFF??FFFFFT
TTTTTTTT?-TTTTTT
--:-- / 7
TFFFTTFF?FFFFFFT
TTTTTTTT?TTTTTTT
--:-- / 7
TFFFTTFF????????
TTTTTTTT?-------
--:-- / 4
TFFFTTFF??FFFFFT
TTTTTTTT?-TTTTTT
--:-- / 7
TFFFTTFF??FFFFFT
TTTTTTTT?-TTTTTT
--:-- / 7
CloudDeployment — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 124 123 59 59 93 87 65 65
Road Runner 3 4 0 0 2 0 0 0
Camel 3 5 0 0 0 0 0 1
2a

TTFFTFFFTFFFTTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 11
TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
2b

FFFFFFFTFFFTFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 11
FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
3a

FFFFFFFTFFTFFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFTFFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFTFFTTF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
FFFFFFFTFFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFTFFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
3b

FFFFFFFTFFFFTFFF (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 3.00 3.00 3.00 3.00 2.00 2.00 (confidence rate)

FFFFFFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 11
FFFFFFFT?FFFTF?F
TTTTTTTT-TTTTT-T
--:-- / 10
CC

0
CC

0
FFFFFFFTF?FFTFF?
TTTTTTTTT-TTTTT-
--:-- / 10
F?FFFFFT????????
T-TTTTTT--------
--:-- / 5
CC

0
CC

0
4a

FTTFFFTFFFFFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFFFTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FTTFFFTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:P- / 11
FTTFFFTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
4b

T? FT? FFFFFFTTTFF (expected value)

4.00 0 4.00 4.00 0 3.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

T?FT?FFFFFFTTTFF
T?TT?TTTTTTTTTTT
--:-- / 10
T?FT?FFFFFFTTTFF
T?TT?TTTTTTTTTTT
--:-- / 10
CC

0
CC

0
T?FT????????????
T?TT?-----------
--:-- / 2
T?FT?FFF????????
T?TT?TTT--------
--:-- / 4
CC

0
CC

0
5a

TFFFFTFFFTTFFFFF (expected value)

8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 (confidence rate)

TFFFFTFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
TFFFFTFFFTTFFF?F
TTTTTTTTTTTTTT-T
--:-- / 10
TFF?FTFFFTTFFF?F
TTT-TTTTTTTTTT-T
--:-- / 10
TFF?FTFFFTTFFF?F
TTT-TTTTTTTTTT-T
--:-- / 10
TFFFFTFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFTFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFTFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFTFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
5b

FFTFFFFFFFT? TTTF (expected value)

1.00 1.00 2.00 3.00 3.00 3.00 3.00 2.00 1.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate)

?FTFFFFF?FT?TTTF
-TTTTTTT-TT?TTTT
--:-- / 9
F?TFFFFFFFT?TTTF
T-TTTTTTTTT?TTTT
--:-- / 10
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
???FFFF?????????
---TTTT----?----
--:-- / 3
CC

0
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
6a

TFFFFFFFTFFFFTTT (expected value)

8.00 8.00 4.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 6.00 6.00 6.00 6.00 (confidence rate)

TF?F?FFFTFF?FTTT
TT-T-TTTTTT-TTTT
--:-- / 9
TF?F?FFFTFF?FTTT
TT-T-TTTTTT-TTTT
--:-- / 9
TF?F?FFFTFF?????
TT-T-TTTTTT-----
--:-- / 6
TF?F?FFFTFF?????
TT-T-TTTTTT-----
--:-- / 6
TFFFFFFFTFFFFTTT
TTTTTTTTTTTTTTTT
--:P- / 11
TFFFFFFFTFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFFFFTFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFFFFTFFFFTTT
TTTTTTTTTTTTTTTT
--:-M / 11
6b

TFFFFFFF? FF? FF? F (expected value)

2.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 0 2.00 1.00 0 2.00 (confidence rate)

TFFFFFFF?FF?F??F
TTTTTTTT?TT?T-?T
--:-- / 8
TFFFFFFF?FF?FF?F
TTTTTTTT?TT?TT?T
--:-- / 9
????????????????
--------?--?--?-
--:-- / 0
????????????????
--------?--?--?-
--:-- / 0
?F??????????????
-T------?--?--?-
--:-- / 1
?F??????????????
-T------?--?--?-
--:-- / 1
????????????????
--------?--?--?-
--:-- / 0
????????????????
--------?--?--?-
--:-- / 0
7a

FTTFFFFTTFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
7b

TFFFFFFFTFTFFTFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFFFFFFTFTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 11
TFFFFFFFT?TFFTFF
TTTTTTTTT-TTTTTT
--:-- / 10
TFFFFFFFT?TFFTFF
TTTTTTTTT-TTTTTT
--:-- / 10
TFFFFFFFT?TFFTFF
TTTTTTTTT-TTTTTT
--:-- / 10
CC

0
DNF

0
TFFFFFFFT?TFFTFF
TTTTTTTTT-TTTTTT
--:-- / 10
TFFFFFFFT?TFFTFF
TTTTTTTTT-TTTTTT
--:-- / 10
CloudReconfiguration — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 142 152 90 90 106 35 90 90
Road Runner 3 11 0 0 2 0 0 1
Camel 1 14 0 0 2 0 0 0
301

FFFTFFFFFFFTFFFF (expected value)

7.00 8.00 8.00 8.00 8.00 7.00 5.00 6.00 6.00 7.00 6.00 6.00 6.00 6.00 8.00 8.00 (confidence rate)

?FFTFF?FF?FTFFFF
-TTTTT-TT-TTTTTT
--:-- / 6
FFFTFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 7
FFFTFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFF???F????FF
TTTTTT---T----TT
--:-- / 4
FFFTF????F????FF
TTTTT----T----TT
--:-- / 4
FFFTFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
302

FFFTFFFFFFFFTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFTFFFF?FFFTFTF
TTTTTTTT-TTTTTTT
--:-- / 7
FFFTFFFFFF?FTFTF
TTTTTTTTTT-TTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 7
FFFTFFFF?F??????
TTTTTTTT-T------
--:-- / 4
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
303

FFTFFFFFFFFTFFFF (expected value)

8.00 8.00 8.00 7.00 8.00 7.00 7.00 7.00 7.00 7.00 8.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FFT?FFFFFFFTFFFF
TTT-TTTTTTTTTTTT
--:-- / 7
FFTFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 7
FFTFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FFTFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FFTFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FFTFF?????F?????
TTTTT-----T-----
--:-- / 3
FFTFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FFTFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
304

TFFFFFFFTFFTTFFF (expected value)

8.00 8.00 8.00 8.00 7.00 6.00 6.00 6.00 7.00 7.00 7.00 6.00 7.00 6.00 6.00 6.00 (confidence rate)

TFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:PM / 7
TFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFF???TFF?T???
TTTTT---TTT-T---
--:-- / 4
TFFF????????????
TTTT------------
--:-- / 2
TFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
305

TFFTFTFFFFF? FFFF (expected value)

4.00 4.00 2.00 3.00 2.00 3.00 3.00 3.00 1.00 3.00 3.00 0 2.00 2.00 1.00 1.00 (confidence rate)

TFFT?TFF?FF?FF??
TTTT-TTT-TT?TT--
--:-- / 5
TF?TFTFFFFF?FFFF
TT-TTTTTTTT?TTTT
--:-- / 6
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
TFFTFTFF?FF?????
TTTTTTTT-TT?----
--:-- / 5
TF??????????????
TT---------?----
--:-- / 1
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
306

FFFTFFTTFFFTFTFF (expected value)

4.00 3.00 4.00 4.00 3.00 2.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFTF??TFFFTFTFF
TTTTT--TTTTTTTTT
--:-- / 6
FFFTFFTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:PM / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTFFTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 7
F?FT????????????
T-TT------------
--:-- / 1
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
307

FFFFFFTFFFFFFFFF (expected value)

3.00 4.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

?F?FFFTFF?FFFFFF
-T-TTTTTT-TTTTTT
--:-- / 6
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FF??????????????
TT--------------
--:-- / 1
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
308

FFTFFFFFFTFTFFFF (expected value)

2.00 4.00 2.00 2.00 2.00 2.00 3.00 1.00 2.00 2.00 3.00 2.00 1.00 2.00 3.00 3.00 (confidence rate)

FFTFFFFFFTFT?FFF
TTTTTTTTTTTT-TTT
--:-- / 7
FFTFFFF?FTFTFFFF
TTTTTTT-TTTTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
?F????F???F???FF
-T----T---T---TT
--:-- / 2
?F??????????????
-T--------------
--:-- / 0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
309

FFFFFFTFFTFFFTTF (expected value)

8.00 8.00 7.00 7.00 6.00 6.00 6.00 7.00 5.00 7.00 5.00 7.00 7.00 7.00 6.00 7.00 (confidence rate)

FFFFFFTF?T?FFTTF
TTTTTTTT-T-TTTTT
--:-- / 6
FFFFFFTFFTFFFTTF
TTTTTTTTTTTTTTTT
--:-M / 7
FFFFFFTFFTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FFFFFFTFFTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FFFF???F?T?FFT?F
TTTT---T-T-TTT-T
--:-- / 5
FF??????????????
TT--------------
--:-- / 1
FFFFFFTFFTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FFFFFFTFFTFFFTTF
TTTTTTTTTTTTTTTT
--:P- / 7
310

FTFTFFTFFFFFFFFF (expected value)

8.00 8.00 8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 1.00 7.00 7.00 6.00 6.00 6.00 (confidence rate)

FTFTFFTFFF?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 7
FTFTFFTFFF?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 7
FTFTFFTFFF?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 7
FTFTFFTFFF?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 7
FTFTFFTFFFFFF???
TTTTTTTTTTTTT---
--:-- / 6
FTF?????????????
TTT-------------
--:-- / 1
FTFTFFTFFF?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 7
FTFTFFTFFF?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 7
311

FTTTFFFTFTFFFTTF (expected value)

3.00 4.00 4.00 1.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

?TT?FFFTFTFFFTTF
-TT-TTTTTTTTTTTT
--:-- / 6
FTT?FFFTFTFFFTTF
TTT-TTTTTTTTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTTTFFFTFTFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 7
FTT?F???????????
TTT-T-----------
--:-- / 2
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
312

TFFFFFTTFTFFTTFT (expected value)

8.00 8.00 8.00 7.00 2.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

TFFF?FTTFTFFTTFT
TTTT-TTTTTTTTTTT
--:-- / 7
TFFFFFTTFTFFTTFT
TTTTTTTTTTTTTTTT
--:PM / 7
TFFF?FTTFTFFTTFT
TTTT-TTTTTTTTTTT
--:-- / 7
TFFF?FTTFTFFTTFT
TTTT-TTTTTTTTTTT
--:-- / 7
TFFFFFTTFTFFTTFT
TTTTTTTTTTTTTTTT
--:-- / 7
TFF?????????????
TTT-------------
--:-- / 1
TFFF?FTTFTFFTTFT
TTTT-TTTTTTTTTTT
--:-- / 7
TFFF?FTTFTFFTTFT
TTTT-TTTTTTTTTTT
--:-- / 7
313

FFFTFTFFTFTFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 6.00 5.00 6.00 8.00 8.00 8.00 (confidence rate)

FFFTFTFFT?T?FFFT
TTTTTTTTT-T-TTTT
--:-- / 6
FFFTFTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:PM / 7
FFFTFTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTFFT????FFT
TTTTTTTTT----TTT
--:-- / 5
FFFTFTFFT????FFT
TTTTTTTTT----TTT
--:-- / 5
FFFTFTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
314

TFFFTTTTFFFFFFTF (expected value)

8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFFTTTT?FFFFFTF
TTTTTTTT-TTTTTTT
--:-- / 7
TFFFTTTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 7
TFFFTTTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFTTTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFTTTTFFFF????
TTTTTTTTTTTT----
--:-- / 5
T???????????????
T---------------
--:-- / 0
TFFFTTTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFTTTTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 7
315

FFFTFTTFFFFFTTFF (expected value)

3.00 3.00 4.00 4.00 3.00 3.00 3.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 2.00 2.00 (confidence rate)

??FTFTTF?FFFTTFF
--TTTTTT-TTTTTTT
--:-- / 6
FFFTFTTFFFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTFTTFFF?FTT??
TTTTTTTTTT-TTT--
--:-- / 6
FFFT????????????
TTTT------------
--:-- / 2
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
316

TTTFTFTTFFFTFTTF (expected value)

7.00 8.00 8.00 8.00 2.00 7.00 6.00 7.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TTTF?FTTF?FTFTTF
TTTT-TTTT-TTTTTT
--:-- / 6
?TTFTFTTFFFTFTTF
-TTTTTTTTTTTTTTT
--:-- / 7
TTTF?FTTFFFTFTTF
TTTT-TTTTTTTTTTT
--:-- / 7
TTTF?FTTFFFTFTTF
TTTT-TTTTTTTTTTT
--:-- / 7
TTTFTF?T????????
TTTTTT-T--------
--:-- / 3
TTTF????????????
TTTT------------
--:-- / 2
TTTF?FTTFFFTFTTF
TTTT-TTTTTTTTTTT
--:-- / 7
TTTF?FTTFFFTFTTF
TTTT-TTTTTTTTTTT
--:-- / 7
317

FTFTTTTFFFTTTFFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 2.00 7.00 6.00 6.00 2.00 6.00 6.00 (confidence rate)

FTFTTTTFFFTTTFFF
TTTTTTTTTTTTTTTT
--:P- / 7
FTFTTTTFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-M / 7
FTFTTTTFF?TTT?FF
TTTTTTTTT-TTT-TT
--:-- / 6
FTFTTTTFF?TTT?FF
TTTTTTTTT-TTT-TT
--:-- / 6
FTFTTTTFF?T?????
TTTTTTTTT-T-----
--:-- / 5
CC

0
FTFTTTTFF?TTT?FF
TTTTTTTTT-TTT-TT
--:-- / 6
FTFTTTTFF?TTT?FF
TTTTTTTTT-TTT-TT
--:-- / 6
318

TFTFTFFFTTTFFFFF (expected value)

8.00 8.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 5.00 6.00 6.00 (confidence rate)

TFTFTFFFTTTF??FF
TTTTTTTTTTTT--TT
--:-- / 6
TFTFTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 7
TFTFTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFTFTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFT?????????????
TTT-------------
--:-- / 1
TF??????????????
TT--------------
--:-- / 1
TFTFTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFTFTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 7
319

FFFTFTFFTFFTFTFT (expected value)

8.00 7.00 8.00 8.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 (confidence rate)

F?FT?TFFTFFTFT?T
T-TT-TTTTTTTTT-T
--:-- / 6
FFFTFTFFTFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 7
FFFTFTFFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTFFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTFFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFT????????????
TTTT------------
--:-- / 2
FFFTFTFFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTFFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 7
320

FFTFTFFTTTFTTFFT (expected value)

8.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 7.00 7.00 (confidence rate)

FFTFTFFTTTFTTFFT
TTTTTTTTTTTTTTTT
--:P- / 7
FFTFTFFTTTFTTFFT
TTTTTTTTTTTTTTTT
--:-M / 7
FFTFTFFTTTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFTFTFFTTTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFTF??????????FT
TTTT----------TT
--:-- / 3
F???????????????
T---------------
--:-- / 0
FFTFTFFTTTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFTFTFFTTTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 7
401

FFTFFFTFTFFFFTFF (expected value)

4.00 4.00 4.00 2.00 1.00 3.00 3.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFTFFFTFTFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 7
FFTF?FT?TFFFFTFF
TTTT-TT-TTTTTTTT
--:-- / 6
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFT??FT?????????
TTT--TT---------
--:-- / 2
FFT?????????????
TTT-------------
--:-- / 1
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
402

TFFFTTTTFTT? FFFT (expected value)

4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate)

TFFFTTTTFTT?FFFT
TTTTTTTTTTT?TTTT
--:-- / 7
TFFFTTTTFTT?FFFT
TTTTTTTTTTT?TTTT
--:-- / 7
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
TF??????????????
TT---------?----
--:-- / 1
TF??????????????
TT---------?----
--:-- / 1
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
DES — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 147 146 96 96 148 139 74 74
Road Runner 4 11 0 0 0 0 0 0
Camel 3 12 0 0 0 0 0 0
00a

TTFFFFFFTFFFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 8
TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
00b

FFFTTTTFTFTFFFFF (expected value)

8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 6.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FF?TTTTFT??FFFFF
TT-TTTTTT--TTTTT
--:-- / 6
FFFTTTTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FF?TTTTFT?TFFFFF
TT-TTTTTT-TTTTTT
--:-- / 7
FF?TTTTFT?TFFFFF
TT-TTTTTT-TTTTTT
--:-- / 7
FFFTTTTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FF?TTTTFT???????
TT-TTTTTT-------
--:-- / 4
FFFTTTTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
01a

TFFTFTFTFFTTFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFTFTFFTTFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
TFFTFTFTFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
TFFTFTFTFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFTFTFTFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
01b

TFFFTFTFFFTTFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFTFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TFFFTFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
02a

FFTTFTTTTFFFFTTT (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

F?TTFTTTTFFFFTTT
T-TTTTTTTTTTTTTT
--:-- / 7
FFTTFTTTTFFFFTTT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FFTTFTTTTFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFTTFTTTTFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
02b

TFTFFTFTTFFTFFFT (expected value)

4.00 4.00 4.00 3.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTF?TFTTFFTFFFT
TTTT-TTTTTTTTTTT
--:-- / 7
TFTFFTFTTFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TFT??TFTTFFTFFFT
TTT--TTTTTTTTTTT
--:-- / 7
TFTF?TFTTFFTFFFT
TTTT-TTTTTTTTTTT
--:-- / 7
CC

0
CC

0
05a

FTFFFFFFFTFFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
05b

FFTF? FFF? F? FTFTT (expected value)

4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 0 4.00 0 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFTF?FFF?F?FTFTT
TTTT?TTT?T?TTTTT
--:-- / 6
FFTF?FFF?F?FTFTT
TTTT?TTT?T?TTTTT
--:-- / 6
CC

0
CC

0
FFTF?FFF?F??????
TTTT?TTT?T?-----
--:-- / 4
FFTF?FFF?F??????
TTTT?TTT?T?-----
--:-- / 4
CC

0
CC

0
10a

FTFFFTFFTFFTFFTF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FTFFFTFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
FTFFFTFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
10b

FT? F? FFFTTFFFFTF (expected value)

4.00 4.00 0 4.00 0 4.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 (confidence rate)

FT?F?FFFTTFFFFTF
TT?T?TTTTTTTTTTT
--:-- / 7
FT?F?F?FTTFFFFTF
TT?T?T-TTTTTTTTT
--:-- / 6
????????????????
--?-?-----------
--:-- / 0
????????????????
--?-?-----------
--:-- / 0
FT?F?F?FTTFFF?TF
TT?T?T-TTTTTT-TT
--:-- / 6
FT?F?F??????????
TT?T?T----------
--:-- / 2
DNF

0
DNF

0
20a

FFTTFFFFFFFTFTTT (expected value)

8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTTFFFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 8
FFTT?FFFFFFTFTTT
TTTT-TTTTTTTTTTT
--:-- / 7
FFTTFFFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFTTFFFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFTTFFFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFTTFFFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFTTFFFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFTTFFFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
20b

TFTFFTTTFFTFTFFF (expected value)

8.00 1.00 5.00 2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 5.00 (confidence rate)

TFT?FTTTFFTFTFFF
TTT-TTTTTTTTTTTT
--:-- / 7
T???FTTTFFTFTFFF
T---TTTTTTTTTTTT
--:-- / 6
T?T?FTTTFFTFTFFF
T-T-TTTTTTTTTTTT
--:-- / 7
T?T?FTTTFFTFTFFF
T-T-TTTTTTTTTTTT
--:-- / 7
T?TFFTTTFFTFTF?F
T-TTTTTTTTTTTT-T
--:-- / 7
T?TFFTTTFFTFTF??
T-TTTTTTTTTTTT--
--:-- / 6
T???????????????
T---------------
--:-- / 0
T???????????????
T---------------
--:-- / 0
30a

FFFFFFFFTTFFFFF? (expected value)

8.00 8.00 8.00 6.00 8.00 8.00 7.00 7.00 8.00 8.00 8.00 7.00 7.00 8.00 3.00 0 (confidence rate)

FFF?FFFFTTFFFFF?
TTT-TTTTTTTTTTT?
--:-- / 7
FFF?FF??TTF??F??
TTT-TT--TTT--T-?
--:-- / 4
FFFFFFFFTTFFFF??
TTTTTTTTTTTTTT-?
--:-- / 7
FFFFFFFFTTFFFF??
TTTTTTTTTTTTTT-?
--:-- / 7
FFFFFFFFTTFFFFF?
TTTTTTTTTTTTTTT?
--:-- / 7
FFFFFFFFTTFFFFF?
TTTTTTTTTTTTTTT?
--:-- / 7
FFFFFFFFTTFFFF??
TTTTTTTTTTTTTT-?
--:-- / 7
FFFFFFFFTTFFFF??
TTTTTTTTTTTTTT-?
--:-- / 7
30b

TFFFFTFFFFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 (confidence rate)

TFFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 8
TFFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 8
TFFFFTFFFFFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 7
TFFFFTFFFFFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 7
TFFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 7
TFFFFTFFFFFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 7
40a

FFFFTFFFFFTTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFFFFFTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
40b

TFFTFTTFTFFFTTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 6.00 (confidence rate)

TFFTFTT?TFFFTTT?
TTTTTTT-TTTTTTT-
--:-- / 7
TFFTFTTFTFFFTTTF
TTTTTTTTTTTTTTTT
--:PM / 8
TFFTFTTFT?FFTTTF
TTTTTTTTT-TTTTTT
--:-- / 7
TFFTFTTFT?FFTTTF
TTTTTTTTT-TTTTTT
--:-- / 7
TFFTFTTFT?FFTTTF
TTTTTTTTT-TTTTTT
--:-- / 7
TFFTFTTFT?FFTTT?
TTTTTTTTT-TTTTT-
--:-- / 7
TFFTFTTFT?FFTTTF
TTTTTTTTT-TTTTTT
--:-- / 7
TFFTFTTFT?FFTTTF
TTTTTTTTT-TTTTTT
--:-- / 7
50a

FFFTTTFTFFTFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
50b

FTFFFFTTTFFTFTTT (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FTFFFF?TTFFTFTTT
TTTTTT-TTTTTTTTT
--:-- / 7
FTFFFFTTTFFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 8
FTFFFFTTTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFTTTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFTTTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFTTTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
60a

TFFFFFFTFFFFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
TFFFFFFT?FFFFFTF
TTTTTTTT-TTTTTTT
--:-- / 7
TFFFFFFT?FFFFFTF
TTTTTTTT-TTTTTTT
--:-- / 7
TFFFFFFT?FFFFFTF
TTTTTTTT-TTTTTTT
--:-- / 7
TFFFFFFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFT?FFFFFTF
TTTTTTTT-TTTTTTT
--:-- / 7
TFFFFFFT?FFFFFTF
TTTTTTTT-TTTTTTT
--:-- / 7
60b

TFFFFFFFFF? FFF? F (expected value)

8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 1.00 8.00 0 8.00 8.00 8.00 0 7.00 (confidence rate)

TFFFFFFF?F?FFF?F
TTTTTTTT-T?TTT?T
--:-- / 6
TFFFF?FFFF?FFF?F
TTTTT-TTTT?TTT?T
--:-- / 6
TFFFFFFF?F?FFF?F
TTTTTTTT-T?TTT?T
--:-- / 6
TFFFFFFF?F?FFF?F
TTTTTTTT-T?TTT?T
--:-- / 6
TFFFFFFF?F?FFF?F
TTTTTTTT-T?TTT?T
--:-- / 6
TFFFFFFF?F?FFF??
TTTTTTTT-T?TTT?-
--:-- / 6
TFFFFFFF?F?FFF?F
TTTTTTTT-T?TTT?T
--:-- / 6
TFFFFFFF?F?FFF?F
TTTTTTTT-T?TTT?T
--:-- / 6
DLCround — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 139 146 102 102 90 88 118 118
Road Runner 1 5 0 0 6 1 0 0
Camel 0 6 0 0 0 2 1 4
03a

FTFTFFFTTTFTFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFTFFFT??FTFFTT
TTTTTTTT--TTTTTT
--:-- / 6
FTFTFFFTTTFTFFTT
TTTTTTTTTTTTTTTT
--:PM / 7
FTFTFFFT??FTFFTT
TTTTTTTT--TTTTTT
--:-- / 6
FTFTFFFT??FTFFTT
TTTTTTTT--TTTTTT
--:-- / 6
FTFTFFFTTTFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 7
FTFTFFFTTTFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 7
FTFTFFFTTTFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 7
FTFTFFFTTTFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 7
03b

TFFFFFTFFTFF? FTT (expected value)

6.00 1.00 6.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 3.00 0 2.00 5.00 5.00 (confidence rate)

T?FFFFTFFTFF??TT
T-TTTTTTTTTT?-TT
--:-- / 6
TFFFFFTFFTF??FTT
TTTTTTTTTTT-?TTT
--:-- / 6
T?FFFFTFFTFF??TT
T-TTTTTTTTTT?-TT
--:-- / 6
T?FFFFTFFTFF??TT
T-TTTTTTTTTT?-TT
--:-- / 6
T?F?FFTFFTF??FTT
T-T-TTTTTTT-?TTT
--:-- / 5
T?F?????????????
T-T---------?---
--:-- / 1
CC

0
CC

0
04a

FTFTTTFFFTTFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 3.00 (confidence rate)

FTFTTTFFFT?FFFF?
TTTTTTTTTT-TTTT-
--:-- / 6
FTFTTTFFFT?FFFFT
TTTTTTTTTT-TTTTT
--:-- / 7
FTFTTTFFFT?FFFF?
TTTTTTTTTT-TTTT-
--:-- / 6
FTFTTTFFFT?FFFF?
TTTTTTTTTT-TTTT-
--:-- / 6
FTFTTTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:P- / 7
FTFTTTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:-M / 7
FTFTTTFFFT?FFFF?
TTTTTTTTTT-TTTT-
--:-- / 6
FTFTTTFFFT?FFFF?
TTTTTTTTTT-TTTT-
--:-- / 6
04b

FFFFTTFFFTF? ? FFF (expected value)

4.00 4.00 2.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 1.00 0 0 2.00 1.00 2.00 (confidence rate)

FF??TTFFFTF??F?F
TT--TTTTTTT??T-T
--:-- / 5
FF??TTFFFT???FFF
TT--TTTTTT-??TTT
--:-- / 5
????????????????
-----------??---
--:-- / 0
????????????????
-----------??---
--:-- / 0
FFFFT???????????
TTTTT------??---
--:-- / 2
FFFF????????????
TTTT-------??---
--:-- / 2
CC

0
CC

0
05a

FFFTTTFFTTFTTFTT (expected value)

8.00 8.00 6.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTT?FFTTFTTFTT
TTTTT-TTTTTTTTTT
--:-- / 7
FFFTT?FFTTFTTFTT
TTTTT-TTTTTTTTTT
--:-- / 7
FF?TT?FFTTFTTFTT
TT-TT-TTTTTTTTTT
--:-- / 6
FF?TT?FFTTFTTFTT
TT-TT-TTTTTTTTTT
--:-- / 6
FFFTTTFFTTFTTFTT
TTTTTTTTTTTTTTTT
--:P- / 7
FFFTTTFFTTFTTFTT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTTTFFTTFTTFTT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTTTFFTTFTTFTT
TTTTTTTTTTTTTTTT
--:-M / 7
05b

FTFTF? FFFFFTFFTF (expected value)

7.00 7.00 6.00 6.00 7.00 0 7.00 6.00 6.00 6.00 1.00 6.00 6.00 7.00 7.00 6.00 (confidence rate)

FTFTF?FFFFFTFFTF
TTTTT?TTTTTTTTTT
--:-- / 7
FTFTF?FFFF?TFFTF
TTTTT?TTTT-TTTTT
--:-- / 6
FTFTF?FFFF?TFFTF
TTTTT?TTTT-TTTTT
--:-- / 6
FTFTF?FFFF?TFFTF
TTTTT?TTTT-TTTTT
--:-- / 6
CC

0
FT??F?F??????FT?
TT--T?T------TT-
--:-- / 3
FTFTF?FFFF?TFFTF
TTTTT?TTTT-TTTTT
--:-- / 6
FTFTF?FFFF?TFFTF
TTTTT?TTTT-TTTTT
--:-- / 6
06a

FTFTTFTFTTFTFTTF (expected value)

8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

F?FTTFTFTTFTFTTF
T-TTTTTTTTTTTTTT
--:-- / 7
FTFTTFTFTTFTFTTF
TTTTTTTTTTTTTTTT
--:PM / 7
F?FTTFTFTTFTFTTF
T-TTTTTTTTTTTTTT
--:-- / 7
F?FTTFTFTTFTFTTF
T-TTTTTTTTTTTTTT
--:-- / 7
FTFTTFTFTTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FTFTTFTFTTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FTFTTFTFTTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FTFTTFTFTTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 7
06b

FFFFTFTFFFFFFFFF (expected value)

6.00 6.00 1.00 6.00 6.00 7.00 6.00 6.00 6.00 7.00 6.00 6.00 6.00 1.00 7.00 6.00 (confidence rate)

FFFFTFTFFFFFF?FF
TTTTTTTTTTTTT-TT
--:-- / 7
FF?FTFTFFFFFFFFF
TT-TTTTTTTTTTTTT
--:-- / 7
FF?FTFTFFFFFF?FF
TT-TTTTTTTTTT-TT
--:-- / 6
FF?FTFTFFFFFF?FF
TT-TTTTTTTTTT-TT
--:-- / 6
CC

0
?????F???F????F?
-----T---T----T-
--:-- / 1
FF?FTFTFFFFFF?FF
TT-TTTTTTTTTT-TT
--:-- / 6
FF?FTFTFFFFFF?FF
TT-TTTTTTTTTT-TT
--:-- / 6
07a

FFFTFTTTFFFTTTTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 5.00 5.00 6.00 6.00 6.00 6.00 6.00 4.00 6.00 6.00 (confidence rate)

FFFTFT??FFFTT?TT
TTTTTT--TTTTT-TT
--:-- / 6
FFFTFTTTFFFTT?TT
TTTTTTTTTTTTT-TT
--:-- / 7
FFFTFT??????????
TTTTTT----------
--:-- / 3
FFFTFT??????????
TTTTTT----------
--:-- / 3
FFFTFTTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:P- / 7
FFFTFTTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:-M / 7
07b

FFFFFFTFFFFFFF? T (expected value)

7.00 8.00 6.00 6.00 6.00 6.00 8.00 7.00 6.00 6.00 8.00 7.00 6.00 6.00 0 8.00 (confidence rate)

FFFFFFTFFFFFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
FFFFFFTFFFFFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
FFFFFFTFFFFFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
FFFFFFTFFFFFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
FF????T???FF???T
TT----T---TT--?T
--:-- / 3
?F????TF??F????T
-T----TT--T---?T
--:-- / 2
FFFFFFTFFFFFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
FFFFFFTFFFFFFF?T
TTTTTTTTTTTTTT?T
--:-- / 7
08a

TFFFTTFFFFFFTTFF (expected value)

8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFF?TFFFFFFTTFF
TTTT-TTTTTTTTTTT
--:-- / 7
TFFF?TFFFFFFTTFF
TTTT-TTTTTTTTTTT
--:-- / 7
TFFF?TFFFFFFTTFF
TTTT-TTTTTTTTTTT
--:-- / 7
TFFF?TFFFFFFTTFF
TTTT-TTTTTTTTTTT
--:-- / 7
TFFFTTFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:P- / 7
TFFFTTFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 7
TFFFTTFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-M / 7
TFFFTTFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 7
08b

FTTFFFFTFTTFFFFT (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FTTFFFFTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FTTFFFFTFTTFFFFT
TTTTTTTTTTTTTTTT
--:PM / 7
FTTFFFFTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FTTFFFFTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
CC

0
CC

0
FTTFFFFTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FTTFFFFTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
09a

FFFFFFTFTFTFTTTT (expected value)

8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 (confidence rate)

FFFFFFTF?FTFTTT?
TTTTTTTT-TTTTTT-
--:-- / 6
FFF?FFTFTFTFTTTT
TTT-TTTTTTTTTTTT
--:-- / 7
FFF?FFTF?FTFTTT?
TTT-TTTT-TTTTTT-
--:-- / 6
FFF?FFTF?FTFTTT?
TTT-TTTT-TTTTTT-
--:-- / 6
FFFFFFTFTFTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFFFFTFTFTFTTTT
TTTTTTTTTTTTTTTT
--:P- / 7
FFFFFFTFTFTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFFFFTFTFTFTTTT
TTTTTTTTTTTTTTTT
--:-M / 7
09b

FTFFTTTFT? FFFF? F (expected value)

6.00 6.00 2.00 6.00 7.00 5.00 6.00 6.00 7.00 0 2.00 6.00 6.00 6.00 0 6.00 (confidence rate)

FTFFTTTFT?FFFF?F
TTTTTTTTT?TTTT?T
--:-- / 6
FTFFT?TFT?FFFF?F
TTTTT-TTT?TTTT?T
--:-- / 6
FT?FTTTFT??FFF?F
TT-TTTTTT?-TTT?T
--:-- / 5
FT?FTTTFT??FFF?F
TT-TTTTTT?-TTT?T
--:-- / 5
????T???T???????
----T---T?----?-
--:-- / 1
CC

0
FT?FTTTFT??FFF?F
TT-TTTTTT?-TTT?T
--:-- / 5
FT?FTTTFT??FFF?F
TT-TTTTTT?-TTT?T
--:-- / 5
10a

TFFTTFTTFFTFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTTF??FFTFTFFF
TTTTTT--TTTTTTTT
--:-- / 6
TFFTTF?TFFTFTFFF
TTTTTT-TTTTTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TFFTTFTTFFTFTFFF
TTTTTTTTTTTTTTTT
--:P- / 7
TFFTTFTTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-M / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
10b

TFTFF? F? FTFFFFFF (expected value)

6.00 6.00 6.00 6.00 6.00 0 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFTFF?F?FTFFFFFF
TTTTT?T?TTTTTTTT
--:-- / 6
TFTFF?F?FTFFFFFF
TTTTT?T?TTTTTTTT
--:-- / 6
TFTFF?F?FTFFFFFF
TTTTT?T?TTTTTTTT
--:-- / 6
TFTFF?F?FTFFFFFF
TTTTT?T?TTTTTTTT
--:-- / 6
CC

0
CC

0
TFTFF?F?FTFFFFFF
TTTTT?T?TTTTTTTT
--:-- / 6
TFTFF?F?FTFFFFFF
TTTTT?T?TTTTTTTT
--:-- / 6
11a

FTFFFFFTFFFTFFFT (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 5.00 6.00 6.00 (confidence rate)

FTFFFFFTFFF?FFFT
TTTTTTTTTTT-TTTT
--:-- / 7
FTFFFFFTFFFTF?FT
TTTTTTTTTTTTT-TT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:P- / 7
FTFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FTFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FTFFFFFTFFFTFFFT
TTTTTTTTTTTTTTTT
--:-M / 7
11b

FTTFFFFFFTF? TFTT (expected value)

2.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 3.00 2.00 0 3.00 2.00 3.00 3.00 (confidence rate)

FTTFFFFF?TF?TFTT
TTTTTTTT-TT?TTTT
--:-- / 6
FTTFFFFFFTF?TFTT
TTTTTTTTTTT?TTTT
--:-- / 7
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
?T??????????????
-T---------?----
--:-- / 0
?T???????T??T?TT
-T-------T-?T-TT
--:-- / 2
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
12a

FTTTFFFFTFTFTFFF (expected value)

8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 (confidence rate)

FTT?FFFF?FTF?FFF
TTT-TTTT-TTT-TTT
--:-- / 6
FTTTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 7
FTT?FFFF?FTF?FFF
TTT-TTTT-TTT-TTT
--:-- / 6
FTT?FFFF?FTF?FFF
TTT-TTTT-TTT-TTT
--:-- / 6
FTTTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FTTTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FTTTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
FTTTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 7
12b

FFFTFTTTTTFFFFFT (expected value)

6.00 6.00 8.00 6.00 6.00 6.00 7.00 7.00 6.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:P- / 7
FFFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-M / 7
FFFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
??F???TT?T??????
--T---TT-T------
--:-- / 2
??F?????????????
--T-------------
--:-- / 0
FFFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
FFFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 7
13a

FTTFFTTFFFFTTTTF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 5.00 6.00 6.00 6.00 (confidence rate)

FTTFFTTFFFF??TTF
TTTTTTTTTTT--TTT
--:-- / 6
FTTFFTTFFFFTTTTF
TTTTTTTTTTTTTTTT
--:PM / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTTFFTTFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FTTFFTTFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FTTFFTTFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 7
FTTFFTTFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 7
13b

FT? TFFTTFF? TFT? F (expected value)

6.00 6.00 0 6.00 2.00 1.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 0 6.00 (confidence rate)

FT?TF?TTFF?TFT?F
TT?TT-TTTT?TTT?T
--:-- / 5
FT?T?FTTFF?TFT?F
TT?T-TTTTT?TTT?T
--:-- / 5
FT?T??TTFF?TFT?F
TT?T--TTTT?TTT?T
--:-- / 5
FT?T??TTFF?TFT?F
TT?T--TTTT?TTT?T
--:-- / 5
????F???????????
--?-T-----?---?-
--:-- / 0
CC

0
FT?T??TTFF?TFT?F
TT?T--TTTT?TTT?T
--:-- / 5
FT?T??TTFF?TFT?F
TT?T--TTTT?TTT?T
--:-- / 5
DLCshifumi — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 105 104 53 53 62 65 72 72
Road Runner 0 2 0 0 0 2 0 0
Camel 0 2 0 0 1 0 0 1
2a

FTTTFFFTFFTFTFFF (expected value)

8.00 8.00 5.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 5.00 8.00 4.00 8.00 8.00 8.00 (confidence rate)

FT?TFFF?FF?F?FFF
TT-TTTT-TT-T-TTT
--:-- / 10
FTTTFFFTFFTF?FFF
TTTTTTTTTTTT-TTT
--:-- / 12
FT?TFFF?FF?F?FFF
TT-TTTT-TT-T-TTT
--:-- / 10
FT?TFFF?FF?F?FFF
TT-TTTT-TT-T-TTT
--:-- / 10
FTTTFFFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 13
FTTTFFFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:P- / 13
FTTTFFFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 13
FTTTFFFTFFTFTFFF
TTTTTTTTTTTTTTTT
--:-M / 13
2b

T? FFFFFTFFFTFFFF (expected value)

7.00 0 6.00 6.00 6.00 7.00 6.00 6.00 7.00 6.00 6.00 7.00 6.00 6.00 6.00 6.00 (confidence rate)

T?FFFFFTFFFTFFFF
T?TTTTTTTTTTTTTT
--:-- / 12
T?FFFFFTFFFTFFFF
T?TTTTTTTTTTTTTT
--:-- / 12
T?FFFFFTFFFTFFFF
T?TTTTTTTTTTTTTT
--:-- / 12
T?FFFFFTFFFTFFFF
T?TTTTTTTTTTTTTT
--:-- / 12
CC

0
T????F??F??T????
T?---T--T--T----
--:-- / 3
T?FFFFFTFFFTFFFF
T?TTTTTTTTTTTTTT
--:-- / 12
T?FFFFFTFFFTFFFF
T?TTTTTTTTTTTTTT
--:-- / 12
3a

TTFFFFTTTFFTTFTT (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 5.00 6.00 (confidence rate)

TTFFFFTT?FF?TF?T
TTTTTTTT-TT-TT-T
--:-- / 10
TTFFFFTTTFFTTFTT
TTTTTTTTTTTTTTTT
--:PM / 13
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFFFFTTTFFTTFTT
TTTTTTTTTTTTTTTT
--:-- / 13
TTFFFFTTTFFTTFTT
TTTTTTTTTTTTTTTT
--:-- / 13
TTFFFFTTTFFTTFTT
TTTTTTTTTTTTTTTT
--:-- / 13
TTFFFFTTTFFTTFTT
TTTTTTTTTTTTTTTT
--:-- / 13
3b

FFFTFFTFFTFFTTFF (expected value)

1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate)

?FFTFFTFFTFFTTFF
-TTTTTTTTTTTTTTT
--:-- / 12
FFFTFFTFFTFFTTF?
TTTTTTTTTTTTTTT-
--:-- / 12
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
4a

FFTFFFTFTFFFTFTF (expected value)

8.00 6.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 6.00 8.00 8.00 (confidence rate)

FF?FFFTFTFFF?FTF
TT-TTTTTTTTT-TTT
--:-- / 11
FFTFFFTFTFFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 13
F??FFFTFTFFF??TF
T--TTTTTTTTT--TT
--:-- / 10
F??FFFTFTFFF??TF
T--TTTTTTTTT--TT
--:-- / 10
FFTFFFTFTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTFFFTFTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTFFFTFTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTFFFTFTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
4b

TFT? ? ? FTTF? TFFTF (expected value)

6.00 6.00 6.00 0 0 0 6.00 6.00 6.00 6.00 0 6.00 2.00 5.00 6.00 6.00 (confidence rate)

TFT???FTTF?TF?TF
TTT???TTTT?TT-TT
--:-- / 9
TFT???FTTF?TFFTF
TTT???TTTT?TTTTT
--:-- / 10
TFT???FTTF?T?FTF
TTT???TTTT?T-TTT
--:-- / 9
TFT???FTTF?T?FTF
TTT???TTTT?T-TTT
--:-- / 9
CC

0
DNF

0
TFT???FTTF?T?FTF
TTT???TTTT?T-TTT
--:-- / 9
TFT???FTTF?T?FTF
TTT???TTTT?T-TTT
--:-- / 9
5a

TFFFFFTFFTTTTTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 3.00 4.00 (confidence rate)

TFFFFFTFF?T?TTFF
TTTTTTTTT-T-TTTT
--:-- / 11
TFFFFFTFFTTTTT?F
TTTTTTTTTTTTTT-T
--:-- / 12
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TFFFFFTFFTTTTTFF
TTTTTTTTTTTTTTTT
--:-M / 13
TFFFFFTFFTTTTTFF
TTTTTTTTTTTTTTTT
--:P- / 13
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
5b

FFFTTFTFFFF? F? TF (expected value)

1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 0 2.00 2.00 (confidence rate)

F?FTTFTFFFF?F?TF
T-TTTTTTTTT?T?TT
--:-- / 10
?FFTTFTFFFF?F?TF
-TTTTTTTTTT?T?TT
--:-- / 10
????????????????
-----------?-?--
--:-- / 0
????????????????
-----------?-?--
--:-- / 0
CC

0
DNF

0
????????????????
-----------?-?--
--:-- / 0
????????????????
-----------?-?--
--:-- / 0
6a

TTTFFFTFFTTT? FTF (expected value)

4.00 2.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 3.00 3.00 4.00 0 2.00 1.00 2.00 (confidence rate)

T?TFFF?FF??T?F?F
T-TTTT-TT--T?T-T
--:-- / 8
T?TFFF?FFTTT?FTF
T-TTTT-TTTTT?TTT
--:-- / 10
????????????????
------------?---
--:-- / 0
????????????????
------------?---
--:-- / 0
TTTFFFTFFTTT????
TTTTTTTTTTTT?---
--:-- / 10
TTTFFFTFFTTT????
TTTTTTTTTTTT?---
--:-- / 10
????????????????
------------?---
--:-- / 0
????????????????
------------?---
--:-- / 0
6b

TTTTTFFTFFFFTTF? (expected value)

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 (confidence rate)

TTTTTFFTFFFFTTF?
TTTTTTTTTTTTTTT?
--:-- / 12
CC

0
TTTTTFFTFFFFTTF?
TTTTTTTTTTTTTTT?
--:-- / 12
TTTTTFFTFFFFTTF?
TTTTTTTTTTTTTTT?
--:-- / 12
CC

0
DNF

0
TTTTTFFTFFFFTTF?
TTTTTTTTTTTTTTT?
--:-- / 12
TTTTTFFTFFFFTTF?
TTTTTTTTTTTTTTT?
--:-- / 12
DNAwalker — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 143 142 119 119 144 144 119 119
Road Runner 10 2 0 0 3 3 0 0
Camel 10 5 0 0 1 1 1 0
01track12Block1

FFFFTTTTFTFTTTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTTTFTFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 8
02track12Block2

FFFFFFTTFFTTTFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFTTFFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
03track12BlockBoth

FFFFFTTFTTFFTFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTTFTTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
04track28LL

TFFFFTFFFFTTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
05track28LR

FFFFFFFFFTTFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 (confidence rate)

FFFFFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFTTFFF?F
TTTTTTTTTTTTTT-T
--:-- / 8
FFFFFFFFFTTFFF?F
TTTTTTTTTTTTTT-T
--:-- / 8
FFFFFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
06track28RL

TFFFTTFFFFTFTTFF (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?FFFTTFFFFTFTTFF
-TTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFFFFTFTTFF
TTTTTTTTTTTTTTTT
--:-M / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TFFFTTFFFFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFFFFTFTTFF
TTTTTTTTTTTTTTTT
--:P- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
07track28RR

TFFFFTFFTFFFTTFF (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?FFFFTFFTFFFTTFF
-TTTTTTTTTTTTTTT
--:-- / 8
TFFFFTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-M / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TFFFFTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:P- / 8
TFFFFTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
08ringLL

FFFTTTFTFTTFTFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTTFTFTTFTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
09ringLR

FTFFFTTTFFFTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 (confidence rate)

FTFFFTTTFFFTF?FF
TTTTTTTTTTTTT-TT
--:-- / 8
FTFFFTTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-M / 8
FTFFFTTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:P- / 8
FTFFFTTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFTTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
10ringRL

TFFFTFFTTTTTTFFF (expected value)

8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate)

TF?FTFFT?TTT?FFF
TT-TTTTT-TTT-TTT
--:-- / 7
TFFFTFFTTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TF?FTFFTTTTTTFFF
TT-TTTTTTTTTTTTT
--:-- / 8
TF?FTFFTTTTTTFFF
TT-TTTTTTTTTTTTT
--:-- / 8
TFFFTFFTTTTTTFFF
TTTTTTTTTTTTTTTT
--:P- / 8
TFFFTFFTTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFFTTTTTTFFF
TTTTTTTTTTTTTTTT
--:-M / 8
TFFFTFFTTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
11ringRR

FTFFFFFFTFFFTTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 8
FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
12ringLLLarge

FFFFFFTFFFTFTFFF (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
?FFFFFTF?FTFTFFF
-TTTTTTT-TTTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
13ringRLLarge

TFFTFFTTFFTFFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFTFFT?FFTFFFTT
TTTTTTT-TTTTTTTT
--:-- / 8
TFFTFFT?FFTFFFTT
TTTTTTT-TTTTTTTT
--:-- / 8
TFFTFFT?FFTFFFTT
TTTTTTT-TTTTTTTT
--:-- / 8
TFFTFFT?FFTFFFTT
TTTTTTT-TTTTTTTT
--:-- / 8
TFFTFFTTFFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 8
TFFTFFTTFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
TFFTFFT?FFTFFFTT
TTTTTTT-TTTTTTTT
--:-- / 8
TFFTFFT?FFTFFFTT
TTTTTTT-TTTTTTTT
--:-- / 8
14ringLRLarge

TFFFFFFFFTTTFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFFFF?TTFFTT
TTTTTTTTT-TTTTTT
--:-- / 8
TFFFFFFFFTTTFFTT
TTTTTTTTTTTTTTTT
--:PM / 8
TFFFFFFFF?TTFFTT
TTTTTTTTT-TTTTTT
--:-- / 8
TFFFFFFFF?TTFFTT
TTTTTTTTT-TTTTTT
--:-- / 8
TFFFFFFFFTTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFF?TTFFTT
TTTTTTTTT-TTTTTT
--:-- / 8
TFFFFFFFF?TTFFTT
TTTTTTTTT-TTTTTT
--:-- / 8
15ringRRLarge

FFFFFTFFFFFFFFFT (expected value)

8.00 8.00 4.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFF?FFFFFFFFFT
TTTTT-TTTTTTTTTT
--:-- / 8
FFFFF?FFFFFFFFFT
TTTTT-TTTTTTTTTT
--:-- / 8
FF?FF?FFFFFFFFFT
TT-TT-TTTTTTTTTT
--:-- / 7
FF?FF?FFFFFFFFFT
TT-TT-TTTTTTTTTT
--:-- / 7
FFFFFTFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFTFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FF?FF?FFFFFFFFFT
TT-TT-TTTTTTTTTT
--:-- / 7
FF?FF?FFFFFFFFFT
TT-TT-TTTTTTTTTT
--:-- / 7
16redondantChoiceR

FFFFFTTTFTFFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTT?FTFFTFFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFFFTTTFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFTT?FTFFTFFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFFFTT?FTFFTFFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFFFTT?FTFFTFFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFFFTT?FTFFTFFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFFFTT?FTFFTFFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFFFTT?FTFFTFFF
TTTTTTT-TTTTTTTT
--:-- / 8
17redondantChoiceL

FFFTFFFFFTFFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFTFFF?FT?FFTFF
TTTTTTT-TT-TTTTT
--:-- / 7
FFFTFFF?FTFFFTFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFTFFF?FTFFFTFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFTFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFFF?FTFFFTFF
TTTTTTT-TTTTTTTT
--:-- / 8
FFFTFFF?FTFFFTFF
TTTTTTT-TTTTTTTT
--:-- / 8
18lozangeBlock

FTFFFFTFFFFTTFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFFFTFFFFTTFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FTFFFFT?FFFTTFFT
TTTTTTT-TTTTTTTT
--:-- / 8
FTFFFFT?FFFTTFFT
TTTTTTT-TTTTTTTT
--:-- / 8
FTFFFFT?FFFTTFFT
TTTTTTT-TTTTTTTT
--:-- / 8
FTFFFFTFFFFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFTFFFFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFT?FFFTTFFT
TTTTTTT-TTTTTTTT
--:-- / 8
FTFFFFT?FFFTTFFT
TTTTTTT-TTTTTTTT
--:-- / 8
DatabaseWithMutex — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 59 0 13 0 0 13 13
Road Runner 0 2 0 0 0 0 0 0
Camel 0 2 0 0 0 0 0 0
02

FTTFFFTTFFFTTTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

DNC FTTFFFTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:PM / 13
DNC FTTFFFTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
FTTFFFTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
FTTFFFTTFFFTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
04

FFTTTTTTF? TFFTF? (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 0 (confidence rate)

DNC FFTTTTTTF?TFFTF?
TTTTTTTTT?TTTTT?
--:-- / 11
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
10

FTFFFFFFFFFFFFFF (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC FTFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 13
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
20

FFTFF? TFFTFFTFFF (expected value)

1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC FFTFF?TFFTFFTFFF
TTTTT?TTTTTTTTTT
--:-- / 12
DNC ????????????????
-----?----------
--:-- / 0
CC

0
CC

0
????????????????
-----?----------
--:-- / 0
????????????????
-----?----------
--:-- / 0
40

TFFFFF? TTT? FFF? F (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 0 1.00 1.00 1.00 0 1.00 (confidence rate)

DNC TFFFFF?TTT?FFF?F
TTTTTT?TTT?TTT?T
--:-- / 10
DNC ????????????????
------?---?---?-
--:-- / 0
CC

0
CC

0
????????????????
------?---?---?-
--:-- / 0
????????????????
------?---?---?-
--:-- / 0
DatabaseWithMutex — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 46 60 0 13 26 29 13 13
Road Runner 0 2 0 0 0 0 0 0
Camel 1 1 0 0 0 0 0 0
02

FTTFFFTTTFTTTTTT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FTTFFFTTTFTTTTTT
TTTTTTTTTTTTTTTT
--:-M / 13
FTTFFFTTTFTTTTTT
TTTTTTTTTTTTTTTT
--:P- / 13
DNC FTTFFFTTTFTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
FTTFFFTTTFTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
FTTFFFTTTFTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
FTTFFFTTTFTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
FTTFFFTTTFTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 13
04

FFTTTTTTFFFFFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTT?T?FFFFFTTF
TTTTT-T-TTTTTTTT
--:-- / 11
FFTTTTTTFFFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 13
CC

0
CC

0
FFTTTTTTFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTTTTTFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
10

FTFF? FFFFFTFFFT? (expected value)

1.00 3.00 2.00 3.00 0 2.00 1.00 1.00 2.00 2.00 2.00 1.00 2.00 1.00 2.00 0 (confidence rate)

?T?F?F??FFT?F?T?
-T-T?T--TTT-T-T?
--:-- / 6
FTFF?FFFFFTFFFT?
TTTT?TTTTTTTTTT?
--:-- / 11
CC

0
CC

0
CC

0
?TFF????????????
-TTT?----------?
--:-- / 2
CC

0
CC

0
20

FFTFFFTFTTTTFTT? (expected value)

2.00 2.00 2.00 2.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 0 (confidence rate)

FFTF??T?TTTTFTT?
TTTT--T-TTTTTTT?
--:-- / 10
FFTFFFTFTTTT?TT?
TTTTTTTTTTTT-TT?
--:-- / 11
DNC ????????????????
---------------?
--:-- / 0
CC

0
CC

0
????????????????
---------------?
--:-- / 0
????????????????
---------------?
--:-- / 0
40

TFFFFF? TTTTTTFTT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 2.00 2.00 2.00 3.00 2.00 2.00 2.00 2.00 (confidence rate)

????????TTTTTFTT
------?-TTTTTTTT
--:-- / 6
TFFFFF?TTTTTTFTT
TTTTTT?TTTTTTTTT
--:-- / 12
DNC ????????????????
------?---------
--:-- / 0
CC

0
???????????T????
------?----T----
--:-- / 1
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
Dekker — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 105 109 36 36 95 95 36 36
Road Runner 0 3 0 0 0 2 0 0
Camel 0 3 0 0 1 1 0 0
010

FFFFFFFTFFTFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
015

FFTTFTFFFFFTTTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTFTFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTTFTFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
FFTTFTFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTTFTFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
020

FFTFFTTFFFTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate)

FFTFFTTFFFTF?FFF
TTTTTTTTTTTT-TTT
--:-- / 18
FFTFFTTFFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
FFTFFTTFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFTTFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
050

TTFTFFFTFFFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 4.00 4.00 2.00 (confidence rate)

TTFTFFFTFFF??FT?
TTTTTTTTTTT--TT-
--:-- / 16
TTFTFFFTFFF??FT?
TTTTTTTTTTT--TT-
--:-- / 16
CC

0
CC

0
TTFTFFFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
TTFTFFFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
100

FTFFFTFFFFFTFTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 3.00 8.00 8.00 8.00 8.00 8.00 2.00 (confidence rate)

FTFFFTF?F?FTFTT?
TTTTTTT-T-TTTTT-
--:-- / 16
FTFFFTFFFFFTFTT?
TTTTTTTTTTTTTTT-
--:-- / 18
FTFFFTFFF?FTFTT?
TTTTTTTTT-TTTTT-
--:-- / 17
FTFFFTFFF?FTFTT?
TTTTTTTTT-TTTTT-
--:-- / 17
FTFFFTFFFFFTFTTF
TTTTTTTTTTTTTTTT
--:-M / 19
FTFFFTFFFFFTFTTF
TTTTTTTTTTTTTTTT
--:P- / 19
FTFFFTFFF?FTFTT?
TTTTTTTTT-TTTTT-
--:-- / 17
FTFFFTFFF?FTFTT?
TTTTTTTTT-TTTTT-
--:-- / 17
200

F? TFFFFFTFFFFTFF (expected value)

2.00 0 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

F?TFFF?FTFFFFTFF
T?TTTT-TTTTTTTTT
--:-- / 17
F?TFFFFFTFFFFTFF
T?TTTTTTTTTTTTTT
--:-- / 18
????????????????
-?--------------
--:-- / 0
????????????????
-?--------------
--:-- / 0
CC

0
CC

0
????????????????
-?--------------
--:-- / 0
????????????????
-?--------------
--:-- / 0
Diffusion2D — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 167 173 51 51 129 128 51 51
Road Runner 6 18 0 0 0 0 1 0
Camel 2 23 0 0 0 0 0 0
D05N010

FFTTFTFFFFFFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 6
FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
FFTTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
D05N050

TTFFFFFFFFFTTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:PM / 6
TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
D05N100

FFFTFFFFFFFFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFTFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FFFTFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFTFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D05N150

FTFFFFTFFFFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FTFFFFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FTFFFFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FTFFFFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D05N200

FFFFFFFFFFFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FFFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D05N250

FFFFFFTFFTFFTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFTFFTFFTFFT
TTTTTTTTTTTTTTTT
--:PM / 6
FFFFFFTFFT?FTFFT
TTTTTTTTTT-TTTTT
--:-- / 6
CC

0
CC

0
FFFFFFTFFTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFFFTFFTFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D05N300

FTTTTFFFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FTTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D05N350

FFFTFFTFFTTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFTFFTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 6
FFFTFFTFFT?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 6
CC

0
CC

0
FFFTFFTFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFTFFTFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D10N010

TFFTFFTTFFTFTTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFFTTFFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 6
TFFTFFTTFFTFTTFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
TFFTFFTTFFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 6
TFFTFFTTFFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D10N050

TTFFFFTTFFFTFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TTFFFFTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
TTFFFFTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFTTFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D10N100

FFTFTFTFFFFTFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFTFTFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 6
FFTFTFTFFFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FFTFTFTFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 6
FFTFTFTFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D10N150

TFTTFFTFFFFTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
TFTTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
TFTTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
TFTTFFTFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D10N200

FFFTFFTFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFTFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FFFTFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFTFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D20N010

TFFFTTFFFFFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
TFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D20N050

FFFFTFFFFFFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FFFFTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D20N100

TFTFTFFFFFTTTFFF (expected value)

4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTFTFFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:P- / 6
TFTFTFFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-M / 6
CC

0
CC

0
T?TFTFFFFFTTTFFF
T-TTTTTTTTTTTTTT
--:-- / 6
T?TFTFFFFFTTTFFF
T-TTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D20N150

FFFTFFFFTFTFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:P- / 6
FFFTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-M / 6
CC

0
CC

0
FFFTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
D30N010

TFTFFTFTTFTFFFFF (expected value)

4.00 4.00 4.00 4.00 2.00 2.00 4.00 4.00 2.00 4.00 4.00 2.00 4.00 2.00 4.00 2.00 (confidence rate)

TFTFFTFTTFTFFFFF
TTTTTTTTTTTTTTTT
--:P- / 6
TFTFFTFTTFTFFFFF
TTTTTTTTTTTTTTTT
--:-M / 6
CC

0
CC

0
TFTF??FT?FT?F?F?
TTTT--TT-TT-T-T-
--:-- / 4
TFTF??FT?FT?F?F?
TTTT--TT-TT-T-T-
--:-- / 4
CC

0
CC

0
D30N050

FTTTFTTFFTFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 2.00 (confidence rate)

FTTTFTTFFTFTFF?F
TTTTTTTTTTTTTT-T
--:-- / 6
FTTTFTTFFTFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FTTTFTTFFTFTFF??
TTTTTTTTTTTTTT--
--:-- / 5
FTTTFTTFFTFTFF??
TTTTTTTTTTTTTT--
--:-- / 5
CC

0
CC

0
D30N100

FTFFTFFFTFFFTTFF (expected value)

1.00 2.00 2.00 4.00 2.00 2.00 2.00 2.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

?TFFTFFFTFFFTTFF
-TTTTTTTTTTTTTTT
--:-- / 6
FTFFTFFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
???F????TF??????
---T----TT------
--:-- / 1
???F????????????
---T------------
--:-- / 0
CC

0
CC

0
D30N150

FTFFFTFFFFFFTFFT (expected value)

4.00 2.00 2.00 4.00 4.00 4.00 2.00 1.00 2.00 2.00 4.00 2.00 4.00 2.00 2.00 2.00 (confidence rate)

FTFFFTF?FFFFTFFT
TTTTTTT-TTTTTTTT
--:-- / 6
FTFFFTFFFFFFTFFT
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
F??FFT????F?T???
T--TTT----T-T---
--:-- / 2
F??FFT????F?T???
T--TTT----T-T---
--:-- / 2
CC

0
CC

0
D40N010

FFFFTFFFFFTFTFFF (expected value)

8.00 6.00 8.00 4.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 3.00 (confidence rate)

FFF?TFFFFFT?TFFF
TTT-TTTTTTT-TTTT
--:-- / 5
FFF?TFFFFFTFTFF?
TTT-TTTTTTTTTTT-
--:-- / 5
FFFFTFFFFFTFTFF?
TTTTTTTTTTTTTTT-
--:-- / 6
FFFFTFFFFFTFTFF?
TTTTTTTTTTTTTTT-
--:-- / 6
F?F???F????????F
T-T---T--------T
--:-- / 2
F?F???F????????F
T-T---T--------T
--:-- / 2
FFFFTFFFFFTFTFF?
TTTTTTTTTTTTTTT-
--:-- / 6
FFFFTFFFFFTFTFF?
TTTTTTTTTTTTTTT-
--:-- / 6
D40N050

FFT? TTTFTFTFFTFF (expected value)

2.00 4.00 2.00 0 2.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate)

FFT?TTTFTFTFFTF?
TTT?TTTTTTTTTTT-
--:-- / 5
FFT?TTTFTFTFFTFF
TTT?TTTTTTTTTTTT
--:-- / 6
????????????????
---?------------
--:-- / 0
????????????????
---?------------
--:-- / 0
?F???TTF????????
-T-?-TTT--------
--:-- / 2
?F???TTF????????
-T-?-TTT--------
--:-- / 2
????????????????
---?------------
--:-- / 0
????????????????
---?------------
--:-- / 0
D40N100

TTFFFFFFFFFFFFFF (expected value)

8.00 8.00 6.00 6.00 8.00 8.00 6.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 6
TTFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 6
TTFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TT??FF??FFFFFFFF
TT--TT--TTTTTTTT
--:-- / 5
TT??FF??FFFFFFFF
TT--TT--TTTTTTTT
--:-- / 5
TTFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
TTFFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
D40N150

TFFTFTFFFFFTFTTT (expected value)

8.00 2.00 1.00 8.00 8.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 (confidence rate)

T??TFTFFFFFT?TTT
T--TTTTTTTTT-TTT
--:-- / 5
TFFTFTFFFFFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 6
T??TFTFFFFFTFTTT
T--TTTTTTTTTTTTT
--:-- / 5
T??TFTFFFFFTFTTT
T--TTTTTTTTTTTTT
--:-- / 5
T??TF?F?????????
T--TT-T---------
--:-- / 2
TF?TF?F?????????
TT-TT-T---------
--:-- / 2
T??TFTFFFFFTFTTT
T--TTTTTTTTTTTTT
--:-- / 5
T??TFTFFFFFTFTTT
T--TTTTTTTTTTTTT
--:-- / 5
D50N010

TTFFFTFFTFFFFFFF (expected value)

8.00 8.00 7.00 8.00 8.00 8.00 6.00 7.00 6.00 1.00 6.00 7.00 6.00 7.00 5.00 6.00 (confidence rate)

TT?FFTFFT?FFFF?F
TT-TTTTTT-TTTT-T
--:-- / 5
TTFFFTFFTF?FFFFF
TTTTTTTTTT-TTTTT
--:-- / 6
TTFFFTFFT?FFFFFF
TTTTTTTTT-TTTTTT
--:-- / 6
TTFFFTFFT?FFFFFF
TTTTTTTTT-TTTTTT
--:-- / 6
TTFFFT?F??FF?F??
TTTTTT-T--TT-T--
--:-- / 4
TTFFFT??????????
TTTTTT----------
--:-- / 2
TTFFFTFFT?FFFFFF
TTTTTTTTT-TTTTTT
--:-- / 6
TTFFFTFFT?FFFFFF
TTTTTTTTT-TTTTTT
--:-- / 6
D50N050

FFFFTTTFFTTTFFFF (expected value)

6.00 6.00 1.00 6.00 7.00 6.00 7.00 3.00 6.00 6.00 6.00 6.00 2.00 6.00 6.00 5.00 (confidence rate)

FF?FTTTFFTTTFFF?
TT-TTTTTTTTTTTT-
--:-- / 5
FFFFTTTFFTTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 6
FF?FTTT?FTTT?FFF
TT-TTTT-TTTT-TTT
--:-- / 5
FF?FTTT?FTTT?FFF
TT-TTTT-TTTT-TTT
--:-- / 5
CC

0
????T?TF????????
----T-TT--------
--:-- / 1
FF?FTTT?FTTT?FFF
TT-TTTT-TTTT-TTT
--:-- / 5
FF?FTTT?FTTT?FFF
TT-TTTT-TTTT-TTT
--:-- / 5
D50N100

TFFFFFTTFFFTTTFF (expected value)

6.00 5.00 8.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

T?F?FFTTFFFTTTFF
T-T-TTTTTTTTTTTT
--:-- / 5
TFFFFFTTFFFTTTFF
TTTTTTTTTTTTTTTT
--:-M / 6
TFFFFFTTFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 6
TFFFFFTTFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 6
??F?????????????
--T-------------
--:-- / 0
??F?????????????
--T-------------
--:-- / 0
TFFFFFTTFFFTTTFF
TTTTTTTTTTTTTTTT
--:P- / 6
TFFFFFTTFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 6
D50N150

FTFFFFFTFFTFFTF? (expected value)

7.00 6.00 7.00 6.00 2.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate)

FTFF?FFT?FTFFTF?
TTTT-TTT-TTTTTT?
--:-- / 5
FTFFFFFTFFTFFTF?
TTTTTTTTTTTTTTT?
--:-- / 6
FTFF?FFT?FTFFTF?
TTTT-TTT-TTTTTT?
--:-- / 5
FTFF?FFT?FTFFTF?
TTTT-TTT-TTTTTT?
--:-- / 5
CC

0
F?F?F???????????
T-T-T----------?
--:-- / 1
FTFF?FFT?FTFFTF?
TTTT-TTT-TTTTTT?
--:-- / 5
FTFF?FFT?FTFFTF?
TTTT-TTT-TTTTTT?
--:-- / 5
DrinkVendingMachine — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 19 14 15 15 15 22 27
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
02

TFFFTTFTFTFFTFFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC TFFFTTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 14
TFFFTTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
10

TFFFF? FFFFTFTTFF (expected value)

6.00 2 2 2 2 0 2 3.00 2 2 2.00 1 2.00 2.00 1 2.00 (confidence rate)

DNC T??????F??T?TT?F
T----?-T--T-TT-T
--:-- / 5
CC

0
T???????????????
T----?----------
--:-- / 1
T???????????????
T----?----------
--:-- / 1
T???????????????
T----?----------
--:-- / 1
TFFFF?FFFF??????
TTTTT?TTTT------
--:-- / 8
TFFFF?FFFFTFTTFF
TTTTT?TTTTTTTTTT
--:-- / 13
16

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
24

? (expected value)

0 (confidence rate)

DNC CC

0
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
48

? (expected value)

0 (confidence rate)

DNC CC

0
CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
76

? (expected value)

0 (confidence rate)

DNC CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
98

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
DNF

0
DNF

0
DNF

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
DrinkVendingMachine — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 24 25 27 17 22 19 27 27
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
02

TFFFTTFTTTFFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 14
TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFTTFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 14
10

TFFFFTFFTFFTFFTT (expected value)

7.00 8.00 7.00 7.00 7.00 2.00 4.00 6.00 6.00 5.00 5.00 5.00 4.00 5.00 5.00 5.00 (confidence rate)

?FFFF??FTFFT?FTT
-TTTT--TTTTT-TTT
--:-- / 10
TF?FF??FTFFTFFTT
TT-TT--TTTTTTTTT
--:-- / 11
TFFFF?FFTFFTFFTT
TTTTT-TTTTTTTTTT
--:-- / 13
TFF?????????????
TTT-------------
--:-- / 3
TFFFFTFFT???????
TTTTTTTTT-------
--:-- / 8
TFFFFT??????????
TTTTTT----------
--:-- / 5
TFFFF?FFTFFTFFTT
TTTTT-TTTTTTTTTT
--:-- / 13
TFFFF?FFTFFTFFTT
TTTTT-TTTTTTTTTT
--:-- / 13
ERK — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 113 113 75 75 96 89 37 37
Road Runner 2 4 0 0 0 0 0 0
Camel 4 2 0 0 0 0 0 0
000001

FFFFFTFTFFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 19
FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 19
FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
000010

FFFFFTFFFFFFTTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFTFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:-M / 19
FFFFFTFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:P- / 19
CC

0
CC

0
FFFFFTFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFTFFFFFFTTTF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
000100

FTFFTFFTFFFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FTFFTFFT?FFFTFFF
TTTTTTTT-TTTTTTT
--:-- / 18
FTFFTFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
FTFFTFFTFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTFFTFF??????
TTTTTTTTTT------
--:-- / 12
CC

0
CC

0
001000

FTTFFFFFFFFFFTFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FTTFFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 19
FTTFFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFFFFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
010000

TTTFFTFFFTTFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate)

TTTFFTFFFTTFFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
TTTFFTFFFTTFFFT?
TTTTTTTTTTTTTTT-
--:-- / 18
TTTFFTFFFTTFFFT?
TTTTTTTTTTTTTTT-
--:-- / 18
TTTFFTFFFTTFFFT?
TTTTTTTTTTTTTTT-
--:-- / 18
TTTFFTFF????????
TTTTTTTT--------
--:-- / 10
TTTFFTFF????????
TTTTTTTT--------
--:-- / 10
TTTFFTFFFTTFFFT?
TTTTTTTTTTTTTTT-
--:-- / 18
TTTFFTFFFTTFFFT?
TTTTTTTTTTTTTTT-
--:-- / 18
100000

TFFTFFTFFFTFFFFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFFTFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFFTFFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
TFFTFFTFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFFTFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFFTF????????
TTTTTTTT--------
--:-- / 10
TFFTFFTF????????
TTTTTTTT--------
--:-- / 10
CC

0
CC

0
Echo — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 104 96 35 35 52 46 35 35
Road Runner 0 0 0 0 0 0 0 0
Camel 0 0 0 0 0 0 0 0
d02r09

FTTFTTF? FTFF? TFF (expected value)

8.00 8.00 7.00 1.00 8.00 8.00 8.00 0 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 (confidence rate)

FTTFTTF?FTFF?TFF
TTTTTTT?TTTT?TTT
--:-- / 12
FT??TTF?FTFF?TFF
TT--TTT?TTTT?TTT
--:-- / 10
FTT?TTF?FTFF?TFF
TTT-TTT?TTTT?TTT
--:-- / 11
FTT?TTF?FTFF?TFF
TTT-TTT?TTTT?TTT
--:-- / 11
FTT?TTF?FTFF?TFF
TTT-TTT?TTTT?TTT
--:-- / 11
FTT?TTF?????????
TTT-TTT?----?---
--:-- / 5
FTT?TTF?FTFF?TFF
TTT-TTT?TTTT?TTT
--:-- / 11
FTT?TTF?FTFF?TFF
TTT-TTT?TTTT?TTT
--:-- / 11
d02r11

TF? FTT? TFFFTFFTF (expected value)

4.00 4.00 0 4.00 4.00 4.00 0 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

TF?FTT?TFFFTFFTF
TT?TTT?TTTTTTTTT
--:-- / 12
TF?FTT?TFF?TFFTF
TT?TTT?TTT-TTTTT
--:-- / 11
????????????????
--?---?---------
--:-- / 0
????????????????
--?---?---------
--:-- / 0
TF?FTT??????????
TT?TTT?---------
--:-- / 4
TF?FTT??????????
TT?TTT?---------
--:-- / 4
????????????????
--?---?---------
--:-- / 0
????????????????
--?---?---------
--:-- / 0
d02r15

FFFTFF? FFTFTTFFT (expected value)

4.00 4.00 4.00 4.00 1.00 1.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFFTFF?FFTFTTFFT
TTTTTT?TTTTTTTTT
--:-- / 13
FFFT???FFTFTTFFT
TTTT--?TTTTTTTTT
--:-- / 11
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
FFFT????????????
TTTT--?---------
--:-- / 3
FFFT????????????
TTTT--?---------
--:-- / 3
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
d02r19

FTTTFFFTT? TFFFTT (expected value)

6.00 8.00 6.00 7.00 7.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 1.00 6.00 6.00 (confidence rate)

FTTTFFFTT?TFF?TT
TTTTTTTTT?TTT-TT
--:-- / 12
FTTTFFFTT?TFFFTT
TTTTTTTTT?TTTTTT
--:-- / 13
FTTTFFFTT?TFF?TT
TTTTTTTTT?TTT-TT
--:-- / 12
FTTTFFFTT?TFF?TT
TTTTTTTTT?TTT-TT
--:-- / 12
?T?TF???????????
-T-TT----?------
--:-- / 3
?T??????????????
-T-------?------
--:-- / 1
FTTTFFFTT?TFF?TT
TTTTTTTTT?TTT-TT
--:-- / 12
FTTTFFFTT?TFF?TT
TTTTTTTTT?TTT-TT
--:-- / 12
d03r03

? TT? TT? FFFTFTFFT (expected value)

0 4.00 4.00 0 4.00 4.00 0 4.00 3.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate)

?TT?TT?FFFTFTFFT
?TT?TT?TTTTTTTTT
--:-- / 11
?TT?TT?F?FTFTF?T
?TT?TT?T-TTTTT-T
--:-- / 9
????????????????
?--?--?---------
--:-- / 0
????????????????
?--?--?---------
--:-- / 0
?TT?TT?FFFTFTF?T
?TT?TT?TTTTTTT-T
--:-- / 10
?TT?TT?FFFTFTFFT
?TT?TT?TTTTTTTTT
--:-- / 11
????????????????
?--?--?---------
--:-- / 0
????????????????
?--?--?---------
--:-- / 0
d03r05

? FFFTTTFTT? TTT? F (expected value)

0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 0 2.00 (confidence rate)

?FFFTTTFTT?TTT??
?TTTTTTTTT?TTT?-
--:-- / 10
?FFFTTTFTT?TTT?F
?TTTTTTTTT?TTT?T
--:-- / 11
????????????????
?---------?---?-
--:-- / 0
????????????????
?---------?---?-
--:-- / 0
?FFFTTTFTT?TTT??
?TTTTTTTTT?TTT?-
--:-- / 10
?FFFTTTFTT?TTT?F
?TTTTTTTTT?TTT?T
--:-- / 11
????????????????
?---------?---?-
--:-- / 0
????????????????
?---------?---?-
--:-- / 0
d03r07

T? ? FTTFFFFF? FFTF (expected value)

2.00 0 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 1.00 2.00 2.00 (confidence rate)

T??FTTFFFFF?FFTF
T??TTTTTTTT?TTTT
--:-- / 11
T??FTTFFFFF?F?TF
T??TTTTTTTT?T-TT
--:-- / 10
????????????????
-??--------?----
--:-- / 0
????????????????
-??--------?----
--:-- / 0
CC

0
CC

0
????????????????
-??--------?----
--:-- / 0
????????????????
-??--------?----
--:-- / 0
d04r03

? TF? ? TFFTFFFTFFT (expected value)

0 4.00 4.00 0 0 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?TF??TFFTFFFTFFT
?TT??TTTTTTTTTTT
--:-- / 11
?TF??TF?TFFFTFFT
?TT??TT-TTTTTTTT
--:-- / 10
????????????????
?--??-----------
--:-- / 0
????????????????
?--??-----------
--:-- / 0
?TF??TFFTFFFTFFT
?TT??TTTTTTTTTTT
--:-- / 11
?TF??TFFTFFFTFFT
?TT??TTTTTTTTTTT
--:-- / 11
????????????????
?--??-----------
--:-- / 0
????????????????
?--??-----------
--:-- / 0
d05r03

F? FTFFFTTFTFFFF? (expected value)

6.00 0 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate)

F?FTFFFTTFTFFFF?
T?TTTTTTTTTTTTT?
--:-- / 12
F?FT?FFTTFTFFFF?
T?TT-TTTTTTTTTT?
--:-- / 11
F?FTFFFTTFTFFFF?
T?TTTTTTTTTTTTT?
--:-- / 12
F?FTFFFTTFTFFFF?
T?TTTTTTTTTTTTT?
--:-- / 12
CC

0
CC

0
F?FTFFFTTFTFFFF?
T?TTTTTTTTTTTTT?
--:-- / 12
F?FTFFFTTFTFFFF?
T?TTTTTTTTTTTTT?
--:-- / 12
EnergyBus — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 96 102 96 96 102 102 102 102
Road Runner 0 0 0 0 1 0 0 0
Camel 0 0 0 0 0 0 1 0
none

FFFTTTFFFTFFFFFF (expected value)

8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

F?FTTTFFFTFFFFFF
T-TTTTTTTTTTTTTT
--:-- / 96
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
F?FTTTFFFTFFFFFF
T-TTTTTTTTTTTTTT
--:-- / 96
F?FTTTFFFTFFFFFF
T-TTTTTTTTTTTTTT
--:-- / 96
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 102
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 102
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
Eratosthenes — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 104 105 0 0 114 114 0 0
Road Runner 0 2 0 0 3 1 0 0
Camel 2 0 0 0 3 1 0 0
010

FFTFFTFTFFFFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFFTFTFFFFFTFT
TTTTTTTTTTTTTTTT
--:-M / 19
FFTFFTFTFFFFFTFT
TTTTTTTTTTTTTTTT
--:P- / 19
CC

0
CC

0
FFTFFTFTFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFTFTFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
020

TFFTFFTFTFFTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFFTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-M / 19
TFFTFFTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:P- / 19
CC

0
CC

0
TFFTFFTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFFTFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
050

FFFTTTFFFFTTFFTF (expected value)

4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFT?TFFFF?TFFTF
TTTT-TTTTT-TTTTT
--:-- / 17
FFFT?TFFFF?TFFTF
TTTT-TTTTT-TTTTT
--:-- / 17
CC

0
CC

0
FFFTTTFFFFTTFFTF
TTTTTTTTTTTTTTTT
--:P- / 19
FFFTTTFFFFTTFFTF
TTTTTTTTTTTTTTTT
--:-M / 19
CC

0
CC

0
100

FTTFTFTFTTFTFTTF (expected value)

4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 2.00 4.00 3.00 3.00 3.00 4.00 4.00 4.00 (confidence rate)

FTTF?FTF?TF?FTTF
TTTT-TTT-TT-TTTT
--:-- / 16
FTTFTFTF?T?T?TTF
TTTTTTTT-T-T-TTT
--:-- / 16
CC

0
CC

0
FTTFTFTFTTFTFTTF
TTTTTTTTTTTTTTTT
--:PM / 19
FTTFTFTFTTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
200

TFTTTTFTFFFTFFTF (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 2.00 2.00 4.00 4.00 4.00 4.00 (confidence rate)

?FTTTTF?FF??FFTF
-TTTTTT-TT--TTTT
--:-- / 15
TFTTTTFTFF??FFTF
TTTTTTTTTT--TTTT
--:-- / 17
CC

0
CC

0
TFTTTTFTFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
TFTTTTFTFFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
500

FFFFFFTTTTTFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 3.00 3.00 (confidence rate)

FFFFFFTTTTTFFTF?
TTTTTTTTTTTTTTT-
--:-- / 18
FFFFFFTTTTT?FT?T
TTTTTTTTTTT-TT-T
--:-- / 17
CC

0
CC

0
FFFFFFTTTTTFFTFT
TTTTTTTTTTTTTTTT
--:-M / 19
FFFFFFTTTTTFFTFT
TTTTTTTTTTTTTTTT
--:P- / 19
CC

0
CC

0
FMS — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 120 119 59 59 114 120 59 59
Road Runner 1 7 0 0 0 0 0 0
Camel 3 5 0 0 0 0 0 0
002

FTFTFFFTTFFTFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-M / 15
FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:P- / 15
FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFTFFFTTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
005

FFTFFTFFFTFFTTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFFTFFFTFFTTTF
TTTTTTTTTTTTTTTT
--:-M / 15
FFTFFTFFFTFFTTTF
TTTTTTTTTTTTTTTT
--:P- / 15
CC

0
CC

0
FFTFFTFFFTFFTTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFTFFFTFFTTTF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
010

FTFFFFFFFFFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
FTFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFFFFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
020

TFFFFFFTTTFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFFFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 15
TFFFF?FTTTFFFFTF
TTTTT-TTTTTTTTTT
--:-- / 14
CC

0
CC

0
TFFFFFFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
TFFFFFFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
050

FFTFTTFTFFTFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFTFTTFTFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTTFTFFTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
FFTFTTFTF???????
TTTTTTTTT-------
--:-- / 9
FFTFTTFTFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
100

FFTFFFFFFFTTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:PM / 15
FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
200

FFTFTTTFFFFFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 15
FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTTTFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
500

FFFFFTFTFFTTTTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTFTFFTTTTFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFTFFTTTTFT
TTTTTTTTTTTTTTTT
--:PM / 15
FFFFFTFT?FTTTTFT
TTTTTTTT-TTTTTTT
--:-- / 14
FFFFFTFT?FTTTTFT
TTTTTTTT-TTTTTTT
--:-- / 14
FFFFFTFTFFTTTTFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFTFFTTTTFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFT?FTTTTFT
TTTTTTTT-TTTTTTT
--:-- / 14
FFFFFTFT?FTTTTFT
TTTTTTTT-TTTTTTT
--:-- / 14
FlexibleBarrier — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 145 137 112 112 107 120 101 101
Road Runner 4 5 0 0 3 0 0 0
Camel 3 5 1 0 0 0 1 2
04a

FTTTFTFTTFFFTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 8
FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTTFTFTTFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
04b

TFFFTFTFTFTFFTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:PM / 8
TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTFTFTFTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
06a

FFTFFFFFFTFTFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFFFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
06b

FTTTFFTFFFFTFFTF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 3.00 6.00 6.00 3.00 5.00 3.00 4.00 5.00 5.00 (confidence rate)

FTTTFFTFFF?T?FTF
TTTTTTTTTT-T-TTT
--:-- / 7
FTTTFFTFFFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
FTTTFFT?FFFTFFTF
TTTTTTT-TTTTTTTT
--:-- / 7
FTTTFFT?FFFTFFTF
TTTTTTT-TTTTTTTT
--:-- / 7
FTTTFFTFFF?T??TF
TTTTTTTTTT-T--TT
--:-- / 6
FTTTFFT?FF??????
TTTTTTT-TT------
--:-- / 4
CC

0
CC

0
08a

FTFTTFTFTTFTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 (confidence rate)

FTFTTFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
FTFTTFTFTTFTFTF?
TTTTTTTTTTTTTTT-
--:-- / 7
FTFTTFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTFTFTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
08b

FTFTFFFFFTFTFTFT (expected value)

6.00 6.00 2.00 6.00 6.00 6.00 5.00 5.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate)

FTFTFFFFFTFTFT?T
TTTTTTTTTTTTTT-T
--:-- / 7
FT?TFF?FFTFTFTFT
TT-TTT-TTTTTTTTT
--:-- / 7
FT?TFFFFFTFTFTFT
TT-TTTTTTTTTTTTT
--:-- / 7
FT?TFFFFFTFTFTFT
TT-TTTTTTTTTTTTT
--:-- / 7
FT?TFFF?????????
TT-TTTT---------
--:-- / 3
FTFTFFFF????????
TTTTTTTT--------
--:-- / 4
CC

0
CC

0
10a

TFFFFFFFFTFFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:P- / 8
TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFFFFFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-M / 8
10b

FTFFTFFFF? FFTTFT (expected value)

6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 5.00 0 1.00 4.00 5.00 5.00 5.00 4.00 (confidence rate)

FTFFTFFFF?FFTTFT
TTTTTTTTT?TTTTTT
--:-- / 7
FT?FTFFF????TTF?
TT-TTTTT-?--TTT-
--:-- / 5
FTFFTFFFF??FTTFT
TTTTTTTTT?-TTTTT
--:-- / 7
FTFFTFFFF??FTTFT
TTTTTTTTT?-TTTTT
--:-- / 7
FTFFTFFFF???????
TTTTTTTTT?------
--:-- / 4
FTFFTFFFF??FTTFT
TTTTTTTTT?-TTTTT
--:-- / 7
CC

0
CC

0
12a

FTTFTFFTFFFFTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate)

FTTFTFFTFFFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 8
FTTFTFFT?FFF?FTF
TTTTTTTT-TTT-TTT
--:-- / 7
FTTFTFFTFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTFFTFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTFFTFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTFFTFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTFFTFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTFFTFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
12b

T? FFTFTFFTTFFFFT (expected value)

8.00 0 8.00 8.00 7.00 7.00 7.00 7.00 2.00 7.00 7.00 7.00 1.00 7.00 1.00 7.00 (confidence rate)

T?FFTFTFFTTF?FFT
T?TTTTTTTTTT-TTT
--:-- / 7
T?FFTFTF?TTFFF?T
T?TTTTTT-TTTTT-T
--:-- / 6
T?FFTFTF?TTF?F?T
T?TTTTTT-TTT-T-T
--:-- / 6
T?FFTFTF?TTF?F?T
T?TTTTTT-TTT-T-T
--:-- / 6
T?FF????????????
T?TT------------
--:-- / 1
T?FFTFTFFTTF?F?T
T?TTTTTTTTTT-T-T
--:-- / 6
T?FFTFTF?TTF?F?T
T?TTTTTT-TTT-T-T
--:-- / 6
T?FFTFTF?TTF?F?T
T?TTTTTT-TTT-T-T
--:-- / 6
14a

FFFFTTFFFFFTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 8
FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 8
FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
14b

? FFFFTT? FFFTFFFF (expected value)

0 1.00 2.00 1.00 2.00 3.00 3.00 0 1.00 3.00 2.00 2.00 3.00 1.00 3.00 2.00 (confidence rate)

?FFFFTT??FFTFFFF
?TTTTTT?-TTTTTTT
--:-- / 6
??F?FTT??FFTF?FF
?-T-TTT?-TTTT-TT
--:-- / 5
????????????????
?------?--------
--:-- / 0
????????????????
?------?--------
--:-- / 0
CC

0
?????TT?FF??F?F?
?----TT?TT--T-T-
--:-- / 3
CC

0
CC

0
16a

FTFFTFTFTFTFFTFT (expected value)

8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFTFTFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFTFTFTFFTFT
TTTTTTTTTTTTTTTT
--:PM / 8
FTF?TFTFTFTFFTFT
TTT-TTTTTTTTTTTT
--:-- / 7
FTF?TFTFTFTFFTFT
TTT-TTTTTTTTTTTT
--:-- / 7
FTFFTFTFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFTFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFTFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTFTFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
16b

? FTFFFFFFTTFTFFF (expected value)

0 4.00 2.00 4.00 1.00 3.00 2.00 1.00 2.00 2.00 2.00 2.00 3.00 2.00 2.00 2.00 (confidence rate)

?FTF?FF?FTTFTFFF
?TTT-TT-TTTTTTTT
--:-- / 6
?FTFFFFFFTTFTFFF
?TTTTTTTTTTTTTTT
--:-- / 7
????????????????
?---------------
--:-- / 0
????????????????
?---------------
--:-- / 0
?F?F????????????
?T-T------------
--:-- / 1
?F?F?F??????T???
?T-T-T------T---
--:-- / 2
????????????????
?---------------
--:-- / 0
????????????????
?---------------
--:-- / 0
18a

FFTFFFTTTTFFFTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate)

FFTFFFTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 8
FFTFFFTTTTFF?TTF
TTTTTTTTTTTT-TTT
--:-- / 7
FFTFFFTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFTTTTFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
18b

FFT? FFF? FFTFTFFF (expected value)

8.00 8.00 7.00 0 6.00 6.00 6.00 0 6.00 6.00 7.00 7.00 7.00 5.00 7.00 7.00 (confidence rate)

FFT?FFF?FFTFTFFF
TTT?TTT?TTTTTTTT
--:-- / 7
FFT?FFF?FFTFT?FF
TTT?TTT?TTTTT-TT
--:-- / 6
FFT?FFF?FFTFTFFF
TTT?TTT?TTTTTTTT
--:-- / 7
FFT?FFF?FFTFTFFF
TTT?TTT?TTTTTTTT
--:-- / 7
FF??????????????
TT-?---?--------
--:-- / 1
FFT???????TFT?FF
TTT?---?--TTT-TT
--:-- / 4
FFT?FFF?FFTFTFFF
TTT?TTT?TTTTTTTT
--:-- / 7
FFT?FFF?FFTFTFFF
TTT?TTT?TTTTTTTT
--:-- / 7
20a

FFFFFFFFFFFFTFFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFF?FF?TFFF
TTTTTTTT-TT-TTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:P- / 8
FFFFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-M / 8
20b

FTTT? T? TF? TTT? T? (expected value)

4.00 2.00 2.00 2.00 0 4.00 0 2.00 2.00 0 2.00 4.00 2.00 0 4.00 0 (confidence rate)

FTTT?T?TF?TTT?T?
TTTT?T?TT?TTT?T?
--:-- / 5
FTTT?T?TF?TTT?T?
TTTT?T?TT?TTT?T?
--:-- / 5
????????????????
----?-?--?---?-?
--:-- / 0
????????????????
----?-?--?---?-?
--:-- / 0
F????T?????T??T?
T---?T?--?-T-?T?
--:-- / 2
F????T?????T??T?
T---?T?--?-T-?T?
--:-- / 2
????????????????
----?-?--?---?-?
--:-- / 0
????????????????
----?-?--?---?-?
--:-- / 0
22a

TFFTFFTTFFFTTFTF (expected value)

8.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 4.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

T?FTFFTTF?FTTFTF
T-TTTTTTT-TTTTTT
--:-- / 7
T?FTFFTT??FTTFTF
T-TTTTTT--TTTTTT
--:-- / 6
T?FTFFTTF?FTTFTF
T-TTTTTTT-TTTTTT
--:-- / 7
T?FTFFTTF?FTTFTF
T-TTTTTTT-TTTTTT
--:-- / 7
TFFTFFTTFFFTTFTF
TTTTTTTTTTTTTTTT
--:P- / 8
TFFTFFTTFFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFTFFTTFFFTTFTF
TTTTTTTTTTTTTTTT
--:-M / 8
TFFTFFTTFFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
22b

FFFFFTFFTTF? F? F? (expected value)

1.00 3.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 0 2.00 0 (confidence rate)

?FFFFTFFTTF?F?F?
-TTTTTTTTTT?T?T?
--:-- / 6
?FFFFTFFTTF?F?F?
-TTTTTTTTTT?T?T?
--:-- / 6
????????????????
-----------?-?-?
--:-- / 0
????????????????
-----------?-?-?
--:-- / 0
FF?F????????????
TT-T-------?-?-?
--:-- / 1
CC

0
????????????????
-----------?-?-?
--:-- / 0
????????????????
-----------?-?-?
--:-- / 0
GPPP — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 129 135 70 70 114 127 62 62
Road Runner 3 7 0 0 0 1 0 0
Camel 4 5 0 0 0 2 0 0
C0001N0000000001

FFFFTFTFFTFFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-M / 9
FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:P- / 9
FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTFTFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
C0001N0000000010

FFFFFFTFTFFTFTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 9
FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFFFTFTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
C0001N0000000100

FFFFTFFTTTTTFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 3.00 8.00 8.00 8.00 3.00 8.00 8.00 (confidence rate)

FFFFTFFTT?TTF?TF
TTTTTTTTT-TTT-TT
--:-- / 8
FFFFTFFTTTTTFFTF
TTTTTTTTTTTTTTTT
--:P- / 9
FFFFT?FTT?TTF?TF
TTTTT-TTT-TTT-TT
--:-- / 7
FFFFT?FTT?TTF?TF
TTTTT-TTT-TTT-TT
--:-- / 7
FFFFTFFTTTTTFFTF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTFFTTTTTFFTF
TTTTTTTTTTTTTTTT
--:-M / 9
FFFFT?FTT?TTF?TF
TTTTT-TTT-TTT-TT
--:-- / 7
FFFFT?FTT?TTF?TF
TTTTT-TTT-TTT-TT
--:-- / 7
C0001N0000001000

TFFFTFFTTFTFTFTF (expected value)

4.00 4.00 3.00 4.00 4.00 4.00 4.00 1.00 4.00 3.00 4.00 3.00 4.00 4.00 3.00 4.00 (confidence rate)

TF?FTFF?TFTFTFTF
TT-TTTT-TTTTTTTT
--:-- / 8
TFFFTFFTT?T?TF?F
TTTTTTTTT-T-TT-T
--:-- / 7
CC

0
CC

0
TFFFTFF?TFTFTFTF
TTTTTTT-TTTTTTTT
--:-- / 8
TFFFTFF?TFTFTFTF
TTTTTTT-TTTTTTTT
--:-- / 8
CC

0
CC

0
C0001N0000010000

FTTFFTFFFTFFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFFTFFFTFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 9
FTTFFTFF?TFFFTFT
TTTTTTTT-TTTTTTT
--:-- / 8
CC

0
CC

0
FTTFFTFFFTFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFTFFFTFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 9
CC

0
CC

0
C0001N0000100000

FFFFFTFFFTFTFFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFT?FFTFTFFTT
TTTTTT-TTTTTTTTT
--:-- / 8
FFFFFTFFFTFTFFTT
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
FFFFFT?FFTFTFFTT
TTTTTT-TTTTTTTTT
--:-- / 8
FFFFFT?FFTFTFFTT
TTTTTT-TTTTTTTTT
--:-- / 8
CC

0
CC

0
C0010N0000000010

TFTFFFFFFFTFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 (confidence rate)

TFTFFFFFFFTFF?FF
TTTTTTTTTTTTT-TT
--:-- / 8
TFTFFFFFFFTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
TFTFFFFFFFTFF?FF
TTTTTTTTTTTTT-TT
--:-- / 8
TFTFFFFFFFTFF?FF
TTTTTTTTTTTTT-TT
--:-- / 8
CC

0
CC

0
C0010N0000000100

FFFFTFTFTTTTFFTF (expected value)

4.00 4.00 4.00 4.00 1.00 4.00 1.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFF?F?FTTTTFFTF
TTTT-T-TTTTTTTTT
--:-- / 8
FFFFTFT?TTTTFFTF
TTTTTTT-TTTTTTTT
--:-- / 8
CC

0
CC

0
FFFF?F?FTTTTFFTF
TTTT-T-TTTTTTTTT
--:-- / 8
FFFF?F?FTTTTFFTF
TTTT-T-TTTTTTTTT
--:-- / 8
CC

0
CC

0
C0010N1000000000

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

????????????????
????????????????
--:-- / 0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
C0100N0000000010

FFTTFFTFFFFTFTTF (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 (confidence rate)

?FTTFFTFFFFTF?TF
-TTTTTTTTTTTT-TT
--:-- / 8
FFTTFFTFFFFTFTT?
TTTTTTTTTTTTTTT-
--:-- / 8
CC

0
CC

0
FFTTFFTFFFFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 9
FFTTFFTFFFFTFTTF
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
C0100N0000000100

TFFTFTFFF? FFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 1.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

TFFTF?FFF?FFTFFF
TTTTT-TTT?TTTTTT
--:-- / 8
TFFTFTFFF?FFTFFF
TTTTTTTTT?TTTTTT
--:-- / 8
TFFTF?FFF?FFTFFF
TTTTT-TTT?TTTTTT
--:-- / 8
TFFTF?FFF?FFTFFF
TTTTT-TTT?TTTTTT
--:-- / 8
TFFTF???????????
TTTTT----?------
--:-- / 3
TFFTF?FFF?FFTFFF
TTTTT-TTT?TTTTTT
--:-- / 8
TFFTF?FFF?FFTFFF
TTTTT-TTT?TTTTTT
--:-- / 8
TFFTF?FFF?FFTFFF
TTTTT-TTT?TTTTTT
--:-- / 8
C0100N0000001000

TTFFTTFTFTFFTFFF (expected value)

8.00 7.00 8.00 8.00 1.00 8.00 7.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 2.00 (confidence rate)

T?FF?TFTF?FFTFFF
T-TT-TTTT-TTTTTT
--:-- / 7
TTFFTT?TFTFFTFFF
TTTTTT-TTTTTTTTT
--:-- / 8
TTFF?TFTF?FFTFF?
TTTT-TTTT-TTTTT-
--:-- / 7
TTFF?TFTF?FFTFF?
TTTT-TTTT-TTTTT-
--:-- / 7
TTFF?TFTF?FFTFF?
TTTT-TTTT-TTTTT-
--:-- / 7
TTFF?TFTF?FFTFF?
TTTT-TTTT-TTTTT-
--:-- / 7
TTFF?TFTF?FFTFF?
TTTT-TTTT-TTTTT-
--:-- / 7
TTFF?TFTF?FFTFF?
TTTT-TTTT-TTTTT-
--:-- / 7
C0100N0000010000

FFFFTTTTTTFFFFTF (expected value)

6.00 6.00 4.00 3.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 1.00 5.00 (confidence rate)

FFFFTTTTTTFFFF?F
TTTTTTTTTTTTTT-T
--:-- / 8
FFFFTTTTTTFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 9
FFF?TTTTTTFFFF?F
TTT-TTTTTTTTTT-T
--:-- / 8
FFF?TTTTTTFFFF?F
TTT-TTTTTTTTTT-T
--:-- / 8
FF??????????????
TT--------------
--:-- / 1
FF?FTTTTTTFFFF?F
TT-TTTTTTTTTTT-T
--:-- / 8
CC

0
CC

0
C0100N0000100000

FTTTFFFFTFTFTFFF (expected value)

8.00 8.00 1.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FT?TFFFFTF?FTFFF
TT-TTTTTTT-TTTTT
--:-- / 8
FTTTFFFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 9
FT?T?FFFTFTFTFFF
TT-T-TTTTTTTTTTT
--:-- / 8
FT?T?FFFTFTFTFFF
TT-T-TTTTTTTTTTT
--:-- / 8
FT?TFFFFTFTFTFFF
TT-TTTTTTTTTTTTT
--:-- / 8
FT?TFFFFTFTFTFFF
TT-TTTTTTTTTTTTT
--:-- / 8
FT?T?FFFTFTFTFFF
TT-T-TTTTTTTTTTT
--:-- / 8
FT?T?FFFTFTFTFFF
TT-T-TTTTTTTTTTT
--:-- / 8
C1000N0000000010

FTFFFFFFFFFTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 1.00 (confidence rate)

FTFFFFFFFFF?FFF?
TTTTTTTTTTT-TTT-
--:-- / 8
FTFFFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTFFFFFFFFF?FFF?
TTTTTTTTTTT-TTT-
--:-- / 8
FTFFFFFFFFF?FFF?
TTTTTTTTTTT-TTT-
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
C1000N0000000100

FFTTTFFFF? FTFFFF (expected value)

7.00 8.00 8.00 1.00 1.00 6.00 6.00 6.00 6.00 0 6.00 6.00 1.00 2.00 6.00 6.00 (confidence rate)

FFT??FFFF?FT?FFF
TTT--TTTT?TT-TTT
--:-- / 6
?FTTTFFFF?FTFFFF
-TTTTTTTT?TTTTTT
--:-- / 8
FFT??FFFF?FT??FF
TTT--TTTT?TT--TT
--:-- / 6
FFT??FFFF?FT??FF
TTT--TTTT?TT--TT
--:-- / 6
FFT?????????????
TTT------?------
--:-- / 2
FFT?????????????
TTT------?------
--:-- / 2
FFT??FFFF?FT??FF
TTT--TTTT?TT--TT
--:-- / 6
FFT??FFFF?FT??FF
TTT--TTTT?TT--TT
--:-- / 6
C1000N0000001000

FFFFFFFTTTFFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 3.00 (confidence rate)

FFFFFFFTTTFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 9
FFFFFFFTT?FFFTFF
TTTTTTTTT-TTTTTT
--:-- / 8
FFFFFFFTTTFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFFTTTFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFFTTTFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFFTTTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFFFFTTTFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFFTTTFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 8
GlobalResAllocation — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 32 0 14 24 24 14 14
Road Runner 0 0 0 0 1 0 0 0
Camel 0 1 0 0 0 0 0 0
03

FFTFTTTFTFFFTFFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

DNC FFTFTTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-M / 14
DNC FFTFTTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:P- / 14
FFTFTTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 14
05

? TF? FFTTFF? TFFFT (expected value)

0 2.00 2.00 0 3.00 2.00 3.00 3.00 3.00 2.00 0 3.00 2.00 2.00 3.00 1.00 (confidence rate)

DNC ????F?TTF??T??FT
?--?T-TTT-?T--TT
--:-- / 6
DNC ????????????????
?--?------?-----
--:-- / 0
?TF?FFTTFF?TFFF?
?TT?TTTTTT?TTTT-
--:-- / 10
?TF?FFTTFF?TFFF?
?TT?TTTTTT?TTTT-
--:-- / 10
????????????????
?--?------?-----
--:-- / 0
????????????????
?--?------?-----
--:-- / 0
06

? FF? FFFTTFFFFFTF (expected value)

0 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC ?FF?FFFTTFFFFFTF
?TT?TTTTTTTTTTTT
--:-- / 12
DNC ????????????????
?--?------------
--:-- / 0
CC

0
CC

0
????????????????
?--?------------
--:-- / 0
????????????????
?--?------------
--:-- / 0
07

? (expected value)

0 (confidence rate)

DNC DNF

0
DNC DNF

0
CC

0
CC

0
DNF

0
DNF

0
09

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
10

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
11

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
GlobalResAllocation — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 27 27 0 14 14 14 14 14
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
03

FFTFTTTFTFTTFTFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FFTFTTTFTFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFTTFTFT
TTTTTTTTTTTTTTTT
--:PM / 14
DNC FFTFTTTFTFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFTFTTTFTFTTFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
05

FTFTFFTTTFTFFFTT (expected value)

2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FT?TFFTTTFTFFFTT
TT-TTTTTTTTTTTTT
--:-- / 13
FTFTFFTTT?TFFFTT
TTTTTTTTT-TTTTTT
--:-- / 13
DNC ????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
HexagonalGrid — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 119 119 117 117 85 82 101 101
Road Runner 0 6 0 1 0 0 0 0
Camel 0 7 0 0 0 0 0 0
110

FFFFTTFFFFFFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 17
FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFTTFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
126

FFFFFFFFFTFFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 17
FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
226

FFFFFTTFFFFFTFTF (expected value)

6.00 4.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFFTTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFTTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 17
F?FFFTTFFFFFTFTF
T-TTTTTTTTTTTTTT
--:-- / 16
F?FFFTTFFFFFTFTF
T-TTTTTTTTTTTTTT
--:-- / 16
FFFFTTTFFFFFTFTF
TTTTXTTTTTTTTTTT
V-:-- / 14
FFFFTTTFFFFFTFTF
TTTTXTTTTTTTTTTT
V-:-- / 14
CC

0
CC

0
316

FFTTFFFFFFFFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 (confidence rate)

FFTTFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 17
FFTTFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTFFFF?FFFTF??
TTTTTTTT-TTTTT--
--:-- / 14
FFTTFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFTTFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
410

FFFFFFTFFTFFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 17
FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 17
FFFFFFTFFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 17
516

TFFFTFFFFTFFTFFF (expected value)

8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 2.00 (confidence rate)

TFFFTFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 17
TFFFTFFFFTFFTFF?
TTTTTTTTTTTTTTT-
--:-- / 16
TFFFTFFFFTFFTFF?
TTTTTTTTTTTTTTT-
--:-- / 16
TFF?????????????
TTT-------------
--:-- / 3
TFF?????????????
TTT-------------
--:-- / 3
TFFFTFFFFTFFTFF?
TTTTTTTTTTTTTTT-
--:-- / 16
TFFFTFFFFTFFTFF?
TTTTTTTTTTTTTTT-
--:-- / 16
816

TFFFTTFFFFFFFFFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFFTTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 17
TFFFTTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 17
CC

0
CC

0
TFFFTTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
TFFFTTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 17
HouseConstruction — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 105 108 55 55 114 114 30 30
Road Runner 2 2 0 0 0 1 0 0
Camel 1 2 0 1 0 1 0 0
002

FFFTFTFFFTTFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:PM / 15
FFFTFTFF?TTFFFFT
TTTTTTTT-TTTTTTT
--:-- / 14
FFFTFTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTFTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTFTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTFTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTFTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTFTFFFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
005

TFTTTTTTFTFFTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTTTTTTFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 15
TFTTTTTTFTFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
TFTTTTTTFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 15
TFTTTTTTFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
010

TFFFTFFTTTFFTFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 (confidence rate)

TFFFTFFTTTFFT??T
TTTTTTTTTTTTT--T
--:-- / 13
TFFFTFFTTTFFTFTT
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
TFFFTFFTTTFFTFTT
TTTTTTTTTTTTTTTT
--:-- / 15
TFFFTFFTTTFFTFTT
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
020

TFFTTFTTTFFFFTTT (expected value)

3.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?FFT?FTT?FFFFTTT
-TTT-TTT-TTTTTTT
--:-- / 12
TFFTT?TT?FFFFTTT
TTTTT-TT-TTTTTTT
--:-- / 13
CC

0
CC

0
TFFTTFTTTFFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 15
TFFTTFTTTFFFFTTT
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
050

TTTTFF? TFTFFTTTT (expected value)

3.00 4.00 3.00 1.00 4.00 4.00 0 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 (confidence rate)

?T??FF??FTFFTTT?
-T--TT?-TTTTTTT-
--:-- / 10
TTTTFF?TFTFFTTT?
TTTTTT?TTTTTTTT-
--:-- / 13
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
TTT?FF?TFTFFTTTT
TTT-TT?TTTTTTTTT
--:-- / 13
TTT?FF?TFTFFTTTT
TTT-TT?TTTTTTTTT
--:-- / 13
????????????????
------?---------
--:-- / 0
????????????????
------?---------
--:-- / 0
100

FFFFTTTTF? TFFFFT (expected value)

5.00 6.00 3.00 6.00 6.00 6.00 6.00 1.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFTTT?F?TFFFFT
TTTTTTT-T?TTTTTT
--:-- / 13
?F?FTTTTF?TFFFFT
-T-TTTTTT?TTTTTT
--:-- / 12
FF?FTTT?F?TFFFFT
TT-TTTT-T?TTTTTT
--:-- / 12
FF?FTTT?F?TFFFFT
TT-TTTT-T?TTTTTT
--:-- / 12
FFFFTTT?F?TFFFFT
TTTTTTT-T?TTTTTT
--:-- / 13
FFFFTTT?F?TFFFFT
TTTTTTT-T?TTTTTT
--:-- / 13
CC

0
CC

0
200

FFT? ? FTFFTFFTFTT (expected value)

6.00 6.00 6.00 0 0 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 (confidence rate)

FFT??FTFFTFFT?TT
TTT??TTTTTTTT-TT
--:-- / 12
FFT???TFFTFFTFTT
TTT??-TTTTTTTTTT
--:-- / 12
FFT??FTFFTFFTFTT
TTT??TTTTTTTTTTT
--:-- / 13
FFT??FTFFTFFTFTT
TTT??TTTTTTTTTTT
--:-- / 13
FFT??FTFFTFFTFTT
TTT??TTTTTTTTTTT
--:-- / 13
FFT??FTFFTFFTFTT
TTT??TTTTTTTTTTT
--:-- / 13
CC

0
CC

0
500

TTFTFTTTFFTTFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 (confidence rate)

TTFTFTTTFFTTFFTF
TTTTTTTTTTTTTTTT
--:P- / 15
TTFTFTTTFFTT?FTF
TTTTTTTTTTTT-TTT
--:-- / 14
TTFTFTTTFFTTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
TTFTFTTTFFTTFFTF
TTTTTTTTTTTTTTTT
--:-M / 15
TTFTFTTTFFTTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
TTFTFTTTFFTTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
TTFTFTTTFFTTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
TTFTFTTTFFTTFFTF
TTTTTTTTTTTTTTTT
--:-- / 15
HypercubeGrid — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 70 81 88 88 2 2 88 88
Road Runner 1 0 0 0 0 0 0 0
Camel 1 0 0 0 0 0 0 0
C3K4P4B12

FTFFFFFFFFTTFFF? (expected value)

6.00 6.00 6.00 5.00 6.00 6.00 6.00 1.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate)

FTFFFFFFF?TTFFF?
TTTTTTTTT-TTTTT?
--:-- / 32
FTF?FFF?FFTTFFF?
TTT-TTT-TTTTTTT?
--:-- / 29
FTFFFFF?F?TTFFF?
TTTTTTT-T-TTTTT?
--:-- / 29
FTFFFFF?F?TTFFF?
TTTTTTT-T-TTTTT?
--:-- / 29
CC

0
CC

0
FTFFFFF?F?TTFFF?
TTTTTTT-T-TTTTT?
--:-- / 29
FTFFFFF?F?TTFFF?
TTTTTTT-T-TTTTT?
--:-- / 29
C4K3P3B12

FFFTFTFFTFFFFFTF (expected value)

6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 2.00 6.00 5.00 6.00 6.00 6.00 (confidence rate)

FFFTFTFFTFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 36
FFFTFTFFTFFF?FTF
TTTTTTTTTTTT-TTT
--:-- / 34
FFFTFTFFTF?FFFTF
TTTTTTTTTT-TTTTT
--:-- / 34
FFFTFTFFTF?FFFTF
TTTTTTTTTT-TTTTT
--:-- / 34
?F??????????????
-T--------------
--:-- / 2
?F??????????????
-T--------------
--:-- / 2
FFFTFTFFTF?FFFTF
TTTTTTTTTT-TTTTT
--:-- / 34
FFFTFTFFTF?FFFTF
TTTTTTTTTT-TTTTT
--:-- / 34
C5K3P3B15

F? FF? FFF? F? FFFFT (expected value)

5.00 0 5.00 5.00 0 5.00 4.00 5.00 0 4.00 0 5.00 4.00 4.00 1.00 6.00 (confidence rate)

???????????????T
-?--?---?-?----T
--:-- / 2
F?FF?F?F???F??FT
T?TT?T-T?-?T--TT
--:-- / 18
F?FF?FFF?F?FFF?T
T?TT?TTT?T?TTT-T
--:-- / 25
F?FF?FFF?F?FFF?T
T?TT?TTT?T?TTT-T
--:-- / 25
CC

0
CC

0
F?FF?FFF?F?FFF?T
T?TT?TTT?T?TTT-T
--:-- / 25
F?FF?FFF?F?FFF?T
T?TT?TTT?T?TTT-T
--:-- / 25
HypertorusGrid — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 97 93 74 74 58 58 74 74
Road Runner 0 1 0 1 0 2 0 1
Camel 1 0 0 0 0 2 0 2
d2k1p8b00

TFFFFFFFFFFFTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-M / 19
TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:P- / 19
TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
d2k2p1b00

FFFFFFFFFTFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate)

FFFFFFFFFTFFFFFF
TTTTTTTTTTTTTTXT
V-:-- / 16
FFFFFFFFFTFFFFFF
TTTTTTTTTTTTTTXT
V-:-- / 16
CC

0
CC

0
FFFFFFFFFTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFFFTFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
d2k3p2b04

FTFFTFFFFFTFFFFF (expected value)

4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 (confidence rate)

FFFFTFFFFFTFFFFF
TXTTTTTTTTTTTTTT
V-:-- / 16
FFFFTFFFFFTFFF?F
TXTTTTTTTTTTTT-T
V-:-- / 15
CC

0
CC

0
FTFFTFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
d3k3p2b06

FFFFFFFFFFFFFFTF (expected value)

7.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:P- / 19
CC

0
F???????????????
T---------------
--:-- / 1
FFFFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-M / 19
d4k3p2b08

FFTFFFFTTFTFFFTF (expected value)

6.00 6.00 6.00 7.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFTFFFFTTFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFF?TTFTFFFTF
TTTTTT-TTTTTTTTT
--:-- / 18
FFTFFFFTTFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFTTFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
???F????????????
---T------------
--:-- / 1
CC

0
FFTFFFFTTFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFTTFTFFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
d5k3p2b10

FTTFTTFT? TFFFFFF (expected value)

4.00 6.00 5.00 1.00 5.00 5.00 4.00 6.00 0 5.00 5.00 4.00 4.00 4.00 5.00 5.00 (confidence rate)

?TTFTT?T?T??????
-TTTTT-T?T------
--:-- / 8
?T?????T??F???FF
-T-----T?-T---TT
--:-- / 6
FTT?TTFT?TFFFFFF
TTT-TTTT?TTTTTTT
--:-- / 17
FTT?TTFT?TFFFFFF
TTT-TTTT?TTTTTTT
--:-- / 17
CC

0
CC

0
FTT?TTFT?TFFFFFF
TTT-TTTT?TTTTTTT
--:-- / 17
FTT?TTFT?TFFFFFF
TTT-TTTT?TTTTTTT
--:-- / 17
IBM319 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 102 102 102 102 102 102 102
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
none

FFFTTFFFTFFTFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 102
FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTTFFFTFFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 102
IBM5964 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 102 102 102 102 102 102 102
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
none

FFFTFFFFFTFFTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 102
FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 102
FFFTFFFFFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 102
IBM703 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 102 102 102 102 102 102 102
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
none

FTFFFFFTTFFTTTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:PM / 102
FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFFTTFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 102
IBMB2S565S3960 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 102 102 102 96 96 102 102
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
none

FTFFFFTFTFTFTTFF (expected value)

8.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFFFTFTFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFTFTFTFTTFF
TTTTTTTTTTTTTTTT
--:PM / 102
FTFFFFTFTFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFTFTFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFF?TFTFTFTTFF
TTTTT-TTTTTTTTTT
--:-- / 96
FTFFF?TFTFTFTTFF
TTTTT-TTTTTTTTTT
--:-- / 96
FTFFFFTFTFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 102
FTFFFFTFTFTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 102
IOTPpurchase — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 112 110 52 52 110 110 52 52
Road Runner 1 3 0 0 0 0 0 0
Camel 1 3 0 0 0 0 0 0
C01M01P01D01

FFTFTTFFFFTTTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 28
FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:PM / 28
FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 28
FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 28
FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 28
FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 28
FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 28
FFTFTTFFFFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 28
C03M03P03D03

FTTFFTFFFFFFFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFFTFFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 28
FTTFFTFFFFFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 28
CC

0
CC

0
FTTFFTFFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 28
FTTFFTFFFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
C05M04P03D02

TTFFFFFFFFTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TTFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 28
TTFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 28
CC

0
CC

0
TTFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 28
TTFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 28
CC

0
CC

0
C12M10P15D17

TFFFTFFFFFFTFFFF (expected value)

8.00 4.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFTFFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 28
TFFFT?FFFFFTFFFF
TTTTT-TTTTTTTTTT
--:-- / 26
T?FFT?FFFFFTFFFF
T-TTT-TTTTTTTTTT
--:-- / 24
T?FFT?FFFFFTFFFF
T-TTT-TTTTTTTTTT
--:-- / 24
TFFFT?FFFFFTFFFF
TTTTT-TTTTTTTTTT
--:-- / 26
TFFFT?FFFFFTFFFF
TTTTT-TTTTTTTTTT
--:-- / 26
T?FFT?FFFFFTFFFF
T-TTT-TTTTTTTTTT
--:-- / 24
T?FFT?FFFFFTFFFF
T-TTT-TTTTTTTTTT
--:-- / 24
JoinFreeModules — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 106 105 0 0 88 90 0 0
Road Runner 1 3 0 0 0 0 0 0
Camel 3 1 0 0 0 0 0 0
0003

FFFTFFTFFFFFTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-M / 11
FFFTFFTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:P- / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTFFTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFTFFTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0004

FFFFFFFFFFTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-M / 11
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:P- / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0005

FFFFFTFFTFFTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFTFFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFTFFTFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFTFFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFTFFTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0010

TTFTTFFFFFFFTTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TTFTTFFFFFFFTTFT
TTTTTTTTTTTTTTTT
--:PM / 11
TTFTTFFF?FFFTTFT
TTTTTTTT-TTTTTTT
--:-- / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFTTFFFFF?FTTFT
TTTTTTTTTT-TTTTT
--:-- / 10
TTFTTFFFFFFFTTFT
TTTTTTTTTTTTTTTT
--:-- / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0020

FTFTTTFFFFTFFFTF (expected value)

4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate)

FTFTTTFFF?TFFFTF
TTTTTTTTT-TTTTTT
--:-- / 10
FT?TTTFFF?TFFFT?
TT-TTTTTT-TTTTT-
--:-- / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FT?TTTFFFFTFFFTF
TT-TTTTTTTTTTTTT
--:-- / 10
FT?TTTFFF?TFFFTF
TT-TTTTTT-TTTTTT
--:-- / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0050

FFFFFTFFFFFTFFFF (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFT?FFFFTFFFF
TTTTTT-TTTTTTTTT
--:-- / 10
?FFFFT?FFF?TFFFF
-TTTTT-TTT-TTTTT
--:-- / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFTF?FF?TFFFF
TTTTTTT-TT-TTTTT
--:-- / 10
FFFFFTF?FF?TFFFF
TTTTTTT-TT-TTTTT
--:-- / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0100

? FFFFFFFFFFF? FTF (expected value)

0 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 2.00 0 2.00 2.00 2.00 (confidence rate)

?F?FFFFFFFF??FTF
?T-TTTTTTTT-?TTT
--:-- / 8
?FFFFFFFF?F??FTF
?TTTTTTTT-T-?TTT
--:-- / 8
????????????????
?-----------?---
--:-- / 0
????????????????
?-----------?---
--:-- / 0
?FFFFFFFF?FF????
?TTTTTTTT-TT?---
--:-- / 7
?FFFFFFFF?FF????
?TTTTTTTT-TT?---
--:-- / 7
????????????????
?-----------?---
--:-- / 0
????????????????
?-----------?---
--:-- / 0
0200

? TFTTTFTFFF? TFFF (expected value)

0 4.00 1.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 0 4.00 4.00 4.00 4.00 (confidence rate)

?TFTTTFTFFF?TFFF
?TTTTTTTTTT?TTTT
--:-- / 10
?T?TTTFTFF??TFFF
?T-TTTTTTT-?TTTT
--:-- / 8
????????????????
?----------?----
--:-- / 0
????????????????
?----------?----
--:-- / 0
?T?TTTFTFFF?TFFF
?T-TTTTTTTT?TTTT
--:-- / 9
?T?TTTFTFFF?TFFF
?T-TTTTTTTT?TTTT
--:-- / 9
????????????????
?----------?----
--:-- / 0
????????????????
?----------?----
--:-- / 0
0500

F? F? FFTTFFFTF? FF (expected value)

3.00 0 4.00 0 2.00 3.00 2.00 4.00 4.00 2.00 3.00 4.00 4.00 0 3.00 2.00 (confidence rate)

F?F?FFTTFFFTF?FF
T?T?TTTTTTTTT?TT
--:-- / 9
F?F?F?TTFF?TF?FF
T?T?T-TTTT-TT?TT
--:-- / 8
????????????????
-?-?---------?--
--:-- / 0
????????????????
-?-?---------?--
--:-- / 0
??F??F?TF?FTF???
-?T?-T-TT-TTT?--
--:-- / 5
F?F??F?TF?FTF?F?
T?T?-T-TT-TTT?T-
--:-- / 6
????????????????
-?-?---------?--
--:-- / 0
????????????????
-?-?---------?--
--:-- / 0
1000

T? TFTFTTTFFTFTTF (expected value)

4.00 0 2.00 2.00 2.00 1.00 2.00 2.00 4.00 2.00 3.00 4.00 3.00 2.00 2.00 2.00 (confidence rate)

T?TFT?TTT??T?TTF
T?TTT-TTT--T-TTT
--:-- / 8
T?TFTFTTT?FTFTTF
T?TTTTTTT-TTTTTT
--:-- / 10
????????????????
-?--------------
--:-- / 0
????????????????
-?--------------
--:-- / 0
T???????TFFTF???
T?------TTTTT---
--:-- / 4
T???????TFFTF???
T?------TTTTT---
--:-- / 4
????????????????
-?--------------
--:-- / 0
????????????????
-?--------------
--:-- / 0
2000

FTFF? F? FFFTFFFTT (expected value)

1.00 2.00 1.00 2.00 0 1.00 0 1.00 1.00 2.00 2.00 1.00 1.00 1.00 2.00 2.00 (confidence rate)

?T?F?????FT???TT
-T-T?-?--TT---TT
--:-- / 4
FTFF?F?FFFTFFFTT
TTTT?T?TTTTTTTTT
--:-- / 10
????????????????
----?-?---------
--:-- / 0
????????????????
----?-?---------
--:-- / 0
DNF

0
DNF

0
????????????????
----?-?---------
--:-- / 0
????????????????
----?-?---------
--:-- / 0
5000

? ? ? TF? ? T? ? ? ? ? ? FT (expected value)

0 0 0 1.00 1.00 0 0 1.00 0 0 0 0 0 0 1.00 1.00 (confidence rate)

???TF??T??????FT
???TT??T??????TT
--:-- / 3
CC

0
????????????????
???--??-??????--
--:-- / 0
????????????????
???--??-??????--
--:-- / 0
DNF

0
DNF

0
????????????????
???--??-??????--
--:-- / 0
????????????????
???--??-??????--
--:-- / 0
Kanban — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 119 116 45 45 103 104 30 30
Road Runner 3 5 0 0 0 0 0 0
Camel 4 4 0 0 0 0 0 0
0005

FFFFTTFFTTFFFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:-M / 15
FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:P- / 15
FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTTFFTTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
0010

TFFTTFFFFTFTFFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTTFFFFTFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
TFFTTFFFFTFTFFTT
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
TFFTTFFFFTFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
TFFTTFFFFTFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
0020

FFFFTFFFFTFTFFFF (expected value)

4.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 15
F?FF?FFFFTFTFFFF
T-TT-TTTTTTTTTTT
--:-- / 13
CC

0
CC

0
FFFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
0050

FFFTFFFTFTFFFTFF (expected value)

4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFTFFFTFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTFFFTFTFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
FFFTFFFTFTFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFT????????????
TTTT------------
--:-- / 4
CC

0
CC

0
0100

TFFTFFFFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 2.00 (confidence rate)

TFFTFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 15
TFFTFFFFFFFFFFF?
TTTTTTTTTTTTTTT-
--:-- / 14
CC

0
CC

0
TFFTFFFFFFF?????
TTTTTTTTTTT-----
--:-- / 10
TFFTFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
0200

FFTFFFFFTFFFTFFT (expected value)

4.00 2.00 4.00 4.00 4.00 4.00 3.00 2.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFTFFFFFTFFFTFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFFFFFTFFFTFFT
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
F?TFFF??????????
T-TTTT----------
--:-- / 5
F?TFFFF?TF?FTFFT
T-TTTTT-TT-TTTTT
--:-- / 12
CC

0
CC

0
0500

FFFFTTFFTFFTFTFF (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 3.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFTT?FTFFTFTFF
TTTTTT-TTTTTTTTT
--:-- / 14
FFFFTTFFTFFTFTFF
TTTTTTTTTTTTTTTT
--:PM / 15
FFFFTTFFTFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTTFFTFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTT??TFFTFTFF
TTTTTT--TTTTTTTT
--:-- / 13
FFFFTT??TFFTFTFF
TTTTTT--TTTTTTTT
--:-- / 13
CC

0
CC

0
1000

FTTTFTFFTFFFFFFT (expected value)

8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTTFTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 15
FT?TFTFFTFFFFFFT
TT-TTTTTTTTTTTTT
--:-- / 14
FTTTFTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FTTTFTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FTTTFTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FTTTFTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FTTTFTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
FTTTFTFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
LamportFastMutEx — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 67 10 29 58 58 20 20
Road Runner 0 4 0 0 0 0 1 0
Camel 0 4 0 0 0 0 1 0
2

FFFFFTFFFTTTTFFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FFFFFTFFFTTTTFFF
TTTTTTTTTTTTTTTT
--:PM / 10
FFFFFTFFFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFFTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
3

TFFTFFFTFFFFFFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TFFTFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
TFFTFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFTFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
4

TFFTFTFFFFFFFFTT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TFFTFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
TFFTFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 10
TFFTFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
5

FFTFFTTFTFFFTFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FFTFFTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
FFTFFTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFTFFTTFTFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
6

FTFFFFFTFTTTFF? T (expected value)

3.00 3.00 3.00 1.00 3.00 2.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 (confidence rate)

DNC FTFFF?FTFTTTFF?T
TTTTT-TTTTTTTT?T
--:-- / 9
CC

0
CC

0
FTF?FFF?????????
TTT-TTT-------?-
--:-- / 4
FTF?FFF?????????
TTT-TTT-------?-
--:-- / 4
CC

0
CC

0
7

FFFFFFTFFTFFTTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate)

DNC FFFFFFTF?TFFTTFF
TTTTTTTT-TTTTTTT
--:-- / 9
????????????????
----------------
--:-- / 0
FFFFFFTFFTFF?TFF
TTTTTTTTTTTT-TTT
--:-- / 9
FFFFFFTF????????
TTTTTTTT--------
--:-- / 5
FFFFFFTF????????
TTTTTTTT--------
--:-- / 5
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
8

FFFFFTTTTFFTFTFT (expected value)

4.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

DNC FFFFFTTTTF?TFTFT
TTTTTTTTTT-TTTTT
--:-- / 9
????????????????
----------------
--:-- / 0
FFFFFTTTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
?FF?FTTTTFFTFTFT
-TT-TTTTTTTTTTTT
--:-- / 9
?FF?FTTTTFFTFTFT
-TT-TTTTTTTTTTTT
--:-- / 9
FFFFFTTTTFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 10
FFFFFTTTTFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
LamportFastMutEx — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 61 69 25 25 52 64 16 16
Road Runner 0 6 0 0 0 0 0 0
Camel 0 6 0 0 0 0 0 0
2

FFFFFTFFTTTFTTTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:PM / 10
FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFTTTFTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
3

TFFTFFFTTFTTTTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFFFTTFTTTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFTFFFTTFTTTTFF
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
TFFTFFFTTFTTTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFTFFFTTFTTTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
4

TFFTFTFFTTFTTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFTFFTTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFFTFTFFTTFTTFFT
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
TFFTFTFFTTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFFTFTFFTTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
5

FFTFFTTFTTFTFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 1.00 4.00 4.00 (confidence rate)

FFTFFTTFTTF?F?FT
TTTTTTTTTTT-T-TT
--:-- / 9
FFTFFTTFTTFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
FFTFFTTFTTF?F?FT
TTTTTTTTTTT-T-TT
--:-- / 9
FFTFFTTFTTF?F?FT
TTTTTTTTTTT-T-TT
--:-- / 9
CC

0
CC

0
6

FTFFFFFTFFFFFTFF (expected value)

4.00 4.00 4.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FTFF?F??FFFFFTFF
TTTT-T--TTTTTTTT
--:-- / 8
FTFFF?FTFFFFFTFF
TTTTT-TTTTTTTTTT
--:-- / 9
CC

0
CC

0
FTF?FFF?????????
TTT-TTT---------
--:-- / 4
FTFFFFF?FFFFFTFF
TTTTTTT-TTTTTTTT
--:-- / 9
CC

0
CC

0
7

FFFFFFTFFTTFTTFT (expected value)

6.00 5.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate)

F?F?FF?FFTTFTTF?
T-T-TT-TTTTTTTT-
--:-- / 7
FFFFFFTFFTTFTTFT
TTTTTTTTTTTTTTTT
--:PM / 10
FFFFFFTFFTTFTTF?
TTTTTTTTTTTTTTT-
--:-- / 9
FFFFFFTFFTTFTTF?
TTTTTTTTTTTTTTT-
--:-- / 9
FFFFFFTFFTTFTTF?
TTTTTTTTTTTTTTT-
--:-- / 9
FFFFFFTFFTTFTTF?
TTTTTTTTTTTTTTT-
--:-- / 9
CC

0
CC

0
8

FFFFFTTTTFTTTFTT (expected value)

6.00 7.00 7.00 6.00 7.00 7.00 6.00 6.00 7.00 7.00 1.00 1.00 3.00 2.00 3.00 3.00 (confidence rate)

FFFFFT??TF??TFTT
TTTTTT--TT--TTTT
--:-- / 7
FFFFFTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:PM / 10
FFFFFTTTTF??????
TTTTTTTTTT------
--:-- / 6
FFFFFTTTTF??????
TTTTTTTTTT------
--:-- / 6
CC

0
?FF?FTTTTF??T?TT
-TT-TTTTTT--T-TT
--:-- / 7
FFFFFTTTTF??????
TTTTTTTTTT------
--:-- / 6
FFFFFTTTTF??????
TTTTTTTTTT------
--:-- / 6
MAPK — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 119 103 20 20 75 102 20 20
Road Runner 2 3 0 0 0 0 0 0
Camel 3 2 0 0 0 0 0 0
008

FFFTFFTFTTTFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-M / 20
FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:P- / 20
FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 20
FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 20
FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 20
FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 20
FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 20
FFFTFFTFTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 20
020

FTFFFFFFTFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FTFFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 20
FTFFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 20
CC

0
CC

0
FTFFFFFFTF??????
TTTTTTTTTT------
--:-- / 13
FTFFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 20
CC

0
CC

0
040

TTFTFTTFFFFTTFFT (expected value)

4.00 3.00 3.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 3.00 3.00 3.00 (confidence rate)

TTFTFTTFFFFTTFFT
TTTTTTTTTTTTTTTT
--:PM / 20
T??TF?TFF??TT???
T--TT-TTT--TT---
--:-- / 10
CC

0
CC

0
TTFTFTTFFFFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 20
TTFTFTTFFFFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 20
CC

0
CC

0
080

FTTFFFFFFFFFFFFT (expected value)

2.00 4.00 4.00 4.00 4.00 3.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 (confidence rate)

FTTFFFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 20
FTTFFFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 20
CC

0
CC

0
?TTFFF?FFFFFFF??
-TTTTT-TTTTTTT--
--:-- / 15
?TTFF???????????
-TTTT-----------
--:-- / 5
CC

0
CC

0
160

FFTFTFFTFFFFFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 1.00 1.00 3.00 3.00 3.00 2.00 3.00 2.00 3.00 3.00 3.00 (confidence rate)

FFTFTFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 20
FFTFT??TFF?F?TTF
TTTTT--TTT-T-TTT
--:-- / 15
CC

0
CC

0
FFTFT???????????
TTTTT-----------
--:-- / 6
FFTFT??TFFFFFTTF
TTTTT--TTTTTTTTT
--:-- / 18
CC

0
CC

0
320

FFTFFTFTFFFFTFFT (expected value)

4.00 1.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

F?TFFTFTFFFFTFFT
T-TTTTTTTTTTTTTT
--:-- / 19
F?TFFT?TFFFFTFFT
T-TTTT-TTTTTTTTT
--:-- / 18
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
F???????????????
T---------------
--:-- / 1
FFTFFT?TFFFFTFFT
TTTTTT-TTTTTTTTT
--:-- / 19
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
MultiwaySync — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 102 102 102 102 102 102 102
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
none

TFFFFFFTFFTFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 102
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
TFFFFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 102
NeighborGrid — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 113 113 115 115 92 90 115 115
Road Runner 1 4 0 0 0 0 0 0
Camel 0 4 0 1 0 0 0 0
d2n3m1c12

FFFTTTFFFFFFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 23
FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFFTTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
d2n3m1t12

FFTFTTFFTFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 23
FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FFTFTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
d3n3m1t11

FFFFTFFFFFFTFTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 23
FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 23
d4n3m2c23

FTFFFFFTFTFTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 7.00 (confidence rate)

FTFFFFFTFTFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 23
FTFFFFFTFTFTF?FF
TTTTTTTTTTTTT-TT
--:-- / 21
FTFFFFFTFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FTFFFFFTFTFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 23
FTFFFFFTFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FTFFFFFTFTFTFFF?
TTTTTTTTTTTTTTT-
--:-- / 21
FTFFFFFTFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FTFFFFFTFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
d5n4m1t35

FFFFFTFTFTFTTFFT (expected value)

6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFF?TFTFTFTTFFT
TTTT-TTTTTTTTTTT
--:-- / 21
FFFFFTFTFTFTTFFT
TTTTTTTTTTTTTTTT
--:PM / 23
FFFFFTFTFTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFTFTFTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 23
CC

0
CC

0
FFFFFTFTFTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFTFTFTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 23
NeoElection — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 66 10 10 25 25 10 10
Road Runner 0 4 0 0 0 0 0 0
Camel 0 4 0 0 0 0 0 0
2

TFTTTTTTFTTFFFFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC TFTTTTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:PM / 10
TFTTTTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTFTTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
3

TTFFFFFTFTFTTTTF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TTFFFFFTFTFTTTTF
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
TTFFFFFTFTFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 10
TTFFFFFTFTFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
4

FTFFFTFTFTTTTTTF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC FTFFFTFTFTTTTTTF
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
FTFFFTF?????????
TTTTTTT---------
--:-- / 4
FTFFFTF?????????
TTTTTTT---------
--:-- / 4
CC

0
CC

0
5

TTF? TFFTT? FFFFFT (expected value)

3.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TTF?TFFTT?FFFFFT
TTT?TTTTT?TTTTTT
--:-- / 9
CC

0
CC

0
T???????????????
T--?-----?------
--:-- / 1
T???????????????
T--?-----?------
--:-- / 1
CC

0
CC

0
6

TFFTFTFFTFTFFFTT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TFFTFTFFTFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
7

? TFTTTFF? ? TTTFFF (expected value)

0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 0 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC ?TFTTTFF??TTTFFF
?TTTTTTT??TTTTTT
--:-- / 8
????????????????
?-------??------
--:-- / 0
????????????????
?-------??------
--:-- / 0
CC

0
CC

0
????????????????
?-------??------
--:-- / 0
????????????????
?-------??------
--:-- / 0
8

FTFFFFTTFFFTF? FT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 (confidence rate)

DNC FTFFFFTTFFFTF?FT
TTTTTTTTTTTTT?TT
--:-- / 9
????????????????
-------------?--
--:-- / 0
????????????????
-------------?--
--:-- / 0
CC

0
CC

0
????????????????
-------------?--
--:-- / 0
????????????????
-------------?--
--:-- / 0
NeoElection — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 41 67 10 10 33 33 10 10
Road Runner 0 4 0 0 0 0 0 0
Camel 0 4 0 0 0 0 0 0
2

TFTTTTTTTTTTTTTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 10
TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
3

TTFFFFFTTTTTTTTT (expected value)

3.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?TFFF??TTTTTTTTT
-TTTT--TTTTTTTTT
--:-- / 8
TTFFFFFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
TTFFFFFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
TTFFFFFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
4

FTFFFTFTTTTTTTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 1.00 4.00 3.00 3.00 4.00 (confidence rate)

FTFFFTF?TTT?T??T
TTTTTTT-TTT-T--T
--:-- / 7
FTFFFTFTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
FTFFFTF?TTT?TTTT
TTTTTTT-TTT-TTTT
--:-- / 9
FTFFFTF?TTT?TTTT
TTTTTTT-TTT-TTTT
--:-- / 9
CC

0
CC

0
5

TTF? TFFTTTTTTTTT (expected value)

3.00 1.00 1.00 0 4.00 1.00 4.00 4.00 2.00 2.00 2.00 4.00 4.00 1.00 1.00 1.00 (confidence rate)

????T?FTTTTTT???
---?T-TTTTTTT---
--:-- / 5
TTF?TFFTTTTTTTTT
TTT?TTTTTTTTTTTT
--:-- / 9
CC

0
CC

0
T???T?FT???TT???
T--?T-TT---TT---
--:-- / 4
T???T?FT???TT???
T--?T-TT---TT---
--:-- / 4
CC

0
CC

0
6

TFFTFTFFTTT? TTTT (expected value)

1.00 2.00 2.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 0 2.00 1.00 2.00 1.00 (confidence rate)

?FF??TF?????T?T?
-TT--TT----?T-T-
--:-- / 4
TFFTFTFFTTT?TTTT
TTTTTTTTTTT?TTTT
--:-- / 9
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
CC

0
CC

0
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
7

? TFTTTFFTTTTTTTT (expected value)

0 1.00 1.00 2.00 1.00 2.00 2.00 2.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

???T?TFF?TT?????
?--T-TTT-TT-----
--:-- / 4
?TFTTTFFTTTTTTTT
?TTTTTTTTTTTTTTT
--:-- / 9
????????????????
?---------------
--:-- / 0
????????????????
?---------------
--:-- / 0
CC

0
CC

0
????????????????
?---------------
--:-- / 0
????????????????
?---------------
--:-- / 0
8

FTFFFFTTTTTTTTTT (expected value)

1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 2.00 2.00 (confidence rate)

?????F?????TT?TT
-----T-----TT-TT
--:-- / 3
FTFFFFTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
PaceMaker — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 96 96 0 0 96 96 0 0
Road Runner 0 0 0 0 0 0 0 0
Camel 0 0 0 0 0 0 0 0
none

FTFFFTTTTTFFTFTF (expected value)

4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 4.00 4.00 4.00 (confidence rate)

FTFFFTTTTTFF?FTF
TTTTTTTTTTTT-TTT
--:-- / 96
FTFF?TTTTTFFTFTF
TTTT-TTTTTTTTTTT
--:-- / 96
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTFFFTTTTTFF?FTF
TTTTTTTTTTTT-TTT
--:-- / 96
FTFFFTTTTTFF?FTF
TTTTTTTTTTTT-TTT
--:-- / 96
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
ParamProductionCell — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 112 113 0 0 114 114 0 0
Road Runner 1 5 0 0 0 0 0 0
Camel 1 5 0 0 0 0 0 0
0

FFTFFFFFTFTFFTFF (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

F?TFFFFFTFTFFTFF
T-TTTTTTTTTTTTTT
--:-- / 18
FFTFFFFFTFTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
FFTFFFFFTFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFFTFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
1

TFFFFTFTTFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFTFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFTFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
TFFFFTFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFFTFTTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
2

FTTFFFFTFFFFTFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFFFFTFFFFTFTT
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFFFFTFFFFTFTT
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
FTTFFFFTFFFFTFTT
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFFFFTFFFFTFTT
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
3

FTFFFTTFFTTTFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFTTFFTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFFTTFFTTTFTTF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
FTFFFTTFFTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFFTTFFTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
4

FFFFFFTTFTFTFFTF (expected value)

4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFTTFTFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 19
FFFF?FTTFTFTFFTF
TTTT-TTTTTTTTTTT
--:-- / 18
CC

0
CC

0
FFFFFFTTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFFFFTTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
5

FFTFFFTFTFTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFFF?FTFTFFFFF
TTTTTT-TTTTTTTTT
--:-- / 18
FFTFFFTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
CC

0
CC

0
FFTFFFTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
Parking — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 99 104 35 35 102 105 35 35
Road Runner 0 1 0 0 3 1 0 0
Camel 0 2 0 0 1 2 0 0
104

FFFTTFFFFFTFTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:PM / 19
FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTTFFFFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 19
208

FFFFTFFFFFFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 3.00 4.00 2.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFTFF?FFF?FFFT
TTTTTTT-TTT-TTTT
--:-- / 17
FFFFTFFFF?F?FFFT
TTTTTTTTT-T-TTTT
--:-- / 17
CC

0
CC

0
FFFFTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:P- / 19
FFFFTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-M / 19
CC

0
CC

0
416

TFFFTTTFFFFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate)

TFFFTTTFFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 18
TFFFTTTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-M / 19
CC

0
CC

0
TFFFTTTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
TFFFTTTFFFFFFFFT
TTTTTTTTTTTTTTTT
--:P- / 19
CC

0
CC

0
432

TFTFFFFFTFFTFFFF (expected value)

4.00 3.00 4.00 2.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

T?T?FF?FTFFTFFFF
T-T-TT-TTTTTTTTT
--:-- / 16
TFT?FF?FTFFTFFFF
TTT-TT-TTTTTTTTT
--:-- / 17
CC

0
CC

0
TFTFFFFFTFFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 19
TFTFFFFFTFFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 19
CC

0
CC

0
832

TFFFFTFFFFFFFTFT (expected value)

4.00 4.00 4.00 3.00 2.00 4.00 4.00 4.00 2.00 3.00 4.00 4.00 4.00 4.00 2.00 4.00 (confidence rate)

TFF??TFF??FFFT?T
TTT--TTT--TTTT-T
--:-- / 13
TFFF?TFF?FFFFT?T
TTTT-TTT-TTTTT-T
--:-- / 16
CC

0
CC

0
TFFFFTFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 19
TFFFFTFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 19
CC

0
CC

0
864

FFFTT? TFFTFF? ? FT (expected value)

8.00 8.00 8.00 8.00 8.00 0 8.00 7.00 7.00 6.00 6.00 6.00 0 0 6.00 6.00 (confidence rate)

FFFTT?TFFTFF??FT
TTTTT?TTTTTT??TT
--:-- / 16
FFFTT?TFFTFF??FT
TTTTT?TTTTTT??TT
--:-- / 16
FFFTT?TFFTFF??FT
TTTTT?TTTTTT??TT
--:-- / 16
FFFTT?TFFTFF??FT
TTTTT?TTTTTT??TT
--:-- / 16
FFFTT?T?????????
TTTTT?T-----??--
--:-- / 7
FFFTT?TFF???????
TTTTT?TTT---??--
--:-- / 10
FFFTT?TFFTFF??FT
TTTTT?TTTTTT??TT
--:-- / 16
FFFTT?TFFTFF??FT
TTTTT?TTTTTT??TT
--:-- / 16
PermAdmissibility — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 57 11 60 42 34 60 60
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
01

TTTFFTFTTTTFFTFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC TTTFFTFTTTTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 11
TTTFFTFTTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTTTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
02

FFFTF? TTFTFFTTFF (expected value)

6.00 6.00 6.00 6.00 6.00 0 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC FFFTF?TTFTFFTTFF
TTTTT?TTTTTTTTTT
--:-- / 10
CC

0
FFFTF?TTFTFFTTFF
TTTTT?TTTTTTTTTT
--:-- / 10
FFFTF?TTFTFFTTFF
TTTTT?TTTTTTTTTT
--:-- / 10
FFFTF???????????
TTTTT?----------
--:-- / 3
FFFTF?TTFTFFTTFF
TTTTT?TTTTTTTTTT
--:-- / 10
FFFTF?TTFTFFTTFF
TTTTT?TTTTTTTTTT
--:-- / 10
05

TFTFFFFFT? FFTT? T (expected value)

6.00 6.00 6.00 6.00 6.00 3.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 0 6.00 (confidence rate)

DNC TFTFFFFFT?FFTT?T
TTTTTTTTT?TTTT?T
--:-- / 10
CC

0
TFTFF?FFT?FFTT?T
TTTTT-TTT?TTTT?T
--:-- / 9
TFTFFFFFT?FFTT?T
TTTTTTTTT?TTTT?T
--:-- / 10
TFTFFFFFT?FFTT?T
TTTTTTTTT?TTTT?T
--:-- / 10
TFTFF?FFT?FFTT?T
TTTTT-TTT?TTTT?T
--:-- / 9
TFTFF?FFT?FFTT?T
TTTTT-TTT?TTTT?T
--:-- / 9
10

FTFFTTT? FFTFTT? F (expected value)

5.00 5.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 (confidence rate)

DNC FTFFTTT?FFTFTT?F
TTTTTTT?TTTTTT?T
--:-- / 10
CC

0
FTFFTTT?FFTFTT?F
TTTTTTT?TTTTTT?T
--:-- / 10
FT??????????????
TT-----?------?-
--:-- / 1
CC

0
FTFFTTT?FFTFTT?F
TTTTTTT?TTTTTT?T
--:-- / 10
FTFFTTT?FFTFTT?F
TTTTTTT?TTTTTT?T
--:-- / 10
20

TFFTTTFFFTFFTFT? (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 4.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate)

DNC TFFTTTFFFTFFTFT?
TTTTTTTTTTTTTTT?
--:-- / 10
CC

0
TFFTTTFFFTFFTFT?
TTTTTTTTTTTTTTT?
--:-- / 10
TFFTTT?FFTFFTFT?
TTTTTT-TTTTTTTT?
--:-- / 10
TFFTTT?FFTFFTFT?
TTTTTT-TTTTTTTT?
--:-- / 10
TFFTTTFFFTFFTFT?
TTTTTTTTTTTTTTT?
--:-- / 10
TFFTTTFFFTFFTFT?
TTTTTTTTTTTTTTT?
--:-- / 10
50

FFFT? FFFTFTT? FFF (expected value)

3.00 4.00 3.00 4.00 0 3.00 4.00 4.00 4.00 4.00 4.00 4.00 0 3.00 3.00 3.00 (confidence rate)

DNC ?F?T??FFTFTT????
-T-T?-TTTTTT?---
--:-- / 6
CC

0
FFFT?FFFTFTT?FFF
TTTT?TTTTTTT?TTT
--:-- / 10
CC

0
CC

0
FFFT?FFFTFTT?FFF
TTTT?TTTTTTT?TTT
--:-- / 10
FFFT?FFFTFTT?FFF
TTTT?TTTTTTT?TTT
--:-- / 10
PermAdmissibility — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 59 58 11 42 30 26 42 42
Road Runner 0 1 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
01

TTTFFTFTFTTTFTTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:PM / 11
TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 11
02

FFFTF? TTT? TTTF? F (expected value)

5.00 5.00 5.00 5.00 5.00 0 5.00 5.00 5.00 0 5.00 5.00 5.00 5.00 0 5.00 (confidence rate)

FFFTF?TTT?TTTF?F
TTTTT?TTT?TTTT?T
--:-- / 9
FFFTF?TTT?TTTF?F
TTTTT?TTT?TTTT?T
--:-- / 9
CC

0
FFFTF?TTT?TTTF?F
TTTTT?TTT?TTTT?T
--:-- / 9
CC

0
CC

0
FFFTF?TTT?TTTF?F
TTTTT?TTT?TTTT?T
--:-- / 9
FFFTF?TTT?TTTF?F
TTTTT?TTT?TTTT?T
--:-- / 9
05

TFTFFFFFT? TFFTTT (expected value)

7.00 7.00 7.00 7.00 7.00 4.00 7.00 7.00 7.00 0 7.00 2.00 1.00 3.00 3.00 3.00 (confidence rate)

TFTFFFFFT?TFFTTT
TTTTTTTTT?TTTTTT
--:-- / 10
TFTFFFFFT?TF?TTT
TTTTTTTTT?TT-TTT
--:-- / 10
CC

0
TFTFF?FFT?T?????
TTTTT-TTT?T-----
--:-- / 6
TFTFFFFFT?T??TTT
TTTTTTTTT?T--TTT
--:-- / 9
TFTFFFFFT?T?????
TTTTTTTTT?T-----
--:-- / 7
TFTFF?FFT?T?????
TTTTT-TTT?T-----
--:-- / 6
TFTFF?FFT?T?????
TTTTT-TTT?T-----
--:-- / 6
10

FTFFTTTF? TTFTTTF (expected value)

7.00 7.00 5.00 7.00 7.00 7.00 7.00 1.00 0 6.00 6.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FTFFTTTF?TTFTTTF
TTTTTTTT?TTTTTTT
--:-- / 10
FTFFTTT??TTFTTTF
TTTTTTT-?TTTTTTT
--:-- / 10
CC

0
FTFFTTT??TT?????
TTTTTTT-?TT-----
--:-- / 6
FT?FTTT??TT?????
TT-TTTT-?TT-----
--:-- / 6
FT?FTTT?????????
TT-TTTT-?-------
--:-- / 4
FTFFTTT??TT?????
TTTTTTT-?TT-----
--:-- / 6
FTFFTTT??TT?????
TTTTTTT-?TT-----
--:-- / 6
20

TFFTTTFF? FTTTFFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 5.00 5.00 0 5.00 5.00 5.00 5.00 2.00 5.00 5.00 (confidence rate)

TFFTTTFF?FTTTFFT
TTTTTTTT?TTTTTTT
--:-- / 10
TFFTTTFF?FTTTFFT
TTTTTTTT?TTTTTTT
--:-- / 10
CC

0
TFFTTTFF?FTTT?FT
TTTTTTTT?TTTT-TT
--:-- / 10
TFFTTT??????????
TTTTTT--?-------
--:-- / 4
TFFTTT??????????
TTTTTT--?-------
--:-- / 4
TFFTTTFF?FTTT?FT
TTTTTTTT?TTTT-TT
--:-- / 10
TFFTTTFF?FTTT?FT
TTTTTTTT?TTTT-TT
--:-- / 10
50

FFFT? FFFTFF? T? FF (expected value)

2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 1.00 2.00 0 2.00 0 2.00 1.00 (confidence rate)

FFFT?FFFTFF?T?FF
TTTT?TTTTTT?T?TT
--:-- / 9
FFFT?FFFT?F?T?F?
TTTT?TTTT-T?T?T-
--:-- / 8
CC

0
????????????????
----?------?-?--
--:-- / 0
CC

0
CC

0
????????????????
----?------?-?--
--:-- / 0
????????????????
----?------?-?--
--:-- / 0
Peterson — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 65 21 31 24 40 21 31
Road Runner 0 5 0 0 0 0 0 0
Camel 0 5 0 0 0 0 0 0
2

FTFTFTTTTTFFFFFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FTFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 11
FTFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTTTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
3

FTFTFFFTFFFFFTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTFTFFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
FTFTFFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
4

FFTTFFFFFTTTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 1.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FFTTFFFFFTTTFFFT
TTTTTTTTTTTTTTTT
--:PM / 11
????????????????
----------------
--:-- / 0
FFTTFFFFF??TFFFT
TTTTTTTTT--TTTTT
--:-- / 10
CC

0
FFTTFFFFF???????
TTTTTTTTT-------
--:-- / 6
????????????????
----------------
--:-- / 0
FFTTFFFFF??TFFFT
TTTTTTTTT--TTTTT
--:-- / 10
5

TFTTFTTFFTFTTFFT (expected value)

6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

DNC TFTTFTTFFTFTTFFT
TTTTTTTTTTTTTTTT
--:PM / 11
TFTTFTTFF?FTTFFT
TTTTTTTTT-TTTTTT
--:-- / 10
TFTTFTTFF?FTTFFT
TTTTTTTTT-TTTTTT
--:-- / 10
CC

0
TFTTFT?FF?FTTFFT
TTTTTT-TT-TTTTTT
--:-- / 10
TFTTFTTFF?FTTFFT
TTTTTTTTT-TTTTTT
--:-- / 10
TFTTFTTFF?FTTFFT
TTTTTTTTT-TTTTTT
--:-- / 10
6

? FFT? FTFFFFTFFFF (expected value)

0 3.00 3.00 3.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC ?FFT?FTFFFFTFFFF
?TTT?TTTTTTTTTTT
--:-- / 10
????????????????
?---?-----------
--:-- / 0
????????????????
?---?-----------
--:-- / 0
?FFT????????????
?TTT?-----------
--:-- / 2
?FFT????????????
?TTT?-----------
--:-- / 2
????????????????
?---?-----------
--:-- / 0
????????????????
?---?-----------
--:-- / 0
7

TTFFFTFFFFTTFTFF (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TTFFFTFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:PM / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
Peterson — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 43 62 31 31 43 34 31 31
Road Runner 0 4 0 0 0 0 0 0
Camel 0 4 0 0 0 0 0 0
2

FTFTFTTTFFFFFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:PM / 11
FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFTTTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
3

FTFTFFFTFTTFTTFF (expected value)

4.00 3.00 4.00 4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

F?FTF??TFTTFTTFF
T-TTT--TTTTTTTTT
--:-- / 9
FTFTFFFTFTTFTTFF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
FTFTFFFTFTTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTFTFFFTFTTFTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
4

FFTTFFFFFTFTFTTT (expected value)

2.00 3.00 3.00 2.00 2.00 2.00 2.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

?FT????F?TFTFTTT
-TT----T-TTTTTTT
--:-- / 7
FFTTFFFFFTFTFTTT
TTTTTTTTTTTTTTTT
--:PM / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFTTFFFF?TFTFTTT
TTTTTTTT-TTTTTTT
--:-- / 10
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
5

TFTTFTTFFTTTFFT? (expected value)

8.00 8.00 7.00 7.00 7.00 8.00 5.00 8.00 1.00 7.00 7.00 7.00 5.00 1.00 7.00 0 (confidence rate)

TF???T?F?TTT??T?
TT---T-T-TTT--T?
--:-- / 6
TFTTFTTFFTTTFFT?
TTTTTTTTTTTTTTT?
--:-- / 10
TFTTFTTF?TTTF?T?
TTTTTTTT-TTTT-T?
--:-- / 9
TFTTFTTF?TTTF?T?
TTTTTTTT-TTTT-T?
--:-- / 9
TFTTFT?F?TTT??T?
TTTTTT-T-TTT--T?
--:-- / 8
TFTTFT?F????????
TTTTTT-T-------?
--:-- / 5
TFTTFTTF?TTTF?T?
TTTTTTTT-TTTT-T?
--:-- / 9
TFTTFTTF?TTTF?T?
TTTTTTTT-TTTT-T?
--:-- / 9
6

? FFT? FTFTTTT? TT? (expected value)

0 3.00 3.00 3.00 0 3.00 1.00 1.00 2.00 2.00 2.00 2.00 0 2.00 2.00 0 (confidence rate)

????????TTTT?TT?
?---?---TTTT?TT?
--:-- / 4
?FFT?FTFTTTT?TT?
?TTT?TTTTTTT?TT?
--:-- / 8
????????????????
?---?-------?--?
--:-- / 0
????????????????
?---?-------?--?
--:-- / 0
?FFT?F??????????
?TTT?T------?--?
--:-- / 3
?FFT?F??????????
?TTT?T------?--?
--:-- / 3
????????????????
?---?-------?--?
--:-- / 0
????????????????
?---?-------?--?
--:-- / 0
7

TTFFFTFFTTTTTFTT (expected value)

6.00 6.00 5.00 5.00 5.00 5.00 6.00 5.00 6.00 6.00 7.00 6.00 6.00 7.00 7.00 6.00 (confidence rate)

????????TTTTTFTT
--------TTTTTTTT
--:-- / 6
TTFFFTFFTTTTTFTT
TTTTTTTTTTTTTTTT
--:PM / 11
TTFFFTFFTTTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFFTFFTTTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
TT????F???T??FT?
TT----T---T--TT-
--:-- / 4
TTFFFTFFTTTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFFTFFTTTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 11
PhaseVariation — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 121 113 55 55 60 60 55 55
Road Runner 1 2 0 0 0 0 0 0
Camel 1 2 0 0 0 0 0 0
D02CS010

FFFFTTFFFFFFFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 13
FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFTTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
D02CS100

TFFTFTFFFFFFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFTFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 13
TFFTFTFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
TFFTFTFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
TFFTFTFFFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
D05CS010

FFFFFFFTFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 13
CC

0
CC

0
FFFFFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
D05CS100

FTTFTTT? TFTFFFTF (expected value)

2.00 2.00 2.00 1.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FTTFTTT?TFTFFFTF
TTTTTTT?TTTTTTTT
--:-- / 12
FTT?TTT?TFTFFFTF
TTT-TTT?TTTTTTTT
--:-- / 11
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
D10CS010

FFT? FTFFFTFTTFFT (expected value)

8.00 1.00 8.00 0 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFT?FTFFFTFTTFFT
TTT?TTTTTTTTTTTT
--:-- / 12
F?T?FTFFFTFTTFFT
T-T?TTTTTTTTTTTT
--:-- / 11
F?T?FTFFFTFTTFFT
T-T?TTTTTTTTTTTT
--:-- / 11
F?T?FTFFFTFTTFFT
T-T?TTTTTTTTTTTT
--:-- / 11
F?T?FTFFFTFTTFFT
T-T?TTTTTTTTTTTT
--:-- / 11
F?T?FTFFFTFTTFFT
T-T?TTTTTTTTTTTT
--:-- / 11
F?T?FTFFFTFTTFFT
T-T?TTTTTTTTTTTT
--:-- / 11
F?T?FTFFFTFTTFFT
T-T?TTTTTTTTTTTT
--:-- / 11
D10CS100

FFFFFFTFFFFFFTFF (expected value)

8.00 8.00 6.00 3.00 2.00 8.00 8.00 8.00 2.00 6.00 6.00 5.00 6.00 6.00 1.00 6.00 (confidence rate)

FFF?FFTFFFF?FTFF
TTT-TTTTTTT-TTTT
--:-- / 11
FFFFFFTFFFFFFT?F
TTTTTTTTTTTTTT-T
--:-- / 12
FFF??FTF?FFFFT?F
TTT--TTT-TTTTT-T
--:-- / 10
FFF??FTF?FFFFT?F
TTT--TTT-TTTTT-T
--:-- / 10
FF?F?FTF????????
TT-T-TTT--------
--:-- / 5
FF?F?FTF????????
TT-T-TTT--------
--:-- / 5
FFF??FTF?FFFFT?F
TTT--TTT-TTTTT-T
--:-- / 10
FFF??FTF?FFFFT?F
TTT--TTT-TTTTT-T
--:-- / 10
D20CS010

FTTTFTFF? FFFFTTF (expected value)

8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 2.00 (confidence rate)

FTTTFTFF?FFFFTTF
TTTTTTTT?TTTTTTT
--:-- / 12
FTTTFTFF?FFFFTTF
TTTTTTTT?TTTTTTT
--:-- / 12
FTTTFTFF?FFFFTT?
TTTTTTTT?TTTTTT-
--:-- / 11
FTTTFTFF?FFFFTT?
TTTTTTTT?TTTTTT-
--:-- / 11
F???????????????
T-------?-------
--:-- / 1
F???????????????
T-------?-------
--:-- / 1
FTTTFTFF?FFFFTT?
TTTTTTTT?TTTTTT-
--:-- / 11
FTTTFTFF?FFFFTT?
TTTTTTTT?TTTTTT-
--:-- / 11
D20CS100

FFFFFTFTFT? FFFTF (expected value)

8.00 1.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 0 6.00 1.00 6.00 6.00 6.00 (confidence rate)

FFFFFTFTFT?FFFTF
TTTTTTTTTT?TTTTT
--:-- / 12
F?FFFTFTFT?F?FTF
T-TTTTTTTT?T-TTT
--:-- / 10
F?FFFTFTFT?F?FTF
T-TTTTTTTT?T-TTT
--:-- / 10
F?FFFTFTFT?F?FTF
T-TTTTTTTT?T-TTT
--:-- / 10
F?FFFT??????????
T-TTTT----?-----
--:-- / 4
F?FFFT??????????
T-TTTT----?-----
--:-- / 4
F?FFFTFTFT?F?FTF
T-TTTTTTTT?T-TTT
--:-- / 10
F?FFFTFTFT?F?FTF
T-TTTTTTTT?T-TTT
--:-- / 10
D30CS010

FFFFFFTFFFTF? FTF (expected value)

2.00 2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 (confidence rate)

FFFFFFTFFFTF?FTF
TTTTTTTTTTTT?TTT
--:-- / 12
FF?FFFT?FFTF?FTF
TT-TTTT-TTTT?TTT
--:-- / 10
????????????????
------------?---
--:-- / 0
????????????????
------------?---
--:-- / 0
CC

0
CC

0
????????????????
------------?---
--:-- / 0
????????????????
------------?---
--:-- / 0
D30CS100

FFFTFFFFTFF? FFFF (expected value)

2.00 2.00 2.00 2.00 1.00 1.00 2.00 2.00 2.00 2.00 1.00 0 1.00 1.00 2.00 1.00 (confidence rate)

FFFTFFFFTFF?F?FF
TTTTTTTTTTT?T-TT
--:-- / 11
FFFT??FFTF???FF?
TTTT--TTTT-?-TT-
--:-- / 8
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
CC

0
CC

0
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
Philosophers — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 67 8 8 46 46 8 8
Road Runner 0 4 0 0 1 0 0 0
Camel 0 4 0 0 1 0 0 0
000005

FTFTTTFFTFFFTTFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FTFTTTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 8
FTFTTTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
000010

FTFFTTFFTFTFFFFT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTFFTTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTFFTTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTTFFTFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000020

FFFTFTFFFFFFFFTF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FFFTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FFFTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFTFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000050

FFTFFFFTFFFFFFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 (confidence rate)

DNC FFTFFFFTFFFFF?FF
TTTTTTTTTTTTT-TT
--:-- / 7
CC

0
CC

0
FFTFFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFTFFFFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000100

FFFFF? FTFT? TFFTF (expected value)

3.00 2.00 3.00 3.00 3.00 0 3.00 3.00 1.00 3.00 0 3.00 3.00 3.00 3.00 2.00 (confidence rate)

DNC F?FFF?FTFT?TFFT?
T-TTT?TTTT?TTTT-
--:-- / 6
CC

0
CC

0
FFFFF?FT?T?TFFTF
TTTTT?TT-T?TTTTT
--:-- / 6
FFFFF?FT?T?TFFTF
TTTTT?TT-T?TTTTT
--:-- / 6
CC

0
CC

0
000200

FFFFTFFFFT? ? TF? ? (expected value)

2.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 1.00 1.00 0 0 1.00 1.00 0 0 (confidence rate)

DNC ?FFFTFFFFT??TF??
-TTTTTTTTT??TT??
--:-- / 5
CC

0
CC

0
FFFFTF??????????
TTTTTT----??--??
--:-- / 3
FFFFTF??????????
TTTTTT----??--??
--:-- / 3
CC

0
CC

0
000500

TTFFFTFFFFTFFTTF (expected value)

3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TTFFFTFFFFTFFTTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TTF??????F??????
TTT------T------
--:-- / 2
TTF??????F??????
TTT------T------
--:-- / 2
CC

0
CC

0
001000

FTTTTTFFFF? T? F? F (expected value)

3.00 3.00 1.00 3.00 3.00 3.00 1.00 1.00 2.00 1.00 0 3.00 0 1.00 0 2.00 (confidence rate)

DNC FTTTTTFFFF?T?F?F
TTTTTTTTTT?T?T?T
--:-- / 6
CC

0
CC

0
FT?TTT??F??T????
TT-TTT--T-?T?-?-
--:-- / 3
FT?TTT?????T???F
TT-TTT----?T?-?T
--:-- / 3
CC

0
CC

0
002000

FTT? ? ? ? TTTFT? FTF (expected value)

1.00 1.00 1.00 0 0 0 0 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 (confidence rate)

DNC FTT????TTTFT?FTF
TTT????TTTTT?TTT
--:-- / 5
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
005000

? TFFTFF? ? ? ? F? F? ? (expected value)

0 1.00 1.00 1.00 1.00 1.00 1.00 0 0 0 0 1.00 0 1.00 0 0 (confidence rate)

DNC ?TFFTFF????F?F??
?TTTTTT????T?T??
--:-- / 4
????????????????
?------????-?-??
--:-- / 0
????????????????
?------????-?-??
--:-- / 0
CC

0
CC

0
????????????????
?------????-?-??
--:-- / 0
????????????????
?------????-?-??
--:-- / 0
010000

? F? ? ? TFF? ? ? ? ? ? ? T (expected value)

0 1.00 0 0 0 1.00 1.00 1.00 0 0 0 0 0 0 0 1.00 (confidence rate)

DNC ?F???TFF???????T
?T???TTT???????T
--:-- / 2
????????????????
?-???---???????-
--:-- / 0
????????????????
?-???---???????-
--:-- / 0
CC

0
DNF

0
????????????????
?-???---???????-
--:-- / 0
????????????????
?-???---???????-
--:-- / 0
050000

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
100000

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
Philosophers — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 51 77 8 8 41 48 8 8
Road Runner 0 7 0 0 0 0 0 0
Camel 0 7 0 0 0 0 0 0
000005

FTFTTTFFFFTFFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 8
FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
FTFTTTFFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
000010

FTFFTTFFTFFTTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFTTFFTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTTFFTFFTTFTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTFFTTFFTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTTFFTFFTTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000020

FFFTFTFFFTFFFTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFTFFFTFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFTFFFTFFFTTT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FFFTFTFFFTFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTFTFFFTFFFTTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000050

FFTFFFFTFFFTTTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

????????FFFTTTFF
--------TTTTTTTT
--:-- / 4
FFTFFFFTFFFTTTFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FFTFFFFTFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFTFFFFTFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000100

FFFFFFFTFFTFFTTF (expected value)

3.00 1.00 3.00 3.00 3.00 1.00 3.00 3.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

????????FFTFFTTF
--------TTTTTTTT
--:-- / 4
FFFFFFFTFFTFFTTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
F?FFF?FTFFT?????
T-TTT-TTTTT-----
--:-- / 4
F?FFF?FTFFT?????
T-TTT-TTTTT-----
--:-- / 4
CC

0
CC

0
000200

FFFFTFFFTFTTTFTF (expected value)

1.00 3.00 1.00 2.00 2.00 2.00 2.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

????????TFTTTFTF
--------TTTTTTTT
--:-- / 4
FFFFTFFFTFTTTFTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
?F??????????????
-T--------------
--:-- / 0
?F?FTFFFTFTTTFTF
-T-TTTTTTTTTTTTT
--:-- / 7
CC

0
CC

0
000500

TTF? FTFFTFFFTFTT (expected value)

3.00 3.00 3.00 0 1.00 1.00 1.00 1.00 2.00 4.00 4.00 1.00 2.00 2.00 2.00 2.00 (confidence rate)

????????TFFFTFTT
---?----TTTTTTTT
--:-- / 4
TTF?FTFFTFF?TFTT
TTT?TTTTTTT-TTTT
--:-- / 7
CC

0
CC

0
TTF??????FF?????
TTT?-----TT-----
--:-- / 2
TTF??????FF?????
TTT?-----TT-----
--:-- / 2
CC

0
CC

0
001000

FTTTTTFFFFTTTTTT (expected value)

3.00 3.00 1.00 3.00 3.00 3.00 1.00 1.00 3.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

????????FFTTTTTT
--------TTTTTTTT
--:-- / 4
FTTTTTFFFFTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FT?TTT??FF??????
TT-TTT--TT------
--:-- / 3
FT?TTT???F??????
TT-TTT---T------
--:-- / 3
CC

0
CC

0
002000

FTT? ? ? ? TTFFTFFTF (expected value)

1.00 1.00 1.00 0 0 0 0 1.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate)

????????TFFTF?TF
---????-TTTTT-TT
--:-- / 3
FTT????TTFFTFFTF
TTT????TTTTTTTTT
--:-- / 6
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
005000

? TFFTFF? FF? ? ? FFF (expected value)

0 1.00 1.00 1.00 1.00 1.00 1.00 0 2.00 2.00 0 0 0 2.00 2.00 1.00 (confidence rate)

????????FF???FF?
?------?TT???TT-
--:-- / 2
?TFFTFF?FF???FFF
?TTTTTT?TT???TTT
--:-- / 5
????????????????
?------?--???---
--:-- / 0
????????????????
?------?--???---
--:-- / 0
CC

0
CC

0
????????????????
?------?--???---
--:-- / 0
????????????????
?------?--???---
--:-- / 0
010000

? ? F? ? T? FTTT? TT? ? (expected value)

0 0 1.00 0 0 1.00 0 1.00 2.00 2.00 2.00 0 2.00 1.00 0 0 (confidence rate)

????????TTT?TT??
??-??-?-TTT?TT??
--:-- / 2
??F??T?FTTT?T???
??T??T?TTTT?T-??
--:-- / 3
????????????????
??-??-?----?--??
--:-- / 0
????????????????
??-??-?----?--??
--:-- / 0
DNF

0
DNF

0
????????????????
??-??-?----?--??
--:-- / 0
????????????????
??-??-?----?--??
--:-- / 0
PhilosophersDyn — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 45 30 30 0 0 30 30
Road Runner 0 2 0 0 0 0 0 1
Camel 0 3 0 0 0 0 0 0
03

FFTFTFFTTFTFFTFT (expected value)

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC FFTFTFFTTFTFFTFT
TTTTTTTTTTTTTTTT
--:PM / 15
FFTFTFFTTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
FFTFTFFTTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 15
10

FFFFTTTFFFTFFFTT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC FFFFTTTFFFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
20

FFFTTTTFFFFFTFTF (expected value)

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC FFFTTTTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-M / 15
FFFTTTTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTTTTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
FFFTTTTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTTTTFFFFFTFTF
TTTTTTTTTTTTTTTT
--:P- / 15
50

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
CC

0
CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
80

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
PhilosophersDyn — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 40 45 30 30 30 30 30 30
Road Runner 0 2 0 1 0 0 0 0
Camel 0 3 0 0 0 0 0 0
03

FFTFTFFTTFTFFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 15
FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
FFTFTFFTTFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 15
10

FFFFTTTFTTTFFTTF (expected value)

4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFF?TTTFTTTFFTTF
TTT-TTTTTTTTTTTT
--:-- / 14
FFFFTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:PM / 15
CC

0
CC

0
FFFFTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
20

FFFTTTTFTTTFFTTF (expected value)

5.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 5.00 6.00 (confidence rate)

?FFTTT?FTT?FFT?F
-TTTTT-TTT-TTT-T
--:-- / 11
FFFTTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:-M / 15
FFFTTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:P- / 15
CC

0
CC

0
FFFTTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTTTTFTTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
Planning — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 83 89 32 32 89 89 32 32
Road Runner 0 0 0 0 0 0 0 0
Camel 0 0 0 0 0 0 0 0
none

FFFFTTFTTTFFFTFT (expected value)

8.00 8.00 8.00 4.00 8.00 8.00 4.00 4.00 1.00 4.00 4.00 4.00 2.00 4.00 3.00 1.00 (confidence rate)

FFFFTTFT?TFF?TF?
TTTTTTTT-TTT-TT-
--:-- / 83
FFFFTTFTTTFF?T?T
TTTTTTTTTTTT-T-T
--:-- / 89
FFF?TT??????????
TTT-TT----------
--:-- / 32
FFF?TT??????????
TTT-TT----------
--:-- / 32
FFFFTTFT?TFFFTF?
TTTTTTTT-TTTTTT-
--:-- / 89
FFFFTTFT?TFFFTF?
TTTTTTTT-TTTTTT-
--:-- / 89
FFF?TT??????????
TTT-TT----------
--:-- / 32
FFF?TT??????????
TTT-TT----------
--:-- / 32
PolyORBLF — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 90 46 54 65 65 49 47
Road Runner 0 1 0 0 0 0 0 3
Camel 0 3 1 0 0 0 0 0
S02J04T06

FTTFTFFFFFTTFTTF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-M / 6
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:P- / 6
S02J04T08

FFTTFFFFFFFFFTF? (expected value)

3.00 1.00 3.00 3.00 3.00 3.00 3.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 (confidence rate)

DNC FFTTFFFFFFFFFTF?
TTTTTTTTTTTTTTT?
--:-- / 5
CC

0
CC

0
F?TTFFF?FFFFFTF?
T-TTTTT-TTTTTTT?
--:-- / 4
F?TTFFF?????????
T-TTTTT--------?
--:-- / 2
CC

0
CC

0
S02J04T10

FTTFFTFTFFTFFFTF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTTFFTFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:PM / 6
CC

0
CC

0
FTTFFTFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
FTTFFTFTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
S02J06T06

FFF? FFFTFFFTFFFF (expected value)

3.00 3.00 3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FFF?FFFTFFFTFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
CC

0
CC

0
FFF?FFFTFFFTFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
FFF?FFFTFFFTFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
CC

0
CC

0
S02J06T08

FTF? FFTTFFTTFFFF (expected value)

7.00 7.00 3.00 0 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FTF?FFTTFF?TFFFF
TTT?TTTTTT-TTTTT
--:-- / 5
FT??FFTTFFTTFFFF
TT-?TTTTTTTTTTTT
--:-- / 5
FT??FFTTFFTTFFFF
TT-?TTTTTTTTTTTT
--:-- / 5
FTF?FFTTFFTTFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
FTF?FFTTFFTTFFFF
TTT?TTTTTTTTTTTT
--:-- / 5
FT??FFTTFFTTFFFF
TT-?TTTTTTTTTTTT
--:-- / 5
FT??FFTTFFTTFFFF
TT-?TTTTTTTTTTTT
--:-- / 5
S02J06T10

FFFFTFFTFFTFFFFF (expected value)

7.00 7.00 5.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

DNC FFFFTFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-M / 6
FFFFTFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFTFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FF?FTFFTFF??????
TT-TTTTTTT------
--:-- / 3
FFFFTFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 6
FF?FTFFTFFTFFFFF
TT-TTTTTTTTTTTTT
--:-- / 5
FFFFTFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:P- / 6
S04J04T06

FTF? FFFTTTFFTFTF (expected value)

7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 5.00 5.00 1.00 7.00 2.00 6.00 (confidence rate)

DNC FTF?FFFTTTFFTF?F
TTT?TTTTTTTTTT-T
--:-- / 5
FTF?FFFTTTFF?F?F
TTT?TTTTTTTT-T-T
--:-- / 4
FTF?FFFTTTFF?FTF
TTT?TTTTTTTT-TTT
--:-- / 5
FTF?FFFTTT???F?F
TTT?TTTTTT---T-T
--:-- / 4
FTF?FFFTTT???F??
TTT?TTTTTT---T--
--:-- / 3
FTF?FFFTTTFF?F?F
TTT?TTTTTTTT-T-T
--:-- / 4
FTF?FFFTTTFF?FTF
TTT?TTTTTTTT-TTT
--:-- / 5
S04J04T08

FFFFFFFTFTFFTFFF (expected value)

4.00 4.00 4.00 2.00 2.00 4.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC FFFF?FFTFTFFTFFF
TTTT-TTTTTTTTTTT
--:-- / 5
????????????????
----------------
--:-- / 0
FFFF?F??????????
TTTT-T----------
--:-- / 2
FFF?FFFTFTF?????
TTT-TTTTTTT-----
--:-- / 3
FFF?FFFTFTF?????
TTT-TTTTTTT-----
--:-- / 3
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
S04J04T10

FFF? FT? T? ? ? FFFTF (expected value)

3.00 3.00 3.00 0 3.00 3.00 0 2.00 0 0 0 2.00 2.00 2.00 2.00 2.00 (confidence rate)

DNC FFF?FT?T???FFFTF
TTT?TT?T???TTTTT
--:-- / 4
????????????????
---?--?-???-----
--:-- / 0
????????????????
---?--?-???-----
--:-- / 0
FFF?FT?T???FFFTF
TTT?TT?T???TTTTT
--:-- / 4
FFF?FT??????????
TTT?TT?-???-----
--:-- / 2
????????????????
---?--?-???-----
--:-- / 0
????????????????
---?--?-???-----
--:-- / 0
S04J06T06

TTT? TFFFFTFFTFTT (expected value)

7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC TTT?TFFFFTFFTFTT
TTT?TTTTTTTTTTTT
--:-- / 5
TTT?TFFFFTFFTFTT
TTT?TTTTTTTTTTTT
--:-- / 5
TTT?TFFFFTFFTFTT
TTT?TTTTTTTTTTTT
--:-- / 5
TTT?TFFFFTFFTFTT
TTT?TTTTTTTTTTTT
--:-- / 5
TTT?TFFFFTFFTFTT
TTT?TTTTTTTTTTTT
--:-- / 5
TTT?TFFFFT?FTFTT
TTT?TTTTTT-TTTTT
--:-- / 5
TTT?TFFFFTFFTFTT
TTT?TTTTTTTTTTTT
--:-- / 5
S04J06T08

TFFFFFTTTTFT? FFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 0 1.00 1.00 1.00 (confidence rate)

DNC TFFFFFTTTTFT?FFF
TTTTTTTTTTTT?TTT
--:-- / 5
????????????????
------------?---
--:-- / 0
????????????????
------------?---
--:-- / 0
TFFFFFTTTTF?????
TTTTTTTTTTT-?---
--:-- / 4
TFFFFFTTTTF?????
TTTTTTTTTTT-?---
--:-- / 4
????????????????
------------?---
--:-- / 0
????????????????
------------?---
--:-- / 0
S04J06T10

FFFFFFTTTF? FFFTF (expected value)

7.00 7.00 7.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC FFFFFFTTTF?FFFTF
TTTTTTTTTT?TTTTT
--:-- / 5
FFFFFFTTTF?FFFTF
TTTTTTTTTT?TTTTT
--:-- / 5
FFFFFFTTTF?FFFTF
TTTTTTTTTT?TTTTT
--:-- / 5
FFF?????????????
TTT-------?-----
--:-- / 1
FFF?????????????
TTT-------?-----
--:-- / 1
FFFFFFTTTF?FFFTF
TTTTTTTTTT?TTTTT
--:-- / 5
FFFFFFTTTF?FFFTF
TTTTTTTTTT?TTTTT
--:-- / 5
S06J04T04

FFTFFFTF? FFFFFFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0 7.00 7.00 7.00 7.00 7.00 5.00 7.00 (confidence rate)

DNC FFTFFFTF?FFFFFFF
TTTTTTTT?TTTTTTT
--:-- / 5
FFTFFFTF?FFFFFFF
TTTTTTTT?TTTTTTT
--:-- / 5
FFTFFFTF?FFFFFFF
TTTTTTTT?TTTTTTT
--:-- / 5
FFTFFFTF?FFFFF?F
TTTTTTTT?TTTTT-T
--:-- / 5
FFTFFFTF?FFFFF?F
TTTTTTTT?TTTTT-T
--:-- / 5
FFTFFFTF?FFFFFFF
TTTTTTTT?TTTTTTT
--:-- / 5
FFTFFFTF?FFFFFFF
TTTTTTTT?TTTTTTT
--:-- / 5
S06J04T06

F? TFFFFFFTFF? FFT (expected value)

3.00 0 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 0 1.00 1.00 1.00 (confidence rate)

DNC F?TFFFFFFTFF?FFT
T?TTTTTTTTTT?TTT
--:-- / 5
????????????????
-?----------?---
--:-- / 0
????????????????
-?----------?---
--:-- / 0
F?TFFFFFFTF?????
T?TTTTTTTTT-?---
--:-- / 3
F?TFFFFFFTF?????
T?TTTTTTTTT-?---
--:-- / 3
????????????????
-?----------?---
--:-- / 0
????????????????
-?----------?---
--:-- / 0
S06J04T08

TFFTFT? F? F? F? T? F (expected value)

3.00 3.00 3.00 3.00 3.00 2.00 0 1.00 0 1.00 0 1.00 0 1.00 0 1.00 (confidence rate)

DNC TFFTFT?F?F?F?T?F
TTTTTT?T?T?T?T?T
--:-- / 4
????????????????
------?-?-?-?-?-
--:-- / 0
????????????????
------?-?-?-?-?-
--:-- / 0
TFFTF???????????
TTTTT-?-?-?-?-?-
--:-- / 2
TFFTFT??????????
TTTTTT?-?-?-?-?-
--:-- / 2
????????????????
------?-?-?-?-?-
--:-- / 0
????????????????
------?-?-?-?-?-
--:-- / 0
S06J06T04

FFFTFFFFFFTFFTF? (expected value)

7.00 7.00 1.00 1.00 6.00 6.00 6.00 6.00 5.00 5.00 5.00 5.00 2.00 5.00 5.00 0 (confidence rate)

DNC FFFTFFFFFFTFFTF?
TTTTTTTTTTTTTTT?
--:-- / 5
FF??FFFFFFTF?TF?
TT--TTTTTTTT-TT?
--:-- / 4
FF??FFFFFFTFFTF?
TT--TTTTTTTTTTT?
--:-- / 4
FF??????????????
TT-------------?
--:-- / 1
FF??FFFF????????
TT--TTTT-------?
--:-- / 2
FF??FFFFFFTF?TF?
TT--TTTTTTTT-TT?
--:-- / 4
FF??FFFFFFTF?TF?
TT--TTTTTTTT-TT?
--:-- / 4
S06J06T06

FFFFFTFTTFFTFFFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC FFFFFTFTT?FTFFFT
TTTTTTTTT-TTTTTT
--:-- / 5
FFFFFTFTTFFTFFFT
TTTTTTTTTTTTTTTT
--:-M / 6
FFFFFTFTTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFFTFTTFF?????
TTTTTTTTTTT-----
--:-- / 4
FFFFFTFTTFF?????
TTTTTTTTTTT-----
--:-- / 4
FFFFFTFTTFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 6
FFFFFTFTTFFTFFFT
TTTTTTTTTTTTTTTT
--:P- / 6
S06J06T08

FFFF? FFF? FTFFFFF (expected value)

4.00 3.00 5.00 4.00 0 4.00 3.00 3.00 0 2.00 3.00 2.00 3.00 3.00 2.00 3.00 (confidence rate)

DNC FFFF?FFF??T?FFFF
TTTT?TTT?-T-TTTT
--:-- / 4
????????????????
----?---?-------
--:-- / 0
FFFF?FFF?FTFFFFF
TTTT?TTT?TTTTTTT
--:-- / 5
??F?????????????
--T-?---?-------
--:-- / 0
F?FF?F??????????
T-TT?T--?-------
--:-- / 1
FFFF?FFF?FTFFF?F
TTTT?TTT?TTTTT-T
--:-- / 4
????????????????
----?---?-------
--:-- / 0
PolyORBLF — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 84 88 38 38 35 35 38 38
Road Runner 1 2 0 0 0 0 0 0
Camel 1 2 0 0 0 0 0 0
S02J04T06

FTTFTFFFTTFFTFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTFTFFFT?FFTFTT
TTTTTTTTT-TTTTTT
--:-- / 5
FTTFTFFFTTFFTFTT
TTTTTTTTTTTTTTTT
--:PM / 6
FTTFTFFFT?FFTFTT
TTTTTTTTT-TTTTTT
--:-- / 5
FTTFTFFFT?FFTFTT
TTTTTTTTT-TTTTTT
--:-- / 5
FTTFTFFFT?FFTFTT
TTTTTTTTT-TTTTTT
--:-- / 5
FTTFTFFFT?FFTFTT
TTTTTTTTT-TTTTTT
--:-- / 5
FTTFTFFFT?FFTFTT
TTTTTTTTT-TTTTTT
--:-- / 5
FTTFTFFFT?FFTFTT
TTTTTTTTT-TTTTTT
--:-- / 5
S02J04T08

FFTTFFFF? FFTTTFF (expected value)

4.00 2.00 4.00 4.00 4.00 3.00 4.00 2.00 0 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTF?FF?FFTTTFF
TTTTT-TT?TTTTTTT
--:-- / 5
FFTTFFFF?FFTTTFF
TTTTTTTT?TTTTTTT
--:-- / 5
CC

0
CC

0
F?TTFFF??FFTTTFF
T-TTTTT-?TTTTTTT
--:-- / 4
F?TTFFF??FFTTTFF
T-TTTTT-?TTTTTTT
--:-- / 4
CC

0
CC

0
S02J04T10

FTTFFTFTFTTTFTTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:PM / 6
FTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
FTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 6
FTTFFTFTFTTTFTTT
TTTTTTTTTTTTTTTT
--:-- / 6
CC

0
CC

0
S02J06T06

FFF? FFFT? TT? TTF? (expected value)

4.00 3.00 4.00 0 4.00 4.00 4.00 4.00 0 4.00 4.00 0 2.00 2.00 2.00 0 (confidence rate)

FFF?FFFT?TT?TTF?
TTT?TTTT?TT?TTT?
--:-- / 4
F?F?FFFT?TT?TTF?
T-T?TTTT?TT?TTT?
--:-- / 4
CC

0
CC

0
FFF?FFFT?TT?????
TTT?TTTT?TT?---?
--:-- / 3
FFF?FFFT?TT?????
TTT?TTTT?TT?---?
--:-- / 3
CC

0
CC

0
S02J06T08

FTF? FFTTFTTTFTTT (expected value)

8.00 8.00 4.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FTF?FFTTFTTTFTTT
TTT?TTTTTTTTTTTT
--:-- / 5
FTF?FFTTFTTTFTTT
TTT?TTTTTTTTTTTT
--:-- / 5
FT??FFTTFTTTFTTT
TT-?TTTTTTTTTTTT
--:-- / 5
FT??FFTTFTTTFTTT
TT-?TTTTTTTTTTTT
--:-- / 5
FTF?????????????
TTT?------------
--:-- / 1
FTF?????????????
TTT?------------
--:-- / 1
FT??FFTTFTTTFTTT
TT-?TTTTTTTTTTTT
--:-- / 5
FT??FFTTFTTTFTTT
TT-?TTTTTTTTTTTT
--:-- / 5
S02J06T10

FFFFTFFTFT? TTF? ? (expected value)

8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 0 7.00 7.00 6.00 0 0 (confidence rate)

FF?FTFFTFT?TTF??
TT-TTTTTTT?TTT??
--:-- / 4
FFFFTFFTFT?TTF??
TTTTTTTTTT?TTT??
--:-- / 4
FFFFTFFTFT?TTF??
TTTTTTTTTT?TTT??
--:-- / 4
FFFFTFFTFT?TTF??
TTTTTTTTTT?TTT??
--:-- / 4
FF?FTFFTF???????
TT-TTTTTT-?---??
--:-- / 3
FF?FTFFT?T?TT???
TT-TTTTT-T?TT-??
--:-- / 3
FFFFTFFTFT?TTF??
TTTTTTTTTT?TTT??
--:-- / 4
FFFFTFFTFT?TTF??
TTTTTTTTTT?TTT??
--:-- / 4
S04J04T06

FTF? FFFTFFFTTFFT (expected value)

4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate)

FTF?FFFTFFFTTFFT
TTT?TTTTTTTTTTTT
--:-- / 5
FTF?FFFTFFFT?FFT
TTT?TTTTTTTT-TTT
--:-- / 5
????????????????
---?------------
--:-- / 0
????????????????
---?------------
--:-- / 0
FTF?FFFT????????
TTT?TTTT--------
--:-- / 2
FTF?FFFT????????
TTT?TTTT--------
--:-- / 2
????????????????
---?------------
--:-- / 0
????????????????
---?------------
--:-- / 0
S04J04T08

FFFFFFFTFTTTFTFT (expected value)

4.00 4.00 4.00 2.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FFFF?FFTFTTTFTFT
TTTT-TTTTTTTTTTT
--:-- / 5
FFFFFFFTFTTTFTFT
TTTTTTTTTTTTTTTT
--:PM / 6
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFF?F???????????
TTT-T-----------
--:-- / 1
FFF?F???????????
TTT-T-----------
--:-- / 1
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
S04J04T10

FFF? FT? TFT? TFFFF (expected value)

4.00 3.00 3.00 0 3.00 3.00 0 3.00 3.00 3.00 0 2.00 3.00 2.00 2.00 2.00 (confidence rate)

FFF?FT?TFT?TFFFF
TTT?TT?TTT?TTTTT
--:-- / 4
FFF?FT?TFT?TFFFF
TTT?TT?TTT?TTTTT
--:-- / 4
????????????????
---?--?---?-----
--:-- / 0
????????????????
---?--?---?-----
--:-- / 0
FFF?FT?TFT??F???
TTT?TT?TTT?-T---
--:-- / 3
F???????????????
T--?--?---?-----
--:-- / 0
????????????????
---?--?---?-----
--:-- / 0
????????????????
---?--?---?-----
--:-- / 0
S04J06T06

TTT? TFFF? T? F? TT? (expected value)

4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 0 2.00 0 2.00 0 2.00 2.00 0 (confidence rate)

TTT?TFFF?T?F?TT?
TTT?TTTT?T?T?TT?
--:-- / 4
TTT?TFFF?T?F?TT?
TTT?TTTT?T?T?TT?
--:-- / 4
????????????????
---?----?-?-?--?
--:-- / 0
????????????????
---?----?-?-?--?
--:-- / 0
TTT?TFFF????????
TTT?TTTT?-?-?--?
--:-- / 2
TTT?TFFF????????
TTT?TTTT?-?-?--?
--:-- / 2
????????????????
---?----?-?-?--?
--:-- / 0
????????????????
---?----?-?-?--?
--:-- / 0
S04J06T08

TFFFFFTT? TFFTTTT (expected value)

8.00 8.00 7.00 6.00 6.00 6.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFFFFTT?TFFTTTT
TTTTTTTT?TTTTTTT
--:-- / 5
TFFFFFTT?TFFTTTT
TTTTTTTT?TTTTTTT
--:-- / 5
TFFFFFTT?TFFTTTT
TTTTTTTT?TTTTTTT
--:-- / 5
TFFFFFTT?TFFTTTT
TTTTTTTT?TTTTTTT
--:-- / 5
TFF?????????????
TTT-----?-------
--:-- / 1
TF??????????????
TT------?-------
--:-- / 1
TFFFFFTT?TFFTTTT
TTTTTTTT?TTTTTTT
--:-- / 5
TFFFFFTT?TFFTTTT
TTTTTTTT?TTTTTTT
--:-- / 5
S04J06T10

FFFFFFTTTFT? FTTF (expected value)

2.00 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 2.00 2.00 2.00 2.00 (confidence rate)

FFF?FFTTTFT?FTTF
TTT-TTTTTTT?TTTT
--:-- / 5
FFFFFFTTTFT?FTTF
TTTTTTTTTTT?TTTT
--:-- / 5
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
CC

0
CC

0
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
S06J04T04

FFTFFFTFTFF? FFFF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 2.00 0 3.00 3.00 2.00 3.00 (confidence rate)

FFTFFFTFTFF?FFFF
TTTTTTTTTTT?TTTT
--:-- / 5
FFTFFFTFTFF?FFFF
TTTTTTTTTTT?TTTT
--:-- / 5
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
FFTFF???????????
TTTTT------?----
--:-- / 2
FFTFFFTFTF??FF?F
TTTTTTTTTT-?TT-T
--:-- / 4
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
S06J04T06

F? TFFFFFFTTFTTTF (expected value)

7.00 0 6.00 6.00 7.00 7.00 7.00 7.00 6.00 7.00 6.00 6.00 6.00 6.00 6.00 7.00 (confidence rate)

F?T?FFFFFTTFTTTF
T?T-TTTTTTTTTTTT
--:-- / 5
F?TFFFFFFTTFTTTF
T?TTTTTTTTTTTTTT
--:-- / 5
F?TFFFFFFTTFTTTF
T?TTTTTTTTTTTTTT
--:-- / 5
F?TFFFFFFTTFTTTF
T?TTTTTTTTTTTTTT
--:-- / 5
CC

0
F??FFFFF?T?????F
T?-TTTTT-T-----T
--:-- / 3
F?TFFFFFFTTFTTTF
T?TTTTTTTTTTTTTT
--:-- / 5
F?TFFFFFFTTFTTTF
T?TTTTTTTTTTTTTT
--:-- / 5
S06J04T08

TFFTFTFFFTTFFTF? (expected value)

2.00 2.00 2.00 2.00 2.00 1.00 1.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 0 (confidence rate)

TFFTF?FF?TTFFTF?
TTTTT-TT-TTTTTT?
--:-- / 4
TFFTFT?FFTTFFTF?
TTTTTT-TTTTTTTT?
--:-- / 5
????????????????
---------------?
--:-- / 0
????????????????
---------------?
--:-- / 0
CC

0
CC

0
????????????????
---------------?
--:-- / 0
????????????????
---------------?
--:-- / 0
S06J06T04

FFFTFFFFFTTTFFTT (expected value)

6.00 7.00 1.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFF?FFFFFTTTFFTT
TTT-TTTTTTTTTTTT
--:-- / 5
F??TFFFFFTTTFFTT
T--TTTTTTTTTTTTT
--:-- / 5
FF??FFFFFTTTFFTT
TT--TTTTTTTTTTTT
--:-- / 5
FF??FFFFFTTTFFTT
TT--TTTTTTTTTTTT
--:-- / 5
?F??????????????
-T--------------
--:-- / 0
?F??????????????
-T--------------
--:-- / 0
FF??FFFFFTTTFFTT
TT--TTTTTTTTTTTT
--:-- / 5
FF??FFFFFTTTFFTT
TT--TTTTTTTTTTTT
--:-- / 5
S06J06T06

FFFFFTFTTTTTT? FF (expected value)

8.00 7.00 6.00 5.00 6.00 7.00 6.00 5.00 7.00 6.00 6.00 6.00 7.00 0 6.00 6.00 (confidence rate)

FFF??TF?TTTTT?FF
TTT--TT-TTTTT?TT
--:-- / 4
FFFFFTFTTTTTT?FF
TTTTTTTTTTTTT?TT
--:-- / 5
FFFFFTFTTTTTT?FF
TTTTTTTTTTTTT?TT
--:-- / 5
FFFFFTFTTTTTT?FF
TTTTTTTTTTTTT?TT
--:-- / 5
FF??FT??T???T???
TT--TT--T---T?--
--:-- / 2
F???????????????
T------------?--
--:-- / 0
FFFFFTFTTTTTT?FF
TTTTTTTTTTTTT?TT
--:-- / 5
FFFFFTFTTTTTT?FF
TTTTTTTTTTTTT?TT
--:-- / 5
S06J06T08

FFFF? FFFTFFTFTTT (expected value)

5.00 5.00 6.00 6.00 0 6.00 6.00 6.00 6.00 1.00 6.00 6.00 1.00 6.00 6.00 6.00 (confidence rate)

?FFF?FFFTFFT?TTT
-TTT?TTTTTTT-TTT
--:-- / 4
F?FF?FFFT?FTFTTT
T-TT?TTTT-TTTTTT
--:-- / 4
FFFF?FFFT?FT?TTT
TTTT?TTTT-TT-TTT
--:-- / 4
FFFF?FFFT?FT?TTT
TTTT?TTTT-TT-TTT
--:-- / 4
CC

0
CC

0
FFFF?FFFT?FT?TTT
TTTT?TTTT-TT-TTT
--:-- / 4
FFFF?FFFT?FT?TTT
TTTT?TTTT-TT-TTT
--:-- / 4
PolyORBNT — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 69 43 39 36 35 41 41
Road Runner 0 0 0 0 0 0 1 0
Camel 0 1 0 0 0 0 0 0
S05J20

FTFF? FFFTFFTFFTF (expected value)

7.00 1.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

DNC FTFF?FFFTFFTFFTF
TTTT?TTTTTTTTTTT
--:-- / 7
F?FF?FFFTFFTFFTF
T-TT?TTTTTTTTTTT
--:-- / 7
F?FF?FFFTFFTFFTF
T-TT?TTTTTTTTTTT
--:-- / 7
F?FF?FFFTFFTFFTF
T-TT?TTTTTTTTTTT
--:-- / 7
F???????????????
T---?-----------
--:-- / 0
F?FF?FFFTFFTFFTF
T-TT?TTTTTTTTTTT
--:-- / 7
F?FF?FFFTFFTFFTF
T-TT?TTTTTTTTTTT
--:-- / 7
S05J30

FFTFF? TFTFTFT? FF (expected value)

7.00 7.00 7.00 7.00 7.00 0 7.00 6.00 7.00 5.00 5.00 5.00 5.00 0 5.00 5.00 (confidence rate)

DNC FFTFF?TFTFTFT?FF
TTTTT?TTTTTTT?TT
--:-- / 7
FFTFF?TFTFTFT?FF
TTTTT?TTTTTTT?TT
--:-- / 7
FFTFF?T?TFTFT?FF
TTTTT?T-TTTTT?TT
--:-- / 6
FFTFF?TFT???????
TTTTT?TTT----?--
--:-- / 4
FFTFF?TFT???????
TTTTT?TTT----?--
--:-- / 4
FFTFF?TFTFTFT?FF
TTTTT?TTTTTTT?TT
--:-- / 7
FFTFF?TFTFTFT?FF
TTTTT?TTTTTTT?TT
--:-- / 7
S05J40

FTFTFFFF? FTFFFFF (expected value)

4.00 4.00 2.00 4.00 4.00 4.00 2.00 3.00 0 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate)

DNC FT?TFF?F?FTFFFFF
TT-TTT-T?TTTTTTT
--:-- / 6
FTFTFF??????????
TTTTTT--?-------
--:-- / 3
????????????????
--------?-------
--:-- / 0
FT?TFFFF????????
TT-TTTTT?-------
--:-- / 3
FTFTFFFF?FTFFFF?
TTTTTTTT?TTTTTT-
--:-- / 7
????????????????
--------?-------
--:-- / 0
????????????????
--------?-------
--:-- / 0
S05J60

TFFTTTFFTTFFTF? ? (expected value)

5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0 0 (confidence rate)

DNC TFFTTTFFTTFFTF??
TTTTTTTTTTTTTT??
--:-- / 7
T?FTTTFFTTFFTF??
T-TTTTTTTTTTTT??
--:-- / 6
TFFTTTFFTTFFTF??
TTTTTTTTTTTTTT??
--:-- / 7
CC

0
CC

0
TFFTTTFFTTFFTF??
TTTTTTTTTTTTTT??
--:-- / 7
TFFTTTFFTTFFTF??
TTTTTTTTTTTTTT??
--:-- / 7
S05J80

TTFTFTFTFF? FF? FT (expected value)

1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 0 2.00 2.00 0 2.00 2.00 (confidence rate)

DNC TTFTFTFTFF?FF?FT
TTTTTTTTTT?TT?TT
--:-- / 7
????????????????
----------?--?--
--:-- / 0
????????????????
----------?--?--
--:-- / 0
?TFTFTFTF???????
-TTTTTTTT-?--?--
--:-- / 4
?TFTFTFTF??FF?FT
-TTTTTTTT-?TT?TT
--:-- / 6
????????????????
----------?--?--
--:-- / 0
????????????????
----------?--?--
--:-- / 0
S10J20

FF? FFFF? T? FTFFTF (expected value)

7.00 7.00 0 3.00 7.00 7.00 5.00 0 7.00 0 7.00 7.00 7.00 3.00 7.00 1.00 (confidence rate)

DNC FF?FFFF?T?FTFFTF
TT?TTTT?T?TTTTTT
--:-- / 6
FF??FFF?T?FTF?T?
TT?-TTT?T?TTT-T-
--:-- / 5
FF??FFF?T?FTF?T?
TT?-TTT?T?TTT-T-
--:-- / 5
FF?FFF??T?FTFFT?
TT?TTT-?T?TTTTT-
--:-- / 5
FF?FFF??T?FTFFT?
TT?TTT-?T?TTTTT-
--:-- / 5
FF??FFF?T?FTF?T?
TT?-TTT?T?TTT-T-
--:-- / 5
FF??FFF?T?FTF?T?
TT?-TTT?T?TTT-T-
--:-- / 5
S10J30

FFFFTTTFTFTT? TFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0 1.00 5.00 3.00 (confidence rate)

DNC FFFFTTTFTFTT?TF?
TTTTTTTTTTTT?TT-
--:-- / 7
FFFFTTTFTFTT??FF
TTTTTTTTTTTT?-TT
--:-- / 7
FFFFTTTFTFTT??F?
TTTTTTTTTTTT?-T-
--:-- / 6
FFFFTTTFTFTT????
TTTTTTTTTTTT?---
--:-- / 6
FFFFTTTFTFTT????
TTTTTTTTTTTT?---
--:-- / 6
FFFFTTTFTFTT??FF
TTTTTTTTTTTT?-TT
--:-- / 7
FFFFTTTFTFTT??FF
TTTTTTTTTTTT?-TT
--:-- / 7
S10J40

FFFTTFTFFFTFFTFT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 5.00 5.00 5.00 (confidence rate)

DNC FFFTTFTFFFTFFTFT
TTTTTTTTTTTTTTTT
--:-M / 8
FFFTTFTFFFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTFTFFFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTFTFFFTFF???
TTTTTTTTTTTTT---
--:-- / 6
FFFTTFTFFFTF????
TTTTTTTTTTTT----
--:-- / 6
FFFTTFTFFFTFFTFT
TTTTTTTTTTTTTTTT
--:P- / 8
FFFTTFTFFFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
S10J60

TFTTTFFTFFF? TFFF (expected value)

3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 1.00 (confidence rate)

DNC TFTTTFFTFFF?TFFF
TTTTTTTTTTT?TTTT
--:-- / 7
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
TFT?????????????
TTT--------?----
--:-- / 1
TFT?????????????
TTT--------?----
--:-- / 1
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
S10J80

F? FTTTFFFFFFTTFF (expected value)

3.00 0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC F?FTTTFFFFFFTTFF
T?TTTTTTTTTTTTTT
--:-- / 7
????????????????
-?--------------
--:-- / 0
????????????????
-?--------------
--:-- / 0
F???????????????
T?--------------
--:-- / 0
F???????????????
T?--------------
--:-- / 0
????????????????
-?--------------
--:-- / 0
????????????????
-?--------------
--:-- / 0
PolyORBNT — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 61 67 20 20 21 18 20 20
Road Runner 0 0 0 0 0 0 0 1
Camel 0 1 0 0 0 0 0 0
S05J20

FTFFFFFFTTFTFFF? (expected value)

6.00 1.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0 (confidence rate)

F?FFFFFFTTFTFFF?
T-TTTTTTTTTTTTT?
--:-- / 7
FTFF?FFFTTFTFFF?
TTTT-TTTTTTTTTT?
--:-- / 7
F?FF?FFFTTFTFFF?
T-TT-TTTTTTTTTT?
--:-- / 6
F?FF?FFFTTFTFFF?
T-TT-TTTTTTTTTT?
--:-- / 6
CC

0
CC

0
F?FF?FFFTTFTFFF?
T-TT-TTTTTTTTTT?
--:-- / 6
F?FF?FFFTTFTFFF?
T-TT-TTTTTTTTTT?
--:-- / 6
S05J30

FFTFF? TFTFFFFTTF (expected value)

3.00 3.00 4.00 4.00 4.00 0 4.00 4.00 4.00 4.00 3.00 1.00 2.00 2.00 2.00 2.00 (confidence rate)

??TFF?TFTFF?FTTF
--TTT?TTTTT-TTTT
--:-- / 6
FFTFF?TFTFFFFTTF
TTTTT?TTTTTTTTTT
--:-- / 7
????????????????
-----?----------
--:-- / 0
????????????????
-----?----------
--:-- / 0
FFTFF?TFTFF?????
TTTTT?TTTTT-----
--:-- / 5
FFTFF?TFTF??????
TTTTT?TTTT------
--:-- / 4
????????????????
-----?----------
--:-- / 0
????????????????
-----?----------
--:-- / 0
S05J40

FTFTFFFFTTFTTTFF (expected value)

4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 1.00 4.00 4.00 4.00 4.00 2.00 (confidence rate)

FTF???F?TTFTTTFF
TTT---T-TTTTTTTT
--:-- / 6
FTFTFF?FTT?TTTFF
TTTTTT-TTT-TTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTFTFFFFTT?TTTF?
TTTTTTTTTT-TTTT-
--:-- / 7
FTFTFFFFTT?TTTF?
TTTTTTTTTT-TTTT-
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
S05J60

TFFTTTFFFTT? TFFF (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 3.00 1.00 4.00 4.00 0 3.00 3.00 1.00 3.00 (confidence rate)

TFFTTTF??TT?TFFF
TTTTTTT--TT?TTTT
--:-- / 6
T?FTTTFF?TT?TF?F
T-TTTTTT-TT?TT-T
--:-- / 6
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
TFFTTTFFFTT?TF?F
TTTTTTTTTTT?TT-T
--:-- / 7
TFFTTTFF?TT?????
TTTTTTTT-TT?----
--:-- / 5
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
S05J80

TTFTFTFTFTTTFFFT (expected value)

1.00 4.00 3.00 4.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00 (confidence rate)

?T?T??FTFTTTFFFT
-T-T--TTTTTTTTTT
--:-- / 6
TTFTFTFTFTTTF?FT
TTTTTTTTTTTTT-TT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
?TFT????????????
-TTT------------
--:-- / 1
?TFT????????????
-TTT------------
--:-- / 1
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
S10J20

FF? FFFF? FTFF? FFT (expected value)

8.00 8.00 0 3.00 6.00 6.00 6.00 0 6.00 6.00 6.00 5.00 0 6.00 6.00 6.00 (confidence rate)

FF?FFFF?FTF??FFT
TT?TTTT?TTT-?TTT
--:-- / 6
FF?FFFF?FTFF?FFT
TT?TTTT?TTTT?TTT
--:-- / 6
FF??FFF?FTFF?FFT
TT?-TTT?TTTT?TTT
--:-- / 6
FF??FFF?FTFF?FFT
TT?-TTT?TTTT?TTT
--:-- / 6
FF?F????????????
TT?T---?----?---
--:-- / 1
FF??????????????
TT?----?----?---
--:-- / 1
FF??FFF?FTFF?FFT
TT?-TTT?TTTT?TTT
--:-- / 6
FF??FFF?FTFF?FFT
TT?-TTT?TTTT?TTT
--:-- / 6
S10J30

FFFFTTTFTTT? FFTT (expected value)

4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 1.00 2.00 2.00 2.00 (confidence rate)

FFFFTTTFTTT?FFTT
TTTTTTTTTTT?TTTT
--:-- / 7
FFFFTTTFTTT??FTT
TTTTTTTTTTT?-TTT
--:-- / 7
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
F???????????????
T----------?----
--:-- / 0
F???????????????
T----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
S10J40

FFFTTFTFFTTTTTTT (expected value)

6.00 6.00 6.00 5.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFF??FTFFTTTTTTT
TTT--TTTTTTTTTTT
--:-- / 7
FFFTTFTFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-M / 8
FFFTTFTFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTFTFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
FFFTTFTFFTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 8
FFFTTFTFFTTTTTTT
TTTTTTTTTTTTTTTT
--:P- / 8
S10J60

TFTTTFFT? FT? ? TTT (expected value)

2.00 1.00 2.00 2.00 2.00 2.00 1.00 2.00 0 1.00 2.00 0 0 2.00 2.00 2.00 (confidence rate)

T?TTTF?T?FT??TTT
T-TTTT-T?TT??TTT
--:-- / 5
TFTTTFFT??T??TTT
TTTTTTTT?-T??TTT
--:-- / 6
????????????????
--------?--??---
--:-- / 0
????????????????
--------?--??---
--:-- / 0
CC

0
CC

0
????????????????
--------?--??---
--:-- / 0
????????????????
--------?--??---
--:-- / 0
S10J80

F? FTTTFFT? TTT? TF (expected value)

2.00 0 2.00 1.00 2.00 2.00 2.00 1.00 2.00 0 2.00 2.00 2.00 0 2.00 1.00 (confidence rate)

F?F?TTF?T?TTT?TF
T?T-TTT-T?TTT?TT
--:-- / 5
F?FTTTFFT?TTT?T?
T?TTTTTTT?TTT?T-
--:-- / 6
????????????????
-?-------?---?--
--:-- / 0
????????????????
-?-------?---?--
--:-- / 0
CC

0
CC

0
????????????????
-?-------?---?--
--:-- / 0
????????????????
-?-------?---?--
--:-- / 0
ProductionCell — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 119 119 119 119 119 119 119 119
Road Runner 0 0 0 0 1 0 0 0
Camel 0 1 0 0 0 0 0 0
none

FFFFFFFTFTFFTTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 119
FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:-M / 119
FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 119
FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 119
FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:P- / 119
FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 119
FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 119
FFFFFFFTFTFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 119
QuasiCertifProtocol — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 55 10 10 47 47 10 10
Road Runner 0 2 0 0 0 0 0 0
Camel 0 2 0 0 0 0 0 0
02

FFFFFTTFFTFFFFFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FFFFFTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 10
FFFFFTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
06

FTFFFTFFTFFTTTFT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTFFFTFFTFFTTTFT
TTTTTTTTTTTTTTTT
--:PM / 10
CC

0
CC

0
FTFFFTFFTFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFFTFFTFFTTTFT
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
10

? ? ? TFF? FTFFTFTFF (expected value)

0 0 0 3.00 3.00 3.00 0 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC ???TFF?FTFFTFTFF
???TTT?TTTTTTTTT
--:-- / 7
DNF

0
????????????????
???---?---------
--:-- / 0
???TFF??TFFTFTFF
???TTT?-TTTTTTTT
--:-- / 7
???TFF??TFFTFTFF
???TTT?-TTTTTTTT
--:-- / 7
????????????????
???---?---------
--:-- / 0
????????????????
???---?---------
--:-- / 0
18

FTF? TTTFTF? FFT? F (expected value)

1.00 3.00 3.00 0 3.00 3.00 3.00 1.00 1.00 3.00 0 1.00 1.00 1.00 0 1.00 (confidence rate)

DNC FTF?TTTFTF??FT?F
TTT?TTTTTT?-TT?T
--:-- / 7
CC

0
????????????????
---?------?---?-
--:-- / 0
?TF?TTT??F?F????
-TT?TTT--T?T--?-
--:-- / 4
?TF?TTT??F??????
-TT?TTT--T?---?-
--:-- / 4
????????????????
---?------?---?-
--:-- / 0
????????????????
---?------?---?-
--:-- / 0
22

TTF? FF? F? TTFTFF? (expected value)

3.00 3.00 3.00 0 3.00 3.00 0 3.00 0 3.00 3.00 1.00 3.00 3.00 3.00 0 (confidence rate)

DNC TTF?FF?F?TTFTFF?
TTT?TT?T?TTTTTT?
--:-- / 7
CC

0
????????????????
---?--?-?------?
--:-- / 0
TTF?FF?F?TT?TFF?
TTT?TT?T?TT-TTT?
--:-- / 7
TTF?FF?F?TT?TFF?
TTT?TT?T?TT-TTT?
--:-- / 7
????????????????
---?--?-?------?
--:-- / 0
????????????????
---?--?-?------?
--:-- / 0
28

FFFF? FFF? F? FFF? F (expected value)

3.00 3.00 3.00 3.00 0 3.00 1.00 3.00 0 3.00 0 3.00 3.00 3.00 0 1.00 (confidence rate)

DNC FFFF?FFF?F?FFF?F
TTTT?TTT?T?TTT?T
--:-- / 7
CC

0
????????????????
----?---?-?---?-
--:-- / 0
FFFF?F?F?F?FFF??
TTTT?T-T?T?TTT?-
--:-- / 6
FFFF?F?F?F?FFF??
TTTT?T-T?T?TTT?-
--:-- / 6
????????????????
----?---?-?---?-
--:-- / 0
????????????????
----?---?-?---?-
--:-- / 0
32

FTFTFFF? ? ? TFF? FF (expected value)

3.00 3.00 1.00 3.00 3.00 1.00 3.00 0 0 0 1.00 1.00 1.00 0 1.00 1.00 (confidence rate)

DNC FTFTFFF???TFF?FF
TTTTTTT???TTT?TT
--:-- / 7
CC

0
????????????????
-------???---?--
--:-- / 0
FT?TF?F?????????
TT-TT-T???---?--
--:-- / 3
FT?TF?F?????????
TT-TT-T???---?--
--:-- / 3
????????????????
-------???---?--
--:-- / 0
????????????????
-------???---?--
--:-- / 0
QuasiCertifProtocol — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 47 55 10 18 39 39 18 18
Road Runner 1 0 0 0 1 0 0 0
Camel 0 2 0 0 0 0 0 0
02

FFFFFTTFTTTTFTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:P- / 10
FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-M / 10
FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTTFTTTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 10
06

FTFFFTFFFTTTTTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 4.00 (confidence rate)

FTFFFTFFFT?TTT?F
TTTTTTTTTT-TTT-T
--:-- / 9
FTFFFTFFFTTTTTTF
TTTTTTTTTTTTTTTT
--:-M / 10
CC

0
CC

0
FTFFFTFFFTTTTTTF
TTTTTTTTTTTTTTTT
--:P- / 10
FTFFFTFFFTTTTTTF
TTTTTTTTTTTTTTTT
--:-- / 10
CC

0
CC

0
10

? ? ? TFF? FTTTTFFFT (expected value)

0 0 0 4.00 4.00 3.00 0 1.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00 2.00 (confidence rate)

???TF???TTTTF??T
???TT-?-TTTTT--T
--:-- / 5
???TFF?FTTTTFFFT
???TTT?TTTTTTTTT
--:-- / 7
CC

0
????????????????
???---?---------
--:-- / 0
???TFF??????????
???TTT?---------
--:-- / 2
???TFF??????????
???TTT?---------
--:-- / 2
????????????????
???---?---------
--:-- / 0
????????????????
???---?---------
--:-- / 0
18

FTF? TTTFF? ? TTT? T (expected value)

1.00 4.00 3.00 0 4.00 4.00 4.00 1.00 4.00 0 0 2.00 2.00 2.00 0 2.00 (confidence rate)

?T??TTT?F??TTT?T
-T-?TTT-T??TTT?T
--:-- / 6
FTF?TTTFF??TTT?T
TTT?TTTTT??TTT?T
--:-- / 7
CC

0
????????????????
---?-----??---?-
--:-- / 0
?TF?TTT?F???????
-TT?TTT-T??---?-
--:-- / 4
?TF?TTT?F???????
-TT?TTT-T??---?-
--:-- / 4
????????????????
---?-----??---?-
--:-- / 0
????????????????
---?-----??---?-
--:-- / 0
22

TTF? FF? F? ? T? F? TT (expected value)

4.00 4.00 4.00 0 4.00 3.00 0 4.00 0 0 4.00 0 3.00 0 4.00 4.00 (confidence rate)

TTF?F??F??T?F?TT
TTT?T-?T??T?T?TT
--:-- / 6
TTF?FF?F??T?F?TT
TTT?TT?T??T?T?TT
--:-- / 6
CC

0
????????????????
---?--?-??-?-?--
--:-- / 0
TTF?FF?F??T???TT
TTT?TT?T??T?-?TT
--:-- / 6
TTF?FF?F??T?F?TT
TTT?TT?T??T?T?TT
--:-- / 6
????????????????
---?--?-??-?-?--
--:-- / 0
????????????????
---?--?-??-?-?--
--:-- / 0
28

FFFF? FFF? F? TTTTT (expected value)

7.00 6.00 7.00 7.00 0 6.00 5.00 7.00 0 4.00 0 5.00 5.00 5.00 5.00 5.00 (confidence rate)

F?FF??FF???TTTTT
T-TT?-TT?-?TTTTT
--:-- / 6
FFFF?FFF?F?TTTTT
TTTT?TTT?T?TTTTT
--:-- / 8
CC

0
FFFF?FFF?F?TTTTT
TTTT?TTT?T?TTTTT
--:-- / 8
FFFF?F?F????????
TTTT?T-T?-?-----
--:-- / 4
FFFF?F?F????????
TTTT?T-T?-?-----
--:-- / 4
FFFF?FFF?F?TTTTT
TTTT?TTT?T?TTTTT
--:-- / 8
FFFF?FFF?F?TTTTT
TTTT?TTT?T?TTTTT
--:-- / 8
32

FTFTFFF? ? ? ? TT? TT (expected value)

4.00 4.00 1.00 4.00 4.00 1.00 3.00 0 0 0 0 2.00 2.00 0 2.00 2.00 (confidence rate)

FT?TF??????TT?TT
TT-TT--????TT?TT
--:-- / 5
FTFTFFF????TT?TT
TTTTTTT????TT?TT
--:-- / 7
CC

0
????????????????
-------????--?--
--:-- / 0
FT?TF?F?????????
TT-TT-T????--?--
--:-- / 3
FT?TF?F?????????
TT-TT-T????--?--
--:-- / 3
????????????????
-------????--?--
--:-- / 0
????????????????
-------????--?--
--:-- / 0
Raft — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 124 116 39 39 126 126 56 56
Road Runner 2 0 0 0 5 2 0 0
Camel 4 2 0 0 0 2 0 1
02

FFFFFFTFFFTTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-M / 14
FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:P- / 14
FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFFFFTFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 14
03

FFFTTFTFFFFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTTFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 14
CC

0
CC

0
FFFTTFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 14
FFFTTFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
CC

0
CC

0
04

TFFFFTFTFFFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFTF?FFFTFFFF
TTTTTTT-TTTTTTTT
--:-- / 13
TFFFFTF?FFFTFFFF
TTTTTTT-TTTTTTTT
--:-- / 13
CC

0
CC

0
TFFFFTFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 14
TFFFFTFTFFFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 14
CC

0
CC

0
05

TTFFFFFTFTFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 (confidence rate)

TTFFFFFTFTFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 14
TTFFFFFTFTFFFFF?
TTTTTTTTTTTTTTT-
--:-- / 13
CC

0
CC

0
TTFFFFFTFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TTFFFFFTFTFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 14
CC

0
CC

0
06

TFFTTFFFFFFFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate)

TFFTTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-M / 14
TFFTTFFFFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 13
CC

0
CC

0
TFFTTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 14
TFFTTFFFFFFFFFFT
TTTTTTTTTTTTTTTT
--:P- / 14
CC

0
CC

0
07

FTFFFFFTTTFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFF?TTTFFFFFF
TTTTTT-TTTTTTTTT
--:-- / 13
FTFFFF?TTT?FFFFF
TTTTTT-TTT-TTTTT
--:-- / 12
CC

0
CC

0
FTFFFFFTTTFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 14
FTFFFFFTTTFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 14
CC

0
CC

0
08

FFFFFFFFFFFFFTFT (expected value)

6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFFFFFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFFF?FFFFFF?FTFT
TTTT-TTTTTT-TTTT
--:-- / 12
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFFFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:P- / 14
FFFFFFFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFFFFFFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFFFFFFFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-M / 14
09

FFFTFFTFFFFFFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFTFFFFFFFTT
TTTTTTTTTTTTTTTT
--:PM / 14
FFFTFFTFFF?FFFTT
TTTTTTTTTT-TTTTT
--:-- / 13
FFFTFFTFFF?FFFTT
TTTTTTTTTT-TTTTT
--:-- / 13
FFFTFFTFFF?FFFTT
TTTTTTTTTT-TTTTT
--:-- / 13
FFFTFFTFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTFFTFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTFFTFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTFFTFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
10

TFTFFFTTFFTFFFFF (expected value)

8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTFFFTTFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 14
T?TFFFTTF?TFFFFF
T-TTTTTTT-TTTTTT
--:-- / 12
T?TFFFTTF?TFFFFF
T-TTTTTTT-TTTTTT
--:-- / 12
T?TFFFTTF?TFFFFF
T-TTTTTTT-TTTTTT
--:-- / 12
TFTFFFTTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFTFFFTTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFTFFFTTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFTFFFTTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
Railroad — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 113 82 82 84 88 82 82
Road Runner 1 3 0 0 0 0 0 0
Camel 0 4 0 0 0 0 0 0
005

TTTFFTTFFFFTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 23
TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 23
TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
TTTFFTTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
010

FFFFFTTFFTFTFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate)

FFFFFT?FFTFTF?TF
TTTTTT-TTTTTT-TT
--:-- / 20
FFFFFTTFFTFTFTTF
TTTTTTTTTTTTTTTT
--:PM / 23
CC

0
CC

0
FFFFFTTFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFTTFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 23
CC

0
CC

0
020

FFTFTTFTFFFFTFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 7.00 7.00 7.00 (confidence rate)

FFTFTTFTFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 21
FFTFTTFTFFFFTFFT
TTTTTTTTTTTTTTTT
--:PM / 23
FFTFTTFTFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 21
FFTFTTFTFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 21
FFTFTTFTFFFF????
TTTTTTTTTTTT----
--:-- / 17
FFTFTTFTFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 21
FFTFTTFTFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 21
FFTFTTFTFFFF?FFT
TTTTTTTTTTTT-TTT
--:-- / 21
050

TTFFTFFFFTFFFTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 1.00 8.00 8.00 (confidence rate)

TTFFTFFFFTFFF?FT
TTTTTTTTTTTTT-TT
--:-- / 21
TTFFTFFFFTFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 23
TTFFTFFFFTFFF?FT
TTTTTTTTTTTTT-TT
--:-- / 21
TTFFTFFFFTFFF?FT
TTTTTTTTTTTTT-TT
--:-- / 21
TTFFTFFFFTFFF?FT
TTTTTTTTTTTTT-TT
--:-- / 21
TTFFTFFFFTFFF?FT
TTTTTTTTTTTTT-TT
--:-- / 21
TTFFTFFFFTFFF?FT
TTTTTTTTTTTTT-TT
--:-- / 21
TTFFTFFFFTFFF?FT
TTTTTTTTTTTTT-TT
--:-- / 21
100

FFF? TTFTFTTFTFFF (expected value)

6.00 6.00 6.00 0 1.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 (confidence rate)

FFF??TF?FTTFT?FF
TTT?-TT-TTTTT-TT
--:-- / 17
FFF?TTFTFTTFTFFF
TTT?TTTTTTTTTTTT
--:-- / 21
FFF??TF?FTTFT?FF
TTT?-TT-TTTTT-TT
--:-- / 17
FFF??TF?FTTFT?FF
TTT?-TT-TTTTT-TT
--:-- / 17
CC

0
CC

0
FFF??TF?FTTFT?FF
TTT?-TT-TTTTT-TT
--:-- / 17
FFF??TF?FTTFT?FF
TTT?-TT-TTTTT-TT
--:-- / 17
Referendum — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 62 26 26 66 66 44 44
Road Runner 0 0 0 0 4 2 0 0
Camel 0 0 0 1 2 0 3 0
0010

FTTFFFFFFFFFTTFF (expected value)

7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FTT?FFFFFFF?TTFF
TTT-TTTTTTT-TTTT
--:-- / 8
FTTFFFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-M / 9
FTTFFFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:P- / 9
FTTFFFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
0015

FFFFTTFFTFFFFTFF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC FFFFTTFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:P- / 9
FFFFTTFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-M / 9
FFFFTTFFTFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 9
0020

FFFTTTFFFTFFFFFF (expected value)

7.00 7.00 7.00 7.00 4.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 4.00 (confidence rate)

DNC FFFT?TFFFTFFF?F?
TTTT-TTTTTTTT-T-
--:-- / 7
FFFT?TFFFTFFFFF?
TTTT-TTTTTTTTTT-
--:-- / 8
FFFT?TFFFTFFFFF?
TTTT-TTTTTTTTTT-
--:-- / 8
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 9
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 9
FFFTTTFFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 9
0050

FFFTFFFFFTTTTTTF (expected value)

5.00 5.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 (confidence rate)

DNC FFF?FFFFFTTTTTTF
TTT-TTTTTTTTTTTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTFFFFFTTTTTTF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFTFFFFFTTTTTTF
TTTTTTTTTTTTTTTT
--:P- / 9
FFFTFFFFFTTTTTTF
TTTTTTTTTTTTTTTT
--:-M / 9
FFFTFFFFFTTTTTTF
TTTTTTTTTTTTTTTT
--:-- / 9
0100

FFFTTFFTFFFFFFTF (expected value)

2.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC ?FFTTFFTFFFFFFTF
-TTTTTTTTTTTTTTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTTFFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:-M / 9
FFFTTFFTFFFFFFTF
TTTTTTTTTTTTTTTT
--:P- / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0200

TTFTFTFFTTTTTFFF (expected value)

5.00 5.00 5.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 3.00 3.00 (confidence rate)

DNC TTF?FTFFTTTTTFFF
TTT-TTTTTTTTTTTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFTFTFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:PM / 9
TTFTFTFFTTTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 9
TTFTFTFFTTTTTF??
TTTTTTTTTTTTTT--
--:-- / 8
TTFTFTFFTTTTTF??
TTTTTTTTTTTTTT--
--:-- / 8
0500

? ? TFFFTF? FFTFTTT (expected value)

0 0 3.00 2.00 1.00 3.00 3.00 3.00 0 1.00 2.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC ??T?FFTF?F?TFTTT
??T-TTTT?T-TTTTT
--:-- / 6
????????????????
??------?-------
--:-- / 0
????????????????
??------?-------
--:-- / 0
??TF?FTF??FTFTTT
??TT-TTT?-TTTTTT
--:-- / 6
??TF?FTF??FTFTTT
??TT-TTT?-TTTTTT
--:-- / 6
????????????????
??------?-------
--:-- / 0
????????????????
??------?-------
--:-- / 0
1000

FFFTF? TTT? FFFFFF (expected value)

3.00 3.00 3.00 3.00 3.00 0 3.00 3.00 3.00 0 3.00 3.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC FFFTF?TTT?FFFFFF
TTTTT?TTT?TTTTTT
--:-- / 8
????????????????
-----?---?------
--:-- / 0
????????????????
-----?---?------
--:-- / 0
FFFTF?TTT?FF????
TTTTT?TTT?TT----
--:-- / 6
FFFTF?TTT?FF????
TTTTT?TTT?TT----
--:-- / 6
????????????????
-----?---?------
--:-- / 0
????????????????
-----?---?------
--:-- / 0
Referendum — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 45 61 18 18 64 64 45 45
Road Runner 0 0 0 0 4 2 0 0
Camel 0 1 0 0 0 1 1 3
0010

FTTFFFFFFFFTTTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-M / 9
FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:P- / 9
FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
FTTFFFFFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
0015

FFFFTTFFTFFTFTTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTTFF?FFTFTTT
TTTTTTTT-TTTTTTT
--:-- / 8
FFFFTTFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:P- / 9
FFFFTTFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFFTTFFTFFTFTTT
TTTTTTTTTTTTTTTT
--:-M / 9
0020

FFFTTTFFTFTTFFFT (expected value)

6.00 6.00 6.00 6.00 4.00 6.00 6.00 6.00 4.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 (confidence rate)

FFFT?TFF?FT?FFFT
TTTT-TTT-TT-TTTT
--:-- / 7
FFFT?TFF??TTFFFT
TTTT-TTT--TTTTTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTTTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:P- / 9
FFFTTTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFTTTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 9
FFFTTTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-M / 9
0050

FFFTFFFFFFTTTTTF (expected value)

5.00 5.00 5.00 4.00 5.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 6.00 4.00 4.00 (confidence rate)

??????F?FFTTTT??
------T-TTTTTT--
--:-- / 4
FFF?FFFFFFTTTT??
TTT-TTTTTTTTTT--
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTFFFFFFTTTTTF
TTTTTTTTTTTTTTTT
--:P- / 9
FFFTFFFFFFTTTTTF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFTFFFFFFTTTTTF
TTTTTTTTTTTTTTTT
--:-- / 9
FFFTFFFFFFTTTTTF
TTTTTTTTTTTTTTTT
--:-M / 9
0100

FFFTTFFTTTTFFFTT (expected value)

2.00 4.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 2.00 4.00 4.00 3.00 4.00 4.00 (confidence rate)

?F?????TTT?FF?TT
-T-----TTT-TT-TT
--:-- / 5
?FFTTFFTTT?FFFTT
-TTTTTTTTT-TTTTT
--:-- / 8
CC

0
CC

0
FFFTTFFTTTTFFFTT
TTTTTTTTTTTTTTTT
--:P- / 9
FFFTTFFTTTTFFFTT
TTTTTTTTTTTTTTTT
--:-M / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
0200

TTFTFTFFTFTFTFFF (expected value)

5.00 6.00 5.00 4.00 5.00 6.00 5.00 6.00 6.00 5.00 6.00 6.00 4.00 6.00 5.00 6.00 (confidence rate)

?T???T?FTFTF?F?F
-T---T-TTTTT-T-T
--:-- / 5
TTF?FTFFT?TF?FFF
TTT-TTTTT-TT-TTT
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TTFTFTFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:P- / 9
TTFTFTFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 9
TTFTFTFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-M / 9
TTFTFTFFTFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 9
0500

? ? TFFFTFTTTFTTTT (expected value)

0 0 3.00 3.00 1.00 4.00 3.00 3.00 4.00 3.00 4.00 2.00 4.00 4.00 4.00 4.00 (confidence rate)

?????F??TTT?TTTT
??---T--TTT-TTTT
--:-- / 5
??TFFFTFT?TFTTTT
??TTTTTTT-TTTTTT
--:-- / 7
????????????????
??--------------
--:-- / 0
????????????????
??--------------
--:-- / 0
??TF?FTFTTT?TTTT
??TT-TTTTTT-TTTT
--:-- / 7
??TF?FTFTTTFTTTT
??TT-TTTTTTTTTTT
--:-- / 7
????????????????
??--------------
--:-- / 0
????????????????
??--------------
--:-- / 0
1000

FFFTF? TTFF? TF? ? F (expected value)

3.00 4.00 3.00 3.00 1.00 0 4.00 3.00 1.00 1.00 0 2.00 1.00 0 0 2.00 (confidence rate)

?F????T????T???F
-T---?T---?T-??T
--:-- / 2
FFFTF?TTFF?TF??F
TTTTT?TTTT?TT??T
--:-- / 7
????????????????
-----?----?--??-
--:-- / 0
????????????????
-----?----?--??-
--:-- / 0
FFFT??TT????????
TTTT-?TT--?--??-
--:-- / 3
FFFT??TT????????
TTTT-?TT--?--??-
--:-- / 3
????????????????
-----?----?--??-
--:-- / 0
????????????????
-----?----?--??-
--:-- / 0
ResAllocation — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 159 157 60 60 159 158 61 61
Road Runner 7 0 0 0 5 1 0 0
Camel 4 9 0 0 0 0 0 0
R002C002

FFFFFFTFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 11
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R003C002

FFFFFTTTFFTFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFTTTFFTFFFTF
TTTTTTTTTTTTTTTT
--:P- / 11
FFFFFTTTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FFFFFTTTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFTTTFFTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R003C003

FTFFFTFFFFTFTTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFTFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:P- / 11
FTFFFTFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FTFFFTFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 11
FTFFFTFFFFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R003C005

TFFTFTFTTFTTFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFTFTTFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFTFTFTTFTTFTFF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
TFFTFTFTTFTTFTFF
TTTTTTTTTTTTTTTT
--:P- / 11
TFFTFTFTTFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R003C010

FFFFTFFFFFFTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:P- / 11
FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-M / 11
FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFTFFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
R003C015

FFFFFFTFTFTFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 8.00 8.00 3.00 8.00 8.00 (confidence rate)

FFFFFFTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
FFFFFFTFTFTFF?FF
TTTTTTTTTTTTT-TT
--:-- / 10
FFFFFFT?TFTFF?FF
TTTTTTT-TTTTT-TT
--:-- / 10
FFFFFFT?TFTFF?FF
TTTTTTT-TTTTT-TT
--:-- / 10
FFFFFFTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFTFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFT?TFTFF?FF
TTTTTTT-TTTTT-TT
--:-- / 10
FFFFFFT?TFTFF?FF
TTTTTTT-TTTTT-TT
--:-- / 10
R003C020

FFFFTFFFFFTFTFFF (expected value)

8.00 5.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-M / 11
F?FFTFFFFFTFTFFF
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFTFF?FFTFTFFF
T-TTTTT-TTTTTTTT
--:-- / 10
F?FFTFF?FFTFTFFF
T-TTTTT-TTTTTTTT
--:-- / 10
FFFFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:P- / 11
FFFFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFTFFFFFTFTFFF
TTTTTTTTTTTTTTTT
--:-- / 11
R003C050

FFFTFFTFFFFFFFTF (expected value)

8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFTFFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 11
FFFT?FTFFFFFFFTF
TTTT-TTTTTTTTTTT
--:-- / 10
FFFT?FTFFFFFFFTF
TTTT-TTTTTTTTTTT
--:-- / 10
FFFT?FTFFFFFFFTF
TTTT-TTTTTTTTTTT
--:-- / 10
FFFT?FTFF?FFFFTF
TTTT-TTTT-TTTTTT
--:-- / 10
FFFT?FTFFFFFFFTF
TTTT-TTTTTTTTTTT
--:-- / 10
FFFT?FTFFFFFFFTF
TTTT-TTTTTTTTTTT
--:-- / 10
FFFT?FTFFFFFFFTF
TTTT-TTTTTTTTTTT
--:-- / 10
R003C100

FFFFFFTFFFFTFFFF (expected value)

8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFTFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
F?FFFFTFFFFTFFFF
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFFFTFFFFTFFFF
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFFFTFFFFTFFFF
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFFFTFFFFTFFFF
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFFFTFFFFTFFFF
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFFFTFFFFTFFFF
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFFFTFFFFTFFFF
T-TTTTTTTTTTTTTT
--:-- / 10
R005C002

FTTFFFTFFTFTTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFFFTFFTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFFFTFFTFTTFFT
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FTTFFFTFFTFTTFFT
TTTTTTTTTTTTTTTT
--:P- / 11
FTTFFFTFFTFTTFFT
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R010C002

TTFFFFTFFFFFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TTFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
TTFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:P- / 11
TTFFFFTFFFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R015C002

FFTTFTFFFFTFFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTFTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FFTTFTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:P- / 11
FFTTFTFFFFTFFFFT
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R020C002

FFTFTTFTTTFTFTFF (expected value)

4.00 4.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate)

FF??TTFTTTFTF?FF
TT--TTTTTTTTT-TT
--:-- / 9
FFTFTTFTTTFTFTFF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FFTFTTFTTTFTFTFF
TTTTTTTTTTTTTTTT
--:P- / 11
FFTFTTFTTTFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
R050C002

FTFFTTFFFFTTFFFF (expected value)

4.00 4.00 1.00 4.00 4.00 4.00 1.00 4.00 1.00 4.00 1.00 4.00 2.00 1.00 4.00 4.00 (confidence rate)

FTFFTT?F?F?TFFFF
TTTTTT-T-T-TTTTT
--:-- / 9
FT?FTTFFFFTT??FF
TT-TTTTTTTTT--TT
--:-- / 9
CC

0
CC

0
FT?FTT?F?F?TF?FF
TT-TTT-T-T-TT-TT
--:-- / 8
FT?FTT?F?F?T??FF
TT-TTT-T-T-T--TT
--:-- / 7
CC

0
CC

0
R100C002

TFFTFTFFFFFFFTFF (expected value)

8.00 8.00 2.00 8.00 3.00 8.00 8.00 8.00 2.00 7.00 8.00 8.00 8.00 8.00 8.00 5.00 (confidence rate)

TF?TFTFF?FFFFTF?
TT-TTTTT-TTTTTT-
--:-- / 9
TF?T?TFF?FFFFTFF
TT-T-TTT-TTTTTTT
--:-- / 9
TF?T?TFF?FFFFTFF
TT-T-TTT-TTTTTTT
--:-- / 9
TF?T?TFF?FFFFTFF
TT-T-TTT-TTTTTTT
--:-- / 9
TFFTFTFFFFFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 10
TFFTFTFFF?FFFTF?
TTTTTTTTT-TTTTT-
--:-- / 10
TF?T?TFF?FFFFTFF
TT-T-TTT-TTTTTTT
--:-- / 9
TF?T?TFF?FFFFTFF
TT-T-TTT-TTTTTTT
--:-- / 9
Ring — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 149 149 149 149 149 149 149 149
Road Runner 1 0 0 0 0 0 0 0
Camel 0 1 0 0 0 0 0 0
none

FFFFFTTFFFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 149
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 149
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 149
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 149
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 149
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 149
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 149
FFFFFTTFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 149
RobotManipulation — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 130 130 120 120 126 114 120 120
Road Runner 3 8 0 0 0 2 0 0
Camel 4 8 0 0 0 0 0 1
00001

TFTFFTFTFTFTFFTF (expected value)

7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTFFTFTFTFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 10
?FTFFTFTFTFTFFTF
-TTTTTTTTTTTTTTT
--:-- / 10
TFTFFTFTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTFTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTFTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTFTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTFTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTFTFTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 10
00002

TTTTTFTTFFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 10
TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 10
TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTTTTFTTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
00005

FFTFFTFFTFTTFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:PM / 10
FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFTFFTFFTFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
00010

TFTFFTTTFFFTFTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTFFT?TFFFTFTFT
TTTTTT-TTTTTTTTT
--:-- / 10
TFTFFTTTFFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 10
TFTFFTTTFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTTTFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTTTFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTTTFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTTTFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFTTTFFFTFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
00020

TFFFFTFTFTFFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 10
TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFFFFTFTFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 10
00050

FTTTFFTTTFFFFTFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 10
FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTTTFFTTTFFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 10
00100

TFTFTFTFTTTTFFFT (expected value)

8.00 6.00 8.00 8.00 8.00 4.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTFTFTFTTTTFFFT
TTTTTTTTTTTTTTTT
--:PM / 10
TFTFTFTF?TTTFFFT
TTTTTTTT-TTTTTTT
--:-- / 10
TFTFT?TFTTTTFFFT
TTTTT-TTTTTTTTTT
--:-- / 10
TFTFT?TFTTTTFFFT
TTTTT-TTTTTTTTTT
--:-- / 10
T?TFTFTFTTTTFFFT
T-TTTTTTTTTTTTTT
--:-- / 10
T?TFTFTFTTTTFFFT
T-TTTTTTTTTTTTTT
--:-- / 10
TFTFT?TFTTTTFFFT
TTTTT-TTTTTTTTTT
--:-- / 10
TFTFT?TFTTTTFFFT
TTTTT-TTTTTTTTTT
--:-- / 10
00200

FTFFFFTTFFFFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 10
FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFFFTTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
00500

FFFFFTFFFFFFTFTT (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFTFFFFFFTFTT
TTTTTTTTTTTTTTTT
--:-M / 10
?FFFFTFFFFFFTFTT
-TTTTTTTTTTTTTTT
--:-- / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFTFFFFFFTFTT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFTFFFFFFTFTT
TTTTTTTTTTTTTTTT
--:P- / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
01000

FFFFFFFFFFFTFFFT (expected value)

8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FFFFFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:P- / 10
FFFFFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-M / 10
FFFFFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
F?FFFFFFFFFTFFFT
T-TTTTTTTTTTTTTT
--:-- / 10
F?FFFFFF????????
T-TTTTTT--------
--:-- / 5
FFFFFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
FFFFFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 10
02000

TTFTFTTFTFFFTTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TTFTFTTFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTFTFTTFTFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 10
TTFTFTTFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTFTFTTFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTFTFTTFTF??????
TTTTTTTTTT------
--:-- / 6
TTFTFTTFTF??????
TTTTTTTTTT------
--:-- / 6
TTFTFTTFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
TTFTFTTFTFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 10
05000

FTFFTFFFFFFFTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

FTFFTFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFTFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 10
FTFFTFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFTFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFT?FFFFFFTFTF
TTTTT-TTTTTTTTTT
--:-- / 10
FTFFT???????????
TTTTT-----------
--:-- / 3
FTFFTFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 10
FTFFTFFFFFFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 10
10000

TFTFFFFFTFFFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFF?FTFFFFFFF
TTTTTT-TTTTTTTTT
--:-- / 10
TFTFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:P- / 10
TFTFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 10
TFTFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-M / 10
RwMutex — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 126 128 41 41 89 91 41 41
Road Runner 2 6 0 0 0 1 0 0
Camel 1 8 0 0 0 0 0 0
r0010w0010

TTFFTFFFFTFTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
TTFFTFFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
r0010w0020

FFTTFFFFFTTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
FFTTFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFTTFFFFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
r0010w0050

FFFFFFTFFFFTTTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFTFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFTFFFFTTTFF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
FFFFFFTFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFFFFTFFFFTTTFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
r0010w0100

FFFTTFFFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
FFFTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
r0010w0500

TFTFTTFFTFTFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTFTTFFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTFTTFFTFTFFTFT
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
TFTFTTFFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTFTTFFTFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
r0010w1000

TFFFFFTTFTFFTFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 (confidence rate)

TFFFFFTTFTFFTFTF
TTTTTTTTTTTTTTTT
--:PM / 11
TFFFFFTTFTFFT?TF
TTTTTTTTTTTTT-TT
--:-- / 10
CC

0
CC

0
TFFFFFTTFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 11
TFFFFFTTFTFFTFTF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
r0010w2000

FTFFFFTFTFFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FTFFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:P- / 11
FTFFFFTFTFFFFFTF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FTFFF???????????
TTTTT-----------
--:-- / 3
FTFFF???????????
TTTTT-----------
--:-- / 3
CC

0
CC

0
r0020w0010

FTTFTTFFFTFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
FTTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FTTFTTFFFTFTFFFF
TTTTTTTTTTTTTTTT
--:P- / 11
CC

0
CC

0
r0100w0010

FFFTFFFTFFFFFTTF (expected value)

8.00 8.00 8.00 1.00 6.00 6.00 6.00 6.00 2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

FFF?FFFTFFFFFTTF
TTT-TTTTTTTTTTTT
--:-- / 10
FFFTFFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 11
FFF?FFFT?FFFFTTF
TTT-TTTT-TTTTTTT
--:-- / 10
FFF?FFFT?FFFFTTF
TTT-TTTT-TTTTTTT
--:-- / 10
FFF?????????????
TTT-------------
--:-- / 2
FFF?????????????
TTT-------------
--:-- / 2
FFF?FFFT?FFFFTTF
TTT-TTTT-TTTTTTT
--:-- / 10
FFF?FFFT?FFFFTTF
TTT-TTTT-TTTTTTT
--:-- / 10
r0500w0010

FFTFFFFFFFFFFFTF (expected value)

4.00 4.00 4.00 1.00 4.00 4.00 2.00 3.00 2.00 1.00 2.00 2.00 1.00 2.00 2.00 2.00 (confidence rate)

FFT?FF?FF?FF?FTF
TTT-TT-TT-TT-TTT
--:-- / 8
FFTFFFFF?FFFFFTF
TTTTTTTT-TTTTTTT
--:-- / 10
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFT?FF??????????
TTT-TT----------
--:-- / 3
FFT?FFFFF???????
TTT-TTTTT-------
--:-- / 6
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
r1000w0010

TFFTFFFTTFFTTFTF (expected value)

8.00 4.00 8.00 7.00 1.00 6.00 6.00 6.00 5.00 6.00 5.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFTFFFTTF?TTFTF
TTTTTTTTTT-TTTTT
--:-- / 10
TFFT?FFT?FFTTFTF
TTTT-TTT-TTTTTTT
--:-- / 10
T?FT?FFTTFFTTFTF
T-TT-TTTTTTTTTTT
--:-- / 10
T?FT?FFTTFFTTFTF
T-TT-TTTTTTTTTTT
--:-- / 10
TFFT????????????
TTTT------------
--:-- / 3
TFF?????????????
TTT-------------
--:-- / 2
T?FT?FFTTFFTTFTF
T-TT-TTTTTTTTTTT
--:-- / 10
T?FT?FFTTFFTTFTF
T-TT-TTTTTTTTTTT
--:-- / 10
r2000w0010

TFTFFFTFTFTFFFFF (expected value)

6.00 6.00 6.00 6.00 5.00 6.00 8.00 5.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 (confidence rate)

TFTF?FT?TFTFFFFF
TTTT-TT-TTTTTTTT
--:-- / 10
TFTFFFTFTFTF?FFF
TTTTTTTTTTTT-TTT
--:-- / 10
TFTFFFTFTFTF?FFF
TTTTTTTTTTTT-TTT
--:-- / 10
TFTFFFTFTFTF?FFF
TTTTTTTTTTTT-TTT
--:-- / 10
??????T?????????
------T---------
--:-- / 1
??????T?????????
------T---------
--:-- / 1
TFTFFFTFTFTF?FFF
TTTTTTTTTTTT-TTT
--:-- / 10
TFTFFFTFTFTF?FFF
TTTTTTTTTTTT-TTT
--:-- / 10
SafeBus — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 59 20 20 40 39 20 20
Road Runner 0 3 0 0 0 1 0 0
Camel 0 3 0 0 0 0 1 0
03

TFTTFFFTFFFFFTTF (expected value)

7.00 7.00 7.00 7.00 7.00 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 7.00 (confidence rate)

DNC TFTTF?FTFFFFFT?F
TTTTT-TTTTTTTT-T
--:-- / 10
TFTTFFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:P- / 11
TFTTFFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:-M / 11
TFTTFFFTFFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 11
06

FFFTFTTFFTTFFFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FFFTFTTFFTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 11
CC

0
CC

0
FFFTFTTFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
FFFTFTTFFTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 11
CC

0
CC

0
10

FFFFFTTTFTFTTTFF (expected value)

3.00 3.00 1.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 (confidence rate)

DNC FFFFFTTTFTFTTTFF
TTTTTTTTTTTTTTTT
--:PM / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FF?FFTT?FTFTTT??
TT-TTTT-TTTTTT--
--:-- / 8
FF?FFTT?FTFTTT??
TT-TTTT-TTTTTT--
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
15

TFFTFTTFTFTFTTFF (expected value)

1.00 2.00 3.00 3.00 3.00 1.00 1.00 3.00 3.00 1.00 3.00 3.00 3.00 3.00 2.00 3.00 (confidence rate)

DNC TFFTFTTFTFTFTTFF
TTTTTTTTTTTTTTTT
--:PM / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
?FFTF??FT?TFTTFF
-TTTT--TT-TTTTTT
--:-- / 8
??FTF??FT?TFTT?F
--TTT--TT-TTTT-T
--:-- / 7
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
20

TTFF? FTF? TFTTFFF (expected value)

7.00 7.00 7.00 5.00 0 5.00 5.00 5.00 0 5.00 5.00 5.00 1.00 5.00 5.00 5.00 (confidence rate)

DNC TTFF?FTF?TFTTFFF
TTTT?TTT?TTTTTTT
--:-- / 10
TTFF?FTF?TFT?FFF
TTTT?TTT?TTT-TTT
--:-- / 9
TTFF?FTF?TFT?FFF
TTTT?TTT?TTT-TTT
--:-- / 9
TTF?????????????
TTT-?---?-------
--:-- / 2
TTF?????????????
TTT-?---?-------
--:-- / 2
TTFF?FTF?TFT?FFF
TTTT?TTT?TTT-TTT
--:-- / 9
TTFF?FTF?TFT?FFF
TTTT?TTT?TTT-TTT
--:-- / 9
50

? ? F? FF? F? FTF? FT? (expected value)

0 0 1.00 0 1.00 1.00 0 1.00 0 1.00 1.00 1.00 0 1.00 1.00 0 (confidence rate)

DNC ??F?FF?F?FTF?FT?
??T?TT?T?TTT?TT?
--:-- / 6
????????????????
??-?--?-?---?--?
--:-- / 0
????????????????
??-?--?-?---?--?
--:-- / 0
CC

0
CC

0
????????????????
??-?--?-?---?--?
--:-- / 0
????????????????
??-?--?-?---?--?
--:-- / 0
80

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
SafeBus — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 45 51 19 19 31 31 19 19
Road Runner 0 2 0 0 1 0 0 0
Camel 0 2 0 0 0 1 0 0
03

TFTTFFFTTFTTFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:PM / 11
TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
TFTTFFFTTFTTFFTT
TTTTTTTTTTTTTTTT
--:-- / 11
06

FFFTFTTFTTTTTTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFT??TTTTTTTF
TTTTTT--TTTTTTTT
--:-- / 10
FFFTFTTFT?TTTTTF
TTTTTTTTT-TTTTTT
--:-- / 10
CC

0
CC

0
FFFTFTTFTTTTTTTF
TTTTTTTTTTTTTTTT
--:P- / 11
FFFTFTTFTTTTTTTF
TTTTTTTTTTTTTTTT
--:-M / 11
CC

0
CC

0
10

FFFFFTTTTTFTTT? F (expected value)

4.00 4.00 1.00 4.00 4.00 4.00 3.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 0 2.00 (confidence rate)

FF?FFT???TFTTT?F
TT-TTT---TTTTT?T
--:-- / 8
FFFFFTTTTTFTTT?F
TTTTTTTTTTTTTT?T
--:-- / 10
????????????????
--------------?-
--:-- / 0
????????????????
--------------?-
--:-- / 0
FF?FFTT?????????
TT-TTTT-------?-
--:-- / 4
FF?FFTT?????????
TT-TTTT-------?-
--:-- / 4
CC

0
CC

0
15

TFFTFTTFTFTTTFTT (expected value)

1.00 4.00 4.00 4.00 4.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 (confidence rate)

?FFTF??FTFTTTF?T
-TTTT--TTTTTTT-T
--:-- / 8
TFFTFTTFTFTTTFTT
TTTTTTTTTTTTTTTT
--:PM / 11
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
?FFTF???????????
-TTTT-----------
--:-- / 3
?FFTF???????????
-TTTT-----------
--:-- / 3
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
20

TTFF? FTF? TTTFTF? (expected value)

8.00 8.00 8.00 6.00 0 5.00 6.00 6.00 0 6.00 6.00 6.00 6.00 6.00 1.00 0 (confidence rate)

TTFF??TF?TTTFT??
TTTT?-TT?TTTTT-?
--:-- / 8
TTFF?FTF?TTTFTF?
TTTT?TTT?TTTTTT?
--:-- / 9
TTFF?FTF?TTTFT??
TTTT?TTT?TTTTT-?
--:-- / 8
TTFF?FTF?TTTFT??
TTTT?TTT?TTTTT-?
--:-- / 8
TTF?????????????
TTT-?---?------?
--:-- / 2
TTF?????????????
TTT-?---?------?
--:-- / 2
TTFF?FTF?TTTFT??
TTTT?TTT?TTTTT-?
--:-- / 8
TTFF?FTF?TTTFT??
TTTT?TTT?TTTTT-?
--:-- / 8
SharedMemory — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 37 8 8 26 29 8 8
Road Runner 0 3 0 0 0 0 0 0
Camel 0 3 0 0 0 0 0 0
000005

TTFFTFFFFFTTFTTF (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC TTFFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:PM / 8
TTFFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 8
000010

FTTFTTTFTFTFTTTF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTTFTTTFTFTFTTTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTTFTTTFTFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTTTFTFTFTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000020

FTTFTFFTFFFFFTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC FTTFTFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTTFTFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTFFTFFFFFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000050

FFTFFTTTFFTF? FFF (expected value)

3.00 3.00 2.00 3.00 3.00 2.00 2.00 2.00 1.00 1.00 1.00 2.00 0 1.00 2.00 1.00 (confidence rate)

DNC FFTFFTTTFFTF?FFF
TTTTTTTTTTTT?TTT
--:-- / 7
CC

0
CC

0
FF?FF???????????
TT-TT-------?---
--:-- / 2
FFTFFTTT???F??F?
TTTTTTTT---T?-T-
--:-- / 5
CC

0
CC

0
000100

TTFFT? T? F? TTFFFF (expected value)

1.00 1.00 1.00 1.00 1.00 0 1.00 0 1.00 0 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TTFFT?T?F?TTFFFF
TTTTT?T?T?TTTTTT
--:-- / 6
????????????????
-----?-?-?------
--:-- / 0
????????????????
-----?-?-?------
--:-- / 0
CC

0
CC

0
????????????????
-----?-?-?------
--:-- / 0
????????????????
-----?-?-?------
--:-- / 0
000200

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
CC

0
CC

0
CC

0
CC

0
CC

0
000500

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
001000

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
002000

? (expected value)

0 (confidence rate)

DNC CC

0
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
005000

? (expected value)

0 (confidence rate)

DNC CC

0
CC

0
CC

0
DNF

0
CC

0
CC

0
CC

0
010000

? (expected value)

0 (confidence rate)

DNC CC

0
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
020000

? (expected value)

0 (confidence rate)

DNC CC

0
CC

0
CC

0
DNF

0
DNF

0
CC

0
CC

0
050000

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
CC

0
CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
100000

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
CC

0
CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
SharedMemory — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 25 35 8 8 24 21 8 8
Road Runner 0 2 0 0 0 0 0 0
Camel 0 2 0 0 0 0 0 0
000005

TTFFTFFFFFFTTTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:PM / 8
TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTFFTFFFFFFTTTTF
TTTTTTTTTTTTTTTT
--:-- / 8
000010

FTTFTTTFTTTFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFTTTFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTTTFTTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTTFTTTFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTTFTTTFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
000020

FTTFTFFTTFTFFTFT (expected value)

4.00 4.00 3.00 4.00 1.00 4.00 4.00 1.00 4.00 1.00 1.00 1.00 2.00 3.00 3.00 3.00 (confidence rate)

FT?F?FF?T????TFT
TT-T-TT-T----TTT
--:-- / 4
FTTFTFFTT?TFFTFT
TTTTTTTTT-TTTTTT
--:-- / 7
CC

0
CC

0
FTTF?FF?TF??FTFT
TTTT-TT-TT--TTTT
--:-- / 6
FTTF?FF?T???????
TTTT-TT-T-------
--:-- / 3
CC

0
CC

0
000050

FFTFFTTTTTT? TFTF (expected value)

3.00 3.00 1.00 3.00 4.00 1.00 1.00 1.00 2.00 2.00 2.00 0 2.00 1.00 2.00 1.00 (confidence rate)

????F???TTT?TFT?
----T---TTT?TTT-
--:-- / 3
FFTFFTTTTTT?T?TF
TTTTTTTTTTT?T-TT
--:-- / 7
CC

0
CC

0
FF?FF???????????
TT-TT------?----
--:-- / 2
FF?FF???????????
TT-TT------?----
--:-- / 2
CC

0
CC

0
000100

TTFFT? T? TFFT? ? ? ? (expected value)

1.00 2.00 1.00 1.00 1.00 0 2.00 0 2.00 1.00 1.00 2.00 0 0 0 0 (confidence rate)

?T????T?T??T????
-T---?T?T--T????
--:-- / 2
TTFFT?T?TFFT????
TTTTT?T?TTTT????
--:-- / 5
????????????????
-----?-?----????
--:-- / 0
????????????????
-----?-?----????
--:-- / 0
CC

0
CC

0
????????????????
-----?-?----????
--:-- / 0
????????????????
-----?-?----????
--:-- / 0
000200

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

????????????????
????????????????
--:-- / 0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
SimpleLoadBal — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 115 115 69 69 113 113 69 69
Road Runner 1 4 0 0 0 0 0 0
Camel 1 4 0 0 0 0 0 0
02

TFTFFFFFTTFTFFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:PM / 23
TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
TFTFFFFFTTFTFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
05

FTFTFFFFFFFTFFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FTFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 23
CC

0
CC

0
FTFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FTFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
CC

0
CC

0
10

FFFFFFFFFFFTFFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFFFFFFFFFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFFFFFTFFTT
TTTTTTTTTTTTTTTT
--:PM / 23
CC

0
CC

0
FFFFFFFFFFFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFFFFFTFFTT
TTTTTTTTTTTTTTTT
--:-- / 23
CC

0
CC

0
15

FFFFFFFTFFFFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 23
FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
FFFFFFFTFFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 23
20

FTTFFFFFFFFFFFFF (expected value)

8.00 8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 23
FTTFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FTTFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FTTFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FTT?FFFFFFFFFFFF
TTT-TTTTTTTTTTTT
--:-- / 21
FTT?FFFFFFFFFFFF
TTT-TTTTTTTTTTTT
--:-- / 21
FTTFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
FTTFFFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
SmallOperatingSystem — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 150 150 39 39 126 126 39 39
Road Runner 1 14 0 0 0 0 0 0
Camel 1 14 0 0 0 0 0 0
MT0016DC0008

TFTTFTTTFFTTFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:PM / 8
TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTFTTTFFTTFFFT
TTTTTTTTTTTTTTTT
--:-- / 8
MT0032DC0008

FTFFFFFFFTFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFFFFFFTFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0032DC0016

TFFTFFTFTFTTTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFTFFTFTFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFTFFTFTFTTTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TFFTFFTFTFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFFTFFTFTFTTTFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0064DC0016

TTTTTFFTTTFFFFTF (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

T?TTTFFTTTFFFFTF
T-TTTTTTTTTTTTTT
--:-- / 8
TTTTTFFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TTTTTFFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
TTTTTFFTTTFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0064DC0032

TFFFTTFFTTTFTFTT (expected value)

3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?FFFTTFFTTTFTFTT
-TTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFFTTTFTFTT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TFFFTTFFTTTFTFTT
TTTTTTTTTTTTTTTT
--:-- / 8
TFFFTTFFTTTFTFTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0128DC0032

TFTTTFFFFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
TFTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
TFTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
TFTTTFFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0128DC0064

TFTFFFFTFTFFFFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTFFFFTFTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTFFFFTFTFFFFTT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TFTFFFFTFTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
TFTFFFFTFTFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0256DC0064

FTFFTTFTFFTFTFTF (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

F?FFTTFTFFTFTFTF
T-TTTTTTTTTTTTTT
--:-- / 8
FTFFTTFTFFTFTFTF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FTFFTTFTFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
FTFFTTFTFFTFTFTF
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0256DC0128

TTFFFTFFTTFTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

TTFFF?FFT?FTFFFF
TTTTT-TTT-TTTTTT
--:-- / 7
TTFFFTFFTTFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TTFFFTFFTT??????
TTTTTTTTTT------
--:-- / 5
TTFFFTFFTT??????
TTTTTTTTTT------
--:-- / 5
CC

0
CC

0
MT0512DC0128

FFFTFFFFFFTFFTFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 (confidence rate)

FFFTFFFFFFTFFTF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFTFFFFFFTFFTFT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FFFTFF??????????
TTTTTT----------
--:-- / 3
FFFTFFFFFFTFFTFT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT0512DC0256

TFFFFFTFFFTFFFTT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

TFFFFFTFF?TFFFTT
TTTTTTTTT-TTTTTT
--:-- / 8
TFFFFFTFFFTFFFTT
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
TFFFFFTFF???????
TTTTTTTTT-------
--:-- / 5
TFFFFFTFFFTFFFTT
TTTTTTTTTTTTTTTT
--:-- / 8
CC

0
CC

0
MT1024DC0256

FFFFTFTTFFFFTTFF (expected value)

4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFFTFTTFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFTFTTFFFFTTFF
TTTTTTTTTTTTTTTT
--:PM / 8
CC

0
CC

0
FFFFTFTTFFFFTTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFT???????????
TTTTT-----------
--:-- / 3
CC

0
CC

0
MT1024DC0512

FTTTTFFFFTFFFT? T (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1.00 0 4.00 (confidence rate)

FTTTTFFFFTFFF??T
TTTTTTTTTTTTT-?T
--:-- / 7
FTTTTFFFFTFFFT?T
TTTTTTTTTTTTTT?T
--:-- / 8
CC

0
CC

0
FTTTTFFFFTFFF??T
TTTTTTTTTTTTT-?T
--:-- / 7
FTTTTFFFFTFFF??T
TTTTTTTTTTTTT-?T
--:-- / 7
CC

0
CC

0
MT2048DC0512

FTTFTTFTTFTTFTFF (expected value)

2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

?TTFTTFTTFTTFTFF
-TTTTTTTTTTTTTTT
--:-- / 8
?TTFTTFTTFTTFTFF
-TTTTTTTTTTTTTTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FTTFTTFTT?TTFTFF
TTTTTTTTT-TTTTTT
--:-- / 8
FTTFTTFTT?TTFTFF
TTTTTTTTT-TTTTTT
--:-- / 8
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
MT2048DC1024

FTFFFFFFFTF? FTFT (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0 4.00 4.00 3.00 4.00 (confidence rate)

FTFFFFFFFTF?FTFT
TTTTTTTTTTT?TTTT
--:-- / 8
F?FFFFFFFTF?FT?T
T-TTTTTTTTT?TT-T
--:-- / 7
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
FTFFFFFFFTF?FTFT
TTTTTTTTTTT?TTTT
--:-- / 8
FTFFFFFFFTF?FTFT
TTTTTTTTTTT?TTTT
--:-- / 8
????????????????
-----------?----
--:-- / 0
????????????????
-----------?----
--:-- / 0
MT4096DC1024

FFFFFFFFFFTTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 6.00 6.00 6.00 (confidence rate)

FFFFFFFFFFTT?TFF
TTTTTTTTTTTT-TTT
--:-- / 8
FFFFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFF??????????
TTTTTT----------
--:-- / 3
FFFFFF??????????
TTTTTT----------
--:-- / 3
FFFFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
FFFFFFFFFFTTFTFF
TTTTTTTTTTTTTTTT
--:-- / 8
MT4096DC2048

FFTFTFTFFFTFTFFF (expected value)

8.00 8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 8.00 8.00 (confidence rate)

FFTF?FTFFFTFTFFF
TTTT-TTTTTTTTTTT
--:-- / 8
FFTFTFTFFFTFTFFF
TTTTTTTTTTTTTTTT
--:PM / 8
FFTF?FTFFFTFTFFF
TTTT-TTTTTTTTTTT
--:-- / 8
FFTF?FTFFFTFTFFF
TTTT-TTTTTTTTTTT
--:-- / 8
FFTF?FTFFFTFT?FF
TTTT-TTTTTTTT-TT
--:-- / 7
FFTF?FTFFFTFT?FF
TTTT-TTTTTTTT-TT
--:-- / 7
FFTF?FTFFFTFTFFF
TTTT-TTTTTTTTTTT
--:-- / 8
FFTF?FTFFFTFTFFF
TTTT-TTTTTTTTTTT
--:-- / 8
MT8192DC2048

FFFFTFTTFTFTFFFF (expected value)

8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 1.00 6.00 5.00 6.00 6.00 1.00 6.00 6.00 (confidence rate)

FFFFTFTTFTFTF?FF
TTTTTTTTTTTTT-TT
--:-- / 8
FFFFTFTT?T?TFFFF
TTTTTTTT-T-TTTTT
--:-- / 7
FFFFTFTT?TFTF?FF
TTTTTTTT-TTTT-TT
--:-- / 7
FFFFTFTT?TFTF?FF
TTTTTTTT-TTTT-TT
--:-- / 7
F???????????????
T---------------
--:-- / 1
FFFFTFTT????????
TTTTTTTT--------
--:-- / 4
FFFFTFTT?TFTF?FF
TTTTTTTT-TTTT-TT
--:-- / 7
FFFFTFTT?TFTF?FF
TTTTTTTT-TTTT-TT
--:-- / 7
MT8192DC4096

FFFFFFTFTFFTTFFT (expected value)

8.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.00 1.00 (confidence rate)

FFFFFFTFTFFTTFF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFTFTFFTTFFT
TTTTTTTTTTTTTTTT
--:PM / 8
FFFFFFTFTFFTTFF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFTFTFFTTFF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFTFTFFTTF??
TTTTTTTTTTTTTT--
--:-- / 7
F???????????????
T---------------
--:-- / 1
FFFFFFTFTFFTTFF?
TTTTTTTTTTTTTTT-
--:-- / 8
FFFFFFTFTFFTTFF?
TTTTTTTTTTTTTTT-
--:-- / 8
Solitaire — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 114 114 114 114 114 114 114 114
Road Runner 1 5 0 0 0 0 0 0
Camel 1 5 0 0 0 0 0 0
EngCT7x7

FFTFFFFFFFFFTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:PM / 19
FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFTFFFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 19
EngNC7x7

FFFTFFFFFFFTFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:PM / 19
FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFFFFFFFTFFFT
TTTTTTTTTTTTTTTT
--:-- / 19
FrnCT7x7

FTFFTTFFTFTFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FTFFTTFFTFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FrnNC7x7

FTTFTFFFFFTTFTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:PM / 19
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
FTTFTFFFFFTTFTTF
TTTTTTTTTTTTTTTT
--:-- / 19
SqrCT5x5

FFFTFTFFFFFTFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:PM / 19
FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
FFFTFTFFFFFTFFFF
TTTTTTTTTTTTTTTT
--:-- / 19
SqrNC5x5

TFFTFTTFFFTFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 19
TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
TFFTFTTFFFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 19
SquareGrid — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 115 107 42 42 58 35 42 42
Road Runner 4 1 0 0 0 0 0 0
Camel 4 1 0 0 0 0 0 0
020102

FFTFFFFFFFFFFFTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:PM / 23
FFTFFFFFFFF?FFTF
TTTTTTTTTTT-TTTT
--:-- / 21
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFTFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
FFTFFFFFFFFFFFTF
TTTTTTTTTTTTTTTT
--:-- / 23
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
040204

FFFFFFFFTFFFFFFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 23
FFFFFFFFTFF?FFFF
TTTTTTTTTTT-TTTT
--:-- / 21
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFFFFFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 23
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
080408

TFFFFFTFFTFFFFFF (expected value)

8.00 8.00 8.00 8.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFFFFTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 23
TFFFF?TFFTFFFFFF
TTTTT-TTTTTTTTTT
--:-- / 21
TFFFF?TFFTFFFFFF
TTTTT-TTTTTTTTTT
--:-- / 21
TFFFF?TFFTFFFFFF
TTTTT-TTTTTTTTTT
--:-- / 21
TFFF????????????
TTTT------------
--:-- / 6
TFFF????????????
TTTT------------
--:-- / 6
TFFFF?TFFTFFFFFF
TTTTT-TTTTTTTTTT
--:-- / 21
TFFFF?TFFTFFFFFF
TTTTT-TTTTTTTTTT
--:-- / 21
100510

TTTTFFFTTFFFFTFF (expected value)

8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 1.00 (confidence rate)

TTTTFFFTTFFFFTFF
TTTTTTTTTTTTTTTT
--:PM / 23
TTTTFFFTTFFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 21
TTTTFFFTTFFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 21
TTTTFFFTTFFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 21
TTTT????????????
TTTT------------
--:-- / 6
TTTT????????????
TTTT------------
--:-- / 6
TTTTFFFTTFFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 21
TTTTFFFTTFFFFTF?
TTTTTTTTTTTTTTT-
--:-- / 21
130613

FTFFTFFTFFFFFFTT (expected value)

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

FTFFTFFTFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 23
FTFFTFFTFFFFFFTT
TTTTTTTTTTTTTTTT
--:PM / 23
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
SwimmingPool — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 129 128 26 26 107 121 26 26
Road Runner 2 7 0 0 1 0 0 0
Camel 3 6 0 0 0 1 0 0
01

FFTTFTFFFTTFFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 13
FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTFTFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
02

FFFTFFFFFTTFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFFFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-M / 13
FFFTFFFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:P- / 13
CC

0
CC

0
FFFTFFFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFTFFFFFTTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
03

TFTFFTTFTFFFTFFT (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 3.00 (confidence rate)

TFTFFTTFTFFFTFF?
TTTTTTTTTTTTTTT-
--:-- / 12
TFTFFTTFTF?FTFFT
TTTTTTTTTT-TTTTT
--:-- / 12
CC

0
CC

0
TFTFFTTFTFFFTFFT
TTTTTTTTTTTTTTTT
--:P- / 13
TFTFFTTFTFFFTFFT
TTTTTTTTTTTTTTTT
--:-M / 13
CC

0
CC

0
04

FTFTFFTFFTFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTFTFFTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 13
FTFTFFTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 13
CC

0
CC

0
FTFTFFTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 13
FTFTFFTFFTFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
05

FFTTFFFFTFFFFTTF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFTTFFFFTFFFFTTF
TTTTTTTTTTTTTTTT
--:PM / 13
FFTTFFFFTFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
FFTTFFFFTFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 13
FFTTFFFFTFFFFTTF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
06

FFFFFFFFTFFTTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 13
FFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:PM / 13
CC

0
CC

0
FFFFFF??????????
TTTTTT----------
--:-- / 5
FFFFFFFFTFFTTFFF
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
07

FFTFTTFFFTFFFTFT (expected value)

4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFTFTTFFFTFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 13
FFTFTTFFFTFFFTFT
TTTTTTTTTTTTTTTT
--:PM / 13
CC

0
CC

0
FFT?????????????
TTT-------------
--:-- / 2
FFTFTTFFFTFFFTFT
TTTTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
08

TFFFFFTTFTTTTFTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:PM / 13
TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
TFFFFFTTFTTTTFTF
TTTTTTTTTTTTTTTT
--:-- / 13
09

FFTFFFFTTFTTTFFT (expected value)

4.00 4.00 4.00 4.00 3.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFTFFFFTTFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 13
FFTFFFFTTFTTTFFT
TTTTTTTTTTTTTTTT
--:PM / 13
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFTFFFFTTFTTTFFT
TTTTTTTTTTTTTTTT
--:-- / 13
FFTF?F??????????
TTTT-T----------
--:-- / 4
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
10

FFFTFTFFFTTFFFTF (expected value)

4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

FFFTFTFFFTTFFFTF
TTTTTTTTTTTTTTTT
--:PM / 13
FF?TFTFFFTTFFFTF
TT-TTTTTTTTTTTTT
--:-- / 12
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
FFFTFTFFFTT?????
TTTTTTTTTTT-----
--:-- / 9
FFFTFTFFFTTFFFTF
TTTTTTTTTTTTTTTT
--:-- / 13
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TCPcondis — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 125 121 82 82 124 123 82 82
Road Runner 5 4 0 0 0 0 0 0
Camel 5 4 0 0 0 0 0 0
05

TFFFFTFFFFFFFFTT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:PM / 14
TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFFTFFFFFFFFTT
TTTTTTTTTTTTTTTT
--:-- / 14
10

TFFFFTFTFFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 14
TFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
CC

0
CC

0
TFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TFFFFTFTFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
CC

0
CC

0
15

FFFTFTFFFTFFFFFT (expected value)

4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTFTFFFTFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 14
F?FTFTFFFTFFFFFT
T-TTTTTTTTTTTTTT
--:-- / 13
CC

0
CC

0
FFFTFTFFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTFTFFFTFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 14
CC

0
CC

0
20

FTFFFFTTFTTTFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 (confidence rate)

FTFFFFTTFTTTFFFF
TTTTTTTTTTTTTTTT
--:PM / 14
FTFFFFTTFTTT?FFF
TTTTTTTTTTTT-TTT
--:-- / 13
CC

0
CC

0
FTFFFFTTFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FTFFFFTTFTTTFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
CC

0
CC

0
25

FFFFTFFFFFFTFTFT (expected value)

8.00 8.00 8.00 1.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.00 8.00 (confidence rate)

FFFFTFFFFFFTFTFT
TTTTTTTTTTTTTTTT
--:PM / 14
FFF?TFFFFFFTFT?T
TTT-TTTTTTTTTT-T
--:-- / 12
FFF?TFFFFFFTFTFT
TTT-TTTTTTTTTTTT
--:-- / 13
FFF?TFFFFFFTFTFT
TTT-TTTTTTTTTTTT
--:-- / 13
FFF?TFFFFFFTFTFT
TTT-TTTTTTTTTTTT
--:-- / 13
FFF?TFFFFFFTFTFT
TTT-TTTTTTTTTTTT
--:-- / 13
FFF?TFFFFFFTFTFT
TTT-TTTTTTTTTTTT
--:-- / 13
FFF?TFFFFFFTFTFT
TTT-TTTTTTTTTTTT
--:-- / 13
30

FTTFFFFFFFTFFFFF (expected value)

8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 2.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTTFFFFFFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 14
FTT?FFFFFFTFFFFF
TTT-TTTTTTTTTTTT
--:-- / 13
FTTFFFFF?FTFFFFF
TTTTTTTT-TTTTTTT
--:-- / 13
FTTFFFFF?FTFFFFF
TTTTTTTT-TTTTTTT
--:-- / 13
FTTFFFFF?FTFFFFF
TTTTTTTT-TTTTTTT
--:-- / 13
FTTFFFFF?FTFFFFF
TTTTTTTT-TTTTTTT
--:-- / 13
FTTFFFFF?FTFFFFF
TTTTTTTT-TTTTTTT
--:-- / 13
FTTFFFFF?FTFFFFF
TTTTTTTT-TTTTTTT
--:-- / 13
35

FFFTTFFFFTTFFTTF (expected value)

8.00 8.00 8.00 8.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFT?FFFFTTFFTTF
TTTT-TTTTTTTTTTT
--:-- / 13
FFFTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:PM / 14
FFFTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFFTTFFTTF
TTTTTTTTTTTTTTTT
--:-- / 14
40

FFTTFFFTFFTFFFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 14
FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFTTFFFTFFTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
50

FFFTTFFFTTTFFFFF (expected value)

7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFTTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:PM / 14
FFFTTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
?FFTTFFFTTTFFFFF
-TTTTTTTTTTTTTTT
--:-- / 13
FFFTTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
FFFTTFFFTTTFFFFF
TTTTTTTTTTTTTTTT
--:-- / 14
TokenRing — Colored
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 0 63 9 9 36 36 9 9
Road Runner 0 7 0 0 0 0 0 0
Camel 0 7 0 0 0 0 0 0
005

TTTTTTTTTTTTTTTT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 (confidence rate)

DNC TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
010

TTTTTTTTTTTTTTTT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
CC

0
CC

0
015

TTTTTTTTTTTTTTTT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
CC

0
CC

0
020

TTTTTTTTTTTTTTTT (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 (confidence rate)

DNC TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:-- / 9
CC

0
CC

0
030

TTTTTTTTTTTTTTTT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
040

TTTTTTTTTTTTTTTT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
050

TTTTTTTTTTTTTTTT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 (confidence rate)

DNC TTTTTTTTTTTTTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
100

? (expected value)

0 (confidence rate)

DNC DNF

0
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
200

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
DNF

0
DNF

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
500

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? (expected value)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (confidence rate)

DNC CC

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
CC

0
DNF

0
????????????????
????????????????
--:-- / 0
????????????????
????????????????
--:-- / 0
TokenRing — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 27 60 9 9 20 20 9 9
Road Runner 0 4 0 0 0 0 0 0
Camel 0 4 0 0 0 0 0 0
005

TTTTTTTTTFTTTFTT (expected value)

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

????????TFTTTFTT
--------TTTTTTTT
--:-- / 4
TTTTTTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:PM / 9
TTTTTTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTTFTTTFTT
TTTTTTTTTTTTTTTT
--:-- / 9
010

TTTTTTTTFTTTTTFF (expected value)

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

????????FTTTTTFF
--------TTTTTTTT
--:-- / 4
TTTTTTTTFTTTTTFF
TTTTTTTTTTTTTTTT
--:PM / 9
CC

0
CC

0
TTTTTTTTFTTTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
TTTTTTTTFTTTTTFF
TTTTTTTTTTTTTTTT
--:-- / 9
CC

0
CC

0
015

TTTTTTTTTTTT? ? FT (expected value)

1.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 0 0 2.00 2.00 (confidence rate)

????????TTTT??FT
--------TTTT??TT
--:-- / 3
TTTTTTTTTTTT??FT
TTTTTTTTTTTT??TT
--:-- / 8
CC

0
CC

0
??T?????????????
--T---------??--
--:-- / 1
??T?????????????
--T---------??--
--:-- / 1
CC

0
CC

0
020

TTTTTTTTTFTFTTT? (expected value)

1.00 1.00 3.00 1.00 1.00 2.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0 (confidence rate)

????????TFTFTTT?
--------TTTTTTT?
--:-- / 4
TTTTT?TTTFTFTTT?
TTTTT-TTTTTTTTT?
--:-- / 8
CC

0
CC

0
??T??T??????????
--T--T---------?
--:-- / 1
??T??T??????????
--T--T---------?
--:-- / 1
CC

0
CC

0
030

TTTT? TTTFTTTTTTT (expected value)

1.00 1.00 1.00 1.00 0 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

????????FTTTTTTT
----?---TTTTTTTT
--:-- / 4
TTTT?TTTFTTTTTTT
TTTT?TTTTTTTTTTT
--:-- / 8
CC

0
CC

0
CC

0
CC

0
CC

0
CC

0
040

TTTTTTTTTFFFTTFT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 (confidence rate)

????????TFFFTTFT
--------TTTTTTTT
--:-- / 4
TTTTTTTTTFFFTTFT
TTTTTTTTTTTTTTTT
--:PM / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
050

TTTTTTTTTTFFTTTT (expected value)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 (confidence rate)

????????TTFFTTT?
--------TTTTTTT-
--:-- / 4
TTTTTTTTTTFFTTTT
TTTTTTTTTTTTTTTT
--:PM / 9
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
CC

0
CC

0
????????????????
----------------
--:-- / 0
????????????????
----------------
--:-- / 0
TriangularGrid — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 119 113 57 57 99 99 57 57
Road Runner 5 2 0 0 0 0 0 0
Camel 4 3 0 0 0 0 0 0
1200

FFFFFTFFFTFTFTTF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:PM / 15
FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFFFTFFFTFTFTTF
TTTTTTTTTTTTTTTT
--:-- / 15
1500

TFTFFFFFTFFFFFFT (expected value)

4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFTFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:PM / 15
TF?FFFFFTFFFFFFT
TT-TTTTTTTTTTTTT
--:-- / 14
CC

0
CC

0
TFTFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
TFTFFFFFTFFFFFFT
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
2011

FFFTTTFFTFFFFFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 (confidence rate)

FFFTTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 15
FFFTTTFFTFF?FFFF
TTTTTTTTTTT-TTTT
--:-- / 14
CC

0
CC

0
FFFTTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FFFTTTFFTFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
3011

FTTFTTFFTFTFFTFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

FTTFTTFFTFTFFTFF
TTTTTTTTTTTTTTTT
--:PM / 15
FTTFTT?FTFTFFTFF
TTTTTT-TTTTTTTTT
--:-- / 14
CC

0
CC

0
FTTFTTFFTFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
FTTFTTFFTFTFFTFF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
3026

TFFFTFFFFFFFTFFF (expected value)

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 (confidence rate)

TFFFTFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:P- / 15
TFFFTFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-M / 15
CC

0
CC

0
TFFFTFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 15
TFFFTFFFFFFFTFFF
TTTTTTTTTTTTTTTT
--:-- / 15
CC

0
CC

0
4022

FTFFFTFFFFFFFFFF (expected value)

8.00 8.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

FTFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:PM / 15
FTFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FTTFFTFFFFFFFFFF
TTXTTTTTTTTTTTTT
V-:-- / 12
FTTFFTFFFFFFFFFF
TTXTTTTTTTTTTTTT
V-:-- / 12
FTFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
FTFFFTFFFFFFFFFF
TTTTTTTTTTTTTTTT
--:-- / 15
5020

FFFFFFFTFFFFFFFT (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 6.00 1.00 6.00 1.00 6.00 6.00 6.00 (confidence rate)

FFFFFFFT?FFFFFFT
TTTTTTTT-TTTTTTT
--:-- / 14
FFFFFFFT?F?F?FFT
TTTTTTTT-T-T-TTT
--:-- / 12
FFFFFFFTFF?F?FFT
TTTTTTTTTT-T-TTT
--:-- / 13
FFFFFFFTFF?F?FFT
TTTTTTTTTT-T-TTT
--:-- / 13
FFFFFFFT????????
TTTTTTTT--------
--:-- / 8
FFFFFFFT????????
TTTTTTTT--------
--:-- / 8
FFFFFFFTFF?F?FFT
TTTTTTTTTT-T-TTT
--:-- / 13
FFFFFFFTFF?F?FFT
TTTTTTTTTT-T-TTT
--:-- / 13
5046

TFFTFFTFFFTTFFFT (expected value)

8.00 8.00 8.00 8.00 6.00 6.00 6.00 6.00 6.00 1.00 6.00 6.00 6.00 6.00 6.00 6.00 (confidence rate)

TFFTFFTFFFTTFFFT
TTTTTTTTTTTTTTTT
--:PM / 15
TFFTFFTFF?TTFFFT
TTTTTTTTT-TTTTTT
--:-- / 14
TFFTFFTFF?TTFFFT
TTTTTTTTT-TTTTTT
--:-- / 14
TFFTFFTFF?TTFFFT
TTTTTTTTT-TTTTTT
--:-- / 14
TFFT????????????
TTTT------------
--:-- / 4
TFFT????????????
TTTT------------
--:-- / 4
TFFTFFTFF?TTFFFT
TTTTTTTTT-TTTTTT
--:-- / 14
TFFTFFTFF?TTFFFT
TTTTTTTTT-TTTTTT
--:-- / 14
UtahNoC — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 102 102 102 102 102 102 102 102
Road Runner 1 0 0 0 0 0 0 0
Camel 0 0 0 1 0 0 0 0
none

TTFFFTFFFFFTFTFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 (confidence rate)

TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:P- / 102
TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 102
TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 102
TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-M / 102
TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 102
TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 102
TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 102
TTFFFTFFFFFTFTFF
TTTTTTTTTTTTTTTT
--:-- / 102
Vasy2003 — P/T
  LTSMin LoLA M4M.full M4M.struct ITS-Tools ITS-Tools.L Irma.full Irma.struct
Score 96 96 89 89 102 102 89 89
Road Runner 0 0 0 0 1 0 0 0
Camel 0 0 0 0 0 1 0 0
none

FFTFFFFTTFFTTFFF (expected value)

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 4.00 8.00 8.00 8.00 2.00 8.00 (confidence rate)

FFTFFFFTTFFTTF?F
TTTTTTTTTTTTTT-T
--:-- / 96
FFTFFFFTTFFTTF?F
TTTTTTTTTTTTTT-T
--:-- / 96
FFTFFFFTTF?TTF?F
TTTTTTTTTT-TTT-T
--:-- / 89
FFTFFFFTTF?TTF?F
TTTTTTTTTT-TTT-T
--:-- / 89
FFTFFFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:P- / 102
FFTFFFFTTFFTTFFF
TTTTTTTTTTTTTTTT
--:-M / 102
FFTFFFFTTF?TTF?F
TTTTTTTTTT-TTT-T
--:-- / 89
FFTFFFFTTF?TTF?F
TTTTTTTTTT-TTT-T
--:-- / 89